Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “HVAC: Learning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

A review of computing-based automated fault detection and diagnosis of heating, ventilation and air conditioning systems

We report faults in Heating, Ventilation, and Air Conditioning (HVAC) systems of buildings result in significant energy waste in building operation. With fast-growing sensing data availability and advancement in computing, computational modeling has demonstrated strong capability to detect and diagnose HVAC system faults, hence, ensuring efficient building operation. This paper comprehensively reviews the state-of-the-art computing-based fault detection and diagnosis (FDD) for HVAC systems. Overall, the reviewed computing-based FDD methods are classified as two major approaches: knowledge-based and data-driven approaches. We then identify multiple important topics, including data availability, training data size, data quality, approach generality, capability, interpretability, and required modeling efforts, along with corresponding metrics to summarize the most updated FDD development. Generally, the knowledge-based approaches are further divided as physics-based modeling, Diagnostic Bayesian Network, and performance indicator-based methods while data-driven approaches include supervised learning, unsupervised learning, and regression and statistics-based methods. State-of-the-art FDD development, remaining challenges, and future research directions are further discussed to push forward FDD in practice. Availability of fault data, capability of existing methods to deal with complex fault situations (such as simultaneous faults), modeling interpretability for data-driven methods, and required engineering efforts for physics-based methods are identified as remaining challenges in FDD development. Improving modeling fidelity and reducing modeling efforts are essential for applying physics-based methods in real buildings. Meanwhile, addressing fault data availability, increasing algorithm adaptability, and handling multiple faults are essential to further enhance the applicability of data-driven FDD approaches.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Decommissioning of Active Ventilation Systems in a Nuclear R and D Facility to Prepare for Building Demolition (Whiteshell Laboratories Decommissioning Project, Canada) - 13073

Whiteshell Laboratories (WL) is a nuclear research establishment owned by the Canadian government and operated by Atomic Energy of Canada Limited (AECL) since the early 1960's. WL is currently under a decommissioning license and the mandate is to remediate the nuclear legacy liabilities in a safe and cost effective manner. The WL Project is the first major nuclear decommissioning project in Canada. A major initiative underway is to decommission and demolish the main R and D Laboratory complex. The Building 300 R and D complex was constructed to accommodate laboratories and offices which were mainly used for research and development associated with organic-cooled reactors, nuclear fuel waste management, reactor safety, advanced fuel cycles and other applications of nuclear energy. Building 300 is a three storey structure of approximately 16,000 m{sup 2}. In order to proceed with building demolition, the contaminated systems inside the building have to be characterized, removed, and the waste managed. There is a significant focus on volume reduction of radioactive waste for the WL project. The active ventilation system is one of the significant contaminated systems in Building 300 that requires decommissioning and removal. The active ventilation system was designed to manage hazardous fumes and radioactivity from ventilation devices (e.g., fume hoods, snorkels and glove boxes) and to prevent the escape of airborne hazardous material outside of the laboratory boundary in the event of an upset condition. The system includes over 200 ventilation devices and 32 active exhaust fan units and high efficiency particulate air (HEPA) filters. The strategy to remove the ventilation system was to work from the laboratory end back to the fan/filter system. Each ventilation duct was radiologically characterized. Fogging was used to minimize loose contamination. Sections of the duct were removed by various cutting methods and bagged for temporary storage prior to disposition. Maintenance of building heating, ventilation and air conditioning (HVAC) balancing was critical to ensure proper airflow and worker safety. Approximately 103 m{sup 3} of equipment and materials were recovered or generated by the project. Low level waste accounted for approximately 37.4 m{sup 3}. Where possible, ducting was free released for metal recycling. Contaminated ducts were compacted into B-1000 containers and stored in a Shielded Modular Above-Ground Storage Facility (SMAGS) on the WL site awaiting final disposition. The project is divided into three significant phases, with Phases 1 and 2 completed. Lessons learned during the execution of Phases 1 and 2 have been incorporated into the current ventilation removal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Consumer Guide to Home Heating and Cooling

Learn about types of heating and cooling systems, system maintenance, and best practices for saving energy with your heating and cooling. This fact sheet from Energy Saver also includes information on buying a new heating or cooling system; efficiency ratings; and selecting new systems including air conditioners, heat pumps, and furnaces.

