Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Fire Systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Theoretical Analysis of a Single-Stage Gas-Fired Ejector Heat Pump Water Heater

Ejector driven systems have the ability to operate at high efficiencies, utilizing recycled thermal energy as a power source. For a typical ejector heat pump system, the increase of the condenser temperature reduces the coefficient of performance (COP). In addition, if the condenser temperature is higher than the critical temperature, the ejector may not function. In this situation, the condenser temperature must be reduced, and an additional heater will be utilized to heat the production water from the condenser temperature to the desired temperature. In this investigation, a single-stage gas-fired ejector heat pump (EHP) is investigated and thermodynamically modeled in order to optimize the system COP for the purpose of heating water by utilizing the thermal energy from the ambient air. The effects of the high-temperature evaporator (HTE) and low-temperature evaporator (LTE) temperatures on the ejector critical back pressure and the EHP system performance are examined for a HTE temperature range of 120–180 °C and LTE temperatures of 15.5, 17.5, and 19.5 °C. Results show that an optimized COP of the EHP system exists which depends on HTE and LTE temperatures, primary nozzle throat diameters. In addition, it is found that the EHP COP is independent of the ejector COP. From this investigation a maximum EHP COP of 1.31 is able to be achieved for a HTE temperature of 160 °C and a LTE temperature of 19.5 °C with a total heat capacity of 15.98 kW.

Spitzenberger, Jeremy↗

Energy Improvements of Fire Station 71

Since 2018, the City of Shawnee, Kansas has completed two phases of the State of Kansas Facility Conservation Improvement Program (FCIP), an initiative that guarantees operational cost and energy savings through targeted construction improvements on City facilities and infrastructure. The City is currently in the third phase of this FCIP, where one of the projects included an investment in energy improvements for Fire Station 71 (FS 71). The City partnered with Navitas, an Energy Service Company (ESCO), to implement a Photovoltaic Solar Array on FS71. The purpose of this project was to invest in sustainable building improvements with Energy Conservation Measures (ECM) to bring cost savings to the City and to provide sustainable benefits to the residents of Shawnee. In the first task of the project, Navitas collaborated with the City of Shawnee and the Community Development Department to determine the optimal layout and schedule for the installation of the solar array on FS 71. In the second task of the project, Navitas installed the 99.8 kW DC Photovoltaic solar array system. This system installation comprised of racking, inverters, optimizers, load center, and disconnect, which were all installed at a total ECM price of $\$$247,948. The third task focused on start-up and commissioning of the array. Navitas installed a real-time data analytics information management system integrated with utility meters, which evaluates the operations of the utility system and verifies operation of equipment and ensures optimum operation for energy efficiency. In the final task of this project, this analytics system was used for monitoring and verification, which will continue to be used to evaluate the success of the project for the coming years. The primary goal of the project was to install the 99.8 kW DC PV solar array at FS 71 to demonstrate the viability of solar energy systems in essential municipal facilities. Fire stations are energy demanding structures, as they require a constant intake of power and have a high baseline energy usage. The success of solar arrays on a fire station exemplifies their energy efficiency and effectiveness and displays their potential for application on other city facilities. By installing a solar array at such a facility, the City sought not only to offset electricity usage but also to serve as a model for ECMs in other municipal facilities and infrastructure projects. From an economic standpoint, this project demonstrates the feasibility of renewable energy at the municipal level. The total project cost of $\$$247,948 was split evenly between city funds and award funding, minimizing financial risk while ensuring guaranteed long-term savings. Any excess savings that are beyond the guaranteed minimums remain with the city, which enables future investment in sustainable energy initiatives. This project provides many benefits to the public. In addition to reducing the environmental footprint of city operations, it lowers taxpayer-funded utility spending and improves the energy security of a critical facility. The knowledge gained from this implementation motivates the City to focus on similar efforts across other public facilities in future FCIP phases and other City projects.

