Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mission Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

A Generalized Timeline Representation, Services, and Interface for Automating Space Mission Operations

Most use a timeline based representation for operations modeling. Most model a core set of state, resource types. Most provide similar capabilities on this modeling to enable (semi) automated schedule generation. In this paper we explore the commonality of : representation and services for these timelines. These commonalities offer potential to be harmonized to enable interoperability, re-use.

timeline-based systems↗

Development of the Spartan 101 navigation and pointing timeline

This paper presents the techniques and analyses that were used to construct the Spartan 101 mission pointing timeline for the Space Shuttle Orbiter-detached portion of its flight. This covers the design process that had to transform requirements and constraints originating from the experimenter, the Space Transportation System, and the payload hardware design into a workable set of pointing instructions sequenced to mission events. The paper will discuss the technical approach used for initial attitude acquisition, determining target visibility, observation scheduling, and calculation of vehicle maneuvers.

Lambros, S. D.↗

The NEEMO Project: A Report on how NASA Utilizes the "Aquarius" Undersea Habitat as an Analog for Long-Duration Space Flight

NEEMO is the NASA Extreme Environment Mission Operations, a cooperative project between NASA and the National Oceanic and Atmospheric Administration (NOAA). NEEMO was created and is managed by the Mission Operations Directorate at the Johnson Space Center in Houston, Texas. On the NOAA side, the National Undersea Research Center (NURC) in Key Largo, FL, with the help of the University of North Carolina at Wilmington, manages and operates the Aquarius Program. NEEMO was developed by astronaut training specialists to utilize an undersea research habitat as a multi-objective mission analog for long-duration space flight. Each mission was designed to expose astronauts to extreme environments for training purposes and to research crew behavior, habitability, and space analog life sciences. All of this was done much in the model of a space mission utilizing specific crew procedures, mission rules and timelines. Objectives of the missions were very diverse and contained many of the typical space mission type activities such as EV As (also known as extra vehicular activities), in-habitat science and research, and educational, public outreach, and media events. Five missions, dubbed NEEMO 1-5, were conducted between October 2001 and July 2003, the longest of which (NEEMO 5) lasted 14 days.

Reagan, Marc↗

System Validation on the Europa Clipper mission in Early Implementation Phase

NASA’s next flag-ship mission - Europa Clipper, will embark on a journey to Jupiter’s icy moon Europa in 2024 to assess its environment and habitability with a highly capable spacecraft. Post Jupiter-Orbit-Insertion, the spacecraft will be commanded to perform intricate, yet meticulously planned Europa flybys to perform science investigations using a suite of instruments, while withstanding Jupiter’s harsh radiation environment. The success of this mission is dependent on a well-coordinated project and its elements such as the flight hardware and software, the ground support and mission operations teams, procedures and other cross-cutting elements. The Europa Clipper project needs to ensure that these elements are realized at a reasonable confidence level prior to launch and other mission critical events. System Validation test and analysis activities exercise and confirm the integrity of the system of all project elements in the expected flight environment with reasonable stressing conditions. These activities go beyond system design requirements verification and are driven by validation objectives that describe the end-to-end functional and operational capabilities required during nominal and off-nominal flight-like scenarios and critical events. The challenges associated with validating that the Europa Clipper project as a whole can function and perform correctly to meet the intended mission objectives with the as-delivered capabilities of all of its elements are daunting. This paper discusses the systematic methodology established in the early implementation phase of the Europa Clipper project for developing System Validation activities and their validation objectives, and addressing any validation-related challenges on the project. Approaches include decomposition of mission objectives using activity timelines in the Mission Design plan for developing nominal scenarios, use of fault trees for exploring off-nominal cases and system boundaries, and use of Model-based Systems Engineering (MBSE) tools for planning and prioritizing these activities.

