Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

STS-107 Mission after the Mission: Recovery of Data from the Debris of Columbia

STS-107 was a 16-day, dedicated research mission that included over 80 experiments, spanning many disciplines including biology, physics, chemistry, and earth sciences, including many student experiments. The mission was considered a resounding success until February 1, 2003, when tragedy struck the Columbia and her crew as she re-entered the atmosphere over Texas. During the mission, approximately one third of the overall data was obtained but much more was stored in the flight hardware systems. This paper documents a new set of STS-107 experiment objectives, a "mission after the mission," in which several experiment teams attempted, and, in many cases succeeded, to recover data from their flight hardware, now debris. A description of the data recovery efforts is included for these five experiment facilities: Combustion Module-2, Critical Viscosity of Xenon-2, Commercial Instrumentation Technology Associates Biomedical Experiments-2, Biological Research in Canisters-14, and Commercial Protein Crystal Growth.

Over, A. P.

Visualization of Space-Time Ambiguities to be Explored by the NASA GEC Mission with a Critique of Synthesized Measurements for Different GEC Mission Scenarios

The objective of this grant was to study how a multi-satellite mission configuration can be optimized for maximum exploratory scientific return. NASA's Solar Terrestrial Probe (STP) concept mission Geospace Electrodynamic Connections (GEC) was the target mission for this pilot study. GEC prime mission characteristics were two fold: (i) a series of three satellites in the same orbit plane with differential spacing, and (ii) a deep-dipping phase in which these satellites could dip to altitudes as low as 130 km to explore the lower ionosphere and thermosphere. Each satellite would carry a full suite of plasma and neutral in-situ sensors and have the same dipping capability. This latter aspect would be envisaged as a series, up to 10, of deep-dipping campaigns, each lasting 10 days during which the perigee would be lowered to the desired probing depth. The challenge in optimization is to establish the scientific problems that can best be addressed by varying or selecting satellite spacing during a two-year mission while also interspersing, in this two year time frame, the deep-dipping campaigns. Although this sounds like a straightforward trade-off situation, it is complicated by the orbit precession in local time, the location of perigee, and that even the dipping campaigns will have preferred satellite spacing requirements.

Sojka, Jan J.

The Mission Transcript Collection: U.S. Human Spaceflight Missions from Mercury Redstone 3 to Apollo 17

Aboard every U.S. piloted spacecraft, from Mercury through Apollo, NASA installed tape recorders that captured nearly every word spoken by the astronauts during their history-making flights into space. For the first time ever, NASA has digitally scanned all of the transcripts made from both the onboard tapes and those tape recordings made on the ground from the air-to-ground transmissions and placed them on this two CD-ROM set. Gathered in this special collection are 80 transcripts totaling nearly 45,000 pages of text that cover every US human spaceflight from the first human Mercury mission through the last lunar landing flight of Apollo 17. Users of this CD will note that the quantity and type of transcripts made for each mission vary. For example, the Mercury flights each had one transcript whereas the Gemini missions produced several. Starting with the Gemini flights, NASA produced a Public Affairs Office (PAO) commentary version, as well as at least one "technical" air-to-ground transcript version, per mission. Most of the Apollo missions produced four transcripts per flight. These included the onboard voice data recorder transcripts made from the Data Storage Equipment (DSE) on the Command Module (CM), and the Data Storage Electronics Assembly (DSEA) onboard the Lunar Module (LM), in addition to the PAO commentary and air-to-ground technical transcripts. The CD set includes an index listing each transcript file by name. Some of the transcripts include a detailed explanation of their contents and how they were made. Also included in this collection is a listing of all the original air-to-ground audiotapes housed in NASA's archives from which many of these transcripts were made. We hope you find this collection of transcripts interesting and useful.

