Phase C/D program development plan. Volume 1: Program plan

The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.

Source record↗

Preliminary design of a shuttle docking and cargo handling system

Work performed prior to concept selection, concept evaluation, and the preliminary design are summarized. The initial work included selection of the requirements and guidelines used to formulate concepts; analysis to determine detailed requirements for reach, velocity, torque, etc.; formulation of the alternative concepts; the evaluation and ranking of the concepts; and the selection of a concept. The man-in-the-loop simulation performed with a six degree of freedom moving base simulator and a three degree of freedom manipulator arm are described. The analysis and tradeoffs of those design parameters which are the key to the preliminary design are described. Estimates for a future development program are presented, including a schedule and manpower breakdown and cost estimate. The system design parameters, with a weight and power breakdown are summarized.

Source record↗

Modular space station phase B extension program master plan

The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

Munsey, E. H.↗

Physics in perspective, volume 1

Progress in physics and its subfields is presented and the contribution of physics is related to progress in other scientific disciplines and the manner in which these have been utilized by our civilization. The future course of endeavor in the various subfields of physics and the extent to which these will require resources of manpower, facilities, and funding are discussed. The rational responses of the total research effort in physics to alternative funding levels are assayed.

Source record↗

Modularized instrument system for turbojet engine test facilities

A modular instrument system is being developed to handle the many data channels encountered in turbojet engine testing. Each module contains a group of transducers and all the signal conditioning multiplexing, and digitizing electronics necessary for direct interface with a digital computer. The digital interface within each module is the same for all modules; in addition, each module provides a controlled environment for its contents. A minicomputer in the control room gathers the data, performs on-line calculation and display, and interfaces with a shared recording and computing system. The advantages of this system are: (1) reduced manpower for system installation, setup, and checkout; (2) standardized equipment interfaces; (3) increased reliability through automatic system testing and minimization of manual adjustments; and (4) reduced cost through minimization of wiring and simplification of control room display.

Nieberding, W. C.↗

A space maintainability experiment aboard the Ben Franklin submersible during the 30-day Gulf Stream drift mission.

In the summer of 1969, a deep submersible drifted for 30 days below the surface of the Gulf Stream, while operated by a six man crew. The main purpose of the mission was oceanographic research. The crew's activities and completely self-contained environment resembled those of a space station such as Skylab. Because of these similarities aspects of onboard vehicle maintenance during the actual conduct of a scientific mission were investigated. The maintainability study was accomplished in six distinct phases. Two useful plots of manpower distribution were developed. A maintenance action summary is presented in a table.

Kappler, J. R.↗

Occupational Medical Trends in the 70's from Industrial View

Industrial health measures to ensure worker productivity constitute physical examinations as well as environmental control systems. Considered are automatic record keeping facilities for case histories, preventive medical and mental counselling, development of safety standards, and health insurance and disability benefit plans. Cooperation of industry health programs with community health aspects is required to eliminate the loss of manpower capability through alcoholism or mental disease.

Williamson, S. M.↗

Project Cyclops: a Design Study of a System for Detecting Extraterrestrial Intelligent Life

The requirements in hardware, manpower, time and funding to conduct a realistic effort aimed at detecting the existence of extraterrestrial intelligent life are examined. The methods used are limited to present or near term future state-of-the-art techniques. Subjects discussed include: (1) possible methods of contact, (2) communication by electromagnetic waves, (3) antenna array and system facilities, (4) antenna elements, (5) signal processing, (6) search strategy, and (7) radio and radar astronomy.

Source record↗

NASTRAN users' experience of Avco Aerostructures Division

The NASTRAN experiences of a major structural design and fabrication subcontractor that has less engineering personnel and computer facilities than those available to large prime contractors are discussed. Efforts to obtain sufficient computer capacity and the development and implementation of auxiliary programs to reduce manpower requirements are described. Applications of the NASTRAN program for training users, checking out auxiliary programs, performing in-house research and development, and structurally analyzing an Avco designed and manufactured missile case are presented.

Blackburn, C. L.↗

Trace-element analysis of 1000 environmental samples per year using instrumental neutron activation analysis

The technology and methods developed at the Plum Brook Reactor to analyze 1000 samples per year and report data on as many as 56 elements are described. The manpower for the complete analysis of 20 to 24 samples per week required only 3 to 3.5 hours per sample. The solutions to problems encountered in sample preparation, irradiation, and counting are discussed. The automation of data reduction is described. Typical data on various sample matrices are presented.

