Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “HYDROGEN STATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

National Hydrogen Scenarios: How Many Stations, Where, and When?

This report examines development scenarios for hydrogen station networks needed to support a national rollout of fuel cell electric vehicles (FCEVs) in the United States. It was developed within the framework of the U.S. public-private collaboration known as H2USA, with approximately 50 partners committed to enabling hydrogen infrastructure for FCEV adoption. In this report, an internally consistent analytic modeling method simulates how station networks might develop across cities and regions, assuming that successful planning and coordination activities result in a rollout of FCEVs and stations similar to California's. These scenarios are not forecasts of future market outcomes. Rather, they provide insight to various public and private stakeholders engaged in the planning and coordination required to help facilitate their own station networks, while reducing hydrogen station investment risks.

08 HYDROGEN↗

Design and requirements of a hydrogen component reliability database (HyCReD)

Hydrogen technologies are expected to play a key role in the decarbonization of several sectors including energy storage and transportation. Rigorous investigation and quantification of the risk and reliability issues associated with hydrogen technologies will be critical to ensuring both their wider adoption and safe, economical operations. Quantitative risk assessment (QRA) is an important tool that has been used to enable the safe deployment of many engineering systems, including hydrogen fueling stations and hydrogen storage systems. However, QRA studies require reliability data which is currently lacking for expanding applications of hydrogen systems. Here, to address this gap, we present a new structure for a hydrogen component reliability database (HyCReD) that can be used to generate reliability data to be used in QRA, reliability, safety studies, maintenance planning, and more. Building on our previous work examining four major hydrogen safety data collection tools (West et al., 2022) [1], our approach in this work was to consult scientific literature on reliability data collection as well as a number of existing reliability engineering databases in the oil & gas, chemical processing, and nuclear power plant sectors. The evaluation of these databases led to identifying best practices to be implemented in a data collection framework for a hydrogen component reliability database. Based on these best practices, a set of 24 requirements for the proposed database are presented, covering its characteristics and the types of data to be collected. We define the structure of the HyCReD database and 25 data elements to be collected, spanning system description, failure, shutdown, or near-miss events, and maintenance events. The data elements are then defined according to international standards used in the safety and reliability practice and potential choice lists are provided for each field. Since this database is being piloted for hydrogen fueling stations, a generic station component hierarchy developed by West (2021) [2] is used to standardize system data. Finally, we demonstrate populating the database with information extracted from five narrative reports on hydrogen fueling station incidents.

08 HYDROGEN↗

California Hydrogen Infrastructure Project

Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a real-world retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation's hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling stations with a focus on safe, convenient, fast-fills. These potential areas were then compared to and overlaid with suitable sites from various energy companies and other potential station operators. Work continues to match vehicle needs with suitable fueling station locations. Once a specific site was identified, the necessary agreements could be completed with the station operator and expected station users. Detailed work could then begin on the site drawings, permits, safety procedures and training needs. Permanent stations were successfully installed in Irvine (delivered liquid hydrogen), Torrance (delivered pipeline hydrogen) and Fountain Valley (renewable hydrogen from anaerobic digester gas). Mobile fueling stations were also deployed to meet short-term fueling needs in Long Beach and Placerville. Once these stations were brought online, infrastructure data was collected and reported to DOE using Air Products Enterprise Remote Access Monitoring system. Feedback from station operators was incorporated to improve the station user's fueling experience.

08 HYDROGEN↗

Texas Hydrogen Highway Fuel Cell Hybrid Bus and Fueling Infrastructure Technology Showcase (Final Scientific/Technical Report)