Source record

The NASA Soil Moisture Active Passive (SMAP) Mission - Algorithm and Cal/Val Activities and Synergies with SMOS and Other L-Band Missions

NASA's Soil Moisture Active Passive (SMAP) mission, planned for launch in late 2014, has as its key measurement objective the frequent, global mapping of near-surface soil moisture and its freeze-thaw state. SMAP soil moisture and freeze/thaw measurements at 10 km and 3 km resolutions respectively, would enable significantly improved estimates of water, energy and carbon transfers between the land and atmosphere. Soil moisture control of these fluxes is a key factor in the performance of atmospheric models used for weather forecasts and climate projections Soil moisture measurements are also of great importance in assessing floods and for monitoring drought. In addition, observations of soil moisture and freeze/thaw timing over the boreal latitudes can help reduce uncertainties in quantifying the global carbon balance. The SMAP measurement concept utilizes an L-band radar and radiometer sharing a rotating 6-meter mesh reflector antenna. The SMAP radiometer and radar flight hardware and ground processing designs are incorporating approaches to identify and mitigate potential terrestrial radio frequency interference (RFI). The radar and radiometer instruments are planned to operate in a 680 km polar orbit, viewing the surface at a constant 40-degree incidence angle with a 1000-km swath width, providing 3-day global coverage. Data from the instruments would yield global maps of soil moisture and freeze/thaw state to be provided at 10 km and 3 km resolutions respectively, every two to three days. Plans are to provide also a radiometer-only soil moisture product at 40-km spatial resolution. This product and the underlying brightness temperatures have characteristics similar to those provided by the Soil Moisture and Ocean Salinity (SMOS) mission. As a result, there are unique opportunities for common data product development and continuity between the two missions. SMAP also has commonalities with other satellite missions having L-band radiometer and/or radar sensors applicable to soil moisture measurement, such as Aquarius, SAO COM, and ALOS-2. The algorithms and data products for SMAP are being developed in the SMAP Science Data System (SDS) Testbed. The algorithms are developed and evaluated in the SDS Testbed using simulated SMAP observations as well as observational data from current airborne and spaceborne L-band sensors including SMOS. The SMAP project is developing a Calibration and Validation (Cal/Val) Plan that is designed to support algorithm development (pre-launch) and data product validation (post-launch). A key component of the Cal/Val Plan is the identification, characterization, and instrumentation of sites that can be used to calibrate and validate the sensor data (Level I) and derived geophysical products (Level 2 and higher). In this presentation we report on the development status of the SMAP data product algorithms, and the planning and implementation of the SMAP Cal/Val program. Several components of the SMAP algorithm development and Cal/Val plans have commonality with those of SMOS, and for this reason there are shared activities and resources that can be utilized between the missions, including in situ networks, ancillary data sets, and long-term monitoring sites.

Njoku, Eni

Overview of a Preliminary Destination Mission Concept for a Human Orbital Mission to the Martial Moons

The National Aeronautics and Space Administration s Human Spaceflight Architecture Team (HAT) has been developing a preliminary Destination Mission Concept (DMC) to assess how a human orbital mission to one or both of the Martian moons, Phobos and Deimos, might be conducted as a follow-on to a human mission to a near-Earth asteroid (NEA) and as a possible preliminary step prior to a human landing on Mars. The HAT Mars-Phobos-Deimos (MPD) mission also permits the teleoperation of robotic systems by the crew while in the Mars system. The DMC development activity provides an initial effort to identify the science and exploration objectives and investigate the capabilities and operations concepts required for a human orbital mission to the Mars system. In addition, the MPD Team identified potential synergistic opportunities via prior exploration of other destinations currently under consideration.

Mazanek, D. D.

Reducing the Risk and Improving Mission Success for NASA's Human Mission to a Near-Earth Asteroid: How Many Robotic Surveyors?

