Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Near Earth Object Simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

125 records · Page 7

The Use of Dynamic Visual Acuity as a Functional Test of Gaze Stabilization Following Space Flight

After prolonged exposure to a given gravitational environment the transition to another is accompanied by adaptations in the sensorimotor subsystems, including the vestibular system. Variation in the adaptation time course of these subsystems, and the functional redundancies that exist between them make it difficult to accurately assess the functional capacity and physical limitations of astro/cosmonauts using tests on individual subsystems. While isolated tests of subsystem performance may be the only means to address where interventions are required, direct measures of performance may be more suitable for assessing the operational consequences of incomplete adaptation to changes in the gravitational environment. A test of dynamic visual acuity (DVA) is currently being used in the JSC Neurosciences Laboratory as part of a series of measures to assess the efficacy of a countermeasure to mitigate postflight locomotor dysfunction. In the current protocol, subjects visual acuity is determined using Landolt ring optotypes presented sequentially on a computer display. Visual acuity assessments are made both while standing and while walking at 1.8 m/s on a motorized treadmill. The use of a psychophysical threshold detection algorithm reduces the required number of optotype presentations and the results can be presented immediately after the test. The difference between the walking and standing acuity measures provides a metric of the change in the subject s ability to maintain gaze fixation on the visual target while walking. This functional consequence is observable regardless of the underlying subsystem most responsible for the change. Data from 15 cosmo/astronauts have been collected following long-duration (approx. 6 months) stays in space using a visual target viewing distance of 4.0 meters. An investigation of the group mean shows a change in DVA soon after the flight that asymptotes back to baseline approximately one week following their return to earth. The performance of some subjects nicely parallels the stereotypical recovery curve observed in the group mean data. Others show dramatic changes in DVA from one test day to another. These changes may be indicative of a re-adaptation process that is not characterized by a steady improvement with the passage of time, but is instead a dynamic search for appropriate coordinative strategy to achieve the desired gaze stabilization goal. Ground-based data have been collected in our lab using DVA with one of the goals being to improve the DVA test itself. In one of these studies, the DVA test was repeated using a visual target viewing distance of 0.5 meters. While walking, the relative contributions of the otoliths and semi-circular canals that are required to stabilize gaze are affected by visual target viewing distance. It may be possible to exploit this using the current treadmill DVA test to differentially assess changes in these vestibular subsystems. The postflight DVA evaluations currently used have been augmented to include the near target version of the test. Preliminary results from these assessments, as well as the results from the ground-based tests will also be reported. DVA provides a direct measure of a subject's ability to see clearly in the presence of self-motion. The use of the current tests for providing a functionally relevant metric is evident. However, it is possible to expand the scope of DVA testing to include scenarios other than walking. A facility for measuring DVA in the presence of passive movements is being created. Using a mechanized platform to provide the perturbation, it should be possible to simulate aircraft and automobile vibration profiles. Used in conjunction with the far and near visual displays this facility should be able to assess a subject s ability to clearly see distant objects as well as those that appear on the dashboard or instrument control panel during functionally relevant situations.

Peters, B. T.↗

The ARADS Project as an Astrobiological Survey Mission Prototype

An astrobiological survey prior to human arrival will be important for preservation of signs of any existing or past evidence of Martian life, to reduce the risk of unintentional forward contamination of Martian environments in which terrestrial microbes might be able to gain a foothold (e.g., [1]), and to potentially protect the health of any human crews and enable their safe return to Earth. Evaluating for the presence of life and biosignatures may become a critical-path Mars exploration precursor in the not-so-far future, circa 2030-35. The near-subsurface, with its potential combination of volatiles, vapor exchange with the surface, and shelter from surface radiation, will be a primary initial target for in-situ astrobiological investigation. Sample acquisition, drilling and sample handling are key elements of robotic missions that target the subsurface [2], as well as near-surface ground ice deposits. In the mid 2000s, the Mars Astrobiology Field Laboratory (AFL) was proposed as a follow-on mission concept to the Mars Science Laboratory (MSL)/Curiosity rover mission [3]. The AFL would have included precision drilling to 2m, automated sample handling and remote processing of cores. However, the AFL concept needed further development and maturation. The Atacama Rover Astrobiology Drilling Studies (ARADS) project concept [4] was in part AFL-inspired. The 2014 ARADS concept included a medium sized rover, with habitability instruments, including the Phoenix Wet Chemistry Laboratory (WCL) [5], and an enhanced version of the ExoMars Mars Organic Molecule Analyzer (MOMA) Laser Desorption-Linear Ion Trap Mass Spectrometer (LITMS) [6]. ARADS likewise included two biosignature detection instruments -- the Signs of Life Detector (SOLID) immunoassay instrument [7,8] and the Chemical Laptop-derived [9] Planetary In-Situ Capillary Electrophoresis System (PISCES), while mitigating Planetary Protection-relevant contamination issues [10]. ARADS project objectives were to demonstrate the potential science return for such a mission in the context of the search for evidence of life, and technically to demonstrate the feasibility of roving with drilling missions to Mars. ARADS technology goals targeted analog-site demonstrations of automated drilling and sampling, integrated with its mobile habitability and biosignature detection instruments. And ARADS science operations goals developed remote science, contamination mitigation, and communications methods to enable simulating AFL-like science operations with time delays, directed by a remote science team[11]. Five subsequent Mars analog site field demonstrations (in Chile’s hyperarid Atacama Desert, 2016-19) provided a step-by-step development pathway for the ARADS platform’s science capabilities and systems integration, culminating in an integrated remote roving mission simulation in the final ARADS year (2019).

