Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LAUNCHING FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Space Station services and design features for users

The operational design features and services planned for the NASA Space Station will furnish, in addition to novel opportunities and facilities, lower costs through interface standardization and automation and faster access by means of computer-aided integration and control processes. By furnishing a basis for large-scale space exploitation, the Space Station will possess industrial production and operational services capabilities that may be used by the private sector for commercial ventures; it could also ultimately support lunar and planetary exploration spacecraft assembly and launch facilities.

Kurzhals, Peter R.↗

NASA’s Space Launch System Progress Report

NASA’s Space Launch System (SLS) continues to achieve assembly and testing milestones on its way to the launch of the first human-rated spacecraft to the Moon since the Apollo Program. Major flight hardware for Artemis I (see Fig. 1), formerly known as Exploration Mission 1 (EM-1), is complete, including the liquid and solid main propulsion systems. The Artemis I core stage is fully assembled and engine integration and checkout is underway. Structural testing on the core stage engine and payload sections and intertank are complete. Liquid hydrogen tank structural testing is under way, and liquid oxygen tank structural testing will begin in fall 2019. Major structural components for the second and third flights are also in production; hardware has been fabricated for each element of the Artemis II vehicle. SLS and the Orion crew vehicle along with the Exploration Ground Systems (EGS) launch facilities at Kennedy Space Center are critical to the nation’s plans to return to the Moon to stay in a measured, sustainable fashion. Lunar exploration will expand our understanding of Earth’s formation, serve as a proving ground for technologies for pushing deeper into the solar system, and inspire a new generation. This paper will discuss details of 2018-2019 progress and the work ahead to ready SLS for launch.

Honeycutt, John↗

From A-4 to Explorer 1

Historical review of the development of rocket and missile technology in the United States over the period from 1945 to 1958. Attention is given to the organization of activities, the launch facilities, and the scope of test rocket firings at the White Sands Proving Ground area during the initial phase of research with captured German V2 rockets. The development of the Redstone missiles is outlined by discussing aspects of military involvement, cooperation with industrial suppliers, details of ground support equipment, and results of initial test firings. Subsequent development of the Jupiter missiles is examined in a similar manner, and attention is given to activities involved in the launching of the Explorer 1 satellite.

Debus, K. H.↗

COMET: First mission progress

The COMmercial Experiment Transporter (COMET) is a set of hardware and related infrastructure used to support orbital experiments of the Commerical Centers for the Development of Space (CCDS's) and their industrial partners. During the three years since the program started, contracts have been signed, design reviews conducted on all components, experiments selected for the first mission, all hardware has been manufactured, the first phase of integrated testing of the satellite, the experiments, and the Launch Facility have all been completed. The program experienced several delays in 1993. A component failure in the Service Module during preparation for environmental testing in January resulted in an eight-week delay for the Service Module part of the FreeFlyer. Discovery of large overruns of the mass budget required a major revision of the mission profile for COMET 1. In the spring of 1993, Space Industries Incorporated (SII) and Westinghouse stopped work because of a lack of funds. EER continued to work toward completion of their launch systems. SII and Westinghouse resumed work in September 1993. Since resumption of work, a technical review of all systems to ascertain their state of readiness has been completed. No major problems were discovered. All systems are proceeding toward a launch date in the first quarter of 1994.

Pawlick, Joseph F., Jr.↗

Sizing of "Mother Ship and Catcher" Concepts for LEO Small Debris Capture

Most Low Earth Orbit (LEO) debris lies in a limited number of inclination "bands" associated with launch latitudes, or with specific useful orbit inclinations (such as polar orbits). Such narrow inclination bands generally have a uniform spread over all possible Right Ascensions of Ascending Node (RAANs), creating a different orbit plane for nearly every piece of debris. This complicates concept of rendezvous and capture for debris removal. However, a low-orbiting satellite will always phase in RAAN faster than debris objects in higher orbits at the same inclination, potentially solving the problem. Such a base can serve as a single space-based launch facility (a "mother ship") that can tend and then send tiny individual catcher devices for each debris object, as the facility drifts into the same RAAN as the higher object. This presentation will highlight characteristic system requirements of such an architecture, including structural and navigation requirements, power, mass and dV budgets for both the mother ship and the mass-produced common catcher devices that would clean out selected inclination bands. The altitude and inclination regime over which a band is to be cleared, the size distribution of the debris, and the inclusion of additional mission priorities all affect the sizing of the system. It is demonstrated that major LEO hazardous debris reductions can be realized in each band with a single LEO launch of a single mother ship, with simple attached catchers of total mass less than typical commercial LEO launch capability.