The Texas Hydrogen Highway project has showcased a hydrogen fuel cell transit bus and hydrogen fueling infrastructure that was designed and built through previous support from various public and private sector entities. The aim of this project has been to increase awareness among transit agencies and other public entities on these transportation technologies, and to place such technologies into commercial applications, such as a public transit agency. The initial project concept developed in 2004 was to show that a skid-mounted, fully-integrated, factory-built and tested hydrogen fueling station could be used to simplify the design, and lower the cost of fueling infrastructure for fuel cell vehicles. The approach was to design, engineer, build, and test the integrated fueling station at the factory then install it at a site that offered educational and technical resources and provide an opportunity to showcase both the fueling station and advanced hydrogen vehicles. The two primary technology components include: Hydrogen Fueling Station: The hydrogen fueling infrastructure was designed and built by Gas Technology Institute primarily through a funding grant from the Texas Commission on Environmental Quality. It includes hydrogen production, clean-up, compression, storage, and dispensing. The station consists of a steam methane reformer, gas clean-up system, gas compressor and 48 kilograms of hydrogen storage capacity for dispensing at 5000 psig. The station is skid-mounted for easy installation and can be relocated if needed. It includes a dispenser that is designed to provide temperature compensated fills using a control algorithm. The total station daily capacity is approximately 50 kilograms. Fuel Cell Bus: The transit passenger bus built by Ebus, a company located in Downey, CA, was commissioned and acquired by GTI prior to this project. It is a fuel cell plug-in hybrid electric vehicle which is ADA compliant, has air conditioning sufficient for Texas operations, and regenerative braking for battery charging. It uses a 19.3 kW Ballard PEM fuel cell, will store 12.6 kg of hydrogen at 350 Bar, and includes a 60 kWh battery storage system. The objectives of the project included the following: (a) To advance commercialization of hydrogen-powered transit buses and supporting infrastructure; (b) To provide public outreach and education by showcasing the operation of a 22-foot fuel cell hybrid shuttle bus and Texas first hydrogen fueling infrastructure; and (c) To showcase operation of zero-emissions vehicle for potential transit applications. As mentioned above, the project successfully demonstrated an early vehicle technology, the Ebus plug-in hybrid fuel cell bus, and that success has led to the acquisition of a more advanced vehicle that can take advantage of the same fueling infrastructure. Needed hydrogen station improvements have been identified that will enhance the capabilities of the fueling infrastructure to serve the new bus and to meet the transit agency needs. Over the course of this project, public officials, local government staff, and transit operators were engaged in outreach and education activities that acquainted them with the real world operation of a fuel cell bus and fueling infrastructure. Transit staff members in the Dallas/Ft. Worth region were invited to a workshop in Arlington, Texas at the North Central Texas Council of Governments to participate in a workshop on hydrogen and fuel cells, and to see the fuel cell bus in operation. The bus was trucked to the meeting for this purpose so that participants could see and ride the bus. Austin area transit staff members visited the fueling site in Austin to be briefed on the bus and to participate in a fueling demonstration. This led to further meetings to determine how a fuel cell bus and fueling station could be deployed at Capital Metro Transit. Target urban regions that expressed additional interest during the project in response to the outreach meetings and showcase events include San Antonio and Austin, Texas. In summary, the project objectives were achieved in the following ways: Through presentations and papers provided to a variety of audiences in multiple venues, the project team fulfilled its goal of providing education and outreach on hydrogen technology to statewide audiences. The project team generated interest that exists well beyond the completion of the project, and indeed, helped to generate financial support for a subsequent hydrogen vehicle project in Austin. The University of Texas, Center for ElectroMechanics operated the fuel cell-electric Ebus vehicle for over 13,000 miles in Austin, Texas in a variety of routes and loading configurations. The project took advantage of prior efforts that created a hydrogen fueling station and fuel cell electric-hybrid bus and continued to verify their technical foundation, while informing and educating potential future users of how these technologies work.

03 NATURAL GAS↗

H2FIRST Reference Station Design Task: Project Deliverable 2-2

This report presents near-term station cost results and discusses cost trends of different station types. It compares various vehicle rollout scenarios and projects realistic near-term station utilization values using the station infrastructure rollout in California as an example. It describes near-term market demands and matches those to cost-effective station concepts. Finally, the report contains detailed designs for five selected stations, which include piping and instrumentation diagrams, bills of materials, and several site-specific layout studies that incorporate the setbacks required by NFPA 2, the National Fire Protection Association Hydrogen Technologies Code. This work identified those setbacks as a significant factor affecting the ability to site a hydrogen station, particularly liquid stations at existing gasoline stations. For all station types, utilization has a large influence on the financial viability of the station.

30 DIRECT ENERGY CONVERSION↗

Hydrogen Refueling Reference Station Lot Size Analysis for Urban Sites

Hydrogen Fueling Infrastructure Research and Station Technology (H2FIRST) is a project initiated by the DOE in 2015 and executed by Sandia National Laboratories and the National Renewable Energy Laboratory to address R&D barriers to the deployment of hydrogen fueling infrastructure. One key barrier to the deployment of fueling stations is the land area they require (i.e. "footprint"). Space is particularly a constraint in dense urban areas where hydrogen demand is high but space for fueling stations is limited. This work presents current fire code requirements that inform station footprint, then identifies and quantifies opportunities to reduce footprint without altering the safety profile of fueling stations. Opportunities analyzed include potential new methods of hydrogen delivery, as well as alternative placements of station technologies (i.e. rooftop/underground fuel storage). As interest in heavy-duty fueling stations and other markets for hydrogen grows, this study can inform techniques to reduce the footprint of heavy-duty stations as well. This work characterizes generic designs for stations with a capacity of 600 kg/day hydrogen dispensed and 4 dispenser hoses. Three base case designs (delivered gas, delivered liquid, and on-site electrolysis production) have been modified in 5 different ways to study the impacts of recently released fire code changes, colocation with gasoline refueling, alternate delivery assumptions, underground storage of hydrogen, and rooftop storage of hydrogen, resulting in a total of 32 different station designs. The footprints of the base case stations range from 13,000 to 21,000 ft 2 . A significant focus of this study is the NFPA 2 requirements, especially the prescribed setback distances for bulk gaseous or liquid hydrogen storage. While the prescribed distances are large in some cases, these setback distances are found to have a nuanced impact on station lot size; considerations of the delivery truck path, traffic flow, parking, and convenience store location are also important. Station designs that utilize underground and rooftop storage can reduce footprint but may not be practical or economical. For example, burying hydrogen storage tanks underground can reduce footprint, but the cost savings they enable depend on the cost of burial and the cost land. Siting and economic analysis of station lot sizes illustrate the benefit of smaller station footprints in the flexibility and cost savings they can provide. This study can be used as a reference that provides examples of the key design differences that fueling stations can incorporate, the approximate sizes of generic station lots, and considerations that might be unique to particular designs.

08 HYDROGEN↗