Concept of Operations Visualization in Support of Ares I Production

Boeing was selected in 2007 to manufacture Ares I Upper Stage and Instrument Unit according to NASA's design which would require the use of the latest manufacturing and integration processes to meet NASA budget and schedule targets. Past production experience has established that the majority of the life cycle cost is established during the initial design process. Concept of Operations (CONOPs) visualizations/simulations help to reduce life cycle cost during the early design stage. Production and operation visualizations can reduce tooling, factory capacity, safety, and build process risks while spreading program support across government, academic, media and public constituencies. The NASA/Boeing production visualization (DELMIA; Digital Enterprise Lean Manufacturing Interactive Application) promotes timely, concurrent and collaborative producibility analysis (Boeing)while supporting Upper Stage Design Cycles (NASA). The DELMIA CONOPs visualization reduced overall Upper Stage production flow time at the manufacturing facility by over 100 man-days to 312.5 man-days and helped to identify technical access issues. The NASA/Boeing Interactive Concept of Operations (ICON) provides interactive access to Ares using real mission parameters, allows users to configure the mission which encourages ownership and identifies areas for improvement, allows mission operations or spacecraft detail to be added as needed, and provides an effective, low coast advocacy, outreach and education tool.

Chilton, James H.↗

Modeling of a Modern Aircraft Through Calibration Techniques

NASA is seeking a new baseline aircraft model to assess the state-of-the-art technology for aircraft noise, emissions, and fuel/energy consumption as an update to a 2005 baseline. The process of modeling engine and airframe models as a system has historically required many iterations at NASA between the airframe and engine models. A new internal process presented in this paper contains a method that simultaneously calibrates an airframe and engine model to known data to create an aircraft system model. The work presented in this paper proposes a new framework in creating new aircraft models for future NASA research. This approach is presented as a general outline applicable to any chosen commercial aircraft. As an applied example, the B737 MAX 8 aircraft is chosen as the integrated engine and airframe model subjected to calibration. Initial results show a close match to available data but further refinement in the process is necessary for this ongoing work.

Thacker, Robert↗

Space-borne computing for the year 2000 and beyond

The influence and utilization of computers in space science investigations greatly enhances the ability to address difficult and complicated questions about the Universe. Space Science is wholly dependent on computers because the data acquired from instruments on the spacecraft are not only complicated in form but also voluminous. Athough a great deal of attention has been paid to develop efficient and powerful computing systems on-ground, research in the area of spaceborne computing is far from satisfactory. On-board processing of data will be important in future planetary missions where telemetry rates constrain the total amount of data which can be returned and decisions may have to be made in real time. Little thought has been given to a dynamic man-machine interface with regard to scientific real-time interactive control of flight experiments. Careful thinking is therefore essential to define appropriate spaceborne computing requirements for the future. It is imperative that powerful multiprocessing systems for on-board processing be experimentally impleneted and evaluated in selected application missions. The presentation addresses key issues and attempts to define the requirements for such processing with some of NASA's future missions in perspective. The resulting architectural and performance issues and possible developments are also addressed.

Iyer, Ravi K.↗

Institutionalizing Lessons Learned

The NASA Integrated Action Team (NIAT) was formed by the NASA Administrator in March 2000. The purpose of this team was to identify the actions that NASA must take to address systemic findings reported in 4 different anomaly investigations. Team membership represented senior managers from all the field centers and NASA Headquarters. NIAT report addressed 165 findings and developed 17 action plans that are described in five themes: people and teams, technology, risk, formulation rigor, and communications. The NIAT actions present a systems solution for strengthening formulation and implementation of programs and improving the environment for their support. NIAT results included: enhancing success by avoiding failures that could have been prevented through good planning and sound practice; ensuring that prudent risks do not compromise safety; and ensuring that mission risks are objectively assessed, appropriately mitigated and consciously accepted by the program team and customers. Definitions of Faster, Better, Cheaper and Success Criteria were also developed and included as part of the NIAT report. As a result of the NIAT report, program and project management process changes were incorporated into NASA's quality system documentation, including NPG 7120.513, "NASA Program and Project Management Processes and Requirements. This paper describes the NIAT results and the resulting updates to NPG 7120.5 that keep this program and project management description a living process.