heating, cooling, air conditioners, heat pumps, fu↗

Residential HVAC Fault Data Collection Plan – Refrigerant Undercharge and Overcharge Faults

Heating, ventilation, and air-conditioning (HVAC) systems can develop faults due to poor installation practices or gradual wear and tear, leading to decreased HVAC system’s efficiency, compromised thermal comfort, and shortened equipment lifespan (EERE, 2018). Automated fault detection and diagnosis (AFDD) technologies offer a solution by identifying energy-wasting HVAC faults, such as inadequate indoor airflow and incorrect refrigerant charge, and guiding technicians to enhance system efficiency. In the realm of residential HVAC, AFDD can be implemented through various fault detection and diagnosis capabilities, sensor configurations, and target applications. These technologies typically fall into three categories: smart diagnostic tools, original equipment manufacturer (OEM)-embedded tools, and add-on tools. Smart diagnostic tools employ temporarily installed sensors to directly measure HVAC system characteristics, while OEM-embedded tools utilize factory-installed sensors to identify faults or assess system performance. However, both these types of AFDD technologies are often only accessible for high-end HVAC equipment or require additional sensor installation by qualified technicians, resulting in high investment costs and limited applicability for low-income residential buildings. On the other hand, add-on tools rely solely on data from smart thermostats and meters to detect faults by continuously analyzing equipment runtime or energy usage. As smart thermostat and meter costs decrease and their prevalence increases, these tools can be readily deployed in low-income residential buildings. However, they possess limited capabilities as they rely solely on basic trend analysis. Enhancing such tools with advanced machine learning algorithms can significantly improve their effectiveness.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Scientific/Technical Report [Recovery Act: Districtwide Geothermal Heating Conversion]

The Recovery Act: Districtwide Geothermal Heating Conversion project performed by the Blaine County School District was part of a larger effort by the District to reduce operating costs, address deferred maintenance items, and to improve the learning environment of the students. This project evaluated three options for the ground source which were Open-Loop Extraction/Re-injection wells, Closed-Loop Vertical Boreholes, and Closed-Loop Horizontal Slinky approaches. In the end the Closed-Loop Horizontal Slinky approach had the lowest total cost of ownership but the majority of the sites associated with this project did not have enough available ground area to install the system so the second lowest option was used (Open-Loop). In addition to the ground source, this project looked at ways to retrofit existing HVAC systems with new high efficiency systems. The end result was the installation of distributed waterto- air heat pumps with water-to-water heat pumps installed to act as boilers/chillers for areas with a high ventilation demand such as they gymnasiums. A number of options were evaluated and the lowest total cost of ownership approach was implemented in the majority of the facilities. The facilities where the lowest total cost of ownership approaches was not selected were done to maintain consistency of the systems from facility to facility. This project had a number of other benefits to the Blaine County public. The project utilizes guaranteed energy savings to justify the levy funds expended. The project also developed an educational dashboard that can be used in the classrooms and to educate the community on the project and its performance. In addition, the majority of the installation work was performed by contractors local to Blaine County which acted as an economic stimulus to the area during a period of recession.

15 GEOTHERMAL ENERGY↗

An Innovative Fault Impact Analysis Framework for Enhancing Building Operations

The main goal of this paper is to rank building faults based on their impacts on the building energy penalty and occupant thermal comfort penalty considering multiple faults and fault occurrence rates. A fault impact analysis framework is created by incorporating the fault model library with the whole building energy performance simulation (e.g., EnergyPlus used in this study). The fault occurrence rate is introduced as a 'meta' parameter in the simulation. This framework involves three essential aspects of conducting a fault impact analysis: fault constructing, fault simulation, and fault impact analysis. A parametric sensitivity analysis was used to determine and rank the criticality of the faults considering the fault concurrence frequency, by using the deep-learning based response surface model (i.e., the multi-layer perceptron regression). The proposed fault analysis framework with ranking was tested and demonstrated for the DOE's prototype medium-sized office in four different climate zones (i.e., Atlanta, Chicago, Miami, and San Francisco) with 12,000 EnergyPlus fault simulations. A total of 129 fault modes from 41 groups of fault models were simulated for the medium-sized office case. The results demonstrate the proposed framework is robust and scalable for the fault impact analysis. The top critical fault for the medium-sized office is the fault of HVAC-Left-ON for the packaged rooftop unit, regarding the site energy, source energy, and HVAC energy. Excluding the fault of HVAC-Left-ON, the top critical faults vary significantly among the four climate zones.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Efficiency and Infrastructure Upgrades on Nuclear Clean-up Sites: The Hanford Experience - 18641