NASA's recent attention and interest in sending a human mission to land on a Near-Earth asteroid raises the question of need for a robotic surveyor. This paper describes a Bayesian approach for comparing the productivity and cost-risk tradeoffs of sending (versus not sending) one or more robotic surveyor missions prior to a human mission to land on an asteroid. The probability of finding an asteroid suitable for landing was derived from an analysis of more than 1200 asteroids in order to define a quantitative estimate of suitability. The low cost of the surveyors relative to the human mission underlined the multi-surveyor strategy as relatively inexpensive insurance against the risks of encountering an unsuitable asteroid for landing on arrival by a human mission.

decision analysis

Improving the Operations of the Earth Observing One Mission via Automated Mission Planning

We describe the modeling and reasoning about operations constraints in an automated mission planning system for an earth observing satellite - EO-1. We first discuss the large number of elements that can be naturally represented in an expressive planning and scheduling framework. We then describe a number of constraints that challenge the current state of the art in automated planning systems and discuss how we modeled these constraints as well as discuss tradeoffs in representation versus efficiency. Finally we describe the challenges in efficiently generating operations plans for this mission. These discussions involve lessons learned from an operations model that has been in use since Fall 2004 (called R4) as well as a newer more accurate operations model operational since June 2009 (called R5). We present analysis of the R5 software documenting a significant (greater than 50%) increase in the number of weekly observations scheduled by the EO-1 mission. We also show that the R5 mission planning system produces schedules within 15% of an upper bound on optimal schedules. This operational enhancement has created value of millions of dollars US over the projected remaining lifetime of the EO-1 mission.

Chien, Steve A.

Human and Robotic Exploration Missions to Phobos Prior to Crewed Mars Surface Missions

Phobos is a scientifically significant destination that would facilitate the development and operation of the human Mars transportation infrastructure, unmanned cargo delivery systems and other Mars surface systems. In addition to developing systems relevant to Mars surface missions, Phobos offers engineering, operational, and public engagement opportunities that could enhance subsequent Mars surface operations. These opportunities include the use of low latency teleoperations to control Mars surface assets associated with exploration science, human landing‐site selection and infrastructure development which may include in situ resource utilization (ISRU) to provide liquid oxygen for the Mars Ascent Vehicle (MAV). A human mission to Mars' moons would be preceded by a cargo predeploy of a surface habitat and a pressurized excursion vehicle (PEV) to Mars orbit. Once in Mars orbit, the habitat and PEV would spiral to Phobos using solar electric propulsion based systems, with the habitat descending to the surface and the PEV remaining in orbit. When a crewed mission is launched to Phobos, it would include the remaining systems to support the crew during the Earth‐Mars transit and to reach Phobos after insertion in to Mars orbit. The crew would taxi from Mars orbit to Phobos to join with the predeployed systems in a spacecraft that is based on a MAV, dock with and transfer to the PEV in Phobos orbit, and descend in the PEV to the surface habitat. A static Phobos surface habitat was chosen as a baseline architecture, in combination with the PEV that was used to descend from orbit as the main exploration vehicle. The habitat would, however, have limited capability to relocate on the surface to shorten excursion distances required by the PEV during exploration and to provide rescue capability should the PEV become disabled. To supplement exploration capabilities of the PEV, the surface habitat would utilize deployable EVA support structures that allow astronauts to work from portable foot restraints or body restrain tethers in the vicinity of the habitat. Prototype structures were tested as part of NEEMO 20. PEVs would contain closed loop guidance and provide life support and consumables for two crew for 2 weeks plus reserves. The PEV has a cabin that uses the exploration atmosphere of 8.2 psi with 34% oxygen, enabling use of suit ports for rapid EVA with minimal oxygen prebreathe as well as dust control by keeping the suits outside the pressurized volume. When equipped with outriggers and control moment gyros, the PEV enables EVA tasks of up to 8 pounds of force application without the need to anchor. Tasks with higher force requirements can be performed with PEV propulsion providing the necessary thrust to react forces. Exploration of Phobos builds heavily from the developments of the cis‐lunar proving ground, and significantly reduces Mars surface risk by facilitating the development and testing of habitats, MAVs, and pressurized rover cabins that are all Mars surface forward. A robotic precursor mission to Phobos and Deimos is also under consideration and would need to launch in 2022 to support a 2031 human Phobos mission.

Gernhardt, Michael L.