McBrayer, Robert O.↗

Safety and Mission Assurance: A NASA Perspective

Safety and Mission Assurance (S&MA) consists of the safety, reliability, maintainability, software assurance and quality disciplines, which are applied to reduce the probability of mishaps and ensure mission success. NASA uses a risk management process which requires various organizations to identify, analyze and mitigate/control risks associated with operations and decision making processes.

Higginbotham, Scott Alan↗

Applications of the International Space Station Probabilistic Risk Assessment Model

Recently the International Space Station (ISS) has incorporated more Probabilistic Risk Assessments (PRAs) in the decision making process for significant issues. Future PRAs will have major impact to ISS and future spacecraft development and operations. These PRAs will have their foundation in the current complete ISS PRA model and the current PRA trade studies that are being analyzed as requested by ISS Program stakeholders. ISS PRAs have recently helped in the decision making process for determining reliability requirements for future NASA spacecraft and commercial spacecraft, making crew rescue decisions, as well as making operational requirements for ISS orbital orientation, planning Extravehicular activities (EVAs) and robotic operations. This paper will describe some applications of the ISS PRA model and how they impacted the final decision. This paper will discuss future analysis topics such as life extension, requirements of new commercial vehicles visiting ISS.

Grant, Warren↗

Cavity Environmental Control System Upgrade for NASA's Stratospheric Observatory for Infrared Astronomy

The main goal of this project is to fulfill the need of a controller upgrade for the Cavity Environmental Control System (CECS) on the NASA SOFIA aircraft. The preceding controller had multiple disadvantages including operating in an unpressurized region, incomplete functionality implementation, limited fault and status monitoring capability, and reduced maintainability and reliability. The new controller will go through the NASA design process to fulfill all the requirements of CECS operation including complete functionality of all devices currently installed on the aircraft, added devices to improve fault and health monitoring, and overall improvement in maintainability and reliability.

Al-Hajjeh, Ashraf A.↗

Careers at NASA: A Universe of Options

A brief look at the journey to become a Research Chemical Engineer for NASA; highlighting the education requirements and hiring process, the main aspects of the position, and the myriad of employment options within the organization.

Stephanie L Vivod↗

New mission requirements methodologies for services provided by the Office of Space Communications

The Office of Space Communications, NASA Headquarters, has recently revised its methodology for receiving, accepting and responding to customer requests for use of that office's tracking and communications capabilities. This revision is the result of a process which has become over-burdened by the size of the currently active and proposed missions set, requirements reviews that focus on single missions rather than on mission sets, and negotiations most often not completed early enough to effect needed additions to capacity or capability prior to launch. The requirements-coverage methodology described is more responsive to project/program needs and provides integrated input into the NASA budget process early enough to effect change, and describes the mechanisms and tools in place to insure a value-added process which will benefit both NASA and its customers. Key features of the requirements methodology include the establishment of a mechanism for early identification of and systems trades with new customers, and delegates the review and approval of requirements documents to NASA centers in lieu of Headquarters, thus empowering the system design teams to establish and negotiate the detailed requirements with the user. A Mission Requirements Request (MRR) is introduced to facilitate early customer interaction. The expected result is that the time to achieve an approved set of implementation requirements which meet the customer's needs can be greatly reduced. Finally, by increasing the discipline in requirements management, through the use of base lining procedures, a tighter coupling between customer requirements and the budget is provided. A twice-yearly projection of customer requirements accommodation, designated as the Capacity Projection Plan (CPP), provides customer feedback allowing the entire mission set to be serviced.

Holmes, Dwight P.↗

Maturing Pump Technology for EVA Applications in a Collaborative Environment

The transition from low earth orbit Extravehicular Activity (EVA) for construction and maintenance activities to planetary surface EVA on asteroids, moons, and, ultimately, Mars demands a new spacesuit system. NASA's development of that system has resulted in dramatically different pumping requirements from those in the current spacesuit system. Hamilton Sundstrand, Cascon, and NASA are collaborating to develop and mature a pump that will reliably meet those new requirements in space environments and within the design constraints imposed by spacesuit system integration. That collaboration, which began in the NASA purchase of a pump prototype for test evaluation, is now entering a new phase of development. A second generation pump reflecting the lessons learned in NASA's testing of the original prototype will be developed under Hamilton Sundstrand internal research funding and ultimately tested in an integrated Advanced Portable Life Support System (APLSS) in NASA laboratories at the Johnson Space Center. This partnership is providing benefit to both industry and NASA by supplying a custom component for EVA integrated testing at no cost to the government while providing test data for industry that would otherwise be difficult or impossible to duplicate in industry laboratories. This paper discusses the evolving collaborative process, component requirements and design development based on early NASA test experience, component stand alone test results, and near term plans for integrated testing at JSCs.

