Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Overview of Carbon Dioxide Control Issues During International Space Station/Space Shuttle Joint Docked Operations

Manned space vehicles have a common requirement to remove the Carbon Dioxide (CO2) created by the metabolic processes of the crew. The Space Shuttle and International Space Station (ISS) each have systems in place to allow control and removal of CO2 from the habitable cabin environment. During periods where the Space Shuttle is docked to ISS, known as joint docked operations, the Space Shuttle and ISS share a common atmosphere environment. During this period there is an elevated production of CO2 caused by the combined metabolic activity of the Space Shuttle and ISS crew. This elevated CO2 production, combined with the large effective atmosphere created by the collective volumes of the docked vehicles, creates a unique set of requirements for CO2 removal. This paper will describe the individual CO2 control plans implemented by the Space Shuttle and ISS engineering teams, as well as the integrated plans used when both vehicles are docked. In addition, the paper will discuss some of the issues and anomalies experienced by both engineering teams.

Matty, Christopher M.↗

Status of ERDA-DOD applications plans

A demonstration program is reported that defines solar terrestrial photovoltaic systems as power sources for DOD applications by developing requirements and implementation plans for each demonstration project. Evaluation criteria emphasize military market potential and military advantages.

Dinger, D. B.↗

A report on NASA software engineering and Ada training requirements

NASA's software engineering and Ada skill base are assessed and information that may result in new models for software engineering, Ada training plans, and curricula are provided. A quantitative assessment which reflects the requirements for software engineering and Ada training across NASA is provided. A recommended implementation plan including a suggested curriculum with associated duration per course and suggested means of delivery is also provided. The distinction between education and training is made. Although it was directed to focus on NASA's need for the latter, the key relationships to software engineering education are also identified. A rationale and strategy for implementing a life cycle education and training program are detailed in support of improved software engineering practices and the transition to Ada.

Legrand, Sue↗

Technology for the future - Long range planning for space technology development

NASA's Office of Aeronautics and Space Technology (OAST) has begun the definition of an Integrated Technology Plan for the civilian space program which guides long-term technology development for space platforms, in light of continuing marker research and other planning data. OAST has conferred particular responsibility for future candidate space mission evaluations and platform performance requirement projections to NASA-Langley. An implementation plan is devised which is amenable to periodic space-platform technology updates.

Collier, Lisa D.↗

Hybrid Electric MC-12 Ground Testing Plan Chapter

In the commercial aviation world, hybrid/electric propulsion is a promising technology for fuel, emissions, and noise reduction in support of the challenging goals established by 2050 EU Flightpath/SRIA, NASA ARMD Strategic Implementation Plan, and the US Air Force ATTAM programs. Ongoing results indicate operational benefits are possible in those three technical areas. Considering military applications, hybrid/electric propulsion may yield further significant improvements by enabling new, unorthodox mission capabilities. Potential benefits are expected in the areas of vehicle signature reduction (lower noise, lower exhaust signature), usage in enhanced flight environments, minimized human-in-the-loop workload by offering a platform compatible with future goals of autonomous operations facilitation, maintenance cost reductions, and performance burst/dash energy. Additional synergies are likely when used in conjunction with energy weapons. Some potential areas of mutual interest could include, dusty operations capability, remote supply capability, extended surveillance, dispatch able power, fuel-flexible vehicles, and autonomous rescue equipment. Many of the key technologies that have been demonstrated in ground operation must now be qualified for altitude conditions. We expect to have many flight qualified powertrain systems over the next decade for military planners to choose from for new future battlefield capability. This requires new flight-weight and flight-efficient powertrain components, fault tolerant power management, and electromagnetic interference mitigation technologies. Moreover, initial studies indicate some combination of ambient and cryogenic thermal management and relatively high bus voltages when compared to state of practice will be required to achieve a net system benefit. Developing all these powertrain technologies within a realistic aircraft architectural geometry and under realistic operational conditions requires a unique electric aircraft test bed. The MC-12 surveillance aircraft is an ideal military aircraft for demonstrating some of the benefits of incorporating hybrid electric propulsion. This report details an approach for full-scale ground-based altitude testing the hybrid electric MC-12 powertrain through a full flight profile.

military electric aircraft propulsion↗

Biomedical computing facility interface design plan

The results are presented of a design study performed to establish overall system interface requirements for the Biomedical Laboratories Division's Sigma-3 computer system. Emphasis has been placed upon the definition of an overall implementation plan and associated schedule to meet both near-term and long-range requirements within the constraints at available resources.

Puckett, R. D.↗

NASA/ESMD Analogue Mission Plans

A viewgraph presentation exploring Earth and its analogues is shown. The topics include: 1) ESMD Goals for the Use of Earth Analogues; 2) Stakeholders Summary; 3) Issues with Current Analogue Situation; 4) Current state of Analogues; 5) External Implementation Plan (Second Step); 6) Recent Progress in Utilizing Analogues; 7) Website Layout Example-Home Page; 8) Website Layout Example-Analogue Site; 9) Website Layout Example-Analogue Mission; 10) Objectives of ARDIG Analog Initiatives; 11) Future Plans; 12) Example: Cold-Trap Sample Return; 13) Example: Site Characterization Matrix; 14) Integrated Analogue Studies-Prerequisites for Human Exploration; and 15) Rating Scale Definitions.