14 SOLAR ENERGY↗

Wildfire-Power Grid Interactions: Feedback, Impacts, Monitoring, Modeling, and Mitigation Strategies

Wildfires are increasingly interacting with electric power systems through a two-way hazard chain: fires damage grid assets and trigger cascading outages, while grid faults can ignite new fires under hot, dry, and windy conditions. This review synthesizes the state of knowledge across five domains: (i) physical impacts of flames, heat, and smoke on lines, towers, insulators, and substations; (ii) power-infrastructure-initiated ignitions via conductor clash, high-impedance faults, and corona discharge; (iii) widespread blackouts and disproportionate societal impacts; (iv) multi-scale monitoring spanning laboratory tests, in-situ and grid-integrated sensors, and Earth observation; (v) coupled modeling that links fire behavior with grid operations; and (vi) technological and strategic mitigation pathways spanning prevention, response, and recovery. We integrate these domains into a novel 'feedback-aware' socio-technical framework. Through a longitudinal analysis (2005-2025) of global incidents, we identify that while vegetation contact remains the most frequent ignition source, aging infrastructure failure has emerged as a critical driver of catastrophic 'mega-fires'. We further identify persistent gaps, including limited interoperability of high-frequency grid and environmental data, scarce real-time data assimilation, and under-developed equity metrics for outage management. We conclude by outlining a research agenda to (1) deploy interoperable sensing architectures, (2) advance feedback-coupled fire-grid simulations, and (3) evaluate mitigation portfolios through techno-economic and fairness lenses. Recognizing wildfire-grid interactions as coupled socio-technical systems is essential for protecting infrastructure and communities and for ensuring reliable, sustainable electricity in a changing world.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Topical Report – Findings on Subtask 2.7 – Wet ESP and Aerosol Testing at Coal Creek Station