Bacon, John B.↗

Transforming any Facility for Meeting Strict Cleanliness Requirements

Over the life of the James Webb Space Telescope (JWST), Integration & Test (I&T) has taken place in areas that needed considerable work to make the facility itself and/or the protocols used while working in the rooms suitable to meet JWST percent area coverage (PAC) and molecular accumulation requirements. In addition to normal particulate matter, JWST had a uniquely significant challenge: fibers! Fibers not only cause much higher PAC levels, but they also risk damaging the angstrom sized Near Infrared Spectrometer (NIRSpec) microshutter array (MSA), which is critical to NIRSpec instrument performance. The primary emphasis of this paper is to address particulate and fiber contamination. The success of the JWST mission required effective cleanrooms, protocols, and mitigations in non-cleanroom areas that were pressed into service to house contamination-sensitive optics and scientific instruments. Some presented profound challenges. These included: NASA’s 60-year-old Johnson Space Center (JSC) Chamber A, which had never been used for anything contamination-sensitive, and the European tropical launch facilities, which were designed to meet International Standard Organization (ISO) Class 8 processing for communication satellites. The final challenge for JWST, as if to stare us in the face and say, “I dare you to try and make me clean enough,” was preparing the 4 areas in the Centre Spatial Guyanais (CSG) Final Assembly Building (BAF) located in French Guiana, a building in which one entire side opens for Ariane 5 rocket ingress and egress. This paper will describe our initial evaluation processes and the actual work undertaken to transform even the most challenging areas into first class cleanrooms that met JWST particulate and fiber requirements.

James Webb Space Telescope↗

NASA’s Space Launch System: Progress Toward Launch

The Space Launch System (SLS), NASA’s cornerstone launch capability for a new generation of deep space exploration, has begun assembly at Kennedy Space Center (KSC) in preparation for launch in 2021. SLS will provide an unparalleled launch capability for human and robotic deep space exploration missions. Its proven propulsion system, upgrade path to more powerful vehicles, and high-volume payload fairings make it the foundation for ambitious and demanding as part of the Artemis program. Artemis is NASA’s 21st-century plan to put boots on the Moon and to perform sustainable, long-term science in deep space, with eyes toward sending explorers to Mars. The initial SLS vehicle to fly, Block 1 in the crew configuration – with the new Orion spacecraft – is scheduled to lift off from revitalized launch facilities at KSC in 2021 for an uncrewed test flight known as Artemis I. Manufacturing is complete on the vehicle and all elements have been delivered to the Exploration Ground Systems (EGS) Program, except the core stage. The program’s all-new development, the core stage is currently in the midst of a “Green Run” test campaign at Stennis Space Center (SSC). Eight progressively more challenging tests in the Green Run series will culminate in a hot-fire of four flight-proven liquid hydrogen/liquid oxygen (LH2/LOX) RS25 engines. Following the Green Run hotfiring, the core stage will ship to KSC. Already at KSC, aft sections of the fivesegment solid rocket boosters are being assembled. Previously delivered elements, including the upper stage, are undergoing final checkouts in preparation for stacking. An exciting 2021 will include such milestones as stacking SLS and Orion in KSC’s Vehicle Assembly Building (VAB), modal testing, roll out to Launch Pad 39B, Wet Dress Rehearsal (WDR), and launch. Teams across the country are preparing for launch by finalizing procedures, defining launch constraints and flight rules, training console operators, performing simulations, and more. With the SLS Block 1 vehicle for Artemis I nearing integration and launch, the second Block 1 vehicle in the crew configuration, which will carry astronauts on an Artemis II hybrid lunar flyby mission, has several elements manufactured. In fact, the solid rocket motor segments and RS-25 engines are complete. Those program elements are processing hardware for the third flight and working toward manufacturing the second SLS variant to fly, Block 1B, which will onramp a powerful new upper stage, the Exploration Upper Stage (EUS).

