Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FINANCIAL PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Southwestern Power Administration Combined Financial Statements, 2006-2009

We have audited the accompanying combined balance sheets of the Southwestern Federal Power System (SWFPS), as of September 30, 2009, 2008, 2007, and 2006, and the related combined statements of revenues and expenses, changes in capitalization, and cash flows for the years then ended. As described in note 1(a), the combined financial statement presentation includes the hydroelectric generation functions of another Federal agency (hereinafter referred to as the generating agency), for which Southwestern Power Administration (Southwestern) markets and transmits power. These combined financial statements are the responsibility of the management of Southwestern and the generating agency. Our responsibility is to express an opinion on these combined financial statements based on our audits. We conducted our audits in accordance with auditing standards generally accepted in the United States of America. Those standards require that we plan and perform the audits to obtain reasonable assurance about whether the combined financial statements are free of material misstatement. An audit includes consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of Southwestern and the generating agency’s internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the combined financial statements, assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall combined financial statement presentation. We believe that our audits provide a reasonable basis for our opinion. In our opinion, the combined financial statements referred to above present fairly, in all material respects, the respective financial position of the Southwestern Federal Power System, as of September 30, 2009, 2008, 2007, and 2006, and the results of its operations and its cash flow for the years then ended, in conformity with U.S. generally accepted accounting principles. Our audits were conducted for the purpose of forming an opinion on the 2009, 2008, 2007, and 2006 SWFPS’s combined financial statements taken as a whole. The supplementary information in the combining financial statements is presented for purposes of additional analysis and is not a required part of the basic combined financial statements. The supplementary information has been subjected to the auditing procedures applied in the audit of the basic combined financial statements and, in our opinion, is fairly stated in all material respects in relation to the basic combined financial statements taken as a whole.

Financial statements, finance, 2009, 2008, 2007, 2↗

Transportation cost - Impacts on commercial users

The potential impact of transportation price on the financial performance of space business ventures is analyzed. Business plans for generic space facilities (both STS based and free-flying), space processing, and communications satellite businesses were developed. Impacts were established parametrically for return on investment and customer product/service price as a function of transportation price. The following businesses were considered: communications satellite; shuttle based and free-flying space facilities; and space pharmaceuticals manufacturing and minilab leasing.

Greenberg, Joel S.↗

Work In Progress: Using Internships as Means for Indirect Assessment of ABET Criteria 3 "1-7" Student Outcomes

PSU operates the Power Engineering Internship program with funding from two U.S. Department of Energy grants. The program is operated in partnership with the lead organizations of these grants, an investor-owned utility, Portland General Electric (PGE), and the Confederated Tribes of the Warm Springs (CTWS). One of the programmatic goals of the PEI is to create and sustain a clean energy engineering workforce pipeline on behalf of these lead organizations. Both grants support internships at PGE, which is also a partner on the CTWS grant. The PEI provides engineering students with year-long internships, spanning both the academic year and the summer. The interns work at PGE facilities located throughout the Portland metropolitan area. Interns are employed full-time during summers and part-time during the academic year. Proximity of the worksites to the PSU campus enables the interns to participate in the program while attending school full-time. During the academic year, students average fifteen hours per week, adjusting their work schedule according to their academic workload. The interns are allocated 930 hours per year, 480 in the summer and 450 during the academic year, which they can plan as they see fit. The internships provide meaningful financial support for the students, who can earn up to $21k if they use all of their allocated hours. Such funding is particularly important for the typical student who attends a minority serving institutions,

99 GENERAL AND MISCELLANEOUS↗

Community Planning for Solar: Defining Realistic Solar Development Options

This guide is designed to aid in assessing community preferences for solar development and financing alternatives. To evaluate community preferences regarding solar, it is necessary to define the range of realistic options for solar development possible in a community, including potential future targets for solar capacity, the mixes of development possible based on the solar resources available, and potential community benefits and solar ownership structures. This guide can help community officials, volunteers, and regional planning agency staff in constructing a realistic suite of options for solar development, based on existing state and local laws, available solar resources and infrastructure, and economic and financial considerations.

