Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Long-Term Stewardship Challenges at the Piqua, Ohio, Decommissioned Reactor Site - 19578

This paper describes the site history following the decommissioning of the Piqua, Ohio, Nuclear Power Facility to include key features of the 1968 contract and 1969 lease agreement with the City of Piqua still in effect today. Long-term stewardship challenges facing the US Department of Energy Office of Legacy Management (LM) and the path to find long-term solutions that are in the best interest of all parties are described. Lastly, the applications of lessons learned to other LM legacy sites are also presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developing Decommissioning Cost Estimating Relationships and the Decommissioning Estimate Analysis Library Estimating System - 20423

DOE-EM's Consolidated Business Center (EM-CBC) Office of Cost Estimating has developed a system of Decommissioning Cost Estimating Relationships (CERs) and Models to improve the reliability and efficiency of its estimates. The development builds on the multi-year process of collecting and organizing historical cost data from DOEEMs decommissioning projects and estimate model development to support project and program-level decommissioning estimates. The latest work has extended these models down to project scope element and component building area levels, allowing the actual costs of work for these estimate components to be assembled into estimates that reflect specific projects. The CERs have been incorporated into two estimator-friendly products - as cost libraries in the MII estimating program and as an MS Excel-based model, and are available for DOE federal staff use. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of System Integration Analysis Activities for Integrated Waste Management

Spent nuclear fuel (SNF) generated by the current fleet of commercial nuclear reactors is being stored at the reactor sites in spent fuel pools (SFPs) and in dry independent spent fuel storage installations (ISFSIs). The US Department of Energy Office of Nuclear Energy (DOE-NE) is developing an Integrated Waste Management Program (IWMP) comprising a suite of options and supporting analyses to enable future informed choices. The IWMP is organized into the following five major areas: 1) Consent-Based Siting, 2) IWM Facilities and Equipment Concepts and Development, 3) Transportation Capability Analysis and Support, 4) Information Technology Solutions and Support, and 5) System Integration Analysis and Support. This paper discusses the activities ongoing in the IWMP System Integration Analysis and Support area. Two main areas of research in system integration are data and tools development, as well as system analysis assessments. One of the tools being developed in the system integration area is the Used Nuclear Fuel-Storage, Transportation & Disposal Analysis Resource and Data System (UNF-ST&DARDS) tool. It is being developed as a foundational resource for DOE-NE to manage SNF data, along with several compatible analysis tools for time-dependent characterization of SNF and related systems. UNF-ST&DARDS has the unparalleled ability to track SNF through the entire back end of the fuel cycle—from the time the fuel is discharged from a reactor through its disposal in a geological repository. UNF ST&DARDS interfaces with the SCALE code system for nuclear analysis and COBRA-SFS for thermal analysis. Another main tool being developed is the Next Generation System Analysis Model (NGSAM). NGSAM is an agent-based simulation software tool expressly designed to be capable of modeling the waste management system. NGSAM has been developed to enable informed decision-making by providing the capability of analyzing various potential system options for the management of SNF and HLW. Using NGSAM, system architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analysis assessments may investigate the implications of various strategies such as different acceptance rates, acceptance queues, facility capacities and options, standardized canisters, and different assumed system operation start dates. Recently, some system analysis effort has begun to look at how the waste management system might operate for advanced reactor fuel cycles.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons Learned From Decommissioning B411 Decontamination Centre at Whiteshell Laboratories - 18211