biosignatures↗

Operating Small Sat Swarms as a Single Entity: Introducing SODA

Swarm concepts are a growing topic of interest in the small satellite community. Compared to a small satellite constellation, a swarm has the distinction of being multiple spacecraft in close proximity, in approximately the same orbit. Furthermore, we envision swarms to have capabilities for cross-link communication and station-keeping. Of particular interest is a means to maintain operator-specified geometry, alignment, and/or separation.From NASA's decadal survey, it is clear that simultaneous measurements from a 3D volume of space are desired for a variety of Earth scientific studies. As this mission concept is ultimately extended to deep space, some degree of local control for the swarm to self-correct its configuration is required. We claim that the practicality of ground commanding each individual satellite in the swarm is simply not a feasible concept of operations. In other words, the current state-of-practice does not scale to very large swarms (e.g. 100 spacecraft or more) without becoming cost prohibitive. To contain the operations costs and complexity, a new approach is required: the swarm must be operated as a unit, responding to high-level specifications for relative position and velocity.The Mission Design Division at NASA Ames Research Center is looking to the near future for opportunities to develop satellite swarm technology. As part of this effort, we are developing SODA (Swarm Orbital Dynamics Advisor), a tool that provides the orbital maneuvers required to achieve a desired type of relative swarm motion. The purpose of SODA is two-fold. First, it encompasses the algorithms and orbital dynamics model to enable the desired relative motion of the swarm satellites. The process starts with the user specifying the properties of a swarm configuration. This could be as simple as varying in-track spacing of the swarm in one orbit, or as complex as maintaining a specified 3D geometrical orientation. We presume that science objectives will drive this choice. Given these inputs, the tool provides the most efficient maneuver(s) to achieve the objective.Second, SODA provides a variety of visualization tools. We acknowledge that the relationship between a desired relative motion amongst the swarm, and the corresponding orbital parameters for each individual satellite may not be immediately apparent for ground controllers and mission planners. The purpose of SODA's visualization tools is to illustrate this concept clearly with a variety of graphics and animations. After computing the optimal orbital maneuvers to modify the swarm, these results are simulated to demonstrate successful swarm control.Our emphasis in this paper is on the importance of relating the desired motion of the swarm satellites relative to one another with the required orbital element changes. One cannot joystick a drifting swarm satellite back into position; the underlying orbital mechanics dictate the most efficient recovery maneuvers. To illustrate this point, results from several case study simulations are presented. We conclude with our forward work for ongoing SODA development and potential science applications.

small satellites↗

Simulating Ordinary Chondrite (Tamdakht) Ablation at the Hypersonic Materials Environmental Test System (HyMETS) Facility.

NASA’s Science Mission Directorate (SMD) created the Asteroid Threat Assessment Project (ATAP) to inform decision-makers of risks associated with Potentially Hazardous Objects (PHOs), which may pose an existential threat to human civilization. ATAP assesses risk, in part, by developing analytical physics-based damage models which draw upon data collected during material property characterization efforts, entry simulations, hazard simulations, and ground-based arc-jet testing. Therefore, a pathfinder test campaign was con-ducted at the Hypersonic Materials Environmental Test System (HyMETS) at the NASA Langley Re-search Center to investigate the ablation mechanisms of an ordinary chondrite (Tamdakht H5) and a terrestrial analog (basalt). The HyMETS facility is a 400 kW constricted arc heater used to screen material performance under simulated aerothermal conditions of hypersonic flow.1 Facility conditions were chosen to simulate Earth entry conditions be-tween the upper-mesosphere and the lower thermo-sphere. The ablation mechanisms of Tamdakht and bas-alt are illustrated with still images collected from high-speed video cameras (fig. 1, Tamdakht). Tamdakht produces a relatively stable melt flow, as evidenced by the perpetual growth of a flange at the sidewall and the exiguous detachment of molten material into the flow. Furthermore, an inspection of high-speed video and chemical analysis of the post-test melt layer suggests that the dominant mode of mass loss for Tamdakht, at these test conditions, is expressed through the vaporization of volatiles (e.g., iron, potassium, sodium, phosphorus, and sulfur). The vaporization rates of Tamdakht are greater than basalt under the most extreme test conditions, which leads to an enhanced blowing layer, in-creased thermal shielding, and reduced recession. The ablation mechanisms of basalt are markedly different from Tamdakht and are attributed to the presence of hydrated minerals dispersed at irregular intervals throughout the silicate matrix. Rapid de-composition of secondary minerals and the subsequent formation of water lead to the ejection of the subsurface and overlying melt layer. Furthermore, the presence of water is suspected of lowering the viscosity of the melt layer resulting in increased mass loss near the edge of the test article where drag forces overcome rheological properties (fig. 1, bas-alt). Finally, the results will be discussed in the broader context of meteorite-based material response model development and the potential impact on the Asteroid Threat Assessment Project (ATAP).

Brody K. Bessire↗

Buoyancy Effects on Flow Structure and Instability of Low-Density Gas Jets

A low-density gas jet injected into a high-density ambient gas is known to exhibit self-excited global oscillations accompanied by large vortical structures interacting with the flow field. The primary objective of the proposed research is to study buoyancy effects on the origin and nature of the flow instability and structure in the near-field of low-density gas jets. Quantitative rainbow schlieren deflectometry, Computational fluid dynamics (CFD) and Linear stability analysis were the techniques employed to scale the buoyancy effects. The formation and evolution of vortices and scalar structure of the flow field are investigated in buoyant helium jets discharged from a vertical tube into quiescent air. Oscillations at identical frequency were observed throughout the flow field. The evolving flow structure is described by helium mole percentage contours during an oscillation cycle. Instantaneous, mean, and RMS concentration profiles are presented to describe interactions of the vortex with the jet flow. Oscillations in a narrow wake region near the jet exit are shown to spread through the jet core near the downstream location of the vortex formation. The effects of jet Richardson number on characteristics of vortex and flow field are investigated and discussed. The laminar, axisymmetric, unsteady jet flow of helium injected into air was simulated using CFD. Global oscillations were observed in the flow field. The computed oscillation frequency agreed qualitatively with the experimentally measured frequency. Contours of helium concentration, vorticity and velocity provided information about the evolution and propagation of vortices in the oscillating flow field. Buoyancy effects on the instability mode were evaluated by rainbow schlieren flow visualization and concentration measurements in the near-field of self-excited helium jets undergoing gravitational change in the microgravity environment of 2.2s drop tower at NASA John H. Glenn Research Center. The jet Reynolds number was varied from 200 to 1500 and jet Richardson number was varied from 0.72 to 0.002. Power spectra plots generated from Fast Fourier Transform (FFT) analysis of angular deflection data acquired at a temporal resolution of 1000Hz reveal substantial damping of the oscillation amplitude in microgravity at low Richardson numbers (~0.002). Quantitative concentration data in the form of spatial and temporal evolutions of the instability data in Earth gravity and microgravity reveal significant variations in the jet flow structure upon removal of buoyancy forces. Radial variation of the frequency spectra and time traces of helium concentration revealed the importance of gravitational effects in the jet shear layer region. Linear temporal and spatio-temporal stability analyses of a low-density round gas jet injected into a high-density ambient gas were performed by assuming hyper-tan mean velocity and density profiles. The flow was assumed to be non parallel. Viscous and diffusive effects were ignored. The mean flow parameters were represented as the sum of the mean value and a small normal-mode fluctuation. A second order differential equation governing the pressure disturbance amplitude was derived from the basic conservation equations. The effects of the inhomogeneous shear layer and the Froude number (signifying the effects of gravity) on the temporal and spatio-temporal results were delineated. A decrease in the density ratio (ratio of the density of the jet to the density of the ambient gas) resulted in an increase in the temporal amplification rate of the disturbances. The temporal growth rate of the disturbances increased as the Froude number was reduced. The spatio-temporal analysis performed to determine the absolute instability characteristics of the jet yield positive absolute temporal growth rates at all Fr and different axial locations. As buoyancy was removed (Fr . 8), the previously existing absolute instability disappeared at all locations establhing buoyancy as the primary instability mechanism in self-excited low-density jets.

