Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OPERATING SYSTEMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Evaluating Operating System Vulnerability to Memory Errors

Reliability is of great concern to the scalability of extreme-scale systems. Of particular concern are soft errors in main memory, which are a leading cause of failures on current systems and are predicted to be the leading cause on future systems. While great effort has gone into designing algorithms and applications that can continue to make progress in the presence of these errors without restarting, the most critical software running on a node, the operating system (OS), is currently left relatively unprotected. OS resiliency is of particular importance because, though this software typically represents a small footprint of a compute node's physical memory, recent studies show more memory errors in this region of memory than the remainder of the system. In this paper, we investigate the soft error vulnerability of two operating systems used in current and future high-performance computing systems: Kitten, the lightweight kernel developed at Sandia National Laboratories, and CLE, a high-performance Linux-based operating system developed by Cray. For each of these platforms, we outline major structures and subsystems that are vulnerable to soft errors and describe methods that could be used to reconstruct damaged state. Our results show the Kitten lightweight operating system may be an easier target to harden against memory errors due to its smaller memory footprint, largely deterministic state, and simpler system structure.

99 GENERAL AND MISCELLANEOUS↗

TERSSE. Definition of the total earth resources system for the shuttle era. Volume 10: (TOSS) TERSSE operational system study

Economic benefits studies regarding the application of remote sensing to resource management and the Total Earth Resources for the Shuttle Era (TERSSE) study to outline the structure and development of future systems are used, along with experience from LANDSAT and LACIE, to define the system performance and economics of an operational Earth Resources system. The system is to be based on current (LANDSAT follow-on) technology and its application to high priority resource management missions, such as global crop inventory. The TERSSE Operational System Study (TOSS) investigated system-level design alternatives using economic performance as the evaluation criterion. As such, the TOSS effort represented a significant step forward in the systems engineering and economic analysis of Earth Resources programs. By parametrically relating engineering design parameters, such as sensor performance details, to the economic benefit mechanisms a new level of confidence in the conclusions concerning the implementation of such systems can be reached.

Stow, W. K.↗

Application of System Operational Effectiveness Methodology to Space Launch Vehicle Development and Operations

The Department of Defense (DoD) defined System Operational Effectiveness (SOE) model provides an exceptional framework for an affordable approach to the development and operation of space launch vehicles and their supporting infrastructure. The SOE model provides a focal point from which to direct and measure technical effectiveness and process efficiencies of space launch vehicles. The application of the SOE model to a space launch vehicle's development and operation effort leads to very specific approaches and measures that require consideration during the design phase. This paper provides a mapping of the SOE model to the development of space launch vehicles for human exploration by addressing the SOE model key points of measurement including System Performance, System Availability, Technical Effectiveness, Process Efficiency, System Effectiveness, Life Cycle Cost, and Affordable Operational Effectiveness. In addition, the application of the SOE model to the launch vehicle development process is defined providing the unique aspects of space launch vehicle production and operations in lieu of the traditional broader SOE context that examines large quantities of fielded systems. The tailoring and application of the SOE model to space launch vehicles provides some key insights into the operational design drivers, capability phasing, and operational support systems.

Watson, Michael D.↗

Assessment of wind power scenario creation methods for stochastic power systems operations

Probabilistic scenarios of renewable energy production, such as wind, have been gaining popularity for use in stochastic variants of power systems operations scheduling problems, allowing for optimal decision-making under uncertainty. The quality of the scenarios has a direct impact on the value of the resulting decisions, but until now, methods for creating scenarios have not been compared under realistic operational conditions. Here, we compare the quality of scenario sets created using three different methods, based on a simulated re-enactment of stochastic day-ahead unit commitment and subsequent dispatch for a realistic test system. We create scenarios using a dataset of forecasted and actual wind power values, scaled to evaluate the effects of increasing wind penetration levels. We show that the choice of scenario set can significantly impact system operating cost, renewable energy use, and the ability of the system to meet demand. This result has implications for the ability of system operators to efficiently integrate renewable production into their day-ahead planning, highlighting the need for the use of performance-based assessments for scenario evaluation.