Wang, Xu↗

Development of the Space Operations Incident Reporting Tool (SOIRT)

The space operations incident reporting tool (SOIRT) is an instrument used to record information about an anomaly occurring during flight which may have been due to insufficient and/or inappropriate application of human factors knowledge. We originally developed the SOIRT form after researching other incident reporting systems of this type. We modified the form after performing several in-house reviews and a pilot test to access usability. Finally, crew members from Space Shuttle flights participated in a usability test of the tool after their missions. Since the National Aeronautics and Space Administration (NASA) currently has no system for continuous collection of this type of information, the SOIRT was developed to report issues such as reach envelope constraints, control operation difficulties, and vision impairments. However, if the SOIRT were to become a formal NASA process, information from crew members could be collected in a database and made available to individuals responsible for improving in-flight safety and productivity. Potential benefits include documentation to justify the redesign or development of new equipment/systems, provide the mission planners with a method for identifying past incidents, justify the development of timelines and mission scenarios, and require the creation of more appropriate work/rest cycles.

Minton, Jacquie↗

NASA's Lunar Polar Ice Prospector, RESOLVE: Mission Rehearsal in Apollo Valley

After the completion of the Apollo Program, space agencies didn't visit the moon for many years. But then in the 90's, the Clementine and Lunar Prospector missions returned and showed evidence of water ice at the poles. Then in 2009 the Lunar Crater Observation and Sensing Satellite indisputably showed that the Cabeus crater contained water ice and other useful volatiles. Furthermore, instruments aboard the Lunar Reconnaissance Orbiter (LRO) show evidence that the water ice may also be present in areas that receive several days of continuous sunlight each month. However, before we can factor this resource into our mission designs, we must understand the distribution and quantity of ice or other volatiles at the poles and whether it can be reasonably harvested for use as propellant or mission consumables. NASA, in partnership with the Canadian Space Agency (CSA), has been developing a payload to answer these questions. The payload is named RESOLVE. RESOLVE is on a development path that will deliver a tested flight design by the end of 2014. The team has developed a Design Reference Mission using LRO data that has RESOLVE landing near Cabeus Crater in May of2016. One of the toughest obstacles for RESOLVE's solar powered mission is its tight timeline. RESOLVE must be able to complete its objectives in the 5-7 days of available sunlight. The RESOLVE team must be able to work around obstacles to the mission timeline in real time. They can't afford to take a day off to replan as other planetary missions have done. To insure that this mission can be executed as planned, a prototype version of RESOLVE was developed this year and tested at a lunar analog site on Hawaii, known as Apollo Valley, which was once used to train the Apollo astronauts. The RESOLVE team planned the mission with the same type of orbital imagery that would be available from LRO. The simulation team prepositioned a Lander in Apollo Valley with RESOLVE on top mounted on its CSA rover. Then the mission simulation began as the operations team's consoles came alive with data and images. They executed the mission just like the real mission with lunar communications delays and limited bandwidth and a realistic remote mission control room. This paper will describe the RESOLVE payload in detail and describe the results of the mission simulation in Hawaii.

Larson, William E.↗

Human Mars Surface Mission Surface Power Impacts on Timeline and Traverse Capabilities

The National Aeronautics and Aerospace Administration’s (NASA) Mars Architecture Team (MAT) developed a concept for power management operations to support a thirty-day, minimal infrastructure Mars surface mission. The surface elements in this minimal surface mission concept include three landers as platforms for surface operations, a crewed Mars ascent vehicle (MAV), an unpressurized rover, and a pressurized rover where the crew will live for the duration of the thirty-day mission. In this analysis the power system is a ten kilowatt fission power system, which has been selected for its resiliency to dust storms, and will provide power for all aspects of the surface mission including thermal management of propellant and electronic systems, communications, and battery recharge of mobile surface assets. Developing a power management plan with the consideration of the various elements and mission phases helps define the traverse and exploration capabilities for the crew in the pressurized rover. Also, considerations need to be made for the different power requirements for each phase of the surface mission including arrival, offload, surface exploration, launch preparation, and departure. The described analysis aims to achieve a balance of maintaining power to critical systems while enabling desired traverse and exploration range in the pressurized rover. Additionally, a few enhancing technologies were explored that could expand the power capability if the additional capacity is necessary in the future. This study is used as a baseline to understand the constraints on all aspects of the surface mission for a minimal surface infrastructure human Mars campaign if a ten-kilowatt fission surface power system is available on the surface.

