Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Highlight”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

November 2021 Operational Highlights

Completed: 1. the initial tests of document workflows for Titan on the Red, which included standing up a software encryption capability to test data ingestion; 2. a software encryption capability in order to ingest the first data source by the end of the month; 3. a stand-alone computer for classified ontology data entry. Titan on the Red is an artificial intelligence/machine learning system to make digitizing, cataloging, and searching NSRC collections easier and more efficient. Created Online Vault backups, with one copy stored at LANL and one shipped to Lawrence Livermore National Laboratory. The Online Vault is a classified, searchable library of LANL’s nuclear weapons design and test history. Imported new Laboratory Directed Research and Development (LDRD) documents based on revised access categories. Bulk ingested nearly 10,000 documents via java-based PowerLoader. This application ingests metadata and content into the Online Vault to meet the requirements for the NSRC collections. Rehoused 300 linear feet of weapons physics documents in archival, acid-free storage folders and boxes.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Z-Petawatt Laser Highlights for FY21

We’re happy to report that the full-aperture upgrade project, started in FY18, is now complete and short-pulse target experiments are underway. The table below lists the present performance level of ZPW. Additional laser improvements are in progress to increase the laser energy and pulse contrast along with implementing a correction for achromatic aberrations to reduce the focused spot size and pulse width.

47 OTHER INSTRUMENTATION↗

ALDWP Operational Highlights 2021

The Weapons Pit production manufacturing team completed pit build 21-1 assembly operations on December 23, 2020. This build utilized all essential flow sheet steps and included the second -01 long tube cut off extension and welding activity. This is the best build produced in the MC4597-01 pit program to date. Final out-of-line operations, non-destructive evaluation, and radiography was completed during the week of January 4. Depending on the results from high energy radiography, this pit will be considered to be a candidate for CERT-02 and shipment to Lawrence Livermore National Laboratory in support of pit certification. It is notable that this build was completed while concurrently making Plutonium (Pu) metal, producing additional castings, machining Pu parts for Build 22, completing disassembly of two pits, supporting Nightshade B Pu target characterization, and precision machining of Jasper certification base plates.

42 ENGINEERING↗

January 2022 Operational Highlights

The Indexing Lab is now complete and includes classified and unclassified computers, safes and work stations. Staff capture metadata and catalog materials, including classified reports, directors’ correspondence and Rocky Flats materials to ensure the holdings are discoverable and retrievable. Access protocols were updated for products related to the LANL Annual Assessment in the Online Vault (OLV) classified repository. The Annual Assessment is a yearly analysis of the weapons systems in the nation’s nuclear stockpile. The Standardization Quality Assessment (SQA) for the Online Vault (OLV) classified repository was completed and contained no findings. Beta testing, or customer validation, began for the metrics database that generates metrics reports and visualizations from NSRC customer projects.

97 MATHEMATICS AND COMPUTING↗

Operational and Mission Highlights A Monthly Summary of Top Achievements April 2022

When the Laboratory’s Detonator Production team originally completed manufacturing two ALT939 DEV#1 functional cables — the first development units produced in this lot, team members quickly hit an obstacle when electrical testing for these cables failed. Team members sent the cables out for further testing, which revealed the root cause of failure involved the cables’ connectors. Although a challenging issue to resolve, the team worked together and solved the issue ahead of a stipulated deadline, with the cables completed and shipped to support system tests. The team responsible for this challenging work included members from Detonator Production, Nondestructive Testing & Evaluation, and collaborators from Sandia National Laboratories.

42 ENGINEERING↗

Highlights for DOE ASCR Applied Math Office [Slides]

An efficient Picard-based solver is proposed for a novel energy conserving particle integrator preserving all first-order guiding center drifts and correct gyroradius for large time steps in arbitrary (non-uniform) magnetic fields. This research enables the efficient deployment of the novel asymptotic preserving (AP) particle orbit integrator into modern energy-conserving, implicit particle-in-cell codes, delivering a truly multiscale simulation capability.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