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. The facility was centered on the largest organically cooled, heavy water moderated nuclear reactor in the world, the WR-1. It is now operated by Canadian Nuclear Laboratories (CNL) and is the first major decommissioning project of a nuclear research establishment in Canada. One of the major projects to support the closure of Whiteshell Laboratories (WL) is the decommissioning and demolition of the Building 411 (B411) Decontamination Centre, which provided a decontamination service for maintaining research and development of experimental rigs, equipment and tools in a safe usable state. It also provided a laundry service for radioactively contaminated clothing. The team successfully self-performed their first demolition of a nuclear facility, but not without challenges. The baseline decommissioning strategy assumed most of the facility would meet unconditional clearance levels; however when characterization revealed the extent of contamination exceeded initial assumptions projected from process knowledge, in conjunction with resource challenges and a waste disposal pathway not firmly established, active remediation of the facility was undertaken. With an unknown waste acceptance criteria for the future waste disposal facility, sludge that had accumulated in a tank used to collect xylene and organic coolant from contaminated tools and equipment and the selection of appropriate waste packages for waste storage, transportation and disposal forced the project team to adjust their demolition timeline. This, coupled with developing an open air demolition plan and managing an uncertain end state criteria, were just some of the major tasks the team successfully navigated. The impact on both schedule and cost performance caused by the change in strategy, and the lessons learned experienced by the WL Decommissioning Project Team that are being applied as the Whiteshell Laboratories Closure Project (WLCP) moves forward with the next major decommissioning challenge, are highlighted in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-Year Work Plan to De-Inventory TRU Waste Stored at LANL - 12121

The Los Alamos National Laboratory (LANL) continues to accelerate disposition of transuranic (TRU) waste stored at its Technical Area 54 (TA-54) Area G waste management facility. The current focus is on complete removal of all non-cemented above-grade Legacy and newly-generated TRU waste that was in storage on October 1, 2011, by no later than June 30, 2014. This inventory of above-grade TRU is defined as 3,706 m{sup 3} of material. Legacy TRU waste containers were placed into storage up to 40 years ago, and most of the older containers must be remediated to address compliance issues before the waste can be characterized, certified as meeting the Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC), and shipped for disposition. More than half of the remaining TRU waste volume stored above grade is contained within oversize boxes that contain waste items that must be repackaged or size reduced. Facilities and major types of equipment needed to remediate and characterize the TRU waste inventory are largely in place, but two additional oversize box processing lines are being implemented in 2012. Multiple work shifts are planned for most remediation lines in 2013. An integrated risk-based project management schedule for all disposition activities has been developed that is based on a 'Solution Package' approach. Inventories of containers that have issues in common were compiled into about 15 waste categories and about 70 'Solution Packages' that identify all of the activities needed to disposition the inventory of TRU waste in storage. Scheduled activities include all precursor activities to begin remediation, remediation processing, characterization and certification to the WIPP WAC, and shipping of containers to WIPP. Processing of the 3,706 m{sup 3} is projected to result in about 4,500 55-gallon (208 L) drums and 1,000 standard waste boxes that will be shipped to WIPP. About 385 shipments from LANL to WIPP are projected before June 30, 2014, to ship these containers, at a rate of 5 to 6 shipments a week. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The DISTINCTIVE University Consortium: AGR, Magnox and Exotic Spent Fuels - 18345

The Engineering and Physical Sciences Research Council (EPSRC) sponsored consortium Decommissioning, Immobilisation and Storage Solutions for Nuclear Waste Inventories (DISTINCTIVE) is contributing to the development of skilled cross-disciplinary scientists and engineers with the knowledge and experience required to develop engineering solutions tailored for application within radiologically contaminated sites. Of the four themes addressed by the DISTINCTIVE consortium, the AGR (Advanced Gas-Cooled Reactor), Magnox and Exotic Spent Fuels theme considers the UK's diverse spent nuclear fuel inventory and the preferred options for disposal; this includes the retrieval of fuel from current storage facilities and the repackaging options available. Specifically, the research is concerned with AGR, Magnox and so-called 'Exotic' spent fuels; the goal being to increase knowledge and mechanistic understanding of the processes affecting long-term management and mitigation of any potential risks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Latest Developments in PM Systems and Methods and their Application to WM Projects - 20364