The Hanford site, located in southeastern Washington, produced much of our nation's weapons-grade plutonium for the Defense nuclear weapons program. This production lasted the better part of four decades with production ending in 1987. Since 1987, the focus of the Hanford site has turned to clean-up activities. Mission Support Alliance (MSA) is the integrator of the multi-contractor effort to clean up the Hanford site. MSA collaborates with the U.S. Department of Energy (DOE) and all Hanford site contractors in finding and implementing new, cost-saving, safe and practical solutions to cleanup challenges with a continual focus on innovative processes and technologies that reduce costs, energy use and bring safety improvements to the site. Support Services include environmental integration and land management; fleet and road maintenance; water/electric and utilities; cyber security and information management as well as the preservation of the site's cultural artifacts. This paper describes the process, challenges, and focus on infrastructure upgrade and energy efficiency projects in the context of a multi-contractor nuclear clean-up site. Project development and new technology deployment at Hanford has long been plagued with economic challenges. For example, despite extensive auditing, analysis, and project development, most of the energy-related projects on the Hanford site have gone unfunded due to the low cost of electricity, the relatively high cost of labor, and costs associated with detailed safety and cultural reviews. - The Hanford site is a direct-service customer of the Bonneville Power Administration (BPA) and has a marginal electricity rate of $0.033/kWh. - Labor costs on the Hanford site track high because of the requirements associated with the safety and security necessary to operate a legacy nuclear weapons complex. - In partnership with three federally recognized and other affected Native American tribes (Yakama Nation, Confederated Tribes of the Umatilla Indian Reservation, the Nez Perce Tribe, and Wanapum People), most activities on the Hanford site are afforded in-depth cultural reviews. To work within these constraints, the MSA Energy Management team has embarked on a three-pronged approach to energy project development: Program Visibility: The MSA Energy Management team has promoted both project opportunities and requirements across the Hanford site. This information comes in the form of site-wide newsletters, group meetings, e-mails, success stories, and recognition of staff. Single-point Analysis: To by-pass the inevitable duplications of effort, learning curve issues, and to improve project consistency/delivery, the MSA Energy Management team serves as the single resource to the site for energy project analysis. This resource includes initial assessment, engineering analysis, efficiency calculation and project recommendations. Contractor/utility Interface: In addition to the infrastructure under its own purview, MSA provides all support services for the contractor/utility interface. These activities include formulation and submission of incentive-based efficiency projects, project tracking, and incentive awards. All incentive awards are forwarded to the relevant contractor and then highlighted in the visibility campaign. Successful energy efficiency projects at Hanford have included high efficiency heating, ventilation, air conditioning (HVAC) systems, interior and exterior lighting/lighting control systems, pump and motor systems, and the right-sizing of transformers and area-wide electrical distribution systems. Prior to the initiation of this program and structure (roughly 3 years ago) the average annual energy efficiency incentive applied for and received was under $10,000, with an annual energy savings of approximately 36,000 kilowatt hours (kWh). In fiscal year 2017, the annual incentive received was over $419,000, with identified energy savings of over 1.3 million kWh. Details and case studies of the major project accomplishments are included. The success of this program can be traced to an understanding of the constraints, the development of a program to address these constraints, and good communication/coordination across DOE and the multiple contractors serving the Hanford site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Grey-box and ANN-based building models for multistep-ahead prediction of indoor temperature to implement model predictive control