The Impact of Mission Duration on a Mars Orbital Mission

Performance alone is insufficient to assess the total impact of changing mission parameters on a space mission concept, architecture, or campaign; the benefit, cost, and risk must also be understood. This paper examines the impact to benefit, cost, and risk of changing the total mission duration of a human Mars orbital mission. The changes in the sizing of the crew habitat, including consumables and spares, was assessed as a function of duration, including trades of different life support strategies; this was used to assess the impact on transportation system requirements. The impact to benefit is minimal, while the impact on cost is dominated by the increases in transportation costs to achieve shorter total durations. The risk is expected to be reduced by decreasing total mission duration; however, large uncertainty exists around the magnitude of that reduction.

Arney, Dale

A Proposed Approach to Studying Urban Air Mobility Missions Including an Initial Exploration of Mission Requirements

Urban air mobility (UAM) is an emerging aviation market that seeks to revolutionize mobility around metropolitan areas via a safe, efficient, and accessible on-demand air transportation system for passengers and cargo. In this paper we describe our three-pronged approach to studying passenger-carrying UAM missions, and we detail the first phase of this approach, which consists of defining an initial set of requirements for multiple exemplar UAM missions. The development of these mission requirements provides justifiable assumptions that feed the second phase of the approach, which is performing aircraft conceptual design studies. Vehicle design is not included in this paper, but the work described here will define sizing missions for follow-on design and sizing studies. The aircraft that emerge from the design studies can then feed the third phase of our UAM analysis approach, which involves simulating an entire UAM network over a metropolitan area to study transportation-system level characteristics. Iteration between each of the three phases of the UAM analysis approach will be necessary to propagate lessons learned as our research progresses and as the UAM community coalesces on a more unified vision for UAM. Therefore, we anticipate that the mission requirements set forth in this paper will be modified over time as the urban air mobility concept matures.

Patterson, Michael D.

Final Mission and Navigation Design for the 2016 Mars InSight Mission

NASA’s Interior Exploration using Seismic Investigations, Geodesy, and Heat Transport (InSight) mission was scheduled to launch the next lander to Mars in March 2016 arriving to the Red Planet in the fall. Derived from the Phoenix mission which successfully landed on Mars in May 2008, the InSight Entry, Descent, and Landing system will place a lander in the Elysium Planitia region. This paper specifies the mission and navigation requirements set by the Project and how the final mission and navigation design satisfies those requirements. Background information affecting navigation including spacecraft modeling and the physical environment which influences the spacecraft motion are included. (Note from the author: The InSight launch in 2016 was suspended due to critical issues with the Seismic Experiment for Interior Structure (SEIS) instrument that could not be fixed prior to the planned launch period. This paper represents the state of the design for the 2016 mission. No attempt has been made to reflect the latest developments).

Abilleira, Fernando

How Do You Go From a Concept Idea to a NASA Selected Mission? Formulating the Psyche Discovery Mission with JPL's Concurrent Engineering Teams

JPL’s Office of Formulation provides continuity of support and access to domain subject matter experts, as Principal Investigators mature their mission concepts from “cocktail napkin” ideas to Preliminary Design Reviews [1]. Using NASA’s Psyche mission as a case study, we will describe JPL’s concurrent engineering ATeam and Team X support to the Psyche competed concept study team in the areas of 1) Science Feasibility, 2) Trade Space Exploration, 3) Spacecraft Point Design and Cost Estimate, 4) Science, Technical, Management, and Cost Review, and 5) Strategy and Communication Development. NASA’s Psyche Discovery class mission started as a grassroots idea in our A-Team facility, and in less than five years was selected as a mission under NASA’s Discovery Program. While Psyche had a dedicated concept development team [2], they utilized JPL’s concurrent engineering teams, methods, analysis tools, and experts throughout their mission concept lifecycle.