How do you improve on an industry that is well established yet often misses the mark on key metrics demonstrating effective planning and execution of project scope, schedule and budget? With the increased complexity of DOE projects relative to either poorly kept records of what wastes are stored or the lack of specific knowledge relative to the waste concentrations/quantities, this is a question continually asked and investigated by many. In fact, in 2017, the GAO's report to Congress indicated that although the DOE has made some progress on its monitoring effectiveness and demonstrating progress criteria, these goals were not met and there needs to be more improvement and monitoring. This paper will offer some insights into the latest developments in project management methodologies and the possible application of these to waste management projects. Traditional data generated via a project schedule that utilizes critical path methodology (CPM) and additional earned value management (EVM) data needs to be accurate and enable the project manager to better understand the probability of project success. Although this data has readily been available on most large-scale projects, success as measured by various stakeholder groups including the client, project team, regulators, etc. is less than optimal. Therefore, an urgent need exists to explore how traditional project data (CPM and EVM) coupled with new methodologies allows for better planning and execution by the project team. Many new approaches/methodologies can even be used to predict the success of options prior to full implementation on the actual project. Three approaches/methodologies will be discussed: - Artificial Intelligence; - Change Management; - Blend of Traditional Management (Gantt chart) and Agile Methodologies. As market forces change, so will the direction of project management. The days of 'one size fits all' are no longer valid. A combination of predictive and adaptive approaches in the management of projects is essential to enable execution of project deliverables on time, under budget, and within the contractual scope. This paper is intended to provide the reader with insight to the close relationship of project management trends and business management trends, and to provoke critical thinking about what it means to align project management strategy with an environment of non-stop innovation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On SCALE Validation for PBR Analysis

Studies were performed to assess the capabilities of the SCALE code system to provide accurate cross sections for analyses of pebble bed reactor configurations. The analyzed configurations are representative of fuel in the HTR-10 reactor in the first critical core and at full power operation conditions. Relevant parameters-multiplication constant, spectral indices, few-group cross sections-are calculated with SCALE for the considered configurations. The results are compared to results obtained with corresponding consistent MCNP models. The code-to-code comparison shows good agreement at both room and operating temperatures, indicating a good performance of SCALE for analysis of doubly heterogeneous fuel configurations. The development of advanced methods and computational tools for the analysis of pebble bed reactor (PBR) configurations has been a research area of renewed interest for the international community during recent decades. The PBR, which is a High Temperature Gas Cooled Reactor (HTGR) system, represents one of the potential candidates for future deployment throughout the world of reactor systems that would meet the increased requirements of efficiency, safety, and proliferation resistance and would support other applications such as hydrogen production or nuclear waste recycling. In the U.S, the pebble bed design is one of the two designs under consideration by the Next Generation Nuclear Plant (NGNP) Program.

08 HYDROGEN↗

Development of an Alternative Approach to Demonstrating Environmental Performance in the UK - 19354

European basic safety standards require that exposure of humans to the potentially harmful effects of ionising radiation are optimised so that they are as low as reasonably achievable, taking account of economic and societal factors. In the United Kingdom the responsibility for ensuring that exposures to humans are optimised is split between two regulatory functions. The Office of Nuclear Regulation regulates exposures to workers in all scenarios and to members of the public in the event of an accident. Environmental regulators in each of the four nations comprising the United Kingdom regulate exposures to members of the public from normal operations. Since the early 1990's, all permissions granted to nuclear sites in the UK for the discharge/disposal of radioactive waste to the environment have contained conditions requiring holders to demonstrate that they minimise the generation of radioactive waste, apply appropriate abatement and discharge/dispose of it in a way that minimises impacts on members of the public and the environment. For many years, the industry standard for providing this demonstration, which was heavily influenced by regulatory expectations and feedback, was to undertake one or a series of multi-attribute decision assessments (MADA). Wood's team of environmental specialists has been involved in undertaking such MADA studies for many years. Since the mid-2000's, our team has become increasingly aware of some of the limitations of undertaking MADA to demonstrate environmental performance for large scale new nuclear build projects and, in particular, the next generation of new nuclear power stations that are being planned and implemented in the UK. We have collaborated with the vendors of reactor technologies, the prospective/owner operators of new nuclear power stations and the developers of new facilities on existing sites to develop an alternative approach to demonstrating environmental performance. Our alternative approach comprises three main pillars which are summarised as: - Evolution - benefit from progressive improvements, operational experience and recent permitting activities. Our alternative approach uses the claim, argument, evidence approach which is commonly used for nuclear safety cases and which allows us to 'tell the story' of how environmental performance has been achieved. We have successfully deployed this approach for all new nuclear power stations proposed in the UK. - Integration - ensure that optimisation is integrated into the project programme and forms part of the 'big picture'. Our alternative approach allows environmental performance to be managed better throughout the life cycle of the project and ensures that our outputs are 'living' documents and do not 'sit on the shelf'. We have successfully demonstrated how this can be applied during rationalisation of major schemes and significant design changes on nuclear new build projects. - Opportunity - identify the best time to deliver elements of the programme. Our alternative approach aims to minimise the overall time, trouble and costs associated with demonstrating environmental performance by ensuring that decisions are made at the time when they offer greatest benefit and by minimising unnecessary rework. Our advice has helped to reduce the project costs and minimise delays associated with regulatory queries and interventions. This paper describes the journey that we have taken with our clients in developing our alternative approach to demonstrating environmental performance. We explain the UK regulatory context and explore the need for change. We present a number of case studies related to new nuclear power stations and other new facilities on existing nuclear sites that demonstrate the successful application of our alternative approach. We provide examples of how we have successfully implemented the outputs of our alternative approach into project and corporate management arrangements. Finally, we examine feedback from clients, regulators and other interested parties to propose future refinements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Routing Options for Transporting Commercial Spent Nuclear Fuel in the Continental United States - 17504

