Radiation Hardened Foam Cold Test Plan - Phase II: Foam Characterization Testing and Environmental Chamber Testing of FoamBag Fixative Foam

This document outlines the Phase II test objectives and implementation plan for a down-select foam fixative technology intended to facilitate activities in support of the Savannah River Site (SRS) F/H labs deactivation and decommissioning (D&D) efforts. It is a collaborative effort between Savannah River National Laboratory (SRNL), Florida International University (FIU), and the SRS F/H labs team intended to test and evaluate the potential of a polyurethane resin foam in mitigating the release of contamination during dismantling operations on radioactively contaminated piping in legacy facilities. The cold test plan addresses specific requirements highlighted by site and safety personnel and will be executed at FIU and SRNL test and lab facilities. Results from the cold tests will inform the hot test at F/H labs, which will use the foam fixative to confine and/or isolate residual contamination within a 3-dimensional void space of Hastelloy C-22 piping designated for removal from the area and transported to a designated disposal facility. Phase I testing was previously conducted using Hilti CP620 fixative foam. Results from Phase I testing indicate Hilti CP-620 fixative foam is incompatible with SRS site hot taps as an effective foam delivery method into Hastelloy C-22 piping. Phase II testing will be conducted using FoamBag TM fixative foam as an alternative fixative foam option. Phase II testing will address eight test objectives: (1) evaluation of the adhesion and bonding properties of FoamBag TM in Hastelloy C-22 piping, (2) evaluation of the adhesion of FoamBag TM in piping under various moisture conditions, (3) determination of the heat profile of FoamBag TM during curing, (4) determination of the internal pipe pressure after FoamBag TM deployment and curing, (5) conduct a leak test to determine if FoamBag TM is effective at creating a full seal within piping, (6) headspace testing of FoamBag TM to determine if there are any associated off-gas hazards during FoamBag TM curing, (7) conduct environmental chamber testing of FoamBag TM to understand how environmental parameters impacts FoamBag TM curing, and (8) conduct fire testing to evaluate FoamBag TM fire retardant characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiation Hardened Foam Cold Test Plan – Phase-I: Foam Adhesion, Contamination Fixation, Moisture Stresses, Pipe Cutting, and Thermal Profile Testing

This document outlines the Phase-I test objectives and implementation plan for a down-selective foam fixative technology intended to facilitate activities in support of the Savannah River Site (SRS) F/H labs deactivation and decommissioning (D&D) efforts. It is a collaborative effort between Savannah River National Laboratory (SRNL), Florida International University (FIU), and the SRS F/H labs team intended to test and evaluate the potential of an intumescent, fire-retardant foam in mitigating the release of contamination during dismantling operations on radioactively contaminated piping in legacy facilities. The cold test plan addresses specific requirements highlighted by site and safety personnel and will be executed in FIU’s Outdoor Test and Evaluation Facility using a mock-up that replicates the operational conditions at the proposed hot test location at F/H labs. Results from the cold test plan will inform the hot test at F/H labs, which will use the foam fixative to confine and/or isolate residual contamination within a 3-dimensional void space of Hastelloy C-22 piping designated for removal from the site and transported to a proper disposal facility. Phase-I testing will address eight test objectives: (1) evaluation of the adhesion and bonding properties of foam fixative in piping, (2) evaluation of the adhesion of the foam fixative in piping under varying moisture conditions, (3) determination of the heat profile of the foam fixative during curing, (4) determination of the relationship between pipe diameter and foam fixative quantity, (5) determination of the internal pipe pressure after foam deployment and curing, (6) development of a leak test standard operating procedure to test for the effectiveness of the foam plug, (7) initiation of a literature review to determine if using a hot tap is a viable method to deliver foam into piping, and (8) initiation of a 10-foot mock up test that will be used in Phase-II cold testing. The cold test will be conducted at FIU and all testing activities will comply with SRNL Conduct of R&D Protocols (SRNL-IM-2020-00019).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Workshop on Establishing and Operating a National Nuclear Security Support Centre Hypothetical Scenario: “Centralia Nuclear Security Support Centre Technical Support Plan”

This plan outlines the systemic and coordinated management of the CNSSC technical support programme. In accordance with the CNSSC Strategy Implementation Plan and Memoranda of Understanding among stakeholders, Centralia Border Guards (CBG) and Centralia Nuclear Energy Agency (CNEA) will lead the effort to develop standardized approach to technical support and will provide technical support to the following CNSSC stakeholders: CBG, CNEA, Centralia National Police (CNP), Centralia Coast Guard (CCG), and CentrAtom/Centralia Nuclear Power Plant (CNPP).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Poster — Thur Eve — 76: Dosimetric Comparison of Pinnacle and iPlan Algorithms with an Anthropomorphic Lung Phantom