Model-based predictive control (MPC) strategies for heating, ventilation, and air-conditioning (HVAC) systems present an opportunity to lower building energy consumption and operational costs. Such approaches rely on the development of a model to precisely forecast building thermal dynamics, such as room air temperature or heating/cooling rate, and make control-related decisions. The control-oriented modeling of building energy systems should be accurate in predicting indoor conditions and present low computational complexity. These features are the key challenge of implementing advanced control methods such as MPC. Extant studies on building modeling for MPC have focused on step-ahead forecasting techniques to forecast building thermal dynamics, while multistep-ahead forecasting is essential. Moreover, machine learning model suitable in case of the domain-based engineering expertise are also not available. To this aim, we perform a comparative analysis of the grey-box model based on a resistance-capacitance (RC) thermal network and a machine learning model composed of an artificial neural network (ANN) for multistep-ahead prediction of building thermal dynamics using current and historical data. Actual experimental data obtained from the Flexible Research Platform (FRP) in Oak Ridge National Laboratory (US) are used for estimation and validation purposes. The average root mean squared error (RMSE) of the grey-box and ANN models are 0.89 °C and 1.02°C, respectively. Finally, the results indicate that the grey-box model outperforms the ANN model in the considered validation periods in terms of accuracy and prediction stability.

42 ENGINEERING↗

Development of an Improved Process for Installation Projects of High Technology Manufacturing Equipment

High technology manufacturing equipment is utilized at Los Alamos National Laboratory (LANL) to support nuclear missions. This is undertaken from concept initiation where equipment is designed and then taken through several review phases, working closely with system engineers (SEs) responsible for each of the affected systems or involved disciplines (from gasses to HVAC to structural, etc.). After the design is finalized it moves to procurement and custom fabrication of the equipment and equipment installation, including all of the paperwork involved. Not only are the engineering and manufacturing aspects important, but also the scheduling, financial forecasting, and planning portions that take place initially and are sometimes modified as the project progresses should requirements, changes or additions become necessary. The process required to complete a project of this type, including equipment installation, is unique and involves numerous steps to complete. These processes can be improved and recent work on the Direct Current Arc (DC Arc) Glovebox Design, Fabrication and Installation Project provides an opportunity to identify some important lessons learned (LL) that can be implemented in the future for continued project improvement and success.

42 ENGINEERING↗

Cloud-Control of Legacy Building Automation System: A case study

As Internet of Things devices and cloud-based platforms become more mature, Energy Management and Information Systems (EMIS) are increasingly gaining momentum in the building industry. In large commercial buildings, Fault-Detection and Diagnostic (FDD) and energy information systems (EIS) are now established technologies with tens of providers and thousands of deployment sites across North America. The new frontier for the EMIS technology is now represented by control systems that use advanced system optimization (ASO) methods to improve the operations of the HVAC system. Given the complexity of the integration of such systems with the existing building automation systems (BAS) and the higher risk involved with direct control of the HVAC, these systems are still emerging in the market. This paper presents the results of a project in which a start-up company partnered with a research institution to develop a cloud-based software EMIS solution and deployed it in a university campus in California. The software system included advanced sensing, data acquisition, storage and advanced control and analytics applications developed on top of the native BAS. The new platform controls ten buildings on the campus and the FDD and the ASO applications deployed on this platform were able to generate energy savings of up to 35% and 25% in certain buildings for each functionality respectively. Where the platform did not save energy, it improved building service (air quality). Lessons learned include the importance of collaborating with and training the building operators and evaluating whether the legacy system can work reliably with the new technology.

Prakash, Anand Krishnan↗

Improving Ventilation and Saving Energy: Final Report on Indoor Environmental Quality and Energy Monitoring in Sixteen Relocatable Classrooms

