Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Fermilab”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Redesign of the Timeline Generator at Fermilab using a web-based Flutter Application, GraphQL API and an IOC

Redesign of the Timeline Generator at Fermilab using a web-based Flutter application, GraphQL API and an IOC ABSTRACT = The control system at Fermilab is undergoing an evolution with a shift towards web-based applications with connections to the EPICS infrastructure. The Timeline Generator (TLG) is an application that serves to coordinate events across the lab using different timing links. These links include the Tevatron clock (TCLK), a 10 MHz serial link with events encoded at 20Hz and Ma-chine Data (MDAT), a communication link with states encoded at 720Hz. This paper covers the redesign of the major components of the TLG. This includes a web-based Flutter application for building timelines. A placement service is in use that has a GraphQL interface and uses a timeline input to compute a schedule of events and states. The Flutter application sends this computed schedule to the TLG IOC via a GraphQL interface to the Data Pool Manager (DPM). The TLG IOC runs on an Arria FPGA, the Accelerator Clock Generator (ACLK-GEN), which is responsible for writing the events and states on to the different timing links.

Carmichael, Linden [Fermilab]↗

Pre-Commissioning of the Wide-Dynamic Range Halo Monitor to be Installed in the FERMILAB MI-8 Line

The beam halo can contribute to beam losses in accelerators and is very difficult to measure. With an increase in beam intensity following the PIP-II upgrade at Fermilab, the beam losses are expected to be higher with some coming from the beam halo. Therefore, it is important to measure the sources of beam halo to minimize the beam losses. A modified Halo Monitor developed by J-PARC will be installed in Fermilab MI-8 transfer line to measure the beam halo. In this paper, an update on the beam profile monitor fabrication is covered. The updates include the location selection for the Halo Monitor in the MI-8 transfer line, shielding options for instrumentation, and the next steps in commissioning.

Babacan, B. [IIT, Chicago; Fermilab]↗

Design of a GammaT-Jump System for Fermilab Booster

A gammaT scheme may be required for the PIP-II era performance or ACE-MIRT era performance of the Booster. PIP-II era operations of the Fermilab proton complex will require the Fermilab Booster to increase beam intensity from 4.5e12 to 6.5e12 protons, while also increasing its ramp from 15 Hz to 20 Hz. These changes pose particular challenges for transition-crossing in the Booster, where longitudinal beam quality must be controlled in order to facilitate slip-stacking in the Recycler Ring later in the Main Injector cycle. Two novel gammaT jump schemes are proposed, termed double gammaT jump and partial gammaT jump, which optimizes the magnitude of the gammaT jump within optics and power supply constraints.

Eldred, Jeffrey Scott [Fermilab] (ORCID:0000000344↗

Design of a GammaT-Jump System for Fermilab Booster

A $\gamma_{T}$ scheme may be required for the PIP-II era performance or ACE-MIRT era performance of the Booster. PIP-II era operations of the Fermilab proton complex will require the Fermilab Booster to increase beam intensity from 4.5e12 to 6.7e12 protons, while also increasing its ramp from 15 Hz to 20 Hz. These changes pose particular challenges for transition-crossing in the Booster, where longitudinal beam quality must be controlled in order to facilitate slip-stacking in the Recycler Ring later in the Main Injector cycle. Two novel $\gamma_{T}$-jump schemes are proposed, termed Double $\gamma_{T}$ jump and Partial $\gamma_{T}$-jump , which optimize the magnitude of the $\gamma_{T}$-jump within optics and power supply constraints.

Eldred, J. [Fermilab] (ORCID:000000034432072X)↗

QCD Results from the Fermilab Tevatron proton-antiproton Collider

Selected recent quantum chromodynamics (QCD) measurements are reviewed for Fermilab Run II Tevatron proton-antiproton collisions studied by the Collider Detector at Fermilab (CDF) and D0 Collaborations at a centre-of-mass energy of {radical}s = 1.96 TeV. Tantamount to Rutherford scattering studies at the TeV scale, inclusive jet and dijet production cross-section measurements are used to seek and constrain new particle physics phenomena, test perturbative QCD calculations, inform parton distribution function (PDF) determinations, and extract a precise value of the strong coupling constant, a{sub s}(m{sub Z}) = 0.1161{sub -0.0048}{sup +0.0041}. Inclusive photon production cross-section measurements reveal an inability of next-to-leading-order (NLO) perturbative QCD (pQCD) calculations to describe low-energy photons arising directly in the hard scatter. Events with {gamma} + 3-jet configurations are used to measure the increasingly important double parton scattering (DPS) phenomenon, with an obtained effective interaction cross section of {sigma}{sub eff} = 16.4 {+-} 2.3 mb. Observations of central exclusive particle production demonstrate the viability of observing the Standard Model Higgs boson using similar techniques at the Large Hadron Collider (LHC). Three areas of inquiry into lower energy QCD, crucial to understanding high-energy collider phenomena, are discussed: the examination of intra-jet track kinematics to infer that jet formation is dominated by pQCD, and not hadronization, effects; detailed studies of the underlying event and its universality; and inclusive minimum-bias charged-particle momentum and multiplicity measurements, which are shown to challenge the Monte Carlo generators.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The Muon g-2 experiment at Fermilab