Our goal is to compare the dosimetric accuracy of the Pinnacle-3 9.2 Collapsed Cone Convolution Superposition (CCCS) and the iPlan 4.1 Monte Carlo (MC) and Pencil Beam (PB) algorithms in an anthropomorphic lung phantom using measurement as the gold standard. Ion chamber measurements were taken for 6, 10, and 18 MV beams in a CIRS E2E SBRT Anthropomorphic Lung Phantom, which mimics lung, spine, ribs, and tissue. The plan implemented six beams with a 5×5 cm{sup 2} field size, delivering a total dose of 48 Gy. Data from the planning systems were computed at the treatment isocenter in the left lung, and two off-axis points, the spinal cord and the right lung. The measurements were taken using a pinpoint chamber. The best results between data from the algorithms and our measurements occur at the treatment isocenter. For the 6, 10, and 18 MV beams, iPlan 4.1 MC software performs the best with 0.3%, 0.2%, and 4.2% absolute percent difference from measurement, respectively. Differences between our measurements and algorithm data are much greater for the off-axis points. The best agreement seen for the right lung and spinal cord is 11.4% absolute percent difference with 6 MV iPlan 4.1 PB and 18 MV iPlan 4.1 MC, respectively. As energy increases absolute percent difference from measured data increases up to 54.8% for the 18 MV CCCS algorithm. This study suggests that iPlan 4.1 MC computes peripheral dose and target dose in the lung more accurately than the iPlan 4.1 PB and Pinnicale CCCS algorithms.

60 APPLIED LIFE SCIENCES↗

Optimizing Energy Use in Pulp & Paper with DOE’s Energy Intensive Industries Resources

The U.S. pulp and paper industry is the third-largest energy consumer in manufacturing, accounting for roughly 10% of sector energy use. Improving energy efficiency reduces operating costs and strengthens competitiveness. To support this effort, the U.S. Department of Energy (DOE), through Oak Ridge National Laboratory (ORNL), launched the Energy Intensive Industries (EII) Initiative. A two-year pilot across 45 industrial sites identified more than 4 trillion Btu/year in potential energy savings. This presentation outlines plans for a follow-up technical assistance program tailored to pulp and paper mills. Available resources include a cost-savings scoping tool, implementation planning guidance, and technical support for applying advanced methods such as Pinch Analysis for integrated process-utilities optimization. The session introduces key Pinch Analysis principles and highlights case studies demonstrating measurable improvements. ORNL also seeks industry feedback on barriers to efficiency improvements, including technology gaps and resource needs. DOE’s broader objective is to accelerate productivity and economic competitiveness across U.S. energy-intensive industries.

Kamath, Dipti [ORNL] (ORCID:0000000278739994)↗

SU-F-T-343: Dosimetric Investigation for Fluence Smoothing On VMAT Plans in Monaco for Head - Neck Cancers

Purpose: The study investigates the effect of fluence smoothing parameter on VMAT plans for ten head-neck cancer patients using Monaco5.00.04. Methods: VMAT plans were created using Monaco5.00.04 planning system for 10 head-neck patients. Four plans were generated for each patient using available smoothing parameters i.e. high, medium, low and off. The number of monitor units required to deliver 1 cGy was defined as a modulation degree; and was taken as a measure of plan complexity. Routinely used plan quality parameters Conformity index (CI) and Homogeneity index (HI) were used in the study. As a protocol our center, practices “medium” smoothing for clinical implementation. Plans with medium smoothing were opted as reference plans due to the clinical acceptance and dosimetric verifications made on these plans. Plans were generated by varying the smoothing parameter and re-optimization was done. The PTV was evaluated for D98%, D95%, D50%, D1% and prescription isodose volume (PIV). For critical organs; spine and parotids the parameters recorded were D1cc and Dmean respectively. Results: The cohort had the median prescription as 6000 cGy in the range of 6600 cGy - 4500 cGy. The modulation degree was observed to increase up to 6% from reference to the most complex plan. High smoothing had about 11% increase in segments which marginally (0.5 to 1%) increased the homogeneity index while conformity index remains constant. For spine the maximum D1cc was observed in medium smoothing as 4639.8 cGy, this plan was clinically accepted and dosimetrically verified. Similarly for parotids, the Dmean was 2011.9 cGy and 1817.05 cGy. Conclusion: The sensitivity of plan quality in terms of smoothing options (high, medium, low and off) available in Monaco 5.00.04 was resulted in minimal difference in terms of target coverage, conformity index and homogeneity index. Similarly changing smoothing did not result in any enhanced advantage in sparing of critical organs.