An improved HVAC system for portable classrooms was specified to address key problems in existing units. These included low energy efficiency, poor control of and provision for adequate ventilation, and excessive acoustic noise. Working with industry, a prototype improved heat pump air conditioner was developed to meet the specification. A one-year measurement-intensive field-test of ten of these IHPAC systems was conducted in occupied classrooms in two distinct California climates. These measurements are compared to those made in parallel in side by side portable classrooms equipped with standard 10 SEER heat pump air conditioner equipment. The IHPAC units were found to work as designed, providing predicted annual energy efficiency improvements of about 36 percent to 42 percent across California's climate zones, relative to 10 SEER units. Classroom ventilation was vastly improved as evidenced by far lower indoor minus outdoor CO2 concentrations. TheIHPAC units were found to provide ventilation that meets both California State energy and occupational codes and the ASHRAE minimum ventilation requirements; the classrooms equipped with the 10 SEER equipment universally did not meet these targets. The IHPAC system provided a major improvement in indoor acoustic conditions. HVAC system generated background noise was reduced in fan-only and fan and compressor modes, reducing the nose levels to better than the design objective of 45 dB(A), and acceptable for additional design points by the Collaborative on High Performance Schools. The IHPAC provided superior ventilation, with indoor minus outdoor CO2 concentrations that showed that the Title 24 minimum ventilation requirement of 15 CFM per occupant was nearly always being met. The opposite was found in the classrooms utilizing the 10 SEER system, where the indoor minus outdoor CO2 concentrations frequently exceeded levels that reflect inadequate ventilation. Improved ventilation conditions in the IHPAC lead to effective removal of volatile organic compounds and aldehydes, on average lowering the concentrations by 57 percent relative to the levels in the 10 SEER classrooms. The average IHPAC to 10 SEER formaldehyde ratio was about 67 percent, indicating only a 33 percent reduction of this compound in indoor air. The IHPAC thermal control system provided less variability in occupied classroom temperature than the 10 SEER thermostats. The average room temperatures in all seasons tended to be slightly lower in the IHPAC classrooms, often below the lower limit of the ASHRAE 55 thermal comfort band. State-wide and national energy modeling provided conservative estimates of potential energy savings by use of the IHPAC system that would provide payback a the range of time far lower than the lifetime of the equipment. Assuming electricity costs of $0.15/kWh, the perclassroom range of savings is from about $85 to $195 per year in California, and about $89 to $250 per year in the U.S., depending upon the city. These modelsdid not include the non-energy benefits to the classrooms including better air quality and acoustic conditions that could lead to improved health and learning in school. Market connection efforts that were part of the study give all indication that this has been a very successful project. The successes include the specification of the IHPAC equipment in the CHPS portable classroom standards, the release of a commercial product based on the standards that is now being installed in schools around the U.S., and the fact that a public utility company is currently considering the addition of the technology to its customer incentive program. These successes indicate that the IHPAC may reach its potential to improve ventilation and save energy in classrooms.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lessons Learned From Designing and Building Low Organic Outgassing Cleanrooms for NASA OSIRIS-REx and Hayabusa2 Curation Facility

NASA Johnson Space Center Astromaterials Acquisition and Curation Office completed construction and commissioning of the OSIRIS-REx and Hayabusa2 cleanroom laboratory suites along with new precision cleaning and advanced curation laboratories consisting of ISO Class 5, 6, and 7 cleanrooms. The new curation facilities are designed for initial receiving, basic characterization, curation processing, and preliminary examination of carbonaceous asteroidal material. The facilities are also designed to enable long-term pristine sample storage to preserve the scientific integrity of each sample to enable future research by the international science community. The scientific study of organics is critical for both missions. The OSIRIS-REx mission instituted a stringent contamination control plan for low organics. Given these mission requirements and long-term storage preservation requirements, cleanroom construction materials were carefully selected to not hinder the scientific search for amino acids and the study of organics in the samples. Cleanroom candidate construction materials were researched for the HVAC system, floors, walls, ceiling, and plenum areas. The team chose several candidate materials that were further tested for their specific outgassing characteristics using ASTM E-595 per ASTM E-2312. The information gained provided the foundation for the final design selection of the cleanroom materials. While material selection is important before and during the facility design phase, the construction phase is where these choices are implemented by the prime construction contractor through final product and material submittals. These submittals are the last check point and changes are often submitted due to engineering/construction conflicts, especially when renovating an existing building. Any new material or equipment/product change must be identified and scrutinized for low particulate shedding and outgassing properties. In some cases, quick testing of new material is required, and compromises must be made in real-time. Careful selection and implementation of cleanroom materials significantly reduced organic and inorganic contamination beyond normal cleanroom baselines.

astromaterials curation↗

Lessons Learned From Designing and Building Low Organic Outgassing Cleanrooms for NASA OSIRIS-REx and Hayabusa2 Curation Facility