14 SOLAR ENERGY↗

NPP financial and regulatory risks-Importance of a balanced and comprehensive nuclear law for a newcomer country considering nuclear power programme

The nature of Nuclear Power Plant (NPP) projects are: long duration (10-15 years for new build), high capital investment, reasonable risks and highly regulated industries to meet national and international requirement on Safety, Security, Safeguards (3S) and Liabilities. It requires long term planning and commitment from siting to final disposal of waste/spent fuel. Potential financial and regulatory risks are common in massive NPP projects and will be magnified in the case of using unproven technology. If the risks are not properly managed, it can lead to high project and operation costs, and, fail to fulfil its objectives to provide compatible electricity prices and. energy security. To ensure successful, the government and investors need to ensure that the NPP project is bankable with low cost of project and funding, have fair treatment and proper risk mitigation, and able to complete on time with no cost overrun. One of the requirements as prerequisite for the development of NPP as stipulated by the International Atomic Energy Agency (IAEA) is the establishment of a Legal and Regulatory Framework. The main objective of nuclear law is to ensure that the activities and projects carried-out in the country are legal and compliant to national and international requirements. The law should also be able to provide fair treatment of risks on its activities that is acceptable to investors. The challenge for a newcomer country is to develop a balanced and comprehensive national nuclear law that meet these objectives while taking into consideration various stakeholders’ interest without compromising on safety, security, safeguard, liability requirements and other international obligations. This paper highlights the nature of NPP projects, its potential and associated financial and regulatory risks, and its major concerns and challenges. It proposes possible risks treatment and mitigation through the formulation of a balanced and comprehensive legislation by clear understanding of various requirements of public, regulators, investors, financial institutions, international community, operator and other important stakeholders. Ambiguities and uncertainties, especially with regards to certain conditions and requirements should be minimised by emulating good practices of experienced nuclear regulators. The imposition of various financial requirements such as funds for decommissioning, radioactive waste management, financial security, nuclear liabilities and licensing fees are necessary, but at the same time the quantum needs to be clearly defined. Concerns on absolute liability of the operators need to be addressed through a creation of necessary and proper nuclear insurance legislations to mitigate operator S nuclear liability obligations and other financial risks. Another major risk to investors is the possibility of public resistance which will not only can hinder the construction but can also stop operation of the nuclear power plant which will contribute to huge losses to investors and countries. This may require a provision in the legislation that provide proper compensation for these situations and at the same time to allow operators to engage in nuclear promotional activities, such as community benefit and public consultation as voluntary initiatives. Through proper planning, research, consultation and execution, the proposed nuclear law shall be able to promote good regulatory practices for public and investors’ confidence and benefit. Early involvement of various stakeholders is essential as a platform for regular communications between regulators and interested parties. Stakeholders’ participation in the NPP programme and law developments will also promote transparency of the projects while upholding the independency of the regulators.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Flexible Financial Credit Agreements: Blockchain

Flexible Financial Credit Agreements is a broad term used to describe a suite of solar products with innovative features not currently offered in traditional solar financing programs. This brief focuses on blockchain, which is a highly secure, decentralized cryptographic technology that verifies transactional data and stores it on all participating computers in an immutable ledger. Blockchain is best known for its first application in the creation of Bitcoin cryptocurrency, but its principles offer a basis for innovation in a variety of industries where the complexity of transactional data is better suited for secure, decentralized management.

blockchain↗

Canadian Regulatory Framework for Waste Management and Decommissioning - 19373

The Canadian Nuclear Safety Commission (CNSC) licences, monitors and inspects all nuclear facilities and activities in Canada, including radioactive waste management and decommissioning, in order to assure the protection of the health, safety and security of persons and the environment. This paper will discuss the Canadian regulatory framework as it applies to all radioactive waste management and decommissioning of nuclear facilities. The Government of Canada's Radioactive Waste Policy Framework specifies that the Government of Canada is responsible for developing policy and for regulating and overseeing radioactive waste producers and owners and that, in accordance with the 'polluter pays' principle, waste owners are responsible for the funding, organization, management and operation of the facilities required to safely manage their wastes over the short- and long-terms. The CNSC's regulatory approach for radioactive waste stems from the Nuclear Safety and Control Act (NSCA) and identifies the need for long-term management of radioactive and hazardous waste arising from licensed activities and indicates that, when making regulatory decisions about the management of radioactive waste, the CNSC will seek to achieve its objectives by considering certain key principles in the context of the facts and circumstances of each case. These principles cover the concepts of waste minimization in all phases of a facility's life cycle, hazard assessment, future impacts of the waste, and transborder effects. As a facility life cycle regulator, all nuclear facilities are required to keep decommissioning plans up to date throughout the life cycle of a licensed activity. In addition, the CNSC requires that all licensees implement financial guarantees to cover the cost of decommissioning work resulting from the licensed activities. A preliminary decommissioning plan must be filed with the CNSC as early as possible in the life cycle of the activity or facility and must be reviewed and updated at a minimum every five years. Under the CNSC's non-prescriptive approach to regulation, the applicant proposes a waste management or decommissioning approach, supported by scientifically defensible benchmarks. The CNSC then assesses the proposal against existing regulatory requirements to ensure the health, safety and security of the public and the protection of the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project financial evaluation

The project financial section of the Renewable Energy Technology Characterizations describes structures and models to support the technical and economic status of emerging renewable energy options for electricity supply.