Michael B. Chappell↗

Human Mars Mission Surface Power Impacts on Timeline and Traverse Capabilities

The National Aeronautics and Aerospace Administration’s (NASA) Mars Architecture Team (MAT) developed a concept for power management operations to support a thirty-day, minimal infrastructure Mars surface mission. The surface elements in this minimal surface mission concept include three landers as platforms for surface operations, a crewed Mars ascent vehicle (MAV), an unpressurized rover, and a pressurized rover where the crew will live for the duration of the thirty-day mission. In this analysis the power system is a ten kilowatt fission power system, which has been selected for its resiliency to dust storms, and will provide power for all aspects of the surface mission including thermal management of propellant and electronic systems, communications, and battery recharge of mobile surface assets. Developing a power management plan with the consideration of the various elements and mission phases helps define the traverse and exploration capabilities for the crew in the pressurized rover. Also, considerations need to be made for the different power requirements for each phase of the surface mission including arrival, offload, surface exploration, launch preparation, and departure. The described analysis aims to achieve a balance of maintaining power to critical systems while enabling desired traverse and exploration range in the pressurized rover. Additionally, a few enhancing technologies were explored that could expand the power capability if the additional capacity is necessary in the future. This study is used as a baseline to understand the constraints on all aspects of the surface mission for a minimal surface infrastructure human Mars campaign if a ten-kilowatt fission surface power system is available on the surface.

Michael B Chappell↗

Human Mars Mission Performance Crew Taxi Profile

Using the results from Integrated Mission Program (IMP), a simulation language and code used to model present and future Earth Moon, or Mars missions, this report presents six different case studies of a manned Mars mission. The mission profiles, timelines, propellant requirements, feasibility and perturbation analysis is presented for two aborted, two delayed rendezvous, and two normal rendezvous cases for a future Mars mission.

Duaro, Vince A.↗

Demand access communications for TDRSS users

The Tracking and Data Relay Satellite System (TDRSS) has long been used to provide reliable low and high-data rate relay services between user spacecraft in Earth orbit and the ground. To date, these TDRSS services have been implemented via prior scheduling based upon estimates of user needs and mission event timelines. While this approach may be necessary for large users that require greater amounts of TDRSS resources, TDRSS can potentially offer the planned community of smaller science missions (e.g., the small explorer missions), and other emerging users, the unique opportunity for services on demand. In particular, innovative application of the existing TDRSS Multiple Access (MA) subsystem, with its phased array antenna, could be used to implement true demand access services without modification to either the TDRSS satellites or the user transponder, thereby introducing operational and performance benefits to both the user community and the Space Network. In this paper, candidate implementations of demand access service via the TDRSS MA subsystem are examined in detail. Both forward and return link services are addressed and a combination of qualitative and quantitative assessments are provided. The paper also identifies further areas for investigation in this ongoing activity that is being conducted by GSFC/Code 531 under the NASA Code O Advanced Systems Program.

Zillig, David↗

NASA Crew Health & Performance Capability Development for Exploration: 2021 to 2022 Overview

Radiation, reduced gravity, distance from earth, isolation and confinement, and habitation within artificially created and controlled life support environments are hazards that present risk to human space explorers. In many cases, research is required to characterize those risks and help identify risk mitigation strategies. Where new capabilities are necessary to maintain crew health and performance (CHP) during exploration missions, a multi-step process is followed: 1) a Capability Gap is defined; 2) a plan or “roadmap” to develop that capability is established based on agency priorities and anticipated mission development timelines; and 3) work defined on the roadmap is then initiated as resources allow, with the objective that the capability will be available in time to support the future mission. Over the past year, significant progress has occurred in CHP technology development, ground testbed development, ground-based testing, and in preparations for ISS technology demonstrations. This paper provides a development update in the following capability areas: crew health countermeasures, EVA physiology and performance, food and nutrition, exploration medical capabilities, and radiation. Project overviews will include descriptions of CHP development activities over the past year, the human system risks and capability gaps being targeted, as well as planned follow-on activities and anticipated program infusion points.