60 APPLIED LIFE SCIENCES↗

Waste Management Project Success - Regulatory Assurance Systems - 20118

Waste management (WM) and remediation projects are essential within a restorative environmental culture. Despite years of experience, challenges and obstacles associated with efficient and effective WM project execution remain. Although some obstacles are project specific, a common challenge is navigating the regulatory landscape from planning through execution, particularly with first of a kind (FOAK) and first in a while (FIAW) projects. The absence of a comprehensive regulatory assurance strategy places significant hurdles in the path of project success. To clear a path for the successful execution of increasingly complex WM projects, this paper focuses on development of a comprehensive regulatory assurance strategy and implementation plan that effectively engages stakeholders, agencies, and performers to produce project plans that fully and cost effectively integrate applicable regulatory requirements. The most reliable way to align regulatory processes and decisions needed for mission success is through a regulatory assurance system. This system establishes a healthy interface with regulatory decision makers, to work in a collaborative manner, to create a common vision for regulatory decisions on an agreed upon schedule. A regulatory assurance system consists of several elements. Although the mission may vary from cleanup to site closure to nuclear component production, the elements of a regulatory assurance system remain essentially constant and must include: 1) identifying a common vision or end state, 2) developing a long-term, integrated strategy and schedule, 3) establishing a regulatory partnering team consisting of key decision-makers, 4) regular and frequent communication with decision-makers, 5) ensuring consistent surveillance for early identification of issues and changes that may impact the project, 6) quick resolution of emerging issues to prevent schedule impact, 7) identifying core compliance functions, 8) periodically assessing progress of the project as it relates to regulatory assurance and, 9) providing constructive feedback to improve the process. A regulatory assurance system provides a living, multi-faceted approach to planning, visioning, communicating and tracking to avoid surprises and ensure smooth and timely progress to the project. The overall success measures will be whether the system produces common sense regulatory decisions supporting the vision on time without appeal. Effective regulatory frameworks rarely happen on their own. Balanced, common-sense regulatory decisions stem from teams that are trained to work together to achieve shared goals. In this paper, particular attention is placed on the importance of starting with a shared vision for a regulatory assurance and execution strategy that leverages experience to establish optimal approaches. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Strategic environmental assessment (SEA) for wind energy planning: Lessons from the United Kingdom and Germany

This paper reports on SEA applied in the wind energy sector in the UK and Germany. Based on a review of 18 SEAs, it is found that the quality of SEA documentation is variable, with over a third of them being deemed unsatisfactory. Furthermore, SEA processes are conducted to varying degrees of effectiveness, with scoping a strength but impact prediction and mitigation weaknesses. Generally speaking, the influence of SEA on German wind energy plan making was found to be low and the influence of SEA on UK plans deemed to be moderate. The German plans had a low influence mainly because of a perceived high environmental performance of the underlying plans in the first instance. Substantive outcomes of SEA are not always clear and the influence of SEA on decision making is said to be limited in many cases. Finally, a lack of effective tiering between SEA and project level EIA is also observed. In addition, our findings echo some of the weaknesses of SEA practice found in previous studies of SEA effectiveness, including poor impact prediction and significance sections and a lack of detailed monitoring programmes for post plan implementation.

54 ENVIRONMENTAL SCIENCES↗

Development Plan for the Fuel Cycle Simulator

The Fuel Cycle Simulator (FCS) project was initiated late in FY-10 as the activity to develop a next generation fuel cycle dynamic analysis tool for achieving the Systems Analysis Campaign 'Grand Challenge.' This challenge, as documented in the Campaign Implementation Plan, is to: 'Develop a fuel cycle simulator as part of a suite of tools to support decision-making, communication, and education, that synthesizes and visually explains the multiple attributes of potential fuel cycles.'

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Nevada National Security Site Radiological Control Manual

This manual contains the radiological control requirements to be used for all radiological activities conducted by programs under the purview of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO). (Activities conducted under the purview of the U.S. Department of Energy, Office of Environmental Management Nevada[(EM Nevada] may require additional approval authorities as described in the EM Nevada Prime Contractor’s implementation plan.) Compliance with these requirements will ensure compliance with Title 10 Code of Federal Regulations (CFR) Part 835, “Occupational Radiation Protection.” This manual represents policies, guidelines, and best practices for implementing the DOE/NV/03624--0082, “Nevada National Security Site Radiation Protection Program,” (NNSS RPP) according to the requirements of 10 CFR 835.