17 WIND ENERGY↗

Non-Markovian finite-temperature two-time correlation functions of system operators of a pure-dephasing model

We evaluate the non-Markovian finite-temperature two-time correlation functions (CF's) of system operators of a pure-dephasing spin-boson model in two different ways, one by the direct exact operator technique and the other by the recently derived evolution equations, valid to second order in the system-environment interaction Hamiltonian. This pure-dephasing spin-boson model that is exactly solvable has been extensively studied as a simple decoherence model. However, its exact non-Markovian finite-temperature two-time system operator CF's, to our knowledge, have not been presented in the literature. This may be mainly due to the fact, illustrated in this article, that in contrast to the Markovian case, the time evolution of the reduced density matrix of the system (or the reduced quantum master equation) alone is not sufficient to calculate the two-time system operator CF's of non-Markovian open systems. The two-time CF's obtained using the recently derived evolution equations in the weak system-environment coupling case for this non-Markovian pure-dephasing model happen to be the same as those obtained from the exact evaluation. However, these results significantly differ from the non-Markovian two-time CF's obtained by wrongly directly applying the quantum regression theorem (QRT), a useful procedure to calculate the two-time CF's for weak-coupling Markovian open systems. This demonstrates clearly that the recently derived evolution equations generalize correctly the QRT to non-Markovian finite-temperature cases. It is believed that these evolution equations will have applications in many different branches of physics.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Large Unmanned Aircraft System Operations in the National Airspace System - the NASA 2007 Western States Fire Missions

The National Aeronautics and Space Administration (NASA) Dryden Flight Research Center (DFRC) Ikhana (ee-kah-nah) project executed the 2007 Western States Fire Missions over several of the western United States using an MQ-9 unmanned aircraft system (UAS) in partnership with the NASA Ames Research Center, the United States Forest Service, and the National Interagency Fire Center. The missions were intended to supply infrared imagery of wildfires to firefighters on the ground within 10 minutes of data acquisition. For each of the eight missions, the NASA DFRC notified the Federal Aviation Administration (FAA) of specific flight plans within three or fewer days of the flight. The FAA Certificate of Waiver or Authorization (commonly referred to as a COA ) process was used to obtain access to the United States National Airspace System. Significant time and resources were necessary to develop the COA application, perform mission planning, and define and approve emergency landing sites. Unique aspects of flying unmanned aircraft created challenges to mission operations. Close coordination with FAA headquarters and air traffic control resulted in safe and successful missions that assisted firefighters by providing near-real-time imagery of selected wildfires.

Buoni, Gregory P.↗

EOS: A project to investigate the design and construction of real-time distributed embedded operating systems

The EOS project is investigating the design and construction of a family of real-time distributed embedded operating systems for reliable, distributed aerospace applications. Using the real-time programming techniques developed in co-operation with NASA in earlier research, the project staff is building a kernel for a multiple processor networked system. The first six months of the grant included a study of scheduling in an object-oriented system, the design philosophy of the kernel, and the architectural overview of the operating system. In this report, the operating system and kernel concepts are described. An environment for the experiments has been built and several of the key concepts of the system have been prototyped. The kernel and operating system is intended to support future experimental studies in multiprocessing, load-balancing, routing, software fault-tolerance, distributed data base design, and real-time processing.

Campbell, R. H.↗

Lean Mission Operations Systems Design - Using Agile and Lean Development Principles for Mission Operations Design and Development

The Resource Prospector Mission seeks to rove the lunar surface with an in-situ resource utilization payload in search of volatiles at a polar region. The mission operations system (MOS) will need to perform the short-duration mission while taking advantage of the near real time control that the short one-way light time to the Moon provides. To maximize our use of limited resources for the design and development of the MOS we are utilizing agile and lean methods derived from our previous experience with applying these methods to software. By using methods such as "say it then sim it" we will spend less time in meetings and more time focused on the one outcome that counts - the effective utilization of our assets on the Moon to meet mission objectives.

Operations↗

A new technology for manufacturing scheduling derived from space system operations

A new technology for producing finite capacity schedules has been developed in response to complex requirements for operating space systems such as the Space Shuttle, the Space Station, and the Deep Space Network for telecommunications. This technology has proven its effectiveness in manufacturing environments where popular scheduling techniques associated with Materials Resources Planning (MRPII) and with factory simulation are not adequate for shop-floor work planning and control. The technology has three components. The first is a set of data structures that accommodate an extremely general description of a factory's resources, its manufacturing activities, and the constraints imposed by the environment. The second component is a language and set of software utilities that enable a rapid synthesis of functional capabilities. The third component is an algorithmic architecture called the Five Ruleset Model which accommodates the unique needs of each factory. Using the new technology, systems can model activities that generate, consume, and/or obligate resources. This allows work-in-process (WIP) to be generated and used; it permits constraints to be imposed or intermediate as well as finished goods inventories. It is also possible to match as closely as possible both the current factory state and future conditions such as promise dates. Schedule revisions can be accommodated without impacting the entire production schedule. Applications have been successful in both discrete and process manufacturing environments. The availability of a high-quality finite capacity production planning capability enhances the data management capabilities of MRP II systems. These schedules can be integrated with shop-floor data collection systems and accounting systems. Using the new technology, semi-custom systems can be developed at costs that are comparable to products that do not have equivalent functional capabilities and/or extensibility.

