Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Co-optimization of nuclear reactor flexible power operation and maintenance scheduling

As flexible power operation of nuclear power plants becomes more attractive due to the reduction in fossil-fueled dispatchable generation on energy grids, finding optimal power production strategies that balance revenue generation with operational concerns becomes more complex. This article presents a general framework to aid operators in designing economically optimal long term dispatch strategies for nuclear power plants. The principal novelty is the linking of estimated system remaining useable life (RUL) to strategic operational decisions. It is shown that, depending on the relationship between the fixed costs from maintenance and the associated lost revenue from an outage, it can be economically optimal in the long term to delay a maintenance outage and not perform this alongside refueling. For a given relationship between power ramping and degradation, optimal strategies were found that discouraged load following in some situations while minimizing unnecessary maintenance. It is shown that heavy load following can cause maintenance and refueling outages to diverge due to their inverse relationships with respect to load following, potentially leading to a significant loss in capacity factor. As a result, this general framework can be applied to specific reactor dispatch allowing operators to adapt operational strategies as future grid conditions change.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Initial Results of a Phase I Dose-Escalation Trial of Concurrent and Maintenance Erlotinib and Reirradiation for Recurrent and New Primary Head-and-Neck Cancer

Purpose: To present the first report of a Phase I trial evaluating concurrent and maintenance erlotinib and reirradiation in patients with recurrent or secondary primary head-and-neck cancer (HNC). Methods and Materials: Patients with recurrent or new primary HNC with an interval of at least 6 months since prior radiation were eligible. Patients were treated in 3 sequential cohorts: Cohort I, 100 mg of erlotinib daily with reirradiation at 61.6 Gy in 28 fractions; Cohort II, 150 mg of erlotinib with 61.6 Gy in 28 fractions; and Cohort III, 150 mg of erlotinib with 66 Gy in 30 fractions. Maintenance erlotinib started immediately after reirradiation at 150 mg daily and was continued for 2 years or until disease progression or dose-limiting toxicity. Dose-limiting toxicities were defined as any Grade 4 or 5 toxicity or a toxicity-related delay in radiation therapy of greater than 7 days. Results: Fourteen patients were accrued, 3 to Cohort I, 4 to Cohort II, and 7 to Cohort III. Thirteen patients were evaluable for toxicity. Median follow-up was 8.4 months overall and 15.1 months for surviving patients. One patient had a dose-limiting toxicity in Cohort III. This patient declined initial percutaneous endoscopic gastrostomy tube placement, was hospitalized with Grade 3 dysphagia and aspiration, and required a delay in radiation therapy of greater than 7 days. No Grade 4 acute toxicity was observed. Acute Grade 3 toxicity occurred in 9 of 13 patients. No erlotinib-related toxicity of Grade 3 or greater was observed during maintenance therapy. One patient had Grade 5 carotid hemorrhage 6 months after reirradiation, and another patient had Grade 3 osteoradionecrosis. Conclusions: Reirradiation (66 Gy in 2.2 Gy fractions) with concurrent and maintenance erlotinib (150 mg daily) for recurrent or new primary HNC is feasible.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

A Digital Twin Framework Utilizing Machine Learning for Robust Predictive Maintenance: Enhancing Tire Health Monitoring

We introduce a novel digital twin (DT) framework for the predictive maintenance of long-term physical systems. Using monitoring tire health as an application, we show how the DT framework can be used to enhance automotive safety and efficiency, and how the technical challenges can be overcome using a three-step approach. First, to manage the data complexity over a long operation span, we employ data reduction techniques to concisely represent physical tires using historical performance and usage data. Relying on these data, for fast real-time prediction, we train a transformer-based model offline on our concise dataset to predict future tire health over time, represented as remaining casing potential (RCP). Based on our architecture, our model quantifies both epistemic and aleatoric uncertainties, providing reliable confidence intervals around predicted RCP. Second, to incorporate real-time data, we update the predictive model in the DT framework, ensuring its accuracy throughout its lifespan with the aid of hybrid modeling and the use of the discrepancy function. Third, to assist decision-making in predictive maintenance, we implement a tire state decision algorithm, which strategically determines the optimal timing for tire replacement based on RCP forecasted by our transformer model. This approach ensures that our DT accurately predicts system health, continually refines its digital representation, and supports predictive maintenance decisions. Furthermore, our framework effectively embodies a physical system, leveraging big data and machine learning (ML) for predictive maintenance, model updates, and decision-making.