Pasumarthi, Kasyap Sriramachandra↗

Space Launch System Spacecraft and Payload Elements: Progress Toward Crewed Launch and Beyond

While significant and substantial progress continues to be accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. Designed to support human missions into deep space, SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development division. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit (LEO), and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into a next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. For its first flight, SLS will deliver a near-term heavy-lift capability for the nation with its 70-metric-ton (t) Block 1 configuration. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS, which will propel Orion around the moon and back. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress is on track to meet the initial targeted launch date. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on the first flight of SLS. The element has overseen production of the Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage, which was manufactured at United Launch Alliance (ULA) in Decatur, Alabama, prior to being shipped to Florida for flight preparations. Manufacture of the OSA and the Launch Vehicle Stage Adapter (LVSA) took place at the Friction Stir Facility located at Marshall Space Flight Center (MSFC) in Huntsville, Alabama. Marshall is also home to the Integrated Structural Test of the ICPS, LVSA, and OSA, subjecting the stacked components to simulated stresses of launch. The SPIE Element is also overseeing integration of 13 "CubeSat" secondary payloads that will fly on the first flight of SLS, providing access to deep space regions in a way currently not available to the science community. At the same time as this preparation work is taking place toward the first launch of SLS, however, the Space Launch System Program is actively working toward its second launch. For its second flight, SLS will be upgraded to the more-capable Block 1B configuration. While the Block 1 configuration is capable of delivering more than 70 t to LEO, the Block 1B vehicle will increase that capability to 105 t. For that flight, the new configuration introduces two major new elements to the vehicle - an Exploration Upper Stage (EUS) that will be used for both ascent and in-space propulsion, and a Universal Stage Adapter (USA) that serves as a "payload bay" for the rocket, allowing the launch of large exploration systems along with the Orion spacecraft. Already, flight hardware is being prepared for the Block 1B vehicle. Welding is taking place on the second rocket's core stage. Flight hardware production has begun on booster components. An RS-25 engine slated for that flight has been tested. Development work is taking place on the EUS, with contracts in place for both the stage and the RL10 engines which will power it. (The EUS will use four RL10 engines, an increase from one on the ICPS.) For the crew configuration of the Block 1B vehicle, the SLS SPIE element is managing the USA and accompanying Payload Adapter, which will accommodate both large payloads co-manifested with Orion and small-satellite secondary payloads. This co-manifested payload capacity will be instrumental for missions into the proving ground around the moon, where NASA will test new systems and demonstrate new capabilities needed for human exploration farther into deep space.

Schorr, Andrew A.↗

Space Launch System and Missions to Near Rectilinear Halo Orbits

The first major evolution of NASA’s Space Launch System (SLS) will begin its flights starting in the mid-2020’s. This new configuration, called Block 1B, replaces the Interim Cryogenic Propulsion Stage with a larger Exploration Upper Stage (EUS). The additional capability provided by the new upper stage will allow SLS to send heavier payloads into deep space. One destination of interest to the SLS program is called a Near Rectilinear Halo Orbit (NRHO). This is a type of lunar orbit with multiple advantages for deep space exploration. These benefits include Earth/lunar access, low station-keeping requirements, and high communication potential with Earth. Therefore, it is a leading candidate for the proposed Lunar Orbital Platform-Gateway (LOP-G). This paper will provide a detailed assessment of the SLS Block 1B requirements and capabilities for sending payloads to an NRHO. Analysts at Marshall Space Flight Center are producing a multi-year mission availability scan for the SLS Block 1B configuration to a predefined NRHO orbit. The analysis produces an optimized trajectory for each day of the scan window. A maximized payload and minimized propellant requirement are determined for each day. All maneuvers from launch to the end of the Trans-Lunar-Injection (TLI) are being modeled as finite burns. Injections into an NRHO are being modeled as impulsive maneuvers. The payload element is arbitrary, but includes sufficient mass to represent a large habitat or propulsion module. The resulting parameters of payload capability, delta-v requirements, and launch windows length vary over the course of the scan. Many launch days in the scan are eliminated in post-processing as they violate mission constraints such as payload mass and propellant usage to insert into an NRHO. Based off previous one-year scan results for the SLS Block 1B Design Analysis Cycle 2 (DAC-2), it is expected that there will be one to three days per week where the payload is able to insert into an NRHO within SLS constraints objectives. This scan provides results for longer than one-year, allowing analysts to better understand the launch availability and energy requirements of SLS Block 1B over time. The in-space mission design and scans utilize Copernicus, an n-body trajectory optimization tool originally developed out of the University of Texas at Austin with further development at Johnson Space Center in Houston, TX. To seed the in-space trajectory, Copernicus uses a plugin to call a database of SLS ascent trajectories optimized in the Program to Simulate Optimized Trajectories II (POST2). The ascent trajectories are developed using a framework that parametrizes payload mass and LEO inclination, and targets a 100 nmi (nautical mile) altitude circular parking orbit. Though this analysis is specific to the SLS program, it will provide a summary of mission design benefits and constraints associated with generic NRHO access, and may be applied to other programs or concepts that will utilize this orbit.