Growing concerns over the impact of CO 2 emissions from combustion sources on global climate change have prompted numerous research and development projects aimed at developing cost-effective technologies for CO 2 capture. One family of technologies being demonstrated at pilot and full scale globally is postcombustion carbon capture (PCCC) systems that employ amine-based solvents. The captured CO 2 can be compressed and permanently stored underground or used for enhanced oil recovery. The proximity of North Dakota’s lignite-fired fleet of power plants to potential CO 2 storage options creates a unique atmosphere for PCCC within the state. However, the unique components present in lignite flue gas present a challenge for large-scale PCCC at North Dakota power plants by contributing to aerosol formation. Aerosols can negatively impact the long-term performance of amine-based solvents for CO 2 capture. Amine-based solvents are volatile, and flue gas particulate provides nucleation sites where amine vapors can condense as aerosols. Because aerosols cannot be easily captured at the column outlet using conventional technologies, the amine-laden aerosols escape the system and lead to accelerated solvent losses. Moreover, particulate components can chemically react with amines to form degradation products that can permanently deactivate the amine, cause fouling, and lead to hazardous emissions. Many of the elements that have been shown to catalyze solvent degradation are present in lignite coals and can exacerbate solvent replacement economics. Understanding this issue is critical to the implementation of solvent-based CO 2 capture systems as applied to lignite-fired generation systems. The Energy & Environmental Research Center (EERC) designed and carried out this project to fully characterize aerosol behavior with various control technologies installed to better optimize aerosol mitigation technology for CO 2 capture. To meet the goal of this project, the following objectives were identified: Determine the effectiveness of a wet electrostatic precipitator (WESP) on mitigating formation of problematic aerosols at Great River Energy’s Coal Creek Station, upstream of the PCCC system. Determine the effectiveness of the Mitsubishi Heavy Industries (MHI) proprietary amine emission reduction unit (AERU) as a postcapture solvent recovery system for reducing aerosol emissions and extending solvent life downstream of the PCCC system. Determine the impact of aerosols on the efficiency and degradation products of both commercial and advanced solvents within the PCCC system. Work was conducted at Coal Creek Station Unit 1 using a slipstream of flue gas from the outlet of the plant’s flue gas desulfurization (FGD) unit. Flue gas was routed through a pilot-scale FGD unit to remove SO 2 to very low levels (~1 ppm) and then through a direct contact cooler (DCC) to further cool the gas and to remove moisture. The gas exiting the DCC was then optionally routed through a WESP before passing to the CO 2 absorber columns. The MHI solvent was used to scrub CO 2 from the slipstream through a set of two absorber columns. The rich solvent was regenerated in a stripper column by heating to drive off captured CO 2 . Flue gas exiting the absorber column was routed to MHI’s proprietary AERU to recover entrained solvent. The system operated using a catch-and-release method where the CO 2 was separated to provide data on the process, but the captured CO 2 was released back into the host site stack. Particulate was measured, collected, and analyzed from multiple locations throughout the pilot-scale system. Unlike the performance observed in prior work, the inlet FGD and DCC did not remove significant particulate matter from the flue gas. This appears to be due to a difference in the nature of the particulate. The DCC seemed to increase particulate size and count, most likely owing to water condensing onto the surfaces of fly ash particles. When the WESP was operated, it achieved >95% particulate capture. Very little particulate matter or indications of solvent were detected at the AERU outlet. When operating with advanced KS 21 solvent, the particulate material at the AERU outlet was even further decreased. Solvent analysis showed that some species derived from flue gas and ash were slowly concentrating in the solvent over the duration of the test. The levels observed were reported to be within expected ranges and were not of concern to MHI. A high-level techno-economic assessment of installing CO 2 capture at Coal Creek Station suggested that, when using a standard monoethanolamine (MEA)-based solution with simple heat integration, the energy penalty to net generation would be 34%. The bulk of this was due to steam losses for regenerating solvent, followed by parasitic electrical demand for CO 2 compression and then by increased parasitic load for pushing flue gas through the absorber column. These demands could be decreased with a more advanced solvent that exhibits lower heat of regeneration and lower pressure drop than does a simple MEA solution. Further energy could be saved with more thorough heat integration to recover useful energy from the steam used for solvent regeneration. Installing a WESP was predicted to increase the cost of electricity by nearly $5/MWh. This would become cost-effective if solvent losses were roughly 10 times the baseline estimate when not using a WESP but could be returned to baseline by installing the WESP. Piping CO 2 for storage in more favorable geology could help with carbon capture and storage economics. Although storing off-site would necessitate construction of a CO 2 transport pipeline, the cost of this pipeline might be more than offset by reducing the number of wells required, the depths of the wells required, and the electrical demand for the CO 2 compressor. Additional factors that favor off-site storage costs include smaller expected CO 2 plume sizes, which translates to less monitoring and fewer landowner agreements. More detailed assessment of the specific geology in the region under and around Coal Creek Station would be needed to accurately assess the costs and benefits of different storage site options. This subtask was cofunded through the Energy & Environmental Research Center–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission.

Strege, Joshua↗

Evaluating the Durability of Balance of Systems Components Using Combined-Accelerated Stress Testing

The degradation of photovoltaic (PV) balance of systems (BoS) components is not well-studied, but the consequences include offline modules, strings, and inverters; system shutdown; arc faults; and fires. A utility provider experienced a ~30% failure rate in their power transfer chain, originally attributed to branch connectors. Field-failed specimen assemblies were therefore examined, consisting of cable connector, branch connector, and discrete fuse components. Previous papers and presentations have focused on the development of the test method using a benchtop prototype. This presentation covers the early results of C-AST aging of static and dynamic specimens.

balance of systems↗

Carbon Capture Pilot at Dry Fork Power Station (Final Technical Report)

The objective of this project was to design, seek necessary approvals, build and operate a large-scale pilot sorbent-based post combustion carbon capture system (CCS) at a coal fired power generation facility. TDA’s CCS uses a highly stable, low-cost, high-capacity physical adsorbent to effectively remove CO 2 via a combination vacuum and concentration swing adsorption (VCSA) process. The CCS is integrated with the power plant flue gas exhaust, which is rich in CO 2 (~13% vol. CO 2 ) and removes more than 90% of the plant’s overall carbon emissions.