Sheibley, D. W.↗

Apollo experience report: Communications used during recovery operations

Apollo program experience in recovery-support communications is reviewed, and the working relationships among NASA, the Department of Defense, and commercial communications facilities are discussed. The organization, facilities, philosophy, and funding of recovery-support communications are described. The relocation of two recovery control centers is discussed, as are the functions of primary and secondary recovery ships, aircraft, and relay satellities. The possibility of using ships of opportunity for recovery operations is considered. Finally, the means by which money, manpower, and resources have been saved and longlines leased are delineated.

Hoover, J. E.↗

A Markovian model for assessment of personnel hiring plans

As a result of the current economic environment, many organizations are having to operate with fewer resources. In the manpower area, these constraints have forced organizations to operate within well-defined hiring plans. Exceeding personnel ceilings is in most cases an intolerable situation. A mathematical model, based on the theory of Markov processes, is presented which can be used to assess the chances of success of personnel hiring plans. The model considers a plan to be successful if the final population size, at the end of the planning period, lies within a range specified by management. Although this model was developed to assess personnel hiring plans at the Goddard Space Flight Center, it is directly applicable wherever personnel hiring plans are used.

Katz, L. G.↗

Modularized instrument system for turbojet engine test facilities

A new modular instrument system is being developed to handle the many channels of data commonly encountered in turbojet engine testing. Each module contains a group of transducers and all the signal conditioning, multiplexing, and digitizing electronics necessary for direct interface with a digital computer. The digital interface within each module is the same for all modules. Each module provides a controlled environment for its contents. A minicomputer in the control room gathers the data, performs some on-line calculation and display, and interfaces with a shared recording and computing system. The advantages of this system are (1) reduced manpower for system installation, setup, and checkout; (2) standardized equipment interfaces; (3) increased reliability through automatic system testing and through minimization of manual adjustments; and (4) reduced cost through minimization of wiring and simplification of control room display.

Nieberding, W. C.↗

MEGASTAR: The Meaning of Energy Growth: An Assessment of Systems, Technologies, and Requirements

A methodology for the display and analysis of postulated energy futures for the United States is presented. A systems approach that includes the methodology of technology assessment is used to examine three energy scenarios--the Westinghouse Nuclear Electric Economy, the Ford Technical Fix Base Case and a MEGASTAR generated Alternate to the Ford Technical Fix Base Case. The three scenarios represent different paths of energy consumption for the present to the year 2000. Associated with these paths are various mixes of fuels, conversion, distribution, conservation and end-use technologies. MEGASTAR presents the estimated times and unit requirements to supply the fuels, conversion and distribution systems for the postulated end uses for the three scenarios and then estimates the aggregate manpower, materials, and capital requirements needed to develop the energy system described by the particular scenario. The total requirements and the energy subsystems for each scenario are assessed for their primary impacts in the areas of society, the environment, technology and the economy.

Source record↗

Space shuttle orbiter vehicle star tracker test program plan

The development model test program was written to provide guidance for essential star tracker test support to the Space Shuttle Orbiter Program. The program organization included test equipment preparation, prototype baseline/acceptance tests, prototype total performance tests, and prototype special tests. Test configurations, preparation phase, documentation, scheduling, and manpower requirements are discussed. The test program permits an early evaluation of the tracker's performance prior to completion and testing of the final flight models.

Smith, R. A.↗

MEGASTAR: The meaning of growth. An assessment of systems, technologies, and requirements

A methodology for the display and analysis of postulated energy futures for the United States is presented. A systems approach methodology including the methodology of technology assessment is used to examine three energy scenarios--the Westinghouse Nuclear Electric Economy, the Ford Technical Fix Base Case and a MEGASTAR generated Alternate to the Ford Technical Fix Base Case. The three scenarios represent different paths of energy consumption from the present to the year 2000. Associated with these paths are various mixes of fuels, conversion, distribution, conservation and end-use technologies. MEGASTAR presents the estimated times and unit requirements to supply the fuels, conversion and distribution systems for the postulated end uses for the three scenarios and then estimates the aggregate manpower, materials, and capital requirements needed to develop the energy system described by the particular scenario.

Source record↗

User community development for the space transportation system/Skylab

The New User Function plan for identifying beneficial uses of space is described. Critical issues such as funding, manpower, and protection of user proprietary rights are discussed along with common barriers which impede the development of a user community. Studies for developing methodologies of identifying new users and uses of the space transportation system are included.

Archer, J. L.↗