advanced computing infrastructure↗

Xenorhabdus bovienii Strain Diversity Impacts Coevolution and Symbiotic Maintenance with Steinernema spp. Nematode Hosts

Microbial symbionts provide benefits that contribute to the ecology and fitness of host plants and animals. Therefore, the evolutionary success of plants and animals fundamentally depends on long-term maintenance of beneficial associations. Most work investigating coevolution and symbiotic maintenance has focused on species-level associations, and studies are lacking that assess the impact of bacterial strain diversity on symbiotic associations within a coevolutionary framework. Here, we demonstrate that fitness in mutualism varies depending on bacterial strain identity, and this is consistent with variation shaping phylogenetic patterns and maintenance through fitness benefits. Through genome sequencing of nine bacterial symbiont strains and cophylogenetic analysis, we demonstrate diversity among Xenorhabdus bovienii bacteria. Further, we identified cocladogenesis between Steinernema feltiae nematode hosts and their corresponding X. bovienii symbiont strains, indicating potential specificity within the association. To test the specificity, we performed laboratory crosses of nematode hosts with native and nonnative symbiont strains, which revealed that combinations with the native bacterial symbiont and closely related strains performed significantly better than those with more divergent symbionts. Through genomic analyses we also defined potential factors contributing to specificity between nematode hosts and bacterial symbionts. These results suggest that strain-level diversity (e.g., subspecies-level differences) in microbial symbionts can drive variation in the success of host-microbe associations, and this suggests that these differences in symbiotic success could contribute to maintenance of the symbiosis over an evolutionary time scale.

59 BASIC BIOLOGICAL SCIENCES↗

Bioactive exometabolites drive maintenance competition in simple bacterial communities

During prolonged resource limitation, bacterial cells can persist in metabolically active states of non-growth. These maintenance periods, such as those experienced in stationary phase, can include upregulation of secondary metabolism and release of exometabolites into the local environment. As resource limitation is common in many environmental microbial habitats, we hypothesized that neighboring bacterial populations employ exometabolites to compete or cooperate during maintenance and that these exometabolite-facilitated interactions can drive community outcomes. Here, we evaluated the consequences of exometabolite interactions over the stationary phase among three environmental strains: Burkholderia thailandensis E264, Chromobacterium subtsugae ATCC 31532, and Pseudomonas syringae pv. tomato DC3000. We assembled them into synthetic communities that only permitted chemical interactions. We compared the responses (transcripts) and outputs (exometabolites) of each member with and without neighbors. We found that transcriptional dynamics were changed with different neighbors and that some of these changes were coordinated between members. The dominant competitor B. thailandensis consistently upregulated biosynthetic gene clusters to produce bioactive exometabolites for both exploitative and interference competition. These results demonstrate that competition strategies during maintenance can contribute to community-level outcomes. It also suggests that the traditional concept of defining competitiveness by growth outcomes may be narrow and that maintenance competition could be an additional or alternative measure.

59 BASIC BIOLOGICAL SCIENCES↗

WOMBAT (Windfarm Operations and Maintenance cost-Benefit Analysis Tool) WISDEM® [SWR-21-68]

The windfarm operations and maintenance cost-benefit analysis tool (WOMBAT) is software to simulate the operations and maintenance phase of either onshore or offshore windfarms. WOMBAT is a medium-fidelity tool that is designed to model turbine, cable, and substation failures at the subassembly level, but is flexible enough that individual component or asset-level modeling can also be performed. WOMBAT enables users to model technological improvements, the use of a wide range of service equipment from drone repairs and remote resets to heavy lift vessels and crawler cranes, to analyze cost trends with varying trade-offs in conjunction with energy production, availability and a growing range of metrics. This library provides a tool to simulate the operation and maintenance phase (O&M) of distributed, land-based, and offshore windfarms using a discrete event simulation framework. WOMBAT is written around the SimPy discrete event simulation framework. Additionally, this is supported using a flexible and modular object-oriented code base, which enables the modeling of arbitrarily large (or small) windfarms with as many or as few failure and maintenance tasks that can be encoded. Please note that this is still heavily under development, so you may find some functionality to be incomplete at the current moment, but rest assured the functionality is expanding. With that said, it would be greatly appreciated for issues or PRs to be submitted for any improvements at all, from fixing typos (guaranteed to be a few) to features to testing. Also available at: https://pypi.org/project/wombat/

