Emergency response and solutions for damaged fuel assembly handling events - Lessons learned from a 2013 fuel positioning issue
In 2013, during the refueling of a French 1300 MWe reactor, a fuel assembly (FX3599) was damaged by a fuel assembly positioning tool in the reactor vessel. The upper part of a corner rod of the fuel assembly was twisted and the top end grid was torn off. Because of the protruding fuel rod, the assembly could not be easily transferred for repair to the fuel storage pool via the transfer tube. This unexpected and rarely encountered situation was assessed jointly by EDF and AREVA NP. The chosen option was to directly perform the field service inside the reactor building in cells generally used for intermediate storage during refueling. This operation, performed by EDF and AREVA, involved removing the twisted rod and positioning it in a special-purpose canister by means of a gripper-type tool for removal (KIPCI gripper) and a gripper for holding the rod in place. The special-purpose canister was designed, ordered and supplied by a sub-supplier within one week. The operation went through 3 phases. First a preparation step in the fuel building: The stripper was disassembled and technical checks carried out to ensure correct operation. The gripper tightening force was checked in real-life conditions with the gripper suspended from auxiliary crane. The fuel rod removal was simulated several times by trained operators. Second, the equipment was installed in the reactor building. And third, the operation took place in the reactor cavity: the special-purpose canister was opened, the radioactive waste canister placed in the special-purpose canister, the twisted fuel rod was then grasped by the KIPCI gripper and removed from the fuel assembly. The twisted fuel rod was positioned above the canister and dropped into it. Once the fuel rod had been removed, the canister and fuel assembly FX3599 were transferred to the fuel building and refueling resumed. The canister containing the fuel rod is currently in interim storage in the reactor pool until appropriate action is taken for it to be shipped and eventually reprocessed. EDF has performed improvement in its handling procedures and in its handling tools to avoid a similar new event.