Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Jettison”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Orbiter aborts from boost: Presimulation report

A description of a hybrid simulation of the 040C orbiter aborting from boost to specified landing site is provided. The simulation starts when the abort is initiated and continues until a terminal energy state (associated with the selected landing site) is reached. At abort it is assumed that all SRM's are jettisoned with the external tank remaining with the orbiter. The simulation described has six degrees of freedom with the vehicle simulated as a rigid body. A conventional form of autopilot is provided to control engine gimbaling during powered flight. An ideal form of an autopilot is provided to test conventional autopilot function and provide pseudo RCS function during coasting flight. The simulation is proposed to provide means for studies of abort guidance function and to gain information concerning ability to control the abort trajectory.

Backman, H. D.↗

Apollo experience report: Launch escape propulsion subsystem

The Apollo launch escape propulsion subsystem contained three solid rocket motors. The general design, development, and qualification of the solid-propellant pitch-control, tower-jettison, and launch-escape motors of the Apollo launch escape propulsion subsystem were completed during years 1961 to 1966. The launch escape system components are described in general terms, and the sequence of events through the ground-based test programs and flight-test programs is discussed. The initial ground rules established for this system were that it should use existing technology and designs as much as possible. The practicality of this decision is proved by the minimum number of problems that were encountered during the development and qualification program.

Townsend, N. A.↗

Test report for 120-inch-diameter Solid Rocket Booster (SRB) model tests

The space shuttle solid rocket boosters (SRB's) will be jettisoned to impact in the ocean within a 200-mile radius of the launch site. Tests were conducted at Long Beach, California, using a 12-inch diameter Titan 3C model to simulate the full-scale characteristics of the prototype SRB during retrieval operations. The objectives of the towing tests were to investigate and assess the following: (1) a floating and towing characteristics of the SRB; (2) need for plugging the SRB nozzle prior to tow; (3) attach point locations on the SRB; (4) effects of varying the SRB configuration; (5) towing hardware; and (6) difficulty of attaching a tow line to the SRB in the open sea. The model was towed in various sea states using four different types and varying lengths of tow line at various speeds. Three attach point locations were tested. Test data was recorded on magnetic tape for the tow line loads and for model pitch, roll, and yaw characteristics and was reduced by computer to tabular printouts and X-Y plots. Profile and movie photography provided documentary test data.

Jones, W. C.↗

Multi-point release mechanism

A multi-point release mechanism used on the communications technology satellite. The mechanism is designed to jettison one large panel and to release a second panel; both panels have independent multi-point attachments to the spacecraft and require to be released in sequence. The solar array is stowed concertina fashion under 2 psi pressure to ensure that no movement occurs between the stowed folds of the array during the launch. One pair of linear pyrotechnic-actuators releases both the JBSA and the pressure plate via the release mechanism. This release mechanism has successfully passed qualification level vibration launch and thermal environment tests and has accumulated to date close to 30 successful releases.

Groskopfs, E.↗

Mission requirements: Skylab rescue mission SL-R

The Skylab Program includes three low earth orbit missions. These missions are designated SL-1/SL-2,SL-3 and SL-4. In addition to the three nominal Skylab missions, the program includes the Skylab Rescue Mission (SL-R). The SL-R mission is designed to provide a safe return of the Skylab crew in the event the Command Service Module (CSM) becomes disabled while docked to the Saturn Workshop (SWS). Mission requirements for the SL-R mission only are presented. SL-R mission configuration will be a CSM (modified with a field installed kit) manned by two crewmen launched on a Saturn IB Launch Vechicle. The SL-R CSM will rendezvous and dock with the SWS (or Orbital Assembly (OA), consisting of the SWS and disabled CSM, if the disabled CSM has not previously been jettisoned). The SWS configuration includes a Multiple Docking Adapter (MDA), Apollo Telescope Mount (ATM), Airlock Module (AM), and an S-IVB stage (modified as an Orbital Workshop (OWS), previously launched and inserted into orbit on a two-stage Saturn V Launch Vehicle for the SL-1/SL-2 mission.

Source record↗

Thrust-isolating mounting

A supporting frame for a load, such as one or more telescopes, is isolated from all multi-gravitational forces, which will be developed within that load as that load is propelled into space, by using a shroud to fully and solidly hold that load until that load has been propelled into space. Thereafter, that shroud will be jettisoned; and then supports which are on, and which are movable with, that load will have surfaces thereon moved into supporting engagement with complementary surfaces on that supporting frame to enable that supporting frame and those supports to fully and solidly hold that load.