Cooperman, Aubryn↗

Decision Support for Operations and Maintenance IV

DSOM (Decision Support for Operations and Maintenance) is an expert operations and maintenance system that integrates plant operations, fuel management, and maintenance processes. The DSOM package provides operators with the information they need for cost-effective operating decisions creating savings in fuel, personnel, maintenance, and plant life extension. DSOM provides operators real-time system performance information to allow them to determine if the plant is malfunctioning or running below expectations. By catching potential problems, DSOM enables plants to operate safely at peak efficiency, while providing a higher level of reliability and safety.

Sisk, Daniel↗

Solid Waste Management Units And Areas Of Concern Annual Long-Term Monitoring & Maintenance Report For Calendar Year 2016.

Long-term controls were maintained at 21 Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) in accordance with the requirements of the “Long-Term Monitoring and Maintenance Plan for SWMUs and AOCs Granted Corrective Action Complete with Controls” in Attachment M of the Resource Conservation and Recovery Act Facility Operating Permit, which took effect February 26, 2015. Maintenance and controls at these SWMUs and AOCs are described and documented in this report. Conditions requiring maintenance or repair activities were not identified for any of the inspected SWMUs or AOCs. Based upon the inspections performed and site conditions observed, the administrative and physical institutional controls in place at the SWMUs and AOCs are effectively providing continued protection of human health and the environment. This report does not present monitoring and maintenance activities for SWMU 76, the Mixed Waste Landfill; those activities adhere to the approved MWL LTMM Plan, Section 4.8.1 requiring a separate annual report which will be submitted to the NMED by June 30, 2017.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Submittal of Solid Waste Management Units and Areas of Concern Annual Long-Term Monitoring and Maintenance Report for Calendar Year 2017

This SWMU and AOC Annual Long-Term Monitoring and Maintenance (LTMM) Report for Calendar Year 2017 (Annual LTMM Report) details the measures performed for 21 Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) at Sandia National Laboratories/New Mexico (SNL/NM) in accordance with the requirements of the “Long-Term Monitoring and Maintenance [LTMM] Plan for SWMUs and AOCs Granted Corrective Action Complete with Controls” in Attachment M of the Resource Conservation and Recovery Act Facility Operating Permit (Permit), which took effect February 26, 2015. This Annual LTMM Report does not present the measures for SWMU 76, Mixed Waste Landfill (MWL), as the applicable MWL reporting adheres to the approved MWL LTMM Plan, Section 4.8.1 and requires a separate annual report which will be submitted to the New Mexico Environment Department by June 30, 2018. Measures at these SWMUs and AOCs include surveillance of site conditions and maintenance of institutional controls. Conditions requiring maintenance or repair activities were identified at three of the inspected SWMUs and AOCs (SWMUs 45, 46, and 87) during the Permit-required annual site inspections. One SWMU identification sign located at SWMU 46 and two identification signs located at SWMU 87 were replaced due to weathered lettering. Evidence of erosion was observed at SWMU 45 during the annual site inspection; erosion controls will be implemented as needed to prevent the inadvertent exposure of hazardous wastes or hazardous waste constituents. SWMU 45 is located on the sloped border of Tijeras Arroyo south of Technical Area-IV. The erosion controls planned for the Tijeras Arroyo Escarpment will address not only SWMU 45, but also SWMUs 46 and 229 as a best management practice. SNL/NM personnel plan to complete this work in calendar year 2018. The status and progress of this project will be reported in the 2018 Annual SWMUs and AOCs Annual LTMM Report for Calendar Year 2018 to be submitted to the New Mexico Environment Department on March 31, 2019, as required by the Permit. Based upon the inspections performed and site conditions observed, the administrative and physical institutional controls in place at the SWMUs and AOCs are effectively providing continued protection of human health and the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mixed Waste Landfill Annual Long-Term Monitoring & Maintenance Report April 2016-March 2017