61 RADIATION PROTECTION AND DOSIMETRY↗

Nevada National Security Site Radiological Control Manual

Please have this STIP assigned, documented, and recorded in OSTI as Report Number DOE/NV/03624--0257 Revision 1 and Author as Radiological Control Managers' Council. This manual contains the radiological control requirements to be used for all radiological activities conducted by programs under the purview of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO). (Activities conducted under the purview of the U.S. Department of Energy, Office of Environmental Management Nevada[(EM Nevada] may require additional approval authorities as described in the EM Nevada Prime Contractor’s implementation plan.) Compliance with these requirements will ensure compliance with Title 10 Code of Federal Regulations (CFR) Part 835, “Occupational Radiation Protection.” This manual represents policies, guidelines, and best practices for implementing the DOE/NV/03624--0082, “Nevada National Security Site Radiation Protection Program,” (NNSS RPP) according to the requirements of 10 CFR 835.

61 RADIATION PROTECTION AND DOSIMETRY↗

SU-F-T-43: Prediction of Dose Increments by Brain Metastases Resection Cavity Shrinkage Model with I-125 and Cs-131 LDR Seed Implantations

Purpose: This work aims to determine dose variability via a brain metastases resection cavity shrinkage model (RC-SM) with I-125 or Cs-131 LDR seed implantations. Methods: The RC-SM was developed to represent sequential volume changes of 95 consecutive brain metastases patients. All patients underwent serial surveillance MR and change in cavity volume was recorded for each patient. For the initial resection cavity, a prolate-ellipsoid cavity model was suggested and applied volume shrinkage rates to correspond to 1.7, 3.6, 5.9, 11.7, and 20.5 months after craniotomy. Extra-ring structure (6mm) was added on a surface of the resection volume and the same shrinkage rates were applied. Total 31 LDR seeds were evenly distributed on the surface of the resection cavity. The Amersham 6711 I-125 seed model (Oncura, Arlington Heights, IL) and the Model Cs-1 Rev2 Cs-131 seed model (IsoRay, Richland, WA) were used for TG-43U1 dose calculation and in-house-programed 3D-volumetric dose calculation system was used for resection cavity rigid model (RC-RM) and the RC-SM dose calculation. Results: The initial resection cavity volume shrunk to 25±6%, 35±6.8%, 42±7.7%, 47±9.5%, and 60±11.6%, with respect to sequential MR images post craniotomy, and the shrinkage rate (SR) was calculated as SR=56.41Xexp(−0.2024Xt)+33.99 and R-square value was 0.98. The normal brain dose as assessed via the dose to the ring structure with the RC-SM showed 29.34% and 27.95% higher than the RC-RM, I-125 and Cs-131, respectively. The dose differences between I-125 and Cs-131 seeds within the same models, I-125 cases were 9.17% and 10.35% higher than Cs-131 cases, the RC-RM and the RC-SM, respectively. Conclusion: A realistic RC-SM should be considered during LDR brain seed implementation and post-implement planning to prevent potential overdose. The RC-SM calculation shows that Cs-131 is more advantageous in sparing normal brain as the resection cavity volume changes with the LDR seeds implementation.

60 APPLIED LIFE SCIENCES↗

Oak Ridge National Laboratory 2025 Site Sustainability Plan With FY 2024 Performance Data

At the close of each fiscal year, the US Department of Energy (DOE) Sustainability Performance Office (SPO) issues instruction documents and technical resource aids/tools necessary for DOE sites and national laboratories to complete sustainability reporting requirements. SPO is part of the DOE Office of Asset Management. As required by DOE Order 436.1A, Departmental Sustainability, each site develops and commits to an annual site sustainability plan (SSP) that identifies its respective contribution toward meeting DOE’s sustainability goals. SPO collects and compiles information reported by each site to develop an agency-wide sustainability report and implementation plan, which are used to report DOE sustainability progress to the federal government as required by all major federal agencies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Department of Energy – Office of Science: Pacific Northwest Site Office Environmental Monitoring Plan for the DOE-SC PNNL Site