Wetzler, D. G.↗

Trajectory description

The Mariner 9 spacecraft was launched by an Atlas/Centaur launch vehicle (AC-23) on a direct-ascent trajectory from the Air Force Eastern Test Range (AFETR) launch complex 36B on May 30, 1971. Liftoff occurred at 22 h 23 min 04.5 s GMT, slightly more than 6 min after the opening of a 60-min launch window. The vehicle rose vertically for approximately 15 s, during which time, a programmed roll to a launch azimuth of 92.74 deg was performed. After the initial vertical rise, the vehicle, guided by the open-loop Atlas autopilot, began to pitch over into a zero-lift trajectory. The first of three main powered phases was terminated by booster engine cutoff (BECO) at 22 h 25 min 35.5 s. After the Atlas booster engine package was jettisoned 3 s later, the flight continued under the power of the Atlas sustainer engine and guided by the Centaur guidance system operating in a closed-loop mode.

Webb, W. A.↗

Study of the adaptability of existing hardware designs to a Pioneer Saturn/Uranus probe

The basic concept of designing a scientific entry probe for the expected range of environments at Saturn or Uranus and making the probe compatible with the interface constraints of the Pioneer spacecraft was investigated for launches in the early 1980's. It was found that the amount of hardware commonality between that used in the Pioneer Venus program and that for the Saturn/Uranus probe was approximately 85%. It is recommended that additional development studies be conducted to improve the hardware definitions of the probe design for the following: heat shield, battery, nose cap jettisoning, and thermal control insulation.

Source record↗

Titan/Centaur T/C-1 post flight evaluation report

The first Titan/Centaur launch vehicle, TC-1, was launched from the Eastern Test Range Complex 41 at 09:48:01.46 hours Eastern Daylight Time on February 11, 1974. The vehicle carried a dynamic mass model of the Viking spacecraft and a SPHINX spacecraft, intended to study high voltage interactions in space. This launch was a Proof Flight of a vehicle con- figuration integrating the Air Force Titan booster and the NASA Centaur upper stage. It also was the first flight of the Centaur Standard Shroud developed for the Titan/Centaur. The countdown for the launch proceeded normally except for an additional 45 minute hold which was required to resolve a question concerning interpretation of booster hydraulic system data. The launch window opened at 09:03:00 hours Eastern Daylight Time. The vehicle was launched o on a flight azimuth of 105°. The Titan boost phase of flight was satisfactory. Solid Motor operation, Stage I and Stage II operation were normal. Venting of the Centaur Standard Shroud during ascent was successful and shroud separation and jettison was accomplished without incident. At the completion of the Titan Stage II burn, the Centaur successfully separated from the Titan. At this time, the Centaur main engines were sequenced through the first planned starting cycle but failed to achieve steady state operation. The vehicle flight control system, not sensing vehicle acceleration, commanded engine shutdown, and recycled, as programmed, through a back-up engine start attempt. The second engine start attempt was also unsuccessful. The flight control system then placed the vehicle in a coast-phase mode and the vehicle continued downrange in free fall. The vehicle was destroyed by Range Safety when the impact point was approximately 2200 nautical miles downrange, 12 minutes, 28.5 seconds after liftoff.

S. V. Szabo, Jr.↗

Centaur Standard Shroud (CSS) static limit load structural tests

The structural capabilities of the jettisonable metal shroud were tested and the interaction of the shroud with the Centaur stage was evaluated. A flight-configured shroud and the assemblies of the associated Centaur stage were tested for applied axial and shear loads to flight limit values. The tests included various thermal, pressure, and load conditions to verify localized strength capabilities, to evaluate subsystem performance, and to determine the aging effect on insulation system properties. The tests series verified the strength capabilities of the shroud and of all associated flight assembles. Shroud deflections were shown to remain within allowable limits so long as load sharing members were connected between the shroud and the Centaur stage.

Eastwood, C.↗

Centaur Standard Shroud (CSS) static ultimate load structural tests

A series of tests were conducted on the jettisonable metallic shroud used on the Titan/Centaur launch vehicle to verify its structural capabilities and to evaluate its structural interaction with the Centaur stage. A flight configured shroud and the interfacing Titan/Centaur structural assemblies were subjected to tests consisting of combinations of applied axial and shear loads to design ultimate values, including a set of tests on thermal conditions and two dynamic response tests to verify the analytical stiffness model. The strength capabilities were demonstrated at ultimate (125 percent of design limit) loads. It was also verified that the spring rate of the flight configured shroud-to-Centaur forward structural deflections of the specimen became nonlinear, as expected, above limit load values. This test series qualification program verified that the Titan/Centaur shroud and the Centaur and Titan interface components are qualified structurally at design ultimate loads.