Andrew F J Abercromby↗

The OSIRIS-REx Asteroid Sample Return Mission Operations Design

OSIRIS-REx is an acronym that captures the scientific objectives: Origins, Spectral Interpretation, Resource Identification, and Security-Regolith Explorer. OSIRIS-REx will thoroughly characterize near-Earth asteroid Bennu (Previously known as 1019551999 RQ36). The OSIRIS-REx Asteroid Sample Return Mission delivers its science using five instruments and radio science along with the Touch-And-Go Sample Acquisition Mechanism (TAGSAM). All of the instruments and data analysis techniques have direct heritage from flown planetary missions. The OSIRIS-REx mission employs a methodical, phased approach to ensure success in meeting the mission's science requirements. OSIRIS-REx launches in September 2016, with a backup launch period occurring one year later. Sampling occurs in 2019. The departure burn from Bennu occurs in March 2021. On September 24, 2023, the Sample Return Capsule (SRC) lands at the Utah Test and Training Range (UTTR). Stardust heritage procedures are followed to transport the SRC to Johnson Space Center, where the samples are removed and delivered to the OSIRIS-REx curation facility. After a six-month preliminary examination period the mission will produce a catalog of the returned sample, allowing the worldwide community to request samples for detailed analysis. Traveling and returning a sample from an Asteroid that has not been explored before requires unique operations consideration. The Design Reference Mission (DRM) ties together spacecraft, instrument and operations scenarios. Asteroid Touch and Go (TAG) has various options varying from ground only to fully automated (natural feature tracking). Spacecraft constraints such as thermo and high gain antenna pointing impact the timeline. The mission is sensitive to navigation errors, so a late command update has been implemented. The project implemented lessons learned from other "small body" missions. The key lesson learned was 'expect the unexpected' and implement planning tools early in the lifecycle. This paper summarizes the ground and spacecraft design as presented at OSIRIS-REx Critical Design Review(CDR) held April 2014.

mission operations↗

Entry Systems Modeling and Ground Testing: Enabling Flight Performance and Risk Reduction

Entry, Descent, and Landing (EDL) comprise a relatively small portion of a mission’s timeline, however, it is typically among the largest risks. Flying through a body’s atmosphere reliably and accurately – from orbit to ground or via aerocapture – is a critical step toward successful in situ exploration. This exhibit will highlight EDL simulation and ground test capabilities, both existing and under development, that could support mission design, risk reduction, and post-flight analysis for Planetary Science mission concepts displayed in the 2023 SMD Planetary Science Technology Showcase.

Entry Systems↗

International Space Station Mechanisms and Maintenance Flight Control Documentation and Training Development

International Space Station (ISS) crew and flight controller training documentation is used to aid in training operations. The Generic Simulations References SharePoint (Gen Sim) site is a database used as an aid during flight simulations. The Gen Sim site is used to make individual mission segment timelines, data, and flight information easily accessible to instructors. The Waste and Hygiene Compartment (WHC) training schematic includes simple and complex fluid schematics, as well as overall hardware locations. It is used as a teaching aid during WHC lessons for both ISS crew and flight controllers. ISS flight control documentation is used to support all aspects of ISS mission operations. The Quick Look Database and Consolidated Tool Page are imagery-based references used in real-time to help the Operations Support Officer (OSO) find data faster and improve discussions with the Flight Director and Capsule Communicator (CAPCOM). A Quick Look page was created for the Permanent Multipurpose Module (PMM) by locating photos of the module interior, labeling specific hardware, and organizing them in schematic form to match the layout of the PMM interior. A Tool Page was created for the Maintenance Work Area (MWA) by gathering images, detailed drawings, safety information, procedures, certifications, demonstration videos, and general facts of each MWA component and displaying them in an easily accessible and consistent format. Participation in ISS mechanisms and maintenance lessons, mission simulation On-the-Job Training (OJT), and real-time flight OJT was used as an opportunity to train for day-to-day operations as an OSO, as well as learn how to effectively respond to failures and emergencies during mission simulations and real-time flight operations.