The U.S. Department of Energy (DOE) has a goal to develop solutions for the long-term, sustainable management of the nation's spent nuclear fuel and high-level radioactive waste. The DOE is planning for an integrated waste management system to transport, store, and dispose of spent nuclear fuel and high-level radioactive waste from commercial electricity generation, as well national defense activities. The DOE Office of Nuclear Energy (DOE-NE), Office of Spent Fuel and Waste Disposition's (SFWD) Integrated Waste Management (IWM) program is applying integrated waste management system analysis, system engineering, and decision analysis principles to inform future decisions regarding potential future nuclear waste management system architectures. Integrated waste management system architecture analyses are being conducted to support the future deployment of a comprehensive system for managing nuclear waste that considers all aspects of the back-end of the nuclear fuel cycle (transportation, storage, and disposal). One aspect of a potential future nuclear waste management system is transportation of spent nuclear fuel from the fleet of commercial nuclear reactors to destinations where waste management facilities, such as an interim storage facility, would be located. Example rail transportation routes from commercial nuclear reactor sites to various locations in the continental U.S. - chosen as hypothetical locations for future waste management system facilities - were evaluated in 2014 using DOE's GIS-based Stakeholder Tool for Assessing Radioactive Transportation (START). The objective of that evaluation was to identify and parameterize generic transportation routes for use in integrated waste management system analyses, the associated uncertainty in these selections, and the uncertainty associated with different transportation route selection criteria. The analysis presented herein considers rail transportation routes from commercial nuclear reactor sites to hypothetical destinations within the continental U.S. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NNSA-IAEC Science Area V Environmental ISR: Waste Management and Subsurface Science (Final Report FY18-FY20)

In August 2017, the U.S. National Nuclear Security Administration (NNSA) and the Israel Atomic Energy Commission (IAEC) launched a joint waste management program to evaluate the feasibility of siting a radioactive waste repository at intermediate depths in Israel. The bilateral collaboration involves three National Laboratories (LLNL, LANL, and Sandia), and the Nuclear Research Center, Negev, Geological Survey of Israel, and Ben Gurion University in Israel. This research is designed to assist with the evaluation of locations for an intermediate nuclear waste repository in Israel. This final report is a high-level summary of the results from the past three years by the team that worked on the WM-2: Radionuclide colloid-facilitated transport in fractured carbonate rock project for Science Area V, Environmental ISR: Subsurface Science and Waste Management. We have completed all of our tasks and met all of our milestones. MW-2 had three integrated tasks. Task 1 was laboratory experiments investigating colloid transport of radionuclides in natural fractured carbonate rocks from the Avdat formation, Israel. Task 2 was field experiments injecting radionuclide analogues pre-sorbed to clay colloids into fractured carbonate rock, and task 3 was numerical modeling of laboratory and field experimental results to assess the importance of colloids in the migration of relevant radionuclides. This task was incorporated into tasks 1 and 2. A 4 th task was initiated in FY20, to investigate the role of organics in facilitating radionuclide transport under the same conditions explored in task 1 due to the high organic content of the rocks being investigated for the immediate borehole locations. Preliminary results will be summarized here and the work will continue in FY21-23. The overall objective of this research is to evaluate the role of colloids (naturally occurring < 1 micron particles) in facilitating the transport of long-lived radionuclides from a nuclear waste repository situated in fractured carbonate rocks. Currently little data exists on radionuclide transport in carbonate rocks, but this is the main rock type available for siting a repository in Israel. Laboratory experiments were carried out in both Israel and the U.S., field experiments have taken place in Israel, and reactive transport modeling involved LLNL, LANL and Israel partner institutions. LLNL hosted a graduate student, Emily Tran, from Ben Gurion University in FY18 and FY19 and much of the work presented here was part of her PhD research.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT TECHNOLOGY DEVELOPMENT REPORT FISCAL YEAR 2010