Source record↗

Doppler tracking experiment MA-089

The Doppler tracking experiment was designed to test the feasibility of improved mapping of earth gravity field anomalies by means of the low-low satellite-to-satellite tracking method. All prescribed data have been retrieved and are currently being reduced and analyzed. Baseline data taken while the docking module was still attached to the command and service module indicated that the equipment operated satisfactorily. The efficacy of the two frequency ionospheric correction method has been demonstrated, and preliminary reduction of a data sample has successfully removed extraneous signatures down to the 50-millihertz level, where the rotational motion of the docking module is revealed. Photographs of the docking module, taken shortly after jettison, show that its rotation was stable.

Weiffenbach, G. C.↗

Unsteady aerodynamic flow field analysis of the space shuttle configuration. Part 3: Unsteady aerodynamics of bodies with concave nose geometries

An analysis of the unsteady aerodynamics of bodies with concave nose geometries was performed. The results show that the experimentally observed pulsating flow on spiked bodies and in forward facing cavities can be described by the developed simple mathematical model of the phenomenon. Static experimental data is used as a basis for determination of the oscillatory frequency of spike-induced flow pulsations. The agreement between predicted and measured reduced frequencies is generally very good. The spiked-body mathematical model is extended to describe the pulsations observed in forward facing cavities and it is shown that not only the frequency but also the pressure time history can be described with the accuracy needed to predict the experimentally observed time average effects. This implies that it should be possible to determine analytically the impact of the flow pulsation on the structural integrity of the nozzles for the jettisoned empty SRM-shells.

Ericsson, L. E.↗

Molecular shield - An orbiting low-density materials laboratory

Analysis of a molecular shield orbited at 200 km utilizes the kinetic theory of a drifting Maxwellian gas, applied to a hemispherical shell geometry containing internal sources. The molecular shield provides very low gas density conditions for materials experiments at low gravity, while the hemispherical geometry minimizes the internal surface/volume ratio. Deployment of the shield in orbit is described. Contributions to density by shield outgassing, by experiment outgassing, and by interaction with the orbiter are discussed separately. A jettisonable closure plate sealing the hemisphere minimizes any risk of experiment contamination during deployment.

Melfi, L. T., Jr.↗

Deep Space Network to Viking Orbiter telecommunications performance during the Viking extended mission, November 1976 - February 1978

The telecommunications performance during the Viking extended mission, starting with the completion of the first superior conjunction in November 1976 and ending with the jettison of the VO-2 aft bioshield early in March 1978 is discussed. Viking Orbiter activities and problems, the ground system activities and problems, radio science activities, and communication link performance are included. The substantial involvement of the Deep Space Network and the coordination of their telecommunication planners with Viking Project telecommunications analysts in the planning and execution of complex Viking Orbiter sequences are discussed.

Taylor, F. H. J.↗

Study to determine the aquatic biological effects on the Solid Rocket Booster (SRB)

The surface of the reusable solid rocket boosters (SRB), which are jettisoned from the Shuttle Orbiter to parachute in the sea, are studied for colonization by marine life. Techniques for monitoring the marine microbial fouling of SRB materials are presented. An assessment of the nature and degree of the biofouling expected on the SRB materials in the recovery zone is reported. A determination of the degree and the effects of seasonal variation occurring on microbial fouling in the retrieval zone waters is made. The susceptibility of the SRB parachute recovery system to microbial fouling and biodeterioration is investigated. The development of scanning electron microscopy and epifluorescence microscopic observation techniques for rapid assessment of microbial fouling is discussed.

Colwell, R. R.↗

A spin-recovery parachute system for light general-aviation airplanes

A tail mounted spin recovery parachute system was designed and developed by the NASA Langley Research Center for use on light general aviation airplanes. The system was designed for use on typical airplane configurations, including low wing, single engine, and twin-engine design. A mechanically triggered pyrotechnic slug gun is used to forcibly deploy a pilot parachute which extracts a bag that deploys a ring slot spin recovery parachute. The total system weighs 8.2 kg (18 lb). System design factors included airplane wake effects on parachute deployment, prevention of premature parachute deployment, positive parachute jettison, compact size, low weight, system reliability, and pilot and ground crew safety. Extensive ground tests were conducted to qualify the system. The recovery parachute was used successfully in flight 17 times.

Bradshaw, C.↗

Emergency in-flight egress opening for general aviation aircraft

In support of a stall/spin research program, an emergency in-flight egress system is being installed in a light general aviation airplane. To avoid a major structural redesign for a mechanical door, an add-on 11.2 kg pyrotechnic-actuated system was developed to create an opening in the existing structure. The airplane skin will be explosively severed around the side window, across a central stringer, and down to the floor, creating an opening of approximately 76 by 76 cm. The severed panel will be jettisoned at an initial velocity of approximately 13.7 m/sec. System development included a total of 68 explosive severance tests on aluminum material using small samples, small and full scale flat panel aircraft structural mock-ups, and an actual aircraft fuselage. These tests proved explosive sizing/severance margins, explosive initiation, explosive product containment, and system dynamics.

Bement, L. J.↗