The upcoming Fermilab E989 experiment will measure the muon anomalous magnetic moment aμ. This measurement is motivated by the previous measurement performed in 2001 by the BNL E821 experiment that reported a 3-4 standard deviation discrepancy between the measured value and the Standard Model prediction. The new measurement at Fermilab aims to improve the precision by a factor of four reducing the total uncertainty from 540 parts per billion (BNL E821) to 140 parts per billion (Fermilab E989). This paper gives the status of the experiment.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Continuous Integration Service at Fermilab

This paper describes the current architecture of Continuous Integration (CI) service developed at Fermilab, encountered successes and difficulties, as well as future development plans. The current experiment code has hundreds of contributors that provide new features, bug fixes, and other improvements. Version control systems help developers to collaborate in contributing software for their experiments, while the CI system helps developers keep their code healthy. The Fermilab CI service allows experiments and projects to test and validate their offline production and analysis code on the supported platforms. It is built on top of Jenkins, designed to be set up from a configuration file that provides implementation for each phase of the CI workflow, and able to validate experiment code through grid jobs. This CI service provides a dashboard for easy access to logs and statistical graphs. Since the CI service has been adopted by Fermilab experiments/projects, it proved to be very useful to intercept issues in their code early on and get them fixed before running it in production. Currently the CI service is in use by the ArgoNeuT, DUNE, g-2, LArIAT, MINERvA, mu2e, NOvA, SBND and uBooNE experiments and by the following projects: ART and LArSoft software suites, GENIE, and Glidein-WMS. The CI service is under active development and planning to support code profiling.

Di benedetto, Vito↗

Scalability and performance improvements in the Fermilab Mass Storage System

By 2009 the Fermilab Mass Storage System had encountered two major challenges: the required amount of data stored and accessed in both tiers of the system (dCache and Enstore) had significantly increased and the number of clients accessing Mass Storage System had increased from tens to hundreds of nodes and from hundreds to thousands of parallel requests. To address these challenges Enstore and the SRM part of dCache were modified to scale for performance, access rates, and capacity. This work increased the amount of simultaneously processed requests in a single Enstore Library instance from about 1000 to 30000. The rates of incoming requests to Enstore increased from tens to hundreds per second. Fermilab is invested in LTO4 tape technology and we have investigated both LTO5 and Oracle T10000C to cope with the increasing needs in capacity. We have decided to adopt T10000C, mainly due to its large capacity, which allows us to scale up the existing robotic storage space by a factor 6. This paper describes the modifications and investigations that allowed us to meet these scalability and performance challenges and provided some perspectives of Fermilab Mass Storage System.

Crawford, Matt↗

Grids, virtualization, and clouds at Fermilab

Fermilab supports a scientific program that includes experiments and scientists located across the globe. To better serve this community, in 2004, the (then) Computing Division undertook the strategy of placing all of the High Throughput Computing (HTC) resources in a Campus Grid known as FermiGrid, supported by common shared services. In 2007, the FermiGrid Services group deployed a service infrastructure that utilized Xen virtualization, LVS network routing and MySQL circular replication to deliver highly available services that offered significant performance, reliability and serviceability improvements. This deployment was further enhanced through the deployment of a distributed redundant network core architecture and the physical distribution of the systems that host the virtual machines across multiple buildings on the Fermilab Campus. In 2010, building on the experience pioneered by FermiGrid in delivering production services in a virtual infrastructure, the Computing Sector commissioned the FermiCloud, General Physics Computing Facility and Virtual Services projects to serve as platforms for support of scientific computing (FermiCloud 6 GPCF) and core computing (Virtual Services). Lastly, this work will present the evolution of the Fermilab Campus Grid, Virtualization and Cloud Computing infrastructure together with plans for the future.