Sampling activities for this reporting period included two semiannual monitoring events each for groundwater, soil-vapor, and radon. Annual soil-moisture monitoring was conducted in April 2016, annual tritium surface soil sampling was conducted in August 2016, and annual biota sampling (metals and radionuclides) was conducted in September 2016. All monitoring activities were conducted in accordance with LTMMP requirements and no monitoring results exceeded LTMMP trigger levels. All monitoring results were consistent with historic MWL monitoring data. Inspections of the MWL final cover system, storm-water diversion structures, compliance monitoring systems, and security fence were performed in accordance with LTMMP requirements. Required maintenance and repairs were minor and were generally performed during the inspections. The Evapotranspirative (ET) Cover continues to meet successful revegetation criteria and is in excellent condition with even coverage of mature, native perennial grasses. Maintenance was performed during the reporting period as a best management practice for ET Cover vegetation, and included a lower level of effort relative to previous years. The purpose of ongoing ET Cover maintenance efforts is to promote the growth and health of the desired native grass species by reducing competition with weedy species for limited moisture and nutrients. Based on previous inspections, additional best management practice activities were conducted during this reporting period to improve the site and reduce long-term ET Cover and site maintenance. These activities included improvements to site access and drainage (i.e., improvements to the access and perimeter road) and the installation of erosion and burrow control measures at the ten perimeter monitoring well locations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Los Alamos National Laboratory Floodplain Assessment for the West Road Maintenance Project

The National Nuclear Security Administration (NNSA), a semi-autonomous agency within the U.S. Department of Energy (DOE), is proposing to take action at Los Alamos National Laboratory (LANL) and do maintenance on West Road at locations along its entirety from the intersection with West Jemez Road/New Mexico State Road 501 (NM 501) to the intersection with Dulce Street through Los Alamos Canyon. The proposed West Road Maintenance Project is intended to improve vehicular and pedestrian safety on West Road by reducing traffic hazards associated with poor road conditions and unsafe roadside parking. Proposed road maintenance and improvement activities throughout the length of West Road include asphalt milling and resurfacing of approximately 2.06 miles (mi.) of the road. West Road crosses approximately 0.35 mi. (1,900 feet (ft.)) of the Los Alamos Canyon floodplain at the bottom of Los Alamos Canyon. Project activities within the floodplain include: 1) mill and resurface the roadway, 2) replace existing guardrails, 3) block access to the informal roadside parking along either side of West Road in Los Alamos Canyon, 4) install trail signage and perform trail maintenance, and 5) restore habitat and reduce wildland fire risk through invasive species removal.

54 ENVIRONMENTAL SCIENCES↗

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, that is, the “proactive stewardship of the extensive monitoring well network at Y-12" (Consolidated Nuclear Security, L.L.C. [CNS], 2018). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality samples and hydrologic data are obtained from the well network and protects the subsurface environment. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (CNS, 2017), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data, and for that reason the GWPP inspects and performs maintenance on the wells sampled by the GWPP. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime), (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses the section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV west of Scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bounded to the west by a surface drainage feature (Dunaway Branch, located immediately west of Industrial Landfill II) and by Scarboro Road to the east. The GWPP maintains an extensive database of geographic and construction details and related information for the monitoring wells in each hydrogeologic regime in the Updated Subsurface Database for Bear Creek Valley, Chestnut Ridge, and Parts of Bethel Valley on the U.S. DOE Oak Ridge Reservation (CNS, 2019). A detailed description of the hydrogeologic framework at Y-12 can be found in the GWPP Management Plan (CNS, 2018).