John Honeycutt↗

A Five-year Performance Study of Low VOC Coatings over Zinc Thermal Spray for the Protection of Carbon Steel at the Kennedy Space Center

The launch facilities at the Kennedy Space Center (KSC) are located approximately 1000 feet from the Atlantic Ocean where they are exposed to salt deposits, high humidity, high UV degradation, and acidic exhaust from solid rocket boosters. These assets are constructed from carbon steel, which requires a suitable coating to provide long-term protection to reduce corrosion and its associated costs. While currently used coating systems provide excellent corrosion control performance, they are subject to occupational, safety, and environmental regulations at the Federal and State levels that limit their use. Many contain high volatile organic compounds (VOCs), hazardous air pollutants, and other hazardous materials. Hazardous waste from coating operations include vacuum filters, zinc dust, hazardous paint related material, and solid paint. There are also worker safety issues such as exposure to solvents and isocyanates. To address these issues, top-coated thermal spray zinc coating systems were investigated as a promising environmentally friendly corrosion protection for carbon steel in an acidic launch environment. Additional benefits of the combined coating system include a long service life, cathodic protection to the substrate, no volatile contaminants, and high service temperatures. This paper reports the results of a performance based study to evaluate low VOC topcoats (for thermal spray zinc coatings) on carbon steel for use in a space launch environment.

Zinc Thermal Spray↗

Modular space station phase B extension: Shuttle interface requirements

The interface requirements cover both the ground and orbital phases of operation from the launch of the first MSS module until the initial modular station has been manned and in routine operation. As a point of reference, the two-stage, fully reusable space shuttle was selected. The space shuttle is briefly described from the standpoint of its features most important to the interface requirements with the MSS. The environment induced upon the MSS elements when transported to and from orbit by the shuttle orbiter also is included. The mission operation includes the space shuttle launch facilities, the ground flow of the MSS modules, and the orbital operations of rendezvous, MSS buildup, resupply of the manned station, and orbiter descent and landing. The shuttle's once-around abort case is described as it affects the MSS interface requirements. The interfaces between the orbiter and the MSS resulting from the ground and orbital operations, are also described.

Source record↗

Observations of fast auroral waves.

Results of simultaneous observation of a fast wave event from the Ester Dome Observatory (EDO) near College, Alaska, the Poker Flat Rocket Launching Facility (PKR), and Fort Yukon, Alaska (FYU). The display occurred on Mar. 27, 1971, and the general morphology is described and discussed. It is suggested that fast auroral waves occur when a preceding substorm has enhanced the particle population in the region of the magnetosphere near L = 6 in the midnight sector; then transverse hydromagnetic waves, associated with the onset of further local substorm activity, become visible through their action on this enhanced particle population as they propagate inwards in the equatorial region.

Boyd, J. S.↗

Manned space flight nuclear system safety. Volume 3: Reactor system preliminary nuclear safety analysis. Part 1: Reference Design Document (RDD)

The Reference Design Document, of the Preliminary Safety Analysis Report (PSAR) - Reactor System provides the basic design and operations data used in the nuclear safety analysis of the Rector Power Module as applied to a Space Base program. A description of the power module systems, facilities, launch vehicle and mission operations, as defined in NASA Phase A Space Base studies is included. Each of two Zirconium Hydride Reactor Brayton power modules provides 50 kWe for the nominal 50 man Space Base. The INT-21 is the prime launch vehicle. Resupply to the 500 km orbit over the ten year mission is provided by the Space Shuttle. At the end of the power module lifetime (nominally five years), a reactor disposal system is deployed for boost into a 990 km high altitude (long decay time) earth orbit.

Source record↗

The evolution of location and data collection systems in the United States.

Satellite location and data collection systems development began in the early 1960's in NASA and the French CNES. These systems were initially developed for application to meteorology and oceanography as a means of tracking moving platforms on a global scale. Additional applications such as geology, hydrology, and ecology have since evolved. To date, five successful missions have been completed. With each successive launch, systems improved in accordance with user requirements - particularly reduction in cost and complexity of platform equipment. With planned launches, facilities will be available to the user community through 1980; NASA is currently forecasting needs beyond 1980.

Morakis, J. C.↗

MSFC Skylab ATM calibration rocket project

The Apollo Telescope Mount (ATM) Calibration Rocket (CALROC) performances and anomalies encountered are discussed. The performance period included six CALROC flights during the Skylab 2, 3 and 4 missions as well as those rocket flights prior to the Skylab mission which carried CALROC hardware for test purposes. Background material such as project purpose, management, launch facilities, booster and payload configuration is included for better understanding of the CALROC payload and its mission objectives.

Source record↗

Effects of fragments

Methods used to determine structural damage caused by fragments from accidental explosions are outlined. Structures considered include launch facilities for liquid propellant rockets and metal plates and sheets. Penetrating and nonpenetrating fragments were considered.

Source record↗