97 MATHEMATICS AND COMPUTING↗

Big Data over a 100G network at Fermilab

As the need for Big Data in science becomes ever more relevant, networks around the world are upgrading their infrastructure to support high-speed interconnections. To support its mission, the high-energy physics community as a pioneer in Big Data has always been relying on the Fermi National Accelerator Laboratory to be at the forefront of storage and data movement. This need was reiterated in recent years with the data-taking rate of the major LHC experiments reaching tens of petabytes per year. At Fermilab, this resulted regularly in peaks of data movement on the Wide area network (WAN) in and out of the laboratory of about 30 Gbit/s and on the Local are network (LAN) between storage and computational farms of 160 Gbit/s. To address these ever increasing needs, as of this year Fermilab is connected to the Energy Sciences Network (ESnet) through a 100 Gb/s link. To understand the optimal system-and application-level configuration to interface computational systems with the new highspeed interconnect, Fermilab has deployed a Network Research & Development facility connected to the ESnet 100G Testbed. For the past two years, the High Throughput Data Program (HTDP) has been using the Testbed to identify gaps in data movement middleware [5] when transferring data at these high-speeds. The program has published evaluations of technologies typically used in High Energy Physics, such as GridFTP [4], XrootD [9], and Squid [8]. Furthermore, this work presents the new R&D facility and the continuation of the evaluation program.

97 MATHEMATICS AND COMPUTING↗

Cloud services for the Fermilab scientific stakeholders

As part of the Fermilab/KISTI cooperative research project, Fermilab has successfully run an experimental simulation workflow at scale on a federation of Amazon Web Services (AWS), FermiCloud, and local FermiGrid resources. We used the CernVM-FS (CVMFS) file system to deliver the application software. We established Squid caching servers in AWS as well, using the Shoal system to let each individual virtual machine find the closest squid server. We also developed an automatic virtual machine conversion system so that we could transition virtual machines made on FermiCloud to Amazon Web Services. We used this system to successfully run a cosmic ray simulation of the NOvA detector at Fermilab, making use of both AWS spot pricing and network bandwidth discounts to minimize the cost. On FermiCloud we also were able to run the workflow at the scale of 1000 virtual machines, using a private network routable inside of Fermilab. As a result, we present in detail the technological improvements that were used to make this work a reality.

97 MATHEMATICS AND COMPUTING↗

Virtual machine provisioning, code management, and data movement design for the Fermilab HEPCloud Facility

The Fermilab HEPCloud Facility Project has as its goal to extend the current Fermilab facility interface to provide transparent access to disparate resources including commercial and community clouds, grid federations, and HPC centers. This facility enables experiments to perform the full spectrum of computing tasks, including data-intensive simulation and reconstruction. We have evaluated the use of the commercial cloud to provide elasticity to respond to peaks of demand without overprovisioning local resources. Full scale data-intensive workflows have been successfully completed on Amazon Web Services for two High Energy Physics Experiments, CMS and NOνA, at the scale of 58000 simultaneous cores. This paper describes the significant improvements that were made to the virtual machine provisioning system, code caching system, and data movement system to accomplish this work. The virtual image provisioning and contextualization service was extended to multiple AWS regions, and to support experiment-specific data configurations. A prototype Decision Engine was written to determine the optimal availability zone and instance type to run on, minimizing cost and job interruptions. We have deployed a scalable on-demand caching service to deliver code and database information to jobs running on the commercial cloud. It uses the frontiersquid server and CERN VM File System (CVMFS) clients on EC2 instances and utilizes various services provided by AWS to build the infrastructure (stack). We discuss the architecture and load testing benchmarks on the squid servers. We also describe various approaches that were evaluated to transport experimental data to and from the cloud, and the optimal solutions that were used for the bulk of the data transport. Finally, we summarize lessons learned from this scale test, and our future plans to expand and improve the Fermilab HEP Cloud Facility.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Fermilab Muon Campus g-2 Cryogenic Distribution Remote Control System

The Muon Campus (MC) is able to measure Muon g-2 with high precision and comparing its value to the theoretical prediction. The MC has four 300 KW screw compressors and four liquid helium refrigerators. The centerpiece of the Muon g-2 experiment at Fermilab is a large, 50-foot-diameter superconducting muon storage ring. This one-of-a-kind ring, made of steel, aluminum and superconducting wire, was built for the previous g-2 experiment at Brookhaven. Due to each subsystem has to be far away from each other and be placed in the distant location, therefore, Siemens Process Control System PCS7-400, Automation Direct DL205 & DL05 PLC, Synoptic and Fermilab ACNET HMI are the ideal choices as the MC g-2 cryogenic distribution real-time and on-Line remote control system. This paper presents a method which has been successfully used by many Fermilab distribution cryogenic real-time and On-Line remote control systems.