Statham, T. L.↗

MESSENGER at Mercury: Early Orbital Operations

The MErcury Surface, Space ENvironment, GEochemistry, and Ranging (MESSENGER) spacecraft, launched in August 2004 under NASA's Discovery Program, was inserted into orbit about the planet Mercury in March 2011. MESSENGER's three flybys of Mercury in 2008-2009 marked the first spacecraft visits to the innermost planet since the Mariner 10 flybys in 1974-1975. The unprecedented orbital operations are yielding new insights into the nature and evolution of Mercury. The scientific questions that frame the MESSENGER mission led to the mission measurement objectives to be achieved by the seven payload instruments and the radio science experiment. Interweaving the full set of required orbital observations in a manner that maximizes the opportunity to satisfy all mission objectives and yet meet stringent spacecraft pointing and thermal constraints was a complex optimization problem that was solved with a software tool that simulates science observations and tracks progress toward meeting each objective. The final orbital observation plan, the outcome of that optimization process, meets all mission objectives. MESSENGER's Mercury Dual Imaging System is acquiring a global monochromatic image mosaic at better than 90%coverage and at least 250 m average resolution, a global color image mosaic at better than 90%coverage and at least 1 km average resolution, and global stereo imaging at better than 80%coverage and at least 250 m average resolution. Higher-resolution images are also being acquired of targeted areas. The elemental remote sensing instruments, including the Gamma-Ray and Neutron Spectrometer and the X-Ray Spectrometer, are being operated nearly continuously and will establish the average surface abundances of most major elements. The Visible and Infrared Spectrograph channel of MESSENGER's Mercury Atmospheric and Surface Composition Spectrometer is acquiring a global map of spectral reflectance from 300 to 1450 nm wavelength at a range of incidence and emission angles. Targeted areas have been selected for spectral coverage into the ultraviolet with the Ultraviolet and Visible Spectrometer (UVVS). MESSENGER's Mercury Laser Altimeter is acquiring topographic profiles when the slant range to Mercury's surface is less than 1800 km, encompassing latitudes from 201S to the north pole. Topography over the remainder of the southern hemisphere will be derived from stereo imaging, radio occultations, and limb profiles. MESSENGER's radio science experiment is determining Mercury's gravity field from Doppler signals acquired during frequent downlinks. MESSENGER's Magnetometer is measuring the vector magnetic field both within Mercury's magnetosphere and in Mercury's solar wind environment at an instrument sampling rate of up to 20 samples/s. The UVVS is determining the three-dimensional, time-dependent distribution of Mercury's exospheric neutral and ionic species via their emission lines. During each spacecraft orbit, the Energetic Particle Spectrometer measures energetic electrons and ions, and the Fast Imaging Plasma Spectrometer measures the energies and mass per charge of thermal plasma components, both within Mercury's magnetosphere and in Mercury's solar-wind environment. The primary mission observation sequence will continue for one Earth year, until March 2012. An extended mission, currently under discussion with NASA, would add a second year of orbital observations targeting a set of focused follow-on questions that build on observations to date and take advantage of the more active Sun expected during 2012-2013. MESSENGER's total primary mission cost, projected at $446 M in real-year dollars, is comparable to that of Mariner 10 after adjustment for inflation.

Planetary Science↗

MESSENGER at Mercury: Early Orbital Operations

The MErcury Surface, Space ENvironment, GEochemistry, and Ranging (MESSENGER) spacecraft, launched in August 2004 under NASA's Discovery Program, was inserted into orbit about the planet Mercury in March 2011. MESSENGER's three flybys of Mercury in 2008-2009 marked the first spacecraft visits to the innermost planet since the Mariner 10 flybys in 1974-1975. The unprecedented orbital operations are yielding new insights into the nature and evolution of Mercury. The scientific questions that frame the MESSENGER mission led to the mission measurement objectives to be achieved by the seven payload instruments and the radio science experiment. Interweaving the full set of required orbital observations in a manner that maximizes the opportunity to satisfy all mission objectives and yet meet stringent spacecraft pointing and thermal constraints was a complex optimization problem that was solved with a software tool that simulates science observations and tracks progress toward meeting each objective. The final orbital observation plan, the outcome of that optimization process, meets all mission objectives. MESSENGER's Mercury Dual Imaging System is acquiring a global monochromatic image mosaic at better than 90% coverage and at least 250 m average resolution, a global color image mosaic at better than 90% coverage and at least 1 km average resolution, and global stereo imaging at better than 80% coverage and at least 250 m average resolution. Higher-resolution images are also being acquired of targeted areas. The elemental remote sensing instruments, including the Gamma-Ray and Neutron Spectrometer and the X-Ray Spectrometer, are being operated nearly continuously and will establish the average surface abundances of most major elements. The Visible and Infrared Spectrograph channel of MESSENGER's Mercury Atmospheric and Surface Composition Spectrometer is acquiring a global map of spectral reflectance from 300 to 1450 nm wavelength at a range of incidence and emission angles. Targeted areas have been selected for spectral coverage into the ultraviolet with the Ultraviolet and Visible Spectrometer (UVVS). MESSENGER's Mercury Laser Altimeter is acquiring topographic profiles when the slant range to Mercury's surface is less than 1800 km, encompassing latitudes from 20 deg. S to the north pole. Topography over the remainder of the southern hemisphere will be derived from stereo imaging, radio occultations, and limb profiles. MESSENGER's radio science experiment is determining Mercury's gravity field from Doppler signals acquired during frequent downlinks. MESSENGER's Magnetometer is measuring the vector magnetic field both within Mercury's magnetosphere and in Mercury's solar wind environment at an instrument sampling rate of up to 20 samples/s. The UVVS is determining the three-dimensional, time-dependent distribution of Mercury's exospheric neutral and ionic species via their emission lines. During each spacecraft orbit, the Energetic Particle Spectrometer measures energetic electrons and ions, and the Fast Imaging Plasma Spectrometer measures the energies and mass per charge of thermal plasma components, both within Mercury's magnetosphere and in Mercury's solar-wind environment. The primary mission observation sequence will continue for one Earth year, until March 2012. An extended mission, currently under discussion with NASA, would add a second year of orbital observations targeting a set of focused follow-on questions that build on observations to date and take advantage of the more active Sun expected during 2012-2013. MESSENGER's total primary mission cost, projected at $446 M in real-year dollars, is comparable to that of Mariner 10 after adjustment for inflation.