54 ENVIRONMENTAL SCIENCES↗

An Architectural Survey of the REECo Maintenance Compound, Area 6, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to install a 26.45-mile-long 138-kilovolt (kV) transmission line on the Nevada National Security Site (NNSS) in Nye County, Nevada. This new transmission line will upgrade the electrical transmission system and provide reliable power between Mercury Switching Station in Area 23 and the U1a Facility in Area 1. The proposed upgrade to the power transmission system constitutes an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. A portion of this new transmission line will cross the western perimeter of the Reynolds Electrical and Engineering Company (REECo) Maintenance Compound located in Area 6 of the NNSS. This compound with its trade shops, storage sheds, and yards served as a general construction facility that supported nuclear testing activities on the NNSS from 1967 to 1992. Although three architectural resources in the compound have previously been recorded and evaluated for the National Register of Historic Places (NRHP), other resources within it have not, nor has the compound been recorded and evaluated as a potential district. The State Historic Preservation Officer (SHPO) concurred with NNSA/NFO’s determination that the unevaluated REECo Maintenance Compound will be adversely affected by the proposed undertaking (Reed 2021). The NNSA/NFO, in consultation with the SHPO, then developed the Memorandum of Agreement DE-GM58-22NA25553 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Installation of a 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility and the Removal of the Historic 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility in Areas 1, 3, 5, 6, and 23 of the Nevada National Security Site, Nye County, hereafter referred to as the MOA. This architectural survey report was prepared in accordance with MOA Stipulation III.B. It describes the origins, history, layout, and functions of the REECo Maintenance Compound during the Cold War and identifies contributing and noncontributing resources. The report defines a district boundary based on archival research and the field survey and concludes with an appendix that presents digital color images of the compound with descriptions and a map key showing image viewpoints and directions. Although none of the architectural resources are recommended individually eligible, the district evaluation concludes the REECo Maintenance Compound is eligible as a historic district for listing in the NRHP under the Secretary of the Interior’s Significance Criteria A and C at the local level. The historic district retains all seven aspects of integrity and conveys its significance under the abovementioned criteria.

138 kV↗

Report on Year-4 of Water NSTF Matrix Testing: Facility Maintenance and Accident Testing

Under support from the Department of Energy (DOE) and the Office of Advanced Reactor Technologies (ART), a large-scale test facility has been constructed at Argonne National Laboratory to generate NQA-1 qualified validation data for passive decay heat removal systems in advanced reactors. The Natural convection Shutdown heat removal Test Facility (NSTF) reflects key features of a ½ scale, water-based, Reactor Cavity Cooling System (RCCS) and is intended to study the behavior, bound performance, and ultimately guide design decisions for passive decay heat removal systems for advanced reactors. In addition to the experimental activities detailed in this report, a supportive computational modeling effort is on-going which has been demonstrated to significantly strengthen the experimental program while also improving accuracy of the computer models. Together these create a mutually beneficial relationship integral to meeting the overall program objective of examining the heat removal performance of the RCCS concept. This report serves as a summary of maintenance and experimental activities during the program’s fourth year of water-based operation. A planned six-month maintenance period began in August 2021, during which major inspections, repairs, cleaning, and installation of new instrumentation and data acquisition hardware were conducted. Most significantly, two heaters that faulted during Year-3 were repaired, allowing the facility to resume use of the full heated section area and full range of available electric power. The remainder of the year consisted of eight months of test operations, during which the facility logged 211 hours of active heating across one bake-out (following the maintenance period) and seven matrix tests; five classifieds as Accepted per NQA-1, one as Trending, and one as Failed. Testing began by performing two repeat cases to confirm expected facility response and behavior during both single- and two-phase flow conditions, ensuring no changes were introduced during the maintenance period that might have altered the thermal-hydraulic characteristics of the facility. In continuation of the power parametric series initiated in previous years, a high-power test case was then performed examining heat removal performance at a decay heat load equivalent to 2.4 MWt, full-scale, a level exceeding maximum design targets. Additional testing then introduced various blockage scenarios along the network piping, examining the effects of partial and complete blockages of the flow paths on the system behavior and heat removal performance. A study of static boiling tests directed at understanding the geysering two-phase instability was also conducted. The loop was filled only to the bottom of the tank outlet, creating an open loop configuration that prevents any natural circulation flow from occurring, and the heaters were powered on until the facility reached saturation conditions. Following, a series of quasi-steady-state conditions were introduced by adjusting the inventory level in the adiabatic chimney piping at decreasingly lower elevations above the heated region. A strong correlation of geysering characteristics and loop level was observed, with flow and temperature excursions decreasing in intensity, but increasing in frequency, as the fill were reduced to lower elevations along the chimney piping. Once the level fell very low in the chimney, at points near the top of the heated section, the system reached a stable state of continuous boiling without any occurrence of geysering eruptions. A final significant testing accomplishment this year was successful completion of an “accident scenario” test, whose operating conditions were based on a prototypic decay heat curve provided by Framatome and scaled for the NSTF. This test began by establishing steady-state, single-phase “normal operation” conditions, before simulating an accident trip where the availability of active cooling systems was lost. Loop temperatures gradually increased until reaching saturation and subsequent two-phase boiling flow. Over the course of an extended operational period along the defined decay heat curve, steam boil-off caused gradual but continued depletion of liquid inventory until reaching a critically low level causing flow stagnation and cessation of natural circulation heat removal. At this point, after nearly 72 hours of continuous operation, a cold refill was performed to replenish the system inventory and allow the facility to re-establish closed loop natural circulation flow and return to a safe operational state.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Assessment of Cloud-Based Applications Enabling a Scalable Risk-Informed Predictive Maintenance Strategy Across the Nuclear Fleet