The Pacific Northwest Site Office (PNSO) manages the contract for operations at the U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site in Richland, Washington. Radiological operations at the DOE-SC PNNL Site expanded in 2010 with the completion of facilities at the Physical Sciences Facility. As a result of the expanded radiological work at the site, the Washington State Department of Health (WDOH) has required that offsite environmental surveillance be conducted as part of the PNNL Site Radioactive Air Emissions License. The environmental monitoring and surveillance requirements of various orders, regulations, and guidance documents consider emission levels and subsequent risk of negative human and environmental impacts. This Environmental Monitoring Plan (EMP) describes air surveillance activities at the DOE-SC PNNL Site. The determination of offsite environmental surveillance needs evolved out of a Data Quality Objectives process (Barnett et al. 2010) and Implementation Plan (Snyder et al. 2010). The entire EMP is a compilation of several documents, which include: - the Main Document, this text, (PNNL-20919), - Attachment 1, Sampling and Analysis Plan (SAP) (PNNL-20919-1), - Attachment 2, Data Management Plan (DMP) (PNNL-20919-2), and - Attachment 3, Dose Assessment Guidance (DAG) (PNNL-20919-3). Although the EMP is considered the compilation of these documents, each covers topics that can be updated independently. As a result, each may have different publication dates. Current version dates can be verified with Effluent Management staff. The procedures, forms, and data management activities described herein may change with radiological research projects at the DOE-SC PNNL Site. The scope of this EMP will evolve as needed, during routine reviews or in response to changes in facility operations. This document provides the SAP, DMP, and DAG effective at the time of publication. Updates to this document will be published at the discretion of the Effluent Management group of PNNL.

54 ENVIRONMENTAL SCIENCES↗

Oak Ridge National Laboratory FY 2023 Site Sustainability Plan With FY 2022 Performance Data

At the close of each fiscal year, the US Department of Energy (DOE) Sustainability Performance Division (SPD) issues guidance documents and technical resource aids/tools necessary for DOE sites and national laboratories to complete sustainability reporting requirements. SPD is part of the DOE Office of Asset Management. As required by DOE Order 436.1, Departmental Sustainability, “each site will develop and commit to an annual Site Sustainability Plan (SSP) that identifies its respective contribution toward meeting the DOE’s sustainability goals.” SPD collects and compiles information reported by each site to develop an agency-wide Sustainability Report and Implementation Plan, which is used to report DOE sustainability progress to the federal government as required by all major federal agencies. DOE launched a formal Sustainability Office and annual SSP process in 2011. Each year, Oak Ridge National Laboratory (ORNL), in concert with the Office of Science (SC), provides the resources essential to fulfill its commitment to deliver a complete and accurate SSP report and quality performance data for entry into the DOE Sustainability Dashboard as managed by SPD. The performance data entered by each DOE site are then combined to disclose the progress of each DOE Program Office and are further combined to show comprehensive progress for the agency. The Office of Asset Management provides assistance to program offices in sustaining their missions, freeing up resources by reducing waste, avoiding excess expenditure on utilities, maximizing productivity, and improving the efficiency of facilities and processes. By focusing on mission needs, programs and associated DOE sites can help the agency meet its sustainability goals, as outlined in federal statutory and regulatory requirements. In FY 2022, the SSP guidance was updated to capture requirements from Executive Order (EO) 14008, Tackling the Climate Crisis at Home and Abroad, the Energy Act of 2020 (EAct 20), actions outlined in DOE’s Climate Adaptation & Resilience Plan and Sustainability Plan, and EO 14057, Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability. Updates in SSP guidance help to minimize and streamline reporting while simultaneously addressing updated federal requirements. Per DOE, each SSP report should provide an overview of the site’s planned actions, as well as an overview of efforts and accomplishments during the reporting period. SPD collects and compiles information reported by each site to develop DOE’s Annual Sustainability Report, Climate Adaptation & Resilience Plan, and Annual Energy Management Report to Congress. The agency goal has been to lower the reporting burden for sites and increase and improve the consistency of information available to decision makers, allowing them to better identify projects and potential for increased efficiency, as well as to reduce waste, lower emissions, and enhance operational resilience. Sites may elect to produce a more polished publication for their leadership and stakeholders, but this step is no longer required. The ORNL SSP narrative report (this document) and the reporting of DOE SPD Sustainability Dashboard performance data is a collaborative effort of approximately 30 subject matter experts (SMEs) from ORNL facility management and research divisions. Annually, these associates come together to provide a report that can be used by DOE to demonstrate continued agency progress in energy efficiency and sustainable federal operations.