mercury↗

SHARP-B2: Flight Test Objectives, Project Implementation and Initial Results

On September 28, 2000 the SHARP-B2 flight experiment was launched from Vandenberg Air Force Base, California. SHARP-B2 is the 2nd Ballistic flight test in the SHARP (Slender Hypervelocity Aerothermodynamic Research Probes) program which develops and tests new thermal protection materials and sharp body concepts. The flight tested Ultra-High Temperature Ceramics (UHTCs), which may radically change the design and performance of future aerospace vehicles. The new designs may overturn an age-old tenet of aerodynamics: that blunt-body aerospace vehicles, but not those with sharp leading edges, can survive the searing temperatures created as the vehicles tear through the atmosphere. Sharp leading edges offer numerous advantages over the blunt-body design currently in use. They could allow a space shuttle or crew return vehicle to maneuver in space more like an airplane and potentially allow astronauts to return to Earth from anywhere on orbit. They may allow improved astronaut safety by decreasing the risk of aborting into the ocean. They may reduce the electromagnetic interference that causes the communications blackouts that plague reentering blunt-body space vehicles. Reducing the amount of drag could lead to a reduction in propulsion requirements. Planetary probes could make use of sharp-body technology for aerobraking and to maximize their maneuvering capability. SHARP-B2 was a joint effort among NASA Ames, Sandia National Laboratories, the U.S. Air Force and the U.S. Army. It was funded by the Pathfinder Program at NASA's Marshall Space Flight Center. The SHARP-B2 payload was carried aboard a U.S. Air Force Minuteman III missile carrying a modified Mk 12A reentry vehicle (RV), which blasted off from Vandenberg Air Force Base near Lompoc, CA, at 3:01 a.m. PDT on Sept. 28. The RV was equipped with four 5. 1 inch-long strakes, or sharp leading edges. Each strake contained three UHTCs: ZrB2/SiC/C; ZrB2/SiC; and HfB2/SiC. Once it reached an altitude of about 400 nautical miles, the RV was released, returning through Earth's atmosphere at speeds exceeding Mach 22. One pair of strakes was designed to retract just before reaching temperatures high enough to cause the material to begin ablating. The other pair was designed to retract shortly after ablation began, at an expected temperature of nearly 5,100 degrees Fahrenheit. Sensors in the strakes measured how closely performance matched pre-flight calculations, and data was successfully collected throughout the 23-minute flight. A parachute was deployed (but not fully inflated) and the RV splashed down in a lagoon at the Kwajalein missile range in the Pacific Ocean. Within 3 hours radar track analysis showed ocean entry to be precisely at the latitude/longitude coordinates estimated during pre-flight simulation. An hour later a ship was deployed by the Army to recover the reentry vehicle, which was recovered in 165 feet of water, just 500 feet from its planned splash-down point. This is the first RV recovery in over a decade.

Salute, Joan↗

Osiris-REx Spacecraft Current Status and Forward Plans

The NASA New Frontiers OSIRIS-REx spacecraft executed a flawless launch on September 8, 2016 to begin its 23-month journey to near-Earth asteroid (101955). The primary objective of the OSIRIS-REx mission is to collect and return to Earth a pristine sample of regolith from the asteroid surface. The sampling event will occur after a two-year period of remote sensing that will ensure a high probability of successful sampling of a region on the asteroid surface having high science value and within well-defined geological context. The OSIRIS-REx instrument payload includes three high-resolution cameras (OCAMS), a visible and near-infrared spectrometer (OVIRS), a thermal imaging spectrometer (OTES), an X-ray imaging spectrometer (REXIS), and a laser altimeter (OLA). As the spacecraft follows its nominal outbound-cruise trajectory, the propulsion, power, communications, and science instruments have undergone basic functional tests, with no major issues. Outbound cruise science investigations include a search for Earth Trojan asteroids as the spacecraft approaches the Sun-Earth L4 Lagrangian point in February 2017. Additional instrument checkouts and calibrations will be carried out during the Earth gravity assist maneuver in September 2017. During the Earth-moon flyby, visual and spectral images will be acquired to validate instrument command sequences planned for Bennu remote sensing. The asteroid Bennu remote sensing campaign will yield high resolution maps of the temperature and thermal inertia, distributions of major minerals and concentrations of organic matter across the asteroid surface. A high resolution 3d shape model including local surface slopes and a high-resolution gravity field will also be determined. Together, these data will be used to generate four separate maps that will be used to select the sampling site(s). The Safety map will identify hazardous and safe operational regions on the asteroid surface. The Deliverability map will quantify the accuracy with which the navigation team can deliver the spacecraft to and from specific sites on the asteroid surface. The Sampleability map quantifies the regolith properties, providing an estimation of how much material would be sampled at different points on the surface. The final Science Value map synthesizes the chemical, mineralogical, and geological, observations to identify the areas of the asteroid surface with the highest science value. Here, priority is given to organic, water-rich regions that have been minimally altered by surface processes. Asteroid surface samples will be acquired with a touch-and-go sample acquisition system (TAGSAM) that uses high purity pressurized N2 gas to mobilize regolith into a stainless steel canister. Although the mission requirement is to collect at least 60 g of material, tests of the TAGSAM routinely exceeded 300 g of simulant in micro-gravity tests. After acquiring the sample, the spacecraft will depart Bennu in 2021 to begin its return journey, with the sample return capsule landing at the Utah Test and Training Range on September 23, 2023. The OSIRIS-REx science team will carry out a series of detailed chemical, mineralogical, isotopic, and spectral studies that will be used to determine the origin and history of Bennu and to relate high spatial resolution sample studies to the global geological context from remote sensing. The outline of the sample analysis plan is described in a companion abstract.

Messenger, Scott↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Evaluation of Enhanced High Resolution MODIS/AMSR-E SSTs and the Impact on Regional Weather Forecast

Over the last few years, the NASA Short-term Prediction Research and Transition (SPoRT) Center has been generating a 1-km sea surface temperature (SST) composite derived from retrievals of the Moderate Resolution Imaging Spectroradiometer (MODIS) for use in operational diagnostics and regional model initialization. With the assumption that the day-to-day variation in the SST is nominal, individual MODIS passes aboard the Earth Observing System (EOS) Aqua and Terra satellites are used to create and update four composite SST products each day at 0400, 0700, 1600, and 1900 UTC, valid over the western Atlantic and Caribbean waters. A six month study from February to August 2007 over the marine areas surrounding southern Florida was conducted to compare the use of the MODIS SST composite versus the Real-Time Global SST analysis to initialize the Weather Research and Forecasting (WRF) model. Substantial changes in the forecast heat fluxes were seen at times in the marine boundary layer, but relatively little overall improvement was measured in the sensible weather elements. The limited improvement in the WRF model forecasts could be attributed to the diurnal changes in SST seen in the MODIS SST composites but not accounted for by the model. Furthermore, cloud contamination caused extended periods when individual passes of MODIS were unable to update the SSTs, leading to substantial SST latency and a cool bias during the early summer months. In order to alleviate the latency problems, the SPoRT Center recently enhanced its MODIS SST composite by incorporating information from the Advanced Microwave Scanning Radiometer-EOS (AMSR-E) instruments as well as the Operational Sea Surface Temperature and Sea Ice Analysis. These enhancements substantially decreased the latency due to cloud cover and improved the bias and correlation of the composites at available marine point observations. While these enhancements improved upon the modeled cold bias using the original MODIS SSTs, the discernable impacts on the WRF model were still somewhat limited. This paper explores several factors that may have contributed to this result. First, the original methodology to initialize the model used the most recent SST composite available in a hypothetical real ]time configuration, often matching the forecast initial time with an SST field that was 5-8 hours offset. To minimize the differences that result from the diurnal variations in SST, the previous day fs SST composite is incorporated at a time closest to the model initialization hour (e.g. 1600 UTC composite at 1500 UTC model initialization). Second, the diurnal change seen in the MODIS SST composites was not represented by the WRF model in previous simulations, since the SSTs were held constant throughout the model integration. To address this issue, we explore the use of a water skin-temperature diurnal cycle prediction capability within v3.1 of the WRF model to better represent fluctuations in marine surface forcing. Finally, the verification of the WRF model is limited to very few over-water sites, many of which are located near the coastlines. In order to measure the open ocean improvements from the AMSR-E, we could use an independent 2-dimensional, satellite-derived data set to validate the forecast model by applying an object-based verification method. Such a validation technique could aid in better understanding the benefits of the mesoscale SST spatial structure to regional models applications.