The mission of the Department of Energy's (DOE's) Office of Environmental Management (EM) is to clean up the environmental legacy of nuclear weapons research and production during the Cold War. That mission includes cleaning up nuclear waste, contaminated groundwater and soil, nuclear materials, and contaminated facilities covering two million acres of land in thirty-five states. EM's principal program goals include timely completion of tank waste treatment facilities, reduction of the life-cycle costs and acceleration of the cleanup of the Cold War legacy, and reduction of the EM footprint. The mission of the EM Technology Innovation and Development program is to transform science and innovation into practical solutions to achieve the EM mission. During fiscal year 2010 (October 2009-September 2010), EM focused upon accelerating environmental cleanup by expeditiously filling identified gaps in available knowledge and technology in the EM program areas. This report describes some of the approaches and transformational technologies in tank waste processing, groundwater and soil remediation, nuclear materials disposition, and facility deactivation and decommissioning developed during fiscal year 2010 that will enable EM to meet its most pressing program goals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aluminum Clad SNF: Technical Considerations and Challenges for Extended (>50 years) Dry Storage - 1900y

The U.S. Department of Energy (DOE) manages a significant inventory (>13 MTHM) of aluminum clad spent nuclear fuel (ASNF) using a combination of wet and dry storage at three primary sites; Hanford, Idaho National Laboratory (INL), and Savannah River Site (SRS). The majority of this ASNF is generated from U.S. and international research test reactors (RTR), examples include Advanced Test Reactor (ATR) at INL and High-Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL). The Obama Administration suspension of the Yucca Mountain repository, issuance of the January 2013 DOE 'Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste,' delays in implementing the 'regionalization' SNF approach recommended in the 1995 'Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final Environmental Impact Statement,' and limited ASNF processing capability at SRS H-Canyon means that interim storage has become the de-facto strategy for managing ASNF. The 1995 Idaho Settlement Agreement requires the DOE to transfer all SNF stored at INL to interim dry storage prior to December 31, 2023 and wet storage capacity at the SRS is nearing capacity. This situation was recognized by the DOE Spent Nuclear Fuel Working Group (SNFWG) and at its June 2016 meeting formed a ASNF sub-working group comprised subject matter experts to evaluate this area and provide a report of findings. The ASNF sub-working group met many times over several month period to review the engineering and technical basis of existing and planned DOE ASNF dry storage facilities and additional studies on the behavior of ASNF under different conditions, including during reactor service. The ASNF sub-working group focused its review on RTR SNF. Based on these reviews, the ASNF sub-working group identified five knowledge gaps and technical data needs that should be addressed to ensure viability and safety of extended, greater than 50 years, sealed or vented interim dry storage of ASNF. These five areas include; behavior/chemistry of aluminum oxyhydroxide layer in dry storage, radiolytic gas generation properties of aluminum oxyhydroxide layers, effect of episodic breathing and radiolytic generation of corrosive gases during storage, performance of ASNF in existing dry storage systems, and effects of high temperature (>1000 C) drying on chemistry and behavior of aluminum oxyhydroxide layers. The ASNF sub-working group also recommended development of an action plan to identify technical and engineering activities needed to address the knowledge gaps and technical data needs. Results of the ASNF sub-working group are documented in 2017 report 'Aluminum Clad Spent Nuclear Fuel: Technical Considerations and Challenges for Extended (>50 years) Dry Storage,' DOE-ID/RPT-1575. The INL assembled a team comprised of twenty INL and Savannah River National Laboratory SNF management and subject matter experts to develop this action plan. Over the course of 2 months the team worked to develop the action plan. The plan identified and recommended six technical and engineering tasks needed to address the previously identified knowledge gaps and technical data needs. DOE Environmental Management Office of Technology Development is providing funding to the INL to execute these tasks. This paper will present and discuss the results of the ASNF sub-working group, tasks identified in the action plan, and experimental activities underway at INL and SRNL to address the action plan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International Standards as Critical Enablers to Development and Diffusion of D and D Technologies - 19372