Ziemer, John

Trajectory Design and Early Mission Operations for the Lunar IceCube Mission

The Lunar IceCube (LIC) mission, a Next Space Technologies for Exploration Partnerships (NSTEP) program selection, was launched as a rideshare onboard Artemis-I on November 16th 2022, and deployed into a high energy lunar flyby trajectory. The final destination of the mission was a polar elliptical lunar orbit from which it could conduct spectroscopy observations of the lunar surface; however, a near rectilinear halo orbit (NRHO) was planned to be used as a staging orbit that divided the lunar transfer and low-thrust spiral phases of the mission. This paper presents the process used to design the LIC transfer trajectory from the high-energy deployment state to a 9:2 synodic resonance NRHO. Additional analyses performed, to assess the critical deployment to lunar flyby phase of the trajectory and to generate recovery trajectories following a loss of contact with the spacecraft, are described as well. Lessons learned from working on the LIC mission are presented to inform the design of similar future CubeSat missions.

Robert E Pritchett

NASA analysis of space mission options for the 2025 planetary defense conference hypothetical asteroid impact threat scenario

The 2025 Planetary Defense Conference (PDC) hypothetical asteroid impact threat exercise is being conducted in coordination with the United Nations-endorsed Space Mission Planning Advisory Group (SMPAG), exercising SMPAG's processes for assessing space mission options and communicating to decision makers. Here, in this paper, we describe the work performed by our NASA-led team and present the results we contributed to the SMPAG effort for the exercise. Our NASA-led team assessed mission options for asteroid reconnaissance (flyby and rendezvous), deflection, and robust disruption using several viable techniques: kinetic impactors, ion beam deflection, and nuclear explosive devices. Our simulations and analyses considered how much change-in-velocity an asteroid can tolerate before fragmentation onset, and we worked towards establishing requirements for robustly disrupting an asteroid. Heuristics informed by the simulation results are incorporated into optimization of deflection and disruption mission campaign options. Finally, we make some observations about useful generalizations from these results with potential applicability to any planetary defense scenario.

Asteroid deflection

Early Mission Maneuver Operations for the Deep Space Climate Observatory Sun-Earth L1 Libration Point Mission

The Deep Space Climate Observatory mission launched on February 11, 2015, and inserted onto a transfer trajectory toward a Lissajous orbit around the Sun-Earth L1 libration point. This paper presents an overview of the baseline transfer orbit and early mission maneuver operations leading up to the start of nominal science orbit operations. In particular, the analysis and performance of the spacecraft insertion, mid-course correction maneuvers, and the deep-space Lissajous orbit insertion maneuvers are discussed, com-paring the baseline orbit with actual mission results and highlighting mission and operations constraints..

OPERATIONS

Overview of the Mission Design Reference Trajectory for NASA's Asteroid Redirect Robotic Mission

The National Aeronautics and Space Administration's (NASA's) recently cancelled Asteroid Redirect Mission was proposed to rendezvous with and characterize a 100 m plus class near-Earth asteroid and provide the capability to capture and retrieve a boulder off of the surface of the asteroid and bring the asteroidal material back to cislunar space. Leveraging the best of NASA's science, technology, and human exploration efforts, this mission was originally conceived to support observation campaigns, advanced solar electric propulsion, and NASA's Space Launch System heavy-lift rocket and Orion crew vehicle. The asteroid characterization and capture portion of ARM was referred to as the Asteroid Redirect Robotic Mission (ARRM) and was focused on the robotic capture and then redirection of an asteroidal boulder mass from the reference target, asteroid 2008 EV5, into an orbit near the Moon, referred to as a Near Rectilinear Halo Orbit where astronauts would visit and study it. The purpose of this paper is to document the final reference trajectory of ARRM and the challenges and unique methods employed in the trajectory design of the mission.

low thrust

A study of system requirements for Phobos/Deimos missions. Volume 4: Phase 3 results, combined missions to Mars and its satellites

Combined missions to Mars and Phobos/Deimos were considered in relation to large scientific returns at a low total cost. A matrix of all feasible major combined mission concepts was compiled. The most promising approach was selected from which a nominal mission profile was developed. A systems analysis was performed to trade off performance, configuration, and cost characteristics of candidate mission concepts. Configuration and subsystem optimization analysis were then conducted from which a baseline and an alternate program were selected. Program schedules and cost estimates were prepared for the recommended and alternate program.

Source record