Schiferl, Luke D.↗

Engineering the Interface: Advanced Surface Technologies for Lunar Dust Management and Equipment Longevity

Through the Artemis program, NASA intends to develop a sustainable human foothold on the Moon, ultimately paving the way for crewed exploration of Mars. The Moon's hostile environment poses numerous obstacles, including exposure to radiation, temperature extremes, micrometeoroid threats, and particularly the persistent problem of lunar dust. Lunar dust impacts nearly every aspect of surface operations through adhesion and abrasion mechanisms, with contamination from anthropogenic activities (landing, rovers) far outweighing natural phenomena. Multiple adhesion pathways contribute to surface contamination in the lunar environment, including van der Waals forces, electrostatic forces, chemical reaction, and magnetic forces from elemental iron deposits. Sharp asperities from micrometeoroid bombardment and atmospheric absence increase interaction potential and enable mechanical interlocking. Low cohesion between dust particles exacerbates these challenges, as minimal interaction potential between dust and nearby surfaces overcomes particle cohesion, causing contamination. Lunar dust adhesion mitigation technologies can be categorized as either active, requiring external energy, or passive, relying on intrinsic material properties. Ultrasonic and electrodynamic technologies have been developed to the highest technology readiness level for active approaches. Passive strategies primarily focus on surface chemistry and topography modifications. At NASA Langley Research Center, approaches include surface migration agents to reduce surface energy, topographical modification using laser ablation patterning, and tailored surface conductivity to reduce intrinsic adhesion force. Performance has been evaluated using custom-built ultrasonic and centrifuge instruments. Plume-surface interactions from lunar landers can propel micrometer-sized particles at velocities up to 1000 m s-1.8 These particles pose risks to landers, habitats and infrastructure, leading to erosion, degradation, and reduced component lifespan. A panel recovered from Surveyor III was determined to have been severely abraded because of lunar dust displaced from the Apollo 12 lunar module that landed 160 m away. The performance of metallic surfaces has been evaluated via high velocity single particle impact using the laser-induced project impact test (LIPIT) facility at the University of Utah. Peridynamics modeling, a form of continuum mechanics that uses a nonlocal approach enabling greater simulation capabilities of crack initiation and fracture, has also been utilized to gain greater insight into material response during impact events. Lunar dust contamination challenges extend to power generation systems and moving equipment. Cables, rotation stages, and other mechanisms may experience limited range of motion and reduced lifetime due to dust infiltration. NASA Langley Research Center has evaluated traditional aerospace alloys, softgoods, wear resistant ceramics, and several polymer and polymer composite materials. Test methods have included traditional techniques like Taber abrasion testing, as well as designed test configurations developed in the DUSTE (dust, ultraviolet radiation, and space thermal environmental) chamber that reproduce mechanism functions in operational environment. Beyond laboratory experiments, several flight experiments have been conducted. Materials were exposed to the low Earth orbit environment on the Materials International Space Station Experiment (MISSE) and to the lunar surface environment through the Aegis Aerospace Regolith Adherence Characterization (RAC) payload and the Honeybee Robotics PlanetVac payload. Determining lunar dust's impact on surface exploration and habitation requires comprehensive experimental and computational capabilities combined with lessons learned from initial lunar activities. Identifying the greatest environmental challenges and developing mitigation technologies provides the clearest path toward successfully, expeditiously, and efficaciously completing NASA's mission. This presentation will discuss ongoing efforts at NASA Langley Research Center and collaborator contributions to these critical objectives.

Surface Engineering↗

Pre-Mission Input Requirements to Enable Successful Sample Collection by a Remote Field/EVA Team