01 COAL, LIGNITE, AND PEAT↗

Sensitivity of Pyrocumulus Convection to Tree Mortality During the 2020 Creek Fire in California

Abstract This study investigated the sensitivity of pyrocumulonimbus (PyroCb) induced by the California Creek fire of 2020 to the amount and type of surface fuels, within the WRF‐SFIRE modeling system. Satellite data were used to derive fire arrival times to constrain fire progression, and to augment the fuel characterization with better estimates of combustible vegetation accounting for tree mortality. Machine learning was employed to classify standing dead vegetation from aerial imagery, which was then added as a custom fuel class along with the standard Anderson fuel categories. Simulations using this new fuel class produced a larger and more vigorous PyroCb than the control run, however, still under‐predicted the cloud top. Additional augmentation of fuel mass to represent the accumulation of dead vegetation on the forest floor further improved the simulations, demonstrating the efficacy of representing both dead standing and fallen vegetation to produce more realistic PyroCb and smoke simulations.

54 ENVIRONMENTAL SCIENCES↗

Evaluating the Durability of Balance of Systems Components Using Combined-Accelerated Stress Testing

The degradation of photovoltaic (PV) balance of systems (BoS) components is not well-studied, but the consequences include offline modules, strings, and inverters; system shutdown; arc faults; and fires. A utility provider experienced a ~30% failure rate in their power transfer chain, originally attributed to branch connectors. Field-failed specimen assemblies were therefore examined, consisting of cable connector, branch connector, and discrete fuse components. In this study, unused field-vintage specimens are examined using combined-accelerated stress testing (C-AST) to clarify the most influential environmental stressors as well as the effect of external mechanical perturbation. A benchtop prototype fixture was used to develop the perturbation capability for the C-AST chamber. The benchtop experiments were also used to develop the in-situ data acquisition of specimen current, voltage, and temperature. A significant increase in operating temperature (~100 degrees C from ~40 degrees C) and a different failure mode were observed promptly once periodic mechanical perturbation was applied. The current at failure was decreased from 35 A (with failure in the fuses) to 15 A (failure at the male/female metal pin connection). After initial examination using X-ray computed tomography, the external plastic was machined away from failed specimens to allow for failure analysis, including the extraction of the internal convolute springs for morphological examination (optical and electron microscopy).

balance of systems↗

Development of Fixtures and Methods to Assess the Durability of Balance of Systems Components

The degradation of photovoltaic (PV) balance of systems (BoS) components is not well studied, but the consequences include offline modules, strings, and inverters; system shutdown; arc faults; and fires. A utility provider experienced a ~30% failure rate in their power transfer chain, originally attributed to branch connectors. Field-failed specimen assemblies were, therefore, examined, consisting of cable connector, branch connector, and discrete fuse components. In this study, unused field-vintage specimens are examined using a benchtop prototype fixture to identify the most influential environmental stressors on BoS components as well as the effect of external mechanical perturbation. The prototype fixture was used to develop a perturbation capability for future use in the combined-accelerated stress testing chamber. The benchtop experiments were also used to develop the in-situ data acquisition of specimen current, voltage, and temperature. A significant increase in operating temperature (~100 °C from ~40 °C) and a different failure mode (arcing at the metal pins rather than overheating of the fuse filament) were observed promptly once periodic mechanical perturbation was applied. The current at failure was decreased from 35 A (measured for static specimens, with failure occurring in the fuses) to 15 A (for tests with mechanical perturbation, with failure at the male/female metal pin connection). After initial examination using X-ray computed tomography, the external plastic was machined away from failed specimens to allow for failure analysis, including the extraction of the internal convolute springs for morphological examination (optical and electron microscopy). Chemical composition analysis included energy-dispersive X-ray spectroscopy, differential scanning calorimetry, and Fourier transform infrared spectroscopy.