Hoffman, Stephen J.↗

Advanced Curation: Solving Current and Future Sample Return Problems

Advanced Curation is a wide-ranging and comprehensive research and development effort at NASA Johnson Space Center that identifies and remediates sample related issues. For current collections, Advanced Curation investigates new cleaning, verification, and analytical techniques to assess their suitability for improving curation processes. Specific needs are also assessed for future sample return missions. For each need, a written plan is drawn up to achieve the requirement. The plan draws while upon current Curation practices, input from Curators, the analytical expertise of the Astromaterials Research and Exploration Science (ARES) team, and suitable standards maintained by ISO, IEST, NIST and other institutions. Additionally, new technologies are adopted on the bases of need and availability. Implementation plans are tested using customized trial programs with statistically robust courses of measurement, and are iterated if necessary until an implementable protocol is established. Upcoming and potential NASA missions such as OSIRIS-REx, the Asteroid Retrieval Mission (ARM), sample return missions in the New Frontiers program, and Mars sample return (MSR) all feature new difficulties and specialized sample handling requirements. The Mars 2020 mission in particular poses a suite of challenges since the mission will cache martian samples for possible return to Earth. In anticipation of future MSR, the following problems are among those under investigation: What is the most efficient means to achieve the less than 1.0 ng/sq cm total organic carbon (TOC) cleanliness required for all sample handling hardware? How do we maintain and verify cleanliness at this level? The Mars 2020 Organic Contamination Panel (OCP) predicts that organic carbon, if present, will be present at the "one to tens" of ppb level in martian near-surface samples. The same samples will likely contain wt% perchlorate salts, or approximately 1,000,000x as much perchlorate oxidizer as organic carbon. The chemical kinetics of this reaction are poorly understood at present under the conditions of cached or curated martian samples. Among other parameters, what is the maximum temperature allowed during storage in order to preserve native martian organic compounds for analysis? What is the best means to collect headspace gases from cached martian (and other) samples? This gas will contain not only martian atmosphere but also off-gassed volatiles from the cached solids.

Fries, M.↗

Multi-community command and control systems in law enforcement: An introductory planning guide

A set of planning guidelines for multi-community command and control systems in law enforcement is presented. Essential characteristics and applications of these systems are outlined. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Program management techniques and joint powers agreements for multicommunity programs are discussed in detail. A description of a typical multi-community computer-aided dispatch system is appended.

Sohn, R. L.↗

Scientific use of Space Station Freedom

The overall strategic science planning of the Office of Space Science and Applications (OSSA) is presented. The science opportunities inherent to the restructured Space Station are discussed and a synopsis of the OSSA implementation plan for Space Station Freedom utilization is offered. Attention is given to the microgravity science and applications facilities, the advanced protein crystal growth facility, the biotechnology facility, the modular combustion facility, and the life sciences facility.

Rhome, Robert C.↗

New Millennium EO3

The New Millennium Program (NMP) is a NASA technology program that focuses on the validation of advanced spacecraft and instrumentation technologies in space. This program specifically seeks technologies that could significantly benefit future space and Earth science missions by enabling new science capabilities and reducing life cycle costs. These technologies must also require a validation in space to mitigate risks to the first science users, and provide cross-cutting benefits to both NASA's Earth and Space Science enterprises. The NASA Office of Earth Science (OES) directed the NMP to focus the third Earth Observing mission, E03, on innovative measurement concepts that would facilitate remote sensing observations from orbits beyond conventional low-Earth orbit (LEO). These orbits include geosynchronous orbits, highly elliptical orbits, mid-Earth and high-Earth orbits, and other unique vantage points such as L1 and L2. To maximize the input from the Earth science community, a NASA Research Announcement (NRA) was released to solicit innovative measurement concepts for this NMP flight. Because the NMP is a technology validation program, rather than a conventional science program, the NRA required that these measurement concepts employ revolutionary technologies and/or measurement strategies that will enable future science missions from orbits beyond LEO. Another requirement was that a validation in space was needed to reduce real or perceived risks of this concept to future science users. The proposals submitted in response to this NRA were peer reviewed by the NASA OES. The measurement concepts selected through this process will be summarized in this presentation. The E03 measurement concept NRA did not solicit complete mission concepts or flight hardware. Instead, the selected investigators will join integrated project formulation teams to define the mission for the demonstration of the measurement technique and participate in mission design trades and implementation planning. The teams will define and document the measurement approach, the required technologies, the validation plan, the scalability of the design to future science missions, and the infusion path for the completely validated instrument. During this project formulation phase, the specific technologies required to implement each measurement concept will be solicited through an open technology solicitation, and the technology providers will be added to the integrated teams. Once a complete candidate mission concept has been formulated for each measurement concept, these concepts will be subjected to a comprehensive review. The Associate Administrator of the OES will use the results of this review to select a single concept for the E03 flight opportunity. That mission concept will enter its implementation phase, which is expected to last for less than 36 months before launch. During this phase, and after launch, the implementation team will work with the NMP to document and disseminate the information gathered during the flight qualification testing and operations of the measurement concept and its component technologies. This information will be archived and published, where appropriate, to encourage the rapid infusion of these validated technologies into future space and Earth science missions. I