This paper is intended to evaluate the sample collection process with respect to sample characterization and decision making. In some cases, it may be sufficient to know whether a given outcrop or hand sample is the same as or different from previous sampling localities or samples. In other cases, it may be important to have more in-depth characterization of the sample, such as basic composition, mineralogy, and petrology, in order to effectively identify the best sample. Contextual field observations, in situ/handheld analysis, and backroom evaluation may all play a role in understanding field lithologies and their importance for return. For example, whether a rock is a breccia or a clast-laden impact melt may be difficult based on a single sample, but becomes clear as exploration of a field site puts it into context. The FINESSE (Field Investigations to Enable Solar System Science and Exploration) team is a new activity focused on a science and exploration field based research program aimed at generating strategic knowledge in preparation for the human and robotic exploration of the Moon, near-Earth asteroids (NEAs) and Phobos and Deimos. We used the FINESSE field excursion to the West Clearwater Lake Impact structure (WCIS) as an opportunity to test factors related to sampling decisions. In contract to other technology-driven NASA analog studies, The FINESSE WCIS activity is science-focused, and moreover, is sampling-focused, with the explicit intent to return the best samples for geochronology studies in the laboratory. This specific objective effectively reduces the number of variables in the goals of the field test and enables a more controlled investigation of the role of the crewmember in selecting samples. We formulated one hypothesis to test: that providing details regarding the analytical fate of the samples (e.g. geochronology, XRF/XRD, etc.) to the crew prior to their traverse will result in samples that are more likely to meet specific analytical objectives than samples collected in the absence of this premission information. We conducted three tests of this hypothesis. Our investigation was designed to document processes, tools and procedures for crew sampling of planetary targets. This is not meant to be a blind, controlled test of crew efficacy, but rather an effort to recognize the relevant variables that enter into sampling protocol and to develop recommendations for crew and backroom training in future endeavors. Methods: One of the primary FINESSE field deployment objectives was to collect impact melt rocks and impact melt-bearing breccias from a number of locations around the WCIS structure to enable high precision geochronology of the crater to be performed [1]. We conducted three tests at WCIS after two full days of team participation in field site activities, including using remote sensing data and geologic maps, hiking overland to become familiar with the terrain, and examining previously-collected samples from other islands. In addition, the team members shared their projects and techniques with the entire team. We chose our "crew members" as volunteers from the team, all of whom had had moderate training in geologic fieldwork and became familiar with the general field setting. The first two tests were short, focused tests of our hypothesis. Test A was to obtain hydrothermal vugs; Test B was to obtain impact melt and intrusive rock as well as the contact between the two to check for contact metamorphism and age differences. In both cases, the test director had prior knowledge of the site geology and had developed a study-specific objective for sampling prior to deployment. Prior to the field deployment, the crewmember was briefed on the sampling objective and the laboratory techniques that would be used on the samples. At the field sites (Fig. 2), the crewmember was given 30 minutes to survey a small section of outcrop (10-15 m) and acquire a suite of three samples. The crewmember talked through his process and the test director kept track of the timeline in verbal cues to the crewmember. At the conclusion, the team member conducting the scientific study appraised the samples and train of thought. Test C was a 90-minute EVA simulation using two crewmembers working out of line-of-sight in communication with a science backroom. The science objectives were determined by the science backroom team in advance using a Gigapan image of the outcrop (Fig. 1). The science team formulated hypotheses for the outcrop units and created sampling objectives for impact-melt lithologies; the science team turned these into a science plan, which they communicated to the crew in camp prior to crew deployment. As part of the science plan, the science team also discussed their sample needs in depth with the crewmembers, including laboratory methods, objectives, and samples sizes needed. During the deployment, the two crewmembers relayed real-time information to the science backroom by radio with no time delay. Both the crew and science team re-evaluated their hypotheses and science plans in real-time. Discussion: Upon evaluation, we found that the focused tests (Tests A and B) were successful in meeting their scientific objectives. The crewmember used their knowledge of how the samples were to be used in further study (technique, sample size, and scientific need) to focus on the sampling task. The crewmember was comfortable spending minimal time describing and mapping the outcrop. The crewmember used all available time to get a good sample. The larger test was unsuccessful in meeting the sampling objectives. When the crewmembers began describing the lithologies, it was quickly apparent that the lithologies were not as the backroom expected and had communicated to the crew. When the outcrop wasn't as expected, the crew members instinctively switched to field characterization mode, taking significant time to characterize and map the outcrop. One crew member admitted that he "kind of lost track" of the sampling strategy as he focused on the basic outcrop characterization. This is the logical first step in a field geology campaign, that a significant amount of time must be spent by the crew and backroom to understand the outcrop and its significance. Basic field characterization of an outcrop is a focused activity that takes significant time and training [2, 3]. Sampling of representational lithologies can be added to this activity for little cost [4]. However, we have shown that identification of unusual or specific samples for laboratory study also takes significant time and knowledge. We suggest that sampling of this type be considered a separate activity from field characterization, and that crewmembers be trained in sampling needs for different kinds of studies (representative lithologies vs. specialized samples) to acquire a mindset for sampling similar to field mapping. Sampling activities should be given a significant amount of specifically allocated time in scheduling EVA activities; and in the better case, that sampling be done as a second activity to a previously studied outcrop where both crew and backroom are comfortable with its context and characteristics. Our hypothesis posited that crewmember knowledge of how the samples would be used upon return would aid them in choosing relevant samples. Our testing bore this hypothesis out to some extent. We therefore recommend that crewmember training should include exposure to the laboratory techniques and analyses that will be used on the samples to foster this knowledge. There is also the potential for increasing crewmember contextual knowledge real-time in the field through the introduction of in situ geochemical technologies such as field portable XRF. The presence of field portable geochemical technology could enable the astronauts to interrogate the samples for K abundance real-time, ensuring they could collect valuable and dateable samples [5]. Though simulations such as these can teach us a fair bit about decision making processes and timeline building, one EVA participant noted that when he wasn't collecting "real" samples, he wasn't at his best. This effect suggests that higher-fidelity studies involving truly remote participants conducting actual scientific studies merit further attention to capture lessons for application to future crew situations.

sample collection↗

Preliminary Planar Formation: Flight Dynamics Near Sun-Earth L2 Point

NASA's Goddard Space Flight Center is planning a series of missions in the vicinity of the Sun-Earth L2 libration point. Some of these projects will involve a distributed space system of telescope spacecraft acting together as a single telescope for high-resolution. The individual telescopes will be configured in a plane, surrounding a hub, where the telescope plane can be aimed toward various astronomical targets of interest. In preparation for these missions, it is necessary to develop an improved understanding of the dynamical behavior of objects in a planar configuration near L2. The classical circular restricted three body problem is taken as the basis for the analysis. At first order, the motion of such a telescope relative to the hub is described by a system of linear second order differential equations. These equations are identical to the circular restricted problem's linear equations describing the hub motion about L2. Therefore, the fundamental frequencies, both parallel to and normal to the ecliptic plane, are the same for the relative telescope motion as for the hub motion. To maintain the telescope plane for the duration necessary for the planned observations, a halo-type orbit of the telescopes about the hub is investigated. By using a halo orbit, the individual telescopes remain in approximately the same plane over the observation duration. For such an orbit, the fundamental periods parallel to and normal to the ecliptic plane are forced to be the same by careful selection of the initial conditions in order to adjust the higher order forces. The relative amplitudes of the resulting oscillations are associated with the orientation of the telescope plane relative to the ecliptic. As in the circular restricted problem, initial conditions for the linearized equations must be selected so as not to excite the convergent or divergent linear modes. In a higher order analysis, the telescope relative motion equations include the effects of the position of the hub relative to L2. In this paper, the differential equations are developed through second order in the distance of the hub from the libration point. A modified Lindstedt-Poincad perturbation method is employed to construct the solution of these differential equations through that same order of magnitude. In the course of the solution process, relationships are determined between the initial conditions of the telescopes, selected in order to avoid resonance excitation. As the differential equations include the hub position, it is necessary to simultaneously develop the solution for the hub. As has been done in past analyses of the circular restricted problem, the hub position is written in a power series formulation in terms of its distance from L2. Then, in order to be included in the telescope equations, the hub solution is cast in terms of the nonlinear frequency of the relative telescope motion. In the course of the analysis, it is determined that the hub should also maintain a halo orbit - about L2. Additionally, relationships are formed between the initial conditions of the telescopes and the hub. These relationships may be used to associate sets of initial conditions with particular orientations of the telescope plane. The accuracy of the analytical solution is verified through various simulations and comparison to numerical integration of the differential equations. The results of the simulations are presented, along with a graphical representation of the relationships between the initial conditions of the telescopes and hub.