14 SOLAR ENERGY↗

Improving the Cost-Effectiveness of Algal CO2 Utilization by Synergistic Integration With Power Plant and Wastewater Treatment Operations

Creating an economic demand for carbon utilization products will require lowering the overall cost of the products to compete within the current market. Photosynthetic uptake of carbon dioxide is an emerging pathway for product development in the animal feed market that globally amounts to over 400 Billion USD and is expected to continue growing. This project aims to continue the development of a process that utilizes carbon dioxide while increasing the cost competitiveness of algae as an animal feed product. The overall goal of the project is to demonstrate an engineering-scale open raceway pond algae cultivation system (180 m2) including integration of technologies that utilize coal-fired power plant CO2 and wastewater nutrient inputs. The system is designed to maximize the cost-effectiveness and environmental benefits of algal biomass production for commodity animal feed.

20 FOSSIL-FUELED POWER PLANTS↗

Resilience of terrestrial and aquatic fauna to historical and future wildfire regimes in western North America

Wildfires in many western North American forests are becoming more frequent, larger, and severe, with changed seasonal patterns. In response, coniferous forest ecosystems will transition toward dominance by fire-adapted hardwoods, shrubs, meadows, and grasslands, which may benefit some faunal communities, but not others. We describe factors that limit and promote faunal resilience to shifting wildfire regimes for terrestrial and aquatic ecosystems. We highlight the potential value of interspersed nonforest patches to terrestrial wildlife. Similarly, we review watershed thresholds and factors that control the resilience of aquatic ecosystems to wildfire, mediated by thermal changes and chemical, debris, and sediment loadings. We present a 2-dimensional life history framework to describe temporal and spatial life history traits that species use to resist wildfire effects or to recover after wildfire disturbance at a metapopulation scale. The role of fire refuge is explored for metapopulations of species. In aquatic systems, recovery of assemblages postfire may be faster for smaller fires where unburned tributary basins or instream structures provide refuge from debris and sediment flows. We envision that more-frequent, lower-severity fires will favor opportunistic species and that less-frequent high-severity fires will favor better competitors. Along the spatial dimension, we hypothesize that fire regimes that are predictable and generate burned patches in close proximity to refuge will favor species that move to refuges and later recolonize, whereas fire regimes that tend to generate less-severely burned patches may favor species that shelter in place. Looking beyond the trees to forest fauna, we consider mitigation options to enhance resilience and buy time for species facing a no-analog future.

54 ENVIRONMENTAL SCIENCES↗

Filer City Biomass Carbon Removal and Storage (BiCRS) Net-Negative Study

NorthStar Clean Energy Company (NorthStar) conducted the Filer City Biomass Carbon Removal and Storage (BiCRS) Net-Negative Study to develop a conceptual design and cost estimate for retrofitting the TES Filer City Station with post-combustion carbon capture technology in Mainstee Michigan. The Filer City BiCRS Net-Negative Study allowed NorthStar and team to confirm the commercial feasibility of a post-combustion carbon capture system applied to biomass-fired boilers. At the time of the study, there were no operating facilities in the world with carbon capture applied to flue gas from woody biomass as proposed for Filer City. Due to the solvent-agnostic nature of B&W’s SolveBright™ technology, the team determined that multiple amines, both traditional and proprietary, would be capable of 95% CO 2 capture efficiency with the steam available from Filer City’s existing boilers after modifications to burn 100% biomass. Based on the cost estimates produced, NorthStar can now confirm the Filer City BiCRS Project is economically viable with a combination of tax credits available from the Inflation Reduction Act of 2022 and high-quality Carbon Dioxide Removal Credits sold on the Voluntary Carbon Market. The Filer City BiCRS project is uniquely positioned to become one of the first projects to capture and sequester large volumes of CO 2 from a biogenic source, removing existing CO 2 from the atmosphere. The unlimited version of the Filer City Biomass Carbon Removal and Storage (BiCRS) Net-Negative Study Final Technical Report is attached.