43 PARTICLE ACCELERATORS↗

The measurement of muon $g-2$ at Fermilab

The Muon g - 2 Experiment at Fermilab (E989) was built to repeat and improve the previous E821 Experiment at Brookhaven National Laboratory (BNL), aiming to reduce the experimental error by a factor of 4 to the final accuracy of 140 parts per billion (ppb). On April 7th, 2021, the E989 collaboration published the first result based on the first year of data taking (Run-1), measuring a μ = 0.001 165 920 40(54) with a precision of 460 ppb. The measured value is consistent with the BNL measurement and strengthens the long-standing tension with the data-driven SM prediction to a combined discrepancy of 4.2σ. On the theory side, however, new efforts involving lattice-QCD techniques are starting to question the current consensus on the theoretical prediction, demanding new improvements on both the experimental and theoretical sides. The Muon g - 2 Experiment at Fermilab has now concluded its sixth and final year of data taking, and a new result based on the Run-2 and Run-3 data was published in August 2023. This paper briefly describes the Muon g - 2 Experiment at Fermilab and its current status.

43 PARTICLE ACCELERATORS↗

Controls at the Fermilab PIP-II Superconducting Linac

PIP-II is an 800 MeV superconducting RF linac under development at Fermilab. As the new first stage in our accelerator chain, it will deliver high-power beam to multiple experiments simultaneously and thus drive Fermilab’s particle physics program for years to come. In a pivot for Fermilab, controls for PIP-II are based on EPICS instead of ACNET, the legacy control system for accelerators at the lab. This paper discusses the status of the EPICS controls work for PIP-II. We describe the EPICS tools selected for our system and the experience of operators new to EPICS. We introduce our continuous integration / continuous development environment. We also describe some efforts at cooperation between EPICS and ACNET, or efforts to move towards a unified interface that can apply to both control systems.

43 PARTICLE ACCELERATORS↗

LCLS-II Cryomodules Production at Fermilab

LCLS-II is a planned upgrade project for the linear coherent light source (LCLS) at SLAC. The LCLS-II linac will consist of thirty-five 1.3 GHz and two 3.9 GHz superconducting RF continuous wave (CW) cryomodules that Fermilab and Jefferson Lab are currently producing in collaboration with SLAC. The LCLS-II 1.3 GHz cryomodule design is based on the European XFEL pulsed-mode cryomodule design with modifications needed for CW operation. Two prototype cryomodules had been assembled and tested. After prototype cryomodule tests, both laboratories have increased cryomodule production rate to meet the challenging LCLS-II project installation schedule requirements of approximately one cryomodule per month per laboratory. Fermilab is at half point for the production, meaning that 6 cryomodules are fully assembled and tested. This paper presents Fermilab Cryomodule Assembly Facility (CAF) infrastructure for the LCLS-II cryomodules assembly, production experience at the half point emphasizing the challenges and mitigations.

43 PARTICLE ACCELERATORS↗

LCLS-II Cryomodules Production Experience and Lessons Learned at Fermilab

LCLS-II is a planned upgrade project for the linear co-herent light source (LCLS) at SLAC. The LCLS-II Linac will consist of thirty-five 1.3 GHz and two 3.9 GHz super-conducting RF continuous wave (CW) cryomodules that Fermilab and Jefferson Lab are currently producing in collaboration with SLAC. The LCLS-II 1.3 GHz cryomodule design is based on the European XFEL pulsed-mode cryomodule design with modifications needed for CW opera-tion. Two prototype cryomodules had been assembled and tested. After prototype cryomodule tests, both laboratories have increased their cryomodule production rate to meet the challenging LCLS-II project installation schedule requirements of approximately one cryomodule per month per laboratory. To date, Fermilab has completed the assembly and testing of eighteen 1.3GHz cryomodules. Fermilab has successfully shipped nine cryomodules to SLAC and will continue to ship approximately every two weeks. The first 3.9 GHz cryomodule assembly is scheduled to start in June 2019. Production readiness verifications are currently in process. This paper presents LCLS-II 1.3GHz cryomodule assembly and production experience, emphasizing the challenges, mitigations, and lessons learned.

43 PARTICLE ACCELERATORS↗

Design of the 650 MHz High Beta Prototype Cryomodule for PIP-II at Fermilab

The Proton Improvement Plan II (PIP-II) is the first U.S. accelerator project that will have significant contributions from international partners. The prototype High Beta 650 MHz cryomodule (pHB650 CM) is designed by an integrated design team, consisting of Fermilab (USA), CEA (France), UKRI-STFC (UK), and RRCAT (India). The manufacturing & assembly of this prototype cryomodule will be done at Fermilab, whereas the production cryomodules will be manufactured and/or assembled by UKRI-STFC, RRCAT, or Fermilab. Similar to the prototype Single Spoke Resonator 1 cryomodule (pSSR1 CM), this cryomodule is based on a strong-back at room temperature supporting the coldmass. The pSSR1 CM led to significant lessons being learnt on the design, procurement, and assembly processes. These lessons were incorporated into the design and processes for the pHB650 CM. Amongst many challenges faced, the main challenges of the pHB650 CM design were to make the cryomodule compatible to overseas transportation and to design components that can be procured in USA, Europe, and India.

43 PARTICLE ACCELERATORS↗