The U.S. Department of Energy's Office of Environmental Management (DOE EM) has taken a leading role in investing in the research and development (R and D) of critical technologies to support the safe and efficient decommissioning of legacy nuclear facilities. In order to facilitate the complex-wide deployment and adoption of those technologies from the laboratory to end users, and to maximize return on investment of government-sponsored R and D projects, DOE EM proactively solicits and evaluates initiatives intended to enhance achievement of these goals. One such case study emerged and involved the successful deployment of an intumescent fixative technology in support of the SRS 235-F PuFF Facility Risk Reduction Program. A detailed analysis confirmed that a critical enabler and key contributor to this effort was a deliberate, methodical approach to leverage an international, consensus-based standards organization from the onset. There is a substantial body of literature that supports the crucial role of standards in technology programs across all phases of development - from concept, to deployment, to large-scale diffusion - in other industries. Formal standards are the result of a consensual negotiation process carried out by producers, regulators, end users and other interested stakeholders in a voluntary process within standardization organizations (WTO, 2011). Therefore, standard setting is often viewed as a self-regulatory process (Gupta and Lad, 1983), and can often yield better acceptance of technologies in certain industries, particularly if those standards are further referenced in government directives and regulations. This analysis connects several theoretical concepts: information asymmetry, risk adverse markets, and technology diffusion. It is complimented by some initial, rudimentary survey results in a burgeoning academic study conducted by the author, and reinforced by the aforementioned case study on the deployment of a fixative technology at the SRS 235-F PuFF Facility. The importance of managing a holistic technology development program that focuses on not just the technical aspects of the technology itself, but the critical enablers as well, is emphasized. This effort has direct application to potentially enhancing DOE EM technology development programs across the complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

International Approaches for Nuclear Waste Disposal in Geological Formations: Geological Challenges in Radioactive Waste Isolation—Fifth Worldwide Review

The overall objective of the Fifth Worldwide Review (WWR-5) is to document the current state-of-the-art of major developments in a number of nations throughout the World pursuing geological disposal programs, and to summarize challenging problems and experience that have been obtained in siting, preparing and reviewing cases for the operational and long-term safety of proposed and operating nuclear waste repositories. The scope of the Review is to address current specific technical issues and challenges in safety case development along with the interplay of technical feasibility, siting, engineering design issues, and operational and post-closure safety. In particular, the chapters included in the report present the following types of information: the current status of the deep geological repository programs for high level nuclear waste and low- and intermediate level nuclear waste in each country, concepts of siting and radioactive waste and spent nuclear fuel management in different countries (with the emphasis of nuclear waste disposal under different climatic conditions and different geological formations), progress in repository site selection and site characterization, technology development, buffer/backfill materials studies and testing, support activities, programs, and projects, international cooperation, and future plans, as well as regulatory issues and transboundary problems.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary Report of Summer Work: High Purity Single Crystal Growth & Microstructure of Ferritic-Martensitic Steels

Harnessing the power of the nuclear sciences for national security and to benefit others is one of Los Alamos National Laboratory’s missions. MST-8 focuses on manipulating and studying how the structure, processing, properties, and performance of materials interact at the atomic level under nuclear conditions. Within this group, single crystal scintillators contribute to the safety and reliability of weapons, provide global security safeguards, and build on scientific principles that carry over to medical fields for cancer detection. Improved cladding materials made of ferritic-martensitic alloys support the mission of DOE-NE’s Fuel Cycle Research and Development program to close the nuclear fuel cycle, aiming to solve nuclear waste management challenges and thereby increase the performance and safety of current and future reactors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