01 COAL, LIGNITE, AND PEAT↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Theoretical Analysis of a Single-Stage Gas-fired Ejector Heat Pump Water Heater

Ejector-driven systems have the ability to operate at high efficiencies, utilizing recycled thermal energy as a power source. For a typical ejector heat pump (EHP) system, the increase of the condenser temperature reduces the coefficient of performance (COP). In addition, if the condenser temperature is higher than the critical temperature, the ejector may not function. In this situation, the condenser temperature must be reduced, and an additional heater will be utilized to heat the production water from the condenser temperature to the desired temperature. In this study, a single-stage gas-fired EHP is investigated and thermodynamically modeled to optimize the system COP for the purpose of heating water by utilizing the thermal energy from the ambient air. The effects of the high-temperature evaporator (HTE) and low-temperature evaporator (LTE) on the ejector critical back pressure and the EHP system performance are examined for a HTE temperature range of 120–180 °C and LTE temperatures of 15.5, 17.5, and 19.5 °C. Our results show that an optimized COP for the EHP system exists and is dependent on HTE and LTE temperatures and the primary nozzle throat diameter. In addition, it is found that the peak EHP COP does not necessarily coincide with a large ejector COP. From this study, a maximum EHP COP of 1.31 is achieved at a HTE temperature of 170 °C and LTE temperature of 19.5 °C with a total heating capacity of 15.98 kW.

42 ENGINEERING↗

Machine learning-based observation-constrained projections reveal elevated global socioeconomic risks from wildfire

Reliable projections of wildfire and associated socioeconomic risks are crucial for the development of efficient and effective adaptation and mitigation strategies. The lack of or limited observational constraints for modeling outputs impairs the credibility of wildfire projections. Here, we present a machine learning framework to constrain the future fire carbon emissions simulated by 13 Earth system models from the Coupled Model Intercomparison Project phase 6 (CMIP6), using historical, observed joint states of fire-relevant variables. During the twenty-first century, the observation-constrained ensemble indicates a weaker increase in global fire carbon emissions but higher increase in global wildfire exposure in population, gross domestic production, and agricultural area, compared with the default ensemble. Such elevated socioeconomic risks are primarily caused by the compound regional enhancement of future wildfire activity and socioeconomic development in the western and central African countries, necessitating an emergent strategic preparedness to wildfires in these countries.

54 ENVIRONMENTAL SCIENCES↗

Hydrogen Storage for Load-Following and Clean Power: Duct-firing of Hydrogen to Improve the Capacity Factor of NGCC Plants (Final Report, Phase I Conceptual Study)

The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and the proposed system is an improvement over alternate low carbon dispatchable power options. Our demonstration will include 54 MWh of hydrogen storage. CO 2 capture inherent to the CHG process can capture 90% of the CO 2 (with upgrades to >98%) in a commercial system (~300 MWth) for sequestration or other uses. The hydrogen will be utilized in a duct burner in a Heat Recovery Steam Generator (HRSG) integrated with the existing Southern Company fossil asset. Here, the firing rate of the duct burner is varied to let the plant respond to fluctuations of electrical load. However, H 2 production is relatively constant by storing H 2 , and revenues are improved by arbitrage between use of low-cost off-peak variable electricity generation or use of stored H 2 under peak demand. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via system requirements review with the whole team. These requirements were then incorporated into/iterated with our Heat & Mass Balance models and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Our system generates power at 17.4% lower cost than other low carbon approaches for the H 2 generation, H 2 compression and storage, carbon sequestration, and HRSG added electricity production for a large-scale duct-fired system. Our team recommends completing the Phase II Pre-FEED study for the proposed system as the next step for the project and its tasks will achieve the overall objective and be ready to launch the FEED. The Pre-FEED tasks include updating the requirements, Concept of Operations, plant scope/process description, component modeling, system modeling, performance estimates, emission estimates, block flow diagrams, fluid/process conditions (PFD), utility usage, and facility sizing/definition. The approach will be to complete these updates in a greater level of detail for the selected site. The approach for developing the EIV is to use the updated results, including model outputs, for carbon dioxide and waste streams.