NASA Johnson Space Center Astromaterials Acquisition and Curation Office completed construction and commissioning of the OSIRIS-REx and Hayabusa2 cleanroom laboratory suites along with new precision cleaning and advanced curation laboratories consisting of ISO Class 5, 6, and 7 cleanrooms. The new curation facilities are designed for initial receiving, basic characterization, curation processing, and preliminary examination of carbonaceous asteroidal material. The facilities are also designed to enable long-term pristine sample storage to preserve the scientific integrity of each sample to enable future research by the international science community. The scientific study of organics is critical for both missions. The OSIRIS-REx mission instituted a stringent contamination control plan for low organics. Given these mission requirements and long-term storage preservation requirements, cleanroom construction materials were carefully selected to not hinder the scientific search for amino acids and the study of organics in the samples. Cleanroom candidate construction materials were researched for the HVAC system, floors, walls, ceiling, and plenum areas. The team chose several candidate materials that were further tested for their specific outgassing characteristics using ASTM E-595 per ASTM E-2312. The information gained provided the foundation for the final design selection of the cleanroom materials. While material selection is important before and during the facility design phase, the construction phase is where these choices are implemented by the prime construction contractor through final product and material submittals. These submittals are the last check point and changes are often submitted due to engineering/construction conflicts, especially when renovating an existing building. Any new material or equipment/product change must be identified and scrutinized for low particulate shedding and outgassing properties. In some cases, quick testing of new material is required, and compromises must be made in real-time. Careful selection and implementation of cleanroom materials significantly reduced organic and inorganic contamination beyond normal cleanroom baselines.

astromaterials curation↗

Platform for Remote Deployment and Training for Enhanced Building Operation Practices (Building Re-Tuning and On-going Commissioning)

While a building’s energy usage is driven largely by its design and use, building operator behavior has a strong influence on its energy consumption. This project developed and piloted a specific, data-driven coaching methodology to help operators understand how they can adjust operations and/or affect no/low-cost repairs or upgrades to their specific building HVAC systems to reduce energy consumption. Named BuildingCoach, the operational optimization method used is based on the Building Re-tuning approach developed by the Pacific Northwest National Laboratory. A building operations analytics market has matured over the past decade, though its potential to affect energy-saving changes has not been fully realized. Training operators to understand the methods for operational optimization with the explicit approach of using building-system performance data is hypothesized to create a more effective, longer lasting result in building energy efficiency, and this strategy is the fundamental premise of this project. With the support of an Industry Advisory Board, the project succeeded in developing materials and recruiting for and delivering three pilot cohorts. Deliverables included twenty-two self-paced training modules (accessed via a Learning Management System) and a web-based platform that includes access to real-time building system data and a repository for building system documentation. The project set out to have 100 participants from 50 buildings in three pilot cohorts. In the end, there were 28 participants from 17 buildings, i.e., a significant shortfall. The first two pilot cohorts had only two buildings in each, and this was partially due to difficulties in deploying the Building Operator Coaching Solution (“the BOCS”), which is technology that extracts the data from the controls network and presents it as prescribed for coaching. In the third cohort, the project team deployed the BOCS successfully to 13 buildings, the methodology was piloted as intended, and numerous opportunities for optimization were identified. The BuildingCoach business plan charts a path to an economically sustainable effort. However, even with a licensing model captured in the final version of the business plan, the scalability is still limited to keeping less than 1,000 buildings affected by 2033. Even so, there are unexplored paths to greater scalability that are being considered. CUNY BPL is working to perpetuate and grow the use of BuildingCoach. As of this writing, about twenty buildings have either been connected or will be connected with operators coached / to be coached in the NYC municipal portfolio, twelve buildings across four campuses in NY State will use BuildingCoach, a NY upstate county wishes for six or seven buildings to participate with the support of funding from NYSERDA, and others have also expressed interest. In the decades to come, there will be an increasing percentage of large and mid-sized buildings that incorporate automated system optimization (ASO), and the building operators’ role will shift to spend more time on maintenance and monitoring. Meanwhile, programs such as BuildingCoach will play a critical role in optimizing operations. And, regardless of the emergence of ASO, operators will still need to understand how their systems operate so that they can monitor them properly. Within that context, BuildingCoach is an important step towards operators’ understanding of efficient building system operations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of a hardware-in-the-loop testbed for laboratory performance verification of flexible building equipment in typical commercial buildings