Li, Fuk K.↗

Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

Measures↗

The Evolution of Planetary Protection Implementation on Mars Landed Missions

NASA has developed requirements dedicated to the prevention of forward and backward contamination during space exploration. Historically, international agreements provided guidelines to prevent contamination of the Moon and other celestial bodies, as well as the Earth (e.g., sample return missions). The UN Outer Space Treaty was established in 1967 and the Committee on Space Research (COSPAR) maintains a planetary protection policy complying with Article IX of this treaty. By avoiding forward contamination, the integrity of scientific exploration is preserved. Planetary Protection mission requirements are levied on missions to control contamination. These requirements are dependent on the science of the mission and on the celestial bodies encountered or targeted along the way. Consequently, categories are assigned to missions, and specific implementation plans are developed to meet the planetary protection requirements. NASA missions have evolved over time with increasingly more demanding scientific objectives and more complex flight systems to achieve those objectives and, thus, planetary protection methods and processes used for implementation have become much more intricate, complicated, and challenging. Here, we will portray the evolution of planetary protection implementation at JPL in several important areas throughout the course of NASA sponsored robotic Mars lander or rover missions, starting from Mars Pathfinder through the beginning of Mars 2020. Highlighted in the discussion will be process changes in planetary protection requirements development and flow down. Development and implementation of new and improved methods used in the reduction of spacecraft bioburden will be discussed as well as approaches and challenges that come along with setting up remote laboratories to perform bioassays. The consequences and forward planning of delays on missions will be highlighted as well as lessons learned on the impact of communication and training in achieving planetary protection requirements. The evolution of methods used for the detection of microbial bioburden on spacecraft hardware will be considered. These methods use standard microbiology as well as the adaptation of advances in biotechnology, molecular biology, and bioinformatics. Technical approaches developed for the prevention of contamination and recontamination of hardware during Assembly, Test, and Launch Operations will be discussed.

Kazarians, Gayane A.↗

Feasibility of using the Massively Parallel Processor for large eddy simulations and other Computational Fluid Dynamics applications

The results of an investigation into the feasibility of using the MPP for direct and large eddy simulations of the Navier-Stokes equations is presented. A major part of this study was devoted to the implementation of two of the standard numerical algorithms for CFD. These implementations were not run on the Massively Parallel Processor (MPP) since the machine delivered to NASA Goddard does not have sufficient capacity. Instead, a detailed implementation plan was designed and from these were derived estimates of the time and space requirements of the algorithms on a suitably configured MPP. In addition, other issues related to the practical implementation of these algorithms on an MPP-like architecture were considered; namely, adaptive grid generation, zonal boundary conditions, the table lookup problem, and the software interface. Performance estimates show that the architectural components of the MPP, the Staging Memory and the Array Unit, appear to be well suited to the numerical algorithms of CFD. This combined with the prospect of building a faster and larger MMP-like machine holds the promise of achieving sustained gigaflop rates that are required for the numerical simulations in CFD.

Bruno, John↗

Modular space station phase B extension program master plan

The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

Munsey, E. H.↗

SUMC reconfigurable micro-assembler

The development of a reconfigurable micro-assembler to provide the micro-programmer the capability to specify micro-instructions in concise, meaningful terms is discussed. The implementation plan for the development of the micro-assembler was predicted on the existing capabilities of the SUMC Reconfigurable Assembler. Utilizing the reconfigurable assembler as a base, new directives and existing directive modifications were implemented to provide the micro-assembly as a new capability of the reconfigurable assembler. The micro-assembler language allows the specification of all micro-instruction control field settings in one concise assembler source statement. The language appears very similar to a conventional machine instruction assembler language. The machine instruction assembler language has the characteristic of one operation specification per statement whereas, the micro-instruction assembler language allows multiple operations to be designated per statement.

Edwards, A. J.↗

2023 Land Use Control Inspections Report

2023 Land Use Control (LUC) Inspections Report for John F. Kennedy Space Center (KSC), Florida. This letter report documents the quarterly LUC inspections the KSC Remediation Group conducts at Remediation Sites. No LUC findings occurred in 2023. A Corrective Action to address arsenic-impacted soil at the KSC Child Development Center was performed in July 2023. This letter report provides a summary and documents the field activities for that Corrective Action. Copies of the formal LUC Implementation Plans (LUCIPs) for 71 Remediation Sites at KSC are presented in this letter report. For the Remediation Sites that do not have formal LUCIPs, the report documents that informal LUCs that the Remediation Group has implemented at these sites.

Christopher Adkison↗