03 NATURAL GAS↗

EMPOWERED Distributed Energy Resources Permit Accelerator Pilot

This report summarizes the EMPOWERED Distributed Energy Resources (DER) Permit Accelerator Pilot project. Its primary objective was to streamline the design, installation, permitting, and inspections of targeted Distributed Energy Resource (DER) solutions. Streamlining these processes is critical to strengthening and accelerating the adoption of DER solutions nationwide. Moreover, streamlined processes help expedite the clean energy transition and expand energy resilience by improving understanding and capability among key stakeholders like property owners, code officials, and the general workforce. The project team accomplished this by developing and deploying a set of design and permitting guides for simple DER solutions, which they rolled out via a permitting pilot program. The project team developed nine permitting and inspection guides for simple DER solutions, as follows: 1. Single-Family and Duplex: Electric Vehicle Service Equipment (EVSE), and Storage, Solar + Storage (each in two code cycles) 2. Multi-family and Office: EVSE, Storage, Solar + Storage (each in two code cycles) 3. A permitting process guide to support the implementation of the permitting guides. The guides cover key code requirements via plan review and field inspection checklists for code officials and building owners to follow to streamline the permitting and inspections process for DER solutions. Following the development of the initial set of guides, the project team formed two cohorts, each made up of four jurisdictions, to participate in the Permit Accelerator Pilot. Each cohort received training and technical assistance to support them in incorporating the guides into use. The project successfully engaged jurisdictions in two disparate US regions: Chelsea, Somerville, Natick, and Norwood in metro Boston; and Pima County, Town of Gilbert, Flagstaff, and Sedona in Arizona. Feedback gathered from the project was valuable in refining the guides to better address jurisdictional needs. After the pilot period, the project team developed final versions of the guides based on extensive feedback from the cohorts and from external technical peer review. Feedback included needs and barriers related to implementation, as well as detailed technical improvements from external peer review. The final guides were presented in a series of webinars with a national reach, with 192 attendees from 35 states in the live session of the final webinar, and the final guides are posted online and available for use nationwide. Key findings: • The most receptive jurisdictions were those adjacent to other jurisdictions that had already adopted similar initiatives. The least receptive jurisdictions were those in the midst of adopting new code cycles. • The most common barrier to jurisdictional adoption of new guidelines were internal administrative and process delays, more so than technical barriers. • The main technical barrier to adoption proved to be the concern of fire hazard risks posed by energy storage systems. There is some apprehension in the code enforcement community about the safety of the batteries. Education coordinated with fire and safety services will help alleviate concerns and increase confidence in the acceptance of innovative technologies. • Opportunities to further leverage and advance the guides and related resources include outreach, education, and jurisdictional support; updates to the resources to align with code cycle changes and local requirements; and advancements supporting emerging technologies.

14 SOLAR ENERGY↗

Treatment of brackish water for fossil power plant cooling

In this study, we evaluated the technical, economic and environmental impacts of retrofitting brackish groundwater treatment systems at existing coal- and gas-fired electric generating units (EGUs) to reduce freshwater consumption in wet cooling towers. Based on fleet averages, retrofitting brackish water treatment systems decreases unit freshwater consumption by 94–100%, while increasing the cost of electricity generation by 8–10%. The unit capacity shortfalls are less than 1.1%. The resulting cost of freshwater consumption savings by brackish water treatment is US$1.7 m -3 and US$2.9 m -3 on average for coal- and gas-fired EGUs, respectively. However, these trade-offs are highly affected by the brine disposal method. The use of thermal zero liquid discharge for brine disposal can roughly double the average cost of freshwater consumption savings. The cost-effectiveness of brackish water treatment compared with dry cooling deployment depends on how concentrated brines are managed. In conclusion, the identified trade-offs and their dependence fill knowledge gaps to better inform water management.

20 FOSSIL-FUELED POWER PLANTS↗