Hodgson, Edward↗

Evalution of a DE-Identification Process for Ocular Imaging

Medical privacy of NASA astronauts requires an organized and comprehensive approach when data are being made available outside NASA systems. A combination of factors, including the uniquely small patient population, the extensive medical testing done on these individuals, and the relative cultural popularity of the astronauts puts them at a far greater risk to potential exposure of personal information than the general public. Therefore, care must be taken to ensure that the astronauts' identities are concealed. Magnetic Resonance Imaging (MRI) medical data is a recent source of interest to researchers concerned with the development of Visual Impairment due to Intracranial Pressure (VIIP) in the astronaut population. Each vision MRI scan of an astronaut includes 176 separate sagittal images that are saved as an "image series" for clinical use. In addition to the medical information these image sets provide, they also inherently contain a substantial amount of non-medical personally identifiable information (PII) such as-name, date of birth, and date of exam. We have shown that an image set of this type can be rendered, using free software, to give an accurate representation of the patient's face. This currently restricts NASA from dispensing MRI data to researchers in a deidentified format. Automated software programs, such as the Brain Extraction Tool, are available to researchers who wish to de-identify MRI sagittal brain images by "erasing" identifying characteristics such as the nose and jaw on the image sets. However, this software is not useful to NASA for vision research because it removes the portion of the images around the eye orbits, which is the main area of interest to researchers studying the VIIP syndrome. The Lifetime Surveillance of Astronaut Health program has resolved this issue by developing a protocol to de-identify MRI sagittal brain images using Showcase Premier, a DICOM (Digital Imaging and Communications in Medicine) software package. The software allows manual editing of one image from a patient's image set to be automatically applied to the entire image series. This new approach would allow a new level of access to untapped medical imaging data relating to VIIP that can be utilized by researchers while protecting the privacy of the astronauts. In the next step toward finalizing this technique, NASA clinical radiology consultants will test the images to verify removal of all metadata and PII.

LaPelusa, Michael B.↗

NASA Expendable Launch Vehicle (ELV) Payload Safety Review Process

Issues addressed by this program: (1) Complicated roles and responsibilities associated with multi-partner projects (2) Working relationships and communications between all organizations involved in the payload safety process (3) Consistent interpretation and implementation of safety requirements from one project to the rest (4) Consistent implementation of the Tailoring Process (5) Clearly defined NASA decision-making-authority (6) Bring Agency-wide perspective to each ElV payload project. Current process requires a Payload Safety Working Group (PSWG) for eac payload with representatives from all involved organizations.

Starbus, Calvert S.↗

Phase 111A Crew Interface Specifications Development for Inflight Maintenance and Stowage Functions

This report presents the findings and data products developed during the Phase IIIA Crew Interface Specification Study for Inflight Maintenance and Stowage Functions, performed by General Electric for the NASA, Johnson Space Center with a set of documentation that can be used as definitive guidelines to improve the present process of defining, controlling and managing flight crew interface requirements that are related to inflight maintenance (including assembly and servicing) and stowage functions. During the Phase IIIA contract period, the following data products were developed: 1) Projected NASA Crew Procedures/Flight Data File Development Process. 2) Inflight Maintenance Management Process Description. 3) Preliminary Draft, General Specification, Inflight Maintenance Management Requirements. 4) Inflight Maintenance Operational Process Description. 5) Preliminary Draft, General Specification, Inflight Maintenance Task and Support Requirements Analysis. 6) Suggested IFM Data Processing Reports for Logistics Management The above Inflight Maintenance data products have been developed during the Phase IIIA study after review of Space Shuttle Program Documentation, including the Level II Integrated Logistics Requirements and other DOD and NASA data relative to Payloads Accommodations and Satellite On-Orbit Servicing. These Inflight Maintenance data products were developed to be in consonance with Space Shuttle Program technical and management requirements.