Segerman, Alan M.↗

Localization of Ad-Hoc Lunar Constellations in Communication Failure Modes for Distributed Spacecraft Autonomy

As lunar missions increase in complexity inspired by NASA’s Artemis Program, they will require reliable and sufficient capability of the Position, Navigation, and Timing (PNT) system to support their scientific objectives. In addition, NASA's Commercial Lunar Payload Services (CLPS) program initiates the proliferation of public and private exploration partnerships using small satellites from commercial and private organizations, expanding traditionally confined low Earth orbit to be used for missions beyond geosynchronous orbit (Zucherman et al., 2022). Therefore, the Lunar PNT system is also required to provide navigation services compatible with the smaller platforms being sent by the public and private sectors, like CubeSats. However, traditional approaches to deep space missions’ navigation based on ground radio facilities have difficulties in providing sufficient support for the increasing number of users and communication at a distance from the Earth (Kaplev et al., 2022). In particular, the existing Lunar navigation technologies such as weak signal global positioning system (GPS) and deep space network (DSN) are not able to ensure operations of the upcoming small-scale Lunar missions due to their limitations in localization performance as well as capacity aspects. Another way to provide Lunar PNT service is to create a dedicated Lunar global navigation satellite system (GNSS) constellation, like GNSS systems on Earth. Space agencies like NASA, ESA, and JAXA are now developing the lunar communications relay and navigation systems (LCRNS) and Lunar navigation satellite systems (LNSS). In their systems, satellites will be deployed in moon orbits to provide the communication, positioning, navigation, and timing (CPNT) service at the lunar south pole region where the Artemis base camp will be expected (Murata et al., 2022). Meanwhile, common challenges considered in lunar PNT research arise from poor geometry of the terrestrial GNSS satellites when seen from the lunar user, highly perturbed lunar orbits, and limitations in power, size, and cost of the equipment on lunar satellites (Iiyama et al., 2023). It is also not clear if there will be enough Lunar users to support the cost and resources this would require as the Low-cost surface missions may not be able to support the large power, mass, and weight requirements that these navigation solutions entail (Niemoeller et al., 2022). As an alternative, existing Lunar science and exploration assets could be used to create a low-cost, autonomous, ad-hoc, and on-demand mission-centric Lunar PNT swarm capable of providing PNT services to these low-cost lunar missions (Hagenau et al., 2021). Introducing the non-dedicated and ad-hoc Lunar navigation constellation gives a way to provide PNT services on-demand. The non-dedicated swarm assets of Lunar constellations are designed to localize themselves with minimal interaction with Earth by adding cooperative autonomous localization to lunar missions, freeing up valuable bandwidth and ground segment resources. An autonomous localization of Lunar constellations is based on the concept of the decentralized PNT system with a distributed extended Kalman filter (DEKF) approach to state estimation for minimal onboard operating costs. In the distributed data processing algorithm, computation is broken down and assigned to each satellite, resulting in a considerably decreased computational amount while maintaining the accuracy of the orbit ephemeris and clock offsets as the result of centralized data processing (Wen et al., 2019). The DEKF requires spacecraft to perform two-way ranging operations with each other to communicate simultaneously, leveraging neighbor two-way intersatellite link (ISL) measurements such as pseudoranges to, and relative velocities between, visible satellites as sensor values (Frank et al., 2021). The Lunar autonomous PNT simulation (LAPS) demonstrated the feasibility of orbital asset localization among ad-hoc Lunar small-sat constellations based on the DEKF in Hagenau et al. (2021) and evaluated the matching algorithm proposed by Frank et al. (2021) in scheduling position estimation updates. In previous papers, all assets and measurements are assumed to be always available without consideration of the impact of intermittent and permanent communication failure. This study presents localization performance with increasing levels of network degradation for swarm assets and users to demonstrate the robustness of the decentralized Lunar PNT service in more realistic scenarios. Main issues arising from communication failure include spacecraft permanent or transient loss, antenna failures, message delays, etc. We tested four possible reasons for network degradation for 7 days in 21 satellites frozen with an altitude of 5500 km, evenly spaced around 3 circular, 40 inclination orbital planes where each spacecraft has two directional antennas. As anchor nodes with an independent estimate of their position are required in the DEKF approach, two ground nodes in each pole and one node in the gateway were implemented in the simulation. First, the most probable failure scenario involves the loss of a single spacecraft due to solar interference and technical malfunctions of the assets. Losing the availability of a single spacecraft means losing the two-way ISL measurement of the asset in the DEKF update. In order to provide the best possible quality of PNT service with limited time and resources, the distributed Lunar constellations must schedule the communication activities. The scheduler leverages mixed-integer linear programming (MILP) for the coordination and scheduling of the desired “as-needed” localization service (Niemoeller et al., 2022). We assume the scheduler has completely excluded the spacecraft information before the DEKF update in the failure scenario. When a random spacecraft has been turned off at a specific time, the robustness of the autonomous Lunar PNT system is evaluated. The simulation results give an 11.5% degradation in median position accuracy compared to the idealized performance excluding the asset loss. Second, a large number of assets may vanish due to major hardware problems or meteor strikes around the moon. A multiple spacecraft loss can degrade the localization performance very fast by losing the communication ability to do cross-plane measurements and in-plane measurements in a 3-plane constellation. When the matching-based scheduler is aware of ISL availability, we investigate a large number of in-plane and cross-plane asset vanishments both in close proximity and equally spaced throughout the orbital plane. According to the simulations, the loss of in-plane measurements gives 40.2% degradation while cross-plane measurements degrade 50.5% of asset localization performance among available assets. Therefore, it is concluded that cross-plane measurements are more important in improving the position estimation accuracy. Third, spacecraft failure information can be lost due to the internal message delay, resulting in the DEKF update scheduler to solve the matching problem with unavailable assets. The DEKF update cycle is comprised of network setup, communication, and computations where a global broadcast network and a 2-way ISL network setup take 6 minutes in total (Frank et al., 2021). Once the broadcast network successfully transmits and receives information, a random spacecraft may lose its availability right before solving the matching problem. This means the matching solution is no longer optimal, resulting in degradation in the localization performance. A numerical assessment shows the matching-based scheduler with knowing failure holds 11.5% of position accuracy degradation, whereas the scheduler without knowing failure gives 34% degraded localization performance without asset loss. Fourth, a transient loss of a single or multiple spacecraft may occur due to their antenna outages. After losing the two-way ISL availability for a few DEKF update cycles, the availability of spacecraft can easily be recovered as their states have been independently updated using measurements from anchor nodes. It is likely that the longer failure will result in worse localization performance. We have tested the transient failure of a random single asset for 30 min in the simulation, which is losing 3 update cycles in the DEKF system. From the simulation results, the position accuracy has been degraded to 4.84% which is better than the degraded localization performance of 11.5% from the permanent loss scenario among available assets. In conclusion, the autonomous Lunar PNT system based on the DEKF approach shows the ability to maintain resilience and robustness in the possible communication failure scenarios, ensuring that localization accuracy is preserved across various network degradation and outages. Future studies on investigating user localization performance near the South Pole and the broadcast network system will be continued in the following months.

Yeji Kim↗