99 GENERAL AND MISCELLANEOUS↗

Project Basis for Automation of a Quality Assurance System in Radioactive Waste Management - 17317

A low- and intermediate-level radioactive waste management facility is required to comply with Regulation 1.16 of the Brazilian National Nuclear Energy Commission 'Quality Assurance for the Safety of Nuclear Power Plants and Other Facilities'. However, the text of this regulation is very generic and does not address the more specific controls necessary for the management of quality. Therefore, the objective of this paper is to identify such detailed controls in all applicable activities of the facility and to provide an implementation plan in the form of flowcharts, for further development of an automated system. This work takes as a basis the recommendations of the International Atomic Energy Agency and the rules and procedures implemented by the U.S. Department of Energy's Office of Civilian Waste Management related to Quality Assurance. In such way, we intend to provide a more reliable implementation system of quality assurance for the management of radioactive waste in Brazil. Keywords: radioactive waste; quality assurance; automated system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine Nevada National Security Site, Nevada, Revision 1

This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, Nevada National Security Site (NNSS), Nevada. The Yucca Flat/Climax Mine CAU is located in the northeastern portion of the NNSS and comprises 720 corrective action sites. A total of 747 underground nuclear detonations took place within this CAU between 1957 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities. The CADD portion describes the Yucca Flat/Climax Mine CAU data-collection and modeling activities completed during the corrective action investigation (CAI) stage, presents the corrective action objectives, and describes the actions recommended to meet the objectives. The CAP portion describes the corrective action implementation plan. The CAP presents CAU regulatory boundary objectives and initial use-restriction boundaries identified and negotiated by DOE and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the groundwater flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The UGTA strategy assumes that active remediation of subsurface RN contamination is not feasible with current technology. As a result, the corrective action is based on a combination of characterization and modeling studies, monitoring, and institutional controls. The strategy is implemented through a four-stage approach that comprises the following: (1) corrective action investigation plan (CAIP), (2) CAI, (3) CADD/CAP, and (4) closure report (CR) stages.

54 ENVIRONMENTAL SCIENCES↗

Quarterly Technical Progress Report Piperazine Advanced Stripper (PZAS™) Front End Engineering Design

EXECUTIVE SUMMARY This document summarizes the status of Cooperative Agreement DE-FE0031844, “Piperazine Advanced Stripper (PZAS™) Front-End Engineering Design,” during the reporting period of January 1 through March 31, 2020. The objective of this project is to develop accurate installed costs by conducting a Front-End Engineering Design (FEED) of PZAS™ at Golden Spread Electric Cooperative’s (GSEC) Mustang Station located in Denver City, TX. Complementary benefits include positioning the technology for a commercial project with the 45Q tax credits, qualifying PZAS™ for use on a Natural Gas Combined Cycle (NGCC) Cogen facility, and to provide cost detail to optimize PZAS™ and help guide R&D of second-generation solvent CO2 capture technologies. Results from the FEED will be used to evaluate the economic feasibility of the process at Mustang Station. This project is funded by the U.S. DOE National Energy Technology Laboratory under the aforementioned Cooperative Agreement. Exxon, Total, Chevron, UOP-Honeywell, and the University of Texas (UT) are project co-funders. AECOM and Trimeric are project team members; UT is the prime contractor. Summary of Progress Cooperative Agreement DE-FE0031844 was established in October 2019. The current reporting period, January 1 through March 31, 2020, is the second technical progress reporting period for the project. Several milestones were accomplished during this reporting period, including: • Kickoff Meeting with DOE on February 3, 2020. • Kickoff Meeting with GSEC on March 30, 2020. (Note: Due to Covid-19 travel restrictions and shelter-in-place guidelines, the kickoff meeting was conducted remotely via videoconferencing. See attached notes from that telecon.) • Updated Project Management Plan March 2020, submitted with this quarterly report Other activities during the quarter included progress on contracting and other legal agreements (e.g., non-disclosure agreements), internal kickoff meetings at both AECOM and Trimeric, and development of a Technical Implementation Plan (TIP). The TIP will help the team to make critical, early process decisions and, ultimately, to develop a project and process design basis. Note that all agreements between project team participants are complete as of this submittal, except the vendor agreement with Kiewit (steam cycle modeling). Plans for Next Reporting Period Activities during the next reporting period (April 1, 2020 through June 30, 2020) include: the completion of the Project Design Basis and progress towards the Process Design Basis/Process Design Package (PDP). The Project Design Basis is due as a deliverable and milestone during the next reporting period.

Rochelle, Gary T.↗