Daugherty, Colin C.↗

Current Scientific Progress and Future Scientific Prospects Enabled by Spaceborne Precipitation Radar Measurements

First, we examine current scientific progress and understanding that have been possible through use of spaceborne precipitation radar measurements being provided by the TRMM and CloudSat satellites. Second, we look across a future 20-year time frame to assess how and why anticipated improvements in space radar systems will further advance scientific progress into topic areas once considered beyond the realm of space-based remote sensing. JAXA's 13.8 GHz Ku-band cross-track scanning Precipitation Radar (PR) developed for flight on NASA's non-sun-synchronous, diurnally-precessing TRMM satellite, was the first Earth radar flown in space that was designed specifically for precipitation measurement. Its proven accuracy in measuring global rainfall in the tropics and sub-tropics and its unanticipated longevity in continuing these measurements beyond a full decade have established the standards against which all follow-up and future space radars will be evaluated. In regards to the current PR measurement time series, we will discuss a selection of major scientific discoveries and impacts which have set the stage for future radar measuring systems. In fact, the 2nd contemporary space radar applicable for terrestrial precipitation measurement, i.e., JPL-CSA's 94 GHz nadir-staring Cloud Profiling Radar (CPR) flown on NASA's sun-synchronous CloudSat satellite, although designed primarily for measurement of non-precipitating cloud hydrometeors and aerosols, has also unquestionably advanced precipitation measurement because CPR's higher frequency and greatly increased sensitivity (approximately 30 dBZ) has enabled global observations of light rain rate spectrum processes (i.e., rain rates below 0.05 mm per hourand of precipitation processes in the high troposphere (particularly ice phase processes). These processes are beyond reach of the TRMM radar because the PR sensitivity limit is approximately 17 dBZ which means its lower rain rate cutoff is around 0.3 mm per hour and its vertical profiling acuity is greatly limited above the melting layer. Thus, the newer CPR measurements have become important for a variety of scientific reasons that will be highlighted and assessed. In considering scientific progress likely to stem from future precipitation radar systems, we will specifically examine possible scientific impacts from three anticipated missions for which NASA and various of its space agency partners are expected to lead the way. These three missions are: (1) the nearterm Global Precipitation Measuring (GPM) Mission; (2) the decadal timeline Aerosol and Cloud Experiment (ACE) Mission; and the post-decadal timeline NEXRAD in Space (NIS) Mission. The observational capabilities of the planned radar systems for each of these three satellite missions are distinct from each other and each provides progressive improvements in precipitation measuring and scientific research capabilities relative to where we are now -- insofar as TRMM PR and the CloudSat CPR capabilities. The potential innovations in scientific research will be discussed in a framework of likely synergisms between next-generation radar capabilities and accessible dynamical and microphysical properties that have heretofore evaded detection.

Smith, Eric A.↗

Payload analysis for space shuttle applications (study 2.2). Volume 3: Payload system operations analysis (task 2.2.1)

The technical and cost analysis that was performed for the payload system operations analysis is presented. The technical analysis consists of the operations for the payload/shuttle and payload/tug, and the spacecraft analysis which includes sortie, automated, and large observatory type payloads. The cost analysis includes the costing tradeoffs of the various payload design concepts and traffic models. The overall objectives of this effort were to identify payload design and operational concepts for the shuttle which will result in low cost design, and to examine the low cost design concepts to identify applicable design guidelines. The operations analysis examined several past and current NASA and DoD satellite programs to establish a shuttle operations model. From this model the analysis examined the payload/shuttle flow and determined facility concepts necessary for effective payload/shuttle ground operations. The study of the payload/tug operations was an examination of the various flight timelines for missions requiring the tug.

Source record↗

Flight Operations reunion for the Apollo 11 20th anniversary of the first manned lunar landing

The following major areas are presented: (1) the Apollo years; (2) official flight control manning list for Apollo 11; (3) original mission control emblem; (4) foundations of flight control; (5) Apollo-11 20th anniversary program and events; (6) Apollo 11 mission operations team certificate; (7) Apollo 11 mission summary (timeline); and (8) Apollo flight control team photographs and biographies.

Source record↗

ISS/STS Ground Status at KSC

This slide presentation reviews the status of several shuttle missions. It includes a timeline for three STS missions (i.e., OV-103, OV-104, and OV-105), and specific information about each mission, and the status of the shuttle that is to be used

Kirkpatrick, Paul↗