Carl, John G.↗

ISS Logistics Hardware Disposition and Metrics Validation

I was assigned to the Logistics Division of the International Space Station (ISS)/Spacecraft Processing Directorate. The Division consists of eight NASA engineers and specialists that oversee the logistics portion of the Checkout, Assembly, and Payload Processing Services (CAPPS) contract. Boeing, their sub-contractors and the Boeing Prime contract out of Johnson Space Center, provide the Integrated Logistics Support for the ISS activities at Kennedy Space Center. Essentially they ensure that spares are available to support flight hardware processing and the associated ground support equipment (GSE). Boeing maintains a Depot for electrical, mechanical and structural modifications and/or repair capability as required. My assigned task was to learn project management techniques utilized by NASA and its' contractors to provide an efficient and effective logistics support infrastructure to the ISS program. Within the Space Station Processing Facility (SSPF) I was exposed to Logistics support components, such as, the NASA Spacecraft Services Depot (NSSD) capabilities, Mission Processing tools, techniques and Warehouse support issues, required for integrating Space Station elements at the Kennedy Space Center. I also supported the identification of near-term ISS Hardware and Ground Support Equipment (GSE) candidates for excessing/disposition prior to October 2010; and the validation of several Logistics Metrics used by the contractor to measure logistics support effectiveness.

Rogers, Toneka R.↗

Recycle Requirements for NASA's 30 cm Xenon Ion Thruster

Electrical breakdowns have been observed during ion thruster operation. These breakdowns, or arcs, can be caused by several conditions. In flight systems, the power processing unit must be designed to handle these faults autonomously. This has a strong impact on power processor requirements and must be understood fully for the power processing unit being designed for the NASA Solar Electric Propulsion Technology Application Readiness program. In this study, fault conditions were investigated using a NASA 30 cm ion thruster and a power console. Power processing unit output specifications were defined based on the breakdown phenomena identified and characterized.

Pinero, Luis R.↗

Modeling and Analysis of Chill and Fill Processes for the EDU Tank

NASA's future missions may require long-term storage and transfer of cryogenic propellants. The Engineering Development Unit (EDU), a NASA in-house effort supported by both Marshall Space Flight Center (MSFC) and Glenn Research Center (GRC), is a Cryogenic Fluid Management (CFM) test article that primarily serves as a manufacturing pathfinder and a risk reduction task for a future CFM payload. The EDU test article, comprises a flight like tank, internal components, insulation, and attachment struts. The EDU is designed to perform integrated passive thermal control performance testing with liquid hydrogen in a space-like vacuum environment. A series of tests, with liquid hydrogen as a testing fluid, was conducted at Test Stand 300 at MSFC during summer of 2014. The objective of this effort was to develop a thermal/fluid model for evaluating the thermodynamic behavior of the EDU tank during the chill and fill processes. Generalized Fluid System Simulation Program (GFSSP), an MSFC in-house general-purpose computer program for flow network analysis, was utilized to model and simulate the chill and fill portion of the testing. The model contained the liquid hydrogen supply source, feed system, EDU tank, and vent system. The modeling description and comparison of model predictions with the test data will be presented in the final paper.

Hedayat, A.↗

Orbital Space Plane Program Status

The Orbital Space Plane Program is an integral part of NASA's Integrated Space Transportation Program (ISTP). The ISTP consists of three major programs: Space Shuttle, Orbital Space Plane, and Next Generation Launch Technology. The Orbital Space Plane (OSP) Program will develop a new Crew Transfer Vehicle (CTV) with multipurpose utility for the Agency. The CTV will complement and back up the Space Shuttle by taking crews to and from the International Space Station (ISS), as well as enable a transition path to future reusable launch vehicle systems. In the CTV development cycle, around 2010 it will be used as a Crew Return Vehicle (CRV). The OSP will be launched on an Evolved Expendable Launch Vehicle (EELV). NASA is in the process of establishing Level 1 Requirements and initiating concept studies. Ongoing flight demonstrators will continue, while new flight demonstrator projects will begin. The OSP Program contains two elements: (1) Technology and Demonstrations, and (2) Design, Development, and Production. The OSP Design, Development, and Production element will enter the Formulation Phase in FY03. Per NASA Procedures and Guidelines 7120.5B, the Formulation Phase will be utilized to establish the Program schedule and budget plans. Current budget planning is based on Phase A concept studies being conducted in FY03 and FY04, preliminary design activities conducted in FY04 and FY05, and a Preliminary Design Review in FY05. An OSP full-scale development decision will be made in FY05. At that point, a conclusion to proceed will result in the OSP Program transitioning from the Formulation Phase to the Development Phase.

Dumbacher, Daniel L.↗