Hornstein, R. S.↗

Functional implications of component commonality in operational systems

The application of commonality in a system represents an attempt to reduce costs by reducing the number of unique components. Research in this area has primarily addressed a significant benefit of commonality, the reduction of parts inventories in assemble-to-order manufacturing systems. Likewise, in an operational system subject to component failures, spares inventories are reduced through the increased commonality of components. However, commonality tends to degrade system performance parameters, a degradation that can preclude commonality in resource-constrained systems such as spacecraft. The functional impacts of component commonality on a system is addressed in a manner that allows inclusion in a commonality analysis.

Thomas, Lawrence D.↗

REAL TIME SYSTEM OPERATIONS 2006-2007

The Real Time System Operations (RTSO) 2006-2007 project focused on two parallel technical tasks: (1) Real-Time Applications of Phasors for Monitoring, Alarming and Control; and (2) Real-Time Voltage Security Assessment (RTVSA) Prototype Tool. The overall goal of the phasor applications project was to accelerate adoption and foster greater use of new, more accurate, time-synchronized phasor measurements by conducting research and prototyping applications on California ISO's phasor platform - Real-Time Dynamics Monitoring System (RTDMS) -- that provide previously unavailable information on the dynamic stability of the grid. Feasibility assessment studies were conducted on potential application of this technology for small-signal stability monitoring, validating/improving existing stability nomograms, conducting frequency response analysis, and obtaining real-time sensitivity information on key metrics to assess grid stress. Based on study findings, prototype applications for real-time visualization and alarming, small-signal stability monitoring, measurement based sensitivity analysis and frequency response assessment were developed, factory- and field-tested at the California ISO and at BPA. The goal of the RTVSA project was to provide California ISO with a prototype voltage security assessment tool that runs in real time within California ISO?s new reliability and congestion management system. CERTS conducted a technical assessment of appropriate algorithms, developed a prototype incorporating state-of-art algorithms (such as the continuation power flow, direct method, boundary orbiting method, and hyperplanes) into a framework most suitable for an operations environment. Based on study findings, a functional specification was prepared, which the California ISO has since used to procure a production-quality tool that is now a part of a suite of advanced computational tools that is used by California ISO for reliability and congestion management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Distribution System Operator with Transactive (DSO+T) Study

The Distribution System Operator with Transactive (DSO+T) study investigates the engineering and economic performance of a transactive energy retail market coordinating a high penetration of customer-side flexible energy assets. The study seeks to answer whether such an implementation is cost effective for customers, recovers sufficient revenue for DSOs, and is equally applicable and beneficial to a range of flexible asset types, renewable generation scenarios, and market assumptions. Using a highly interdisciplinary co-simulation and valuation framework, this assessment encompasses the entire electrical delivery system from bulk system generation and transmission, through the distribution system, to the modeling of individual customer buildings and flexible assets (including heating, ventilation, and air conditioning [HVAC] units, water heaters, batteries, and electric vehicles). The study exercises a transactive energy retail market coordination scheme designed to integrate with an existing day-ahead and real-time competitive wholesale electricity market. Software decision-making agents are designed for the retail market operator as well as various price-responsive flexible assets. The engineering and economic performance of the transactive energy scheme is studied for two separate flexible asset deployments: flexible loads (HVAC units and residential water heaters) and behind-the-meter batteries. The results of each transactive case are compared to a business-as-usual case. These cases are subject to two different renewable generation scenarios, a moderate renewable generation scenario, representative of current levels of renewable generation deployment, and a future high renewables scenario, including the increased deployment of rooftop solar photovoltaic and electric vehicles. The transactive coordination scheme is shown to produce effective and stable control and decrease peak loads 9–15%. The resulting annual demand flexibility provides net economic savings of $3.3–5.0B per year for a region the size of Texas. Detailed analysis shows that net benefits were seen for a range of distribution system operator, customer, and flexible asset types. Both participating customer (with transactive flexible assets) and nonparticipating customers (with nonflexible assets) see reductions in annual utility bills and net annual energy expenses in the range of 10–16%.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Providing Ramping Service with Wind to Enhance Power System Operational Flexibility

This project develops an innovative, integrated, and transformative approach to mitigate the impact of wind ramping by providing flexible ramping products from wind power. The project will significantly contribute to the reduction of wind integration costs by making wind power dispatchable and allowing the efficient management of wind ramping characteristics. In addition, we collaborated with industry to test and validate the methodology, considering economic and reliability goals, by integrating the proposed methodology into the simulated market frameworks of two independent system operators: California Independent System Operator and the Electric Reliability Council of Texas.