The goals of reducing energy costs, shifting electricity peaks, increasing the use of renewable energy, and enhancing the stability of the electric grid can be met in part by fully exploiting the energy flexibility potential of buildings and building equipment. The development of strategies that exploit these flexibilities could be facilitated by publicly available high-resolution datasets illustrating how control of HVAC systems in commercial buildings can be used in different climate zones to shape the energy use profile of a building for grid needs. This article presents the development and integration of a Hardware-In-the-Loop Flexible load Testbed (HILFT) that integrates physical HVAC systems with a simulated building model and simulated occupants with the goal of generating datasets to verify load flexibility of typical commercial buildings. Compared to simulation-only experiments, the hardware-in-the-loop approach captures the dynamics of the physical systems while also allowing efficient testing of various boundary conditions. The HILFT integration in this article is achieved through the co-simulation among various software environments including LabVIEW, MATLAB, and EnergyPlus. Although theoretically viable, such integration has encountered many real-world challenges, such as: 1) how to design the overall data infrastructure to ensure effective, robust, and efficient integration; 2) how to avoid closed-loop hunting between simulated and emulated variables; 3) how to quantify system response times and minimize system delays; and 4) how to assess the overall integration quality. Lessons-learned using the examples of an AHU-VAV system, an air-source heat pump system, and a water-source heat pump system are presented.

Chen, zhelun↗

Energy Savings Potential and Research, Development, & Demonstration Opportunities for Residential Building Heating, Ventilation, and Air Conditioning Systems

This report is an assessment of 135 different heating, ventilation, and air-conditioning (HVAC) technologies for U.S. residential buildings to identify and provide analysis on 19 priority technology options in various stages of development. The analyses include an estimation of technical energy-savings potential, descriptions of technical maturity, descriptions of non-energy benefits, descriptions of current barriers for market adoption, and descriptions of the technology's applicability to different building or HVAC equipment types. From these technology descriptions, are suggestions for potential research, development and demonstration (RD&D) initiatives that would support further development of the priority technology options.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimal Management of Grid-Interactive Efficient Buildings via Safe Reinforcement Learning

Reinforcement learning (RL)-based methods have achieved significant success in managing grid-interactive efficient buildings (GEBs). However, RL does not carry intrinsic guarantees of constraint satisfaction, which may lead to severe safety consequences. Besides, in GEB control applications, most existing safe RL approaches rely only on the regularisation parameters in neural networks or penalty of rewards, which often encounter challenges with parameter tuning and lead to catastrophic constraint violations. To provide enforced safety guarantees in controlling GEBs, this paper designs a physics-inspired safe RL method whose decision-making is enhanced through safe interaction with the environment. Different energy resources in GEBs are optimally managed to minimize energy costs and maximize customer comfort. The proposed approach can achieve strict constraint guarantees based on prior knowledge of a set of developed hard steady-state rules. Simulations on the optimal management of GEBs, including heating, ventilation, and air conditioning (HVAC), solar photovoltaics, and energy storage systems, demonstrate the effectiveness of the proposed approach.

Huo, Xiang↗

A synthetic building operation dataset

Abstract This paper presents a synthetic building operation dataset which includes HVAC, lighting, miscellaneous electric loads (MELs) system operating conditions, occupant counts, environmental parameters, end-use and whole-building energy consumptions at 10-minute intervals. The data is created with 1395 annual simulations using the U.S. DOE detailed medium-sized reference office building, and 30 years’ historical weather data in three typical climates including Miami, San Francisco, and Chicago. Three energy efficiency levels of the building and systems are considered. Assumptions regarding occupant movements, occupants’ diverse temperature preferences, lighting, and MELs are adopted to reflect realistic building operations. A semantic building metadata schema - BRICK, is used to store the building metadata. The dataset is saved in a 1.2 TB of compressed HDF5 file. This dataset can be used in various applications, including building energy and load shape benchmarking, energy model calibration, evaluation of occupant and weather variability and their influences on building performance, algorithm development and testing for thermal and energy load prediction, model predictive control, policy development for reinforcement learning based building controls.

24 POWER TRANSMISSION AND DISTRIBUTION↗