The current light water reactor fleet uses time-based or failure-based maintenance strategies to achieve high-capacity factors. But to make nuclear more competitive in the energy market, these reactors could utilize emerging technologies in terms of artificial intelligence (AI) and cloud computing to enable a cost-effective, predictive maintenance strategy. This report examines the feasibility of cloud computing for the nuclear industry’s needs in terms of the cloud’s computing capabilities, feasibility, and regulatory concerns. The technical viability of cloud computing was analyzed using one year worth of data from a boiling water reactor’s safety relief valve. Models were hosted on a local desktop, Idaho National Laboratory’s high-performance computer, and Microsoft Azure. Data was loaded, processed, and two types of models were trained in an A/B fashion. Based on the speed at which these actions were completed, it was used to determined that cloud computing has adequate computing resources. Additionally, the computing power can scale with the demanded load. To enable cloud computing in the existing fleet, additional sensors, networks, and other requirements must be implemented to ensure a smooth transition from current maintenance strategies. However, there is a benefit as the plant no longer needs manage their own servers, software, cybersecurity, and IT support staff. Many of these features can be offloaded on to the cloud provider. A comprehensive analysis was completed that showed the current annual cost of operating is more expensive than using cloud computing resources. Lastly, the regulatory framework does not explicitly address AI or autonomous control. Currently, the NRC and other regulatory bodies are evaluating providing guidance to address gaps rather than new regulations to address the use of AI and ML. But since many of the AI applications are focused on non-safety related applications, such as balance-of-plant components, they will likely have little or no regulatory restrictions or necessary approvals. Demonstrating how AI can improve maintenance and operation of these non-safety related systems seems like the likely path forward for implementing AI and cloud computing resources inside nuclear power plants (NPPs).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Adaptive Framework for Maintenance Scheduling Based on Dynamic Preventive Intervals and Remaining Useful Life Estimation

Data-based prognostic methods exploit sensor data to forecast the remaining useful life (RUL) of industrial settings to optimize the scheduling of maintenance actions. However, implementing sensors may not be cost-effective or practical for all components. Traditional preventive approaches are not based on sensor data; however, they schedule maintenance at equally spaced intervals, which is not a cost-effective approach since the distribution of the time between failures changes with the degradation state of other parts or changes in working conditions. This study introduces a novel framework comprising two maintenance scheduling strategies. In the absence of sensor data, we propose a novel dynamic preventive policy that adjusts intervention intervals based on the most recent failure data. When sensor data are available, a method for RUL prediction, designated k-LSTM-GFT, is enhanced to dynamically account for RUL prediction uncertainty. The results demonstrate that dynamic preventive maintenance can yield cost reductions of up to 51.8% compared to conventional approaches. The predictive approach optimizes the exploitation of RUL, achieving costs that are only 3–5% higher than the minimum cost achievable while ensuring the safety of critical systems since all of the failures are avoided.

Nunes, Pedro (ORCID:0000000180012172)↗

Simulation of on-orbit maintenance cycle for LST

A maintenance simulation model of the Large Space Telescope has been developed to assess the operational cost sensitivity to system configuration options. The model lends itself to equipment-level selections for various subsystem alternatives. Maintenance decisions include considerations for LST spacecraft on-orbit service or retrieval. Tradeoffs are identified in terms of on-orbit maintenance for specific design concepts, with Space Shuttle revisit costs balanced against retrieval and ground-facility operations. Simulation output is in the form of computer plots of cost, availability, time to first maintenance, and a cost-effective Shuttle revisit frequency.

Donnelly, J. A.↗

Research requirements to reduce maintenance costs of civil helicopters

The maintenance problems faced by the operators of civil helicopters that result in high costs are documented. Existing technology that can be applied to reduce maintenance costs and research that should be carried out were identified. Good design practice and application of existing technology were described as having a significant impact on reducing maintenance costs immediately. The research and development that have potential for long range reduction of maintenance costs are presented.

Million, D. J.↗