17 WIND ENERGY↗

A Multifaceted Approach to Modernizing NASA's Advanced Multi-Mission Operations System (AMMOS) System Architecture

The Advanced Multi-Mission Operations Systems (AMMOS) is NASA's premier space mission operations product line offering for use in deep-space robotic and astrophysics missions. The general approach to AMMOS modernization over the course of its 29-year history exemplifies a continual, evolutionary approach with periods of sponsor investment peaks and valleys in between. Today, the Multimission Ground Systems and Services (MGSS) office-the program office that manages the AMMOS for NASA-actively pursues modernization initiatives and continues to evolve the AMMOS by incorporating enhanced capabilities and newer technologies into its end-user tool and service offerings. Despite the myriad of modernization investments that have been made over the evolutionary course of the AMMOS, pain points remain. These pain points, based on interviews with numerous flight project mission operations personnel, can be classified principally into two major categories: 1) information-related issues, and 2) process-related issues. By information-related issues, we mean pain points associated with the management and flow of MOS data across the various system interfaces. By process-related issues, we mean pain points associated with the MOS activities performed by mission operators (i.e., humans) and supporting software infrastructure used in support of those activities. In this paper, three foundational concepts-Timeline, Closed Loop Control, and Separation of Concerns-collectively form the basis for expressing a set of core architectural tenets that provides a multifaceted approach to AMMOS system architecture modernization intended to address the information- and process-related issues. Each of these architectural tenets will be further explored in this paper. Ultimately, we envision the application of these core tenets resulting in a unified vision of a future-state architecture for the AMMOS-one that is intended to result in a highly adaptable, highly efficient, and highly cost-effective set of multimission MOS products and services.

Estefan, Jeff A.↗

Stochastic Methods Applied to Power System Operations with Renewable Energy: A Review

Renewable energy resources have been rapidly integrated into power systems in many parts of the world, contributing to a cleaner and more sustainable supply of electricity. Wind and solar resources also introduce new challenges for system operations and planning in terms of economics and reliability because of their variability and uncertainty. Operational strategies based on stochastic optimization have been developed recently to address these challenges. In general terms, these stochastic strategies either embed uncertainties into the scheduling formulations (e.g., the unit commitment [UC] problem) in probabilistic forms or develop more appropriate operating reserve strategies to take advantage of advanced forecasting techniques. Other approaches to address uncertainty are also proposed, where operational feasibility is ensured within an uncertainty set of forecasting intervals. In this report, a comprehensive review is conducted to present the state of the art through Spring 2015 in the area of stochastic methods applied to power system operations with high penetration of renewable energy. Chapters 1 and 2 give a brief introduction and overview of power system and electricity market operations, as well as the impact of renewable energy and how this impact is typically considered in modeling tools. Chapter 3 reviews relevant literature on operating reserves and specifically probabilistic methods to estimate the need for system reserve requirements. Chapter 4 looks at stochastic programming formulations of the UC and economic dispatch (ED) problems, highlighting benefits reported in the literature as well as recent industry developments. Chapter 5 briefly introduces alternative formulations of UC under uncertainty, such as robust, chance-constrained, and interval programming. Finally, in Chapter 6, we conclude with the main observations from our review and important directions for future work.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Naturalistic Decision Making For Power System Operators

Abstract: Motivation -- As indicated by the Blackout of 2003, the North American interconnected electric system is vulnerable to cascading outages and widespread blackouts. Investigations of large scale outages often attribute the causes to the three T’s: Trees, Training and Tools. A systematic approach has been developed to document and understand the mental processes that an expert power system operator uses when making critical decisions. The approach has been developed and refined as part of a capability demonstration of a high-fidelity real-time power system simulator under normal and emergency conditions. To examine naturalistic decision making (NDM) processes, transcripts of operator-to-operator conversations are analyzed to reveal and assess NDM-based performance criteria. Findings/Design -- The results of the study indicate that we can map the Situation Awareness Level of the operators at each point in the scenario. We can also identify clearly what mental models and mental simulations are being performed at different points in the scenario. As a result of this research we expect that we can identify improved training methods and improved analytical and visualization tools for power system operators. Originality/Value -- The research applies for the first time, the concepts of Recognition Primed Decision Making, Situation Awareness Levels and Cognitive Task Analysis to training of electric power system operators. Take away message -- The NDM approach provides an ideal framework for systematic training management and mitigation to accelerate learning in team-based training scenarios with high-fidelity power grid simulators.

24 POWER TRANSMISSION AND DISTRIBUTION↗