1997↗

Estimating the Value of Improved Distributed Photovoltaic Adoption Forecasts for Utility Resource Planning

Misforecasting the adoption of customer-owned distributed photovoltaics (DPV) can have operational and financial implications for utilities; forecasting capabilities can be improved, but generally at a cost. This paper informs this decision-space by using a suite of models to explore the capacity expansion and operation of the Western Interconnection over a 15-year period across a wide range of DPV growth rates and misforecast severities. The system costs under a misforecast are compared against the costs under a perfect forecast, to quantify the costs of misforecasting. Using a simplified probabilistic method applied to these modeling results, an analyst can make a first-order estimate of the financial benefit of improving a utility’s forecasting capabilities, and thus be better informed about whether to make such an investment. For example, under our base assumptions, a utility with 10 TWh per year of retail electric sales who initially estimates that DPV growth could range from 2% to 7.5% of total generation over the next 15 years could expect total present-value savings of approximately $4 million if they could reduce the severity of misforecasting to within ±25%. Utility resource planners can compare those savings against the costs needed to achieve that level of precision, to guide their decision on whether to make an investment in tools or resources.

14 SOLAR ENERGY↗

Energy and remote sensing applications

The nature of the U.S. energy problem is examined. Based upon the best available estimates, it appears that demand for OPEC oil will exceed OPEC productive capacity in the early to mid-eighties. The upward pressure on world oil prices resulting from this supply/demand gap could have serious international consequences, both financial and in terms of foreign policy implementation. National Energy Plan objectives in response to this situation are discussed. Major strategies for achieving these objectives include a conversion of industry and utilities from oil and gas to coal and other abundant fuels. Remote sensing from aircraft and spacecraft could make significant contributions to the solution of energy problems in a number of ways, related to exploration of energy-related resources, the efficiency and safety of exploitation procedures, power plant siting, environmental monitoring and assessment, and the transportation infrastructure.

Summers, R. A.↗

Estimating the Value of Improved Distributed Photovoltaic Adoption Forecasts for Utility Resource Planning

Misforecasting the adoption of customer-owned distributed photovoltaics (DPV) can have operational and financial implications for utilities - forecasting capabilities can be improved, but generally at a cost.This paper informs this decision-space by quantifying the costs of misforecasting across a wide range of DPV growth rates and misforecast severities. Using a simplified probabilistic method presented within, an analyst can make a first-order estimate of the financial benefit of improving a utility's forecasting capabilities, and thus be better informed about whether to make such an investment. For example, we show that a utility with 10 TWh per year of retail electric sales who initially estimates that the increase in DPV's contribution to total generation could range from 2 percent to 7.5 percent over the next 15 years could expect total present-value savings of approximately 4 million if they could keep the severity of successive five-year misforecasts within +/- 25 percent. We also have more general discussions about how misforecasting DPV impacts the buildout and operation of the bulk power system - for example, we observed that misforecasting DPV most strongly influenced the amount of utility-scale PV that gets built, due to the similarity in the energy and capacity services offered by the two solar technologies.

14 SOLAR ENERGY↗

Estimating the Value of Improved Distributed Photovoltaic Adoption Forecasts for Utility Resource Planning

Misforecasting the adoption of customer-owned distributed photovoltaics (DPV) can have operational and financial implications for utilities - forecasting capabilities can be improved, but generally at a cost. This paper informs this decision-space by quantifying the costs of misforecasting across a wide range of DPV growth rates and misforecast severities. Using a simplified probabilistic method presented within, an analyst can make a first-order estimate of the financial benefit of improving a utility's forecasting capabilities, and thus be better informed about whether to make such an investment. For example, we show that a utility with 10 TWh per year of retail electric sales who initially estimates that the increase in DPV's contribution to total generation could range from 2 to 7.5 percent over the next 15 years could expect total present-value savings of approximately 4 million dollars if they could keep the severity of successive five-year misforecasts within plus or minus 25 percent. We also have more general discussions about how misforecasting DPV impacts the buildout and operation of the bulk power system - for example, we observed that misforecasting DPV most strongly influenced the amount of utility-scale PV that gets built, due to the similarity in the energy and capacity services offered by the two solar technologies.

14 SOLAR ENERGY↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Being Prepared for Emergencies - A Key Component of HAZMAT Transportation

This paper describes the efforts by the Office of Environmental Management (EM) to address need for being prepared to handle hazardous material (HAZMAT) transportation emergencies. Effective notification and reporting requirements are being implemented within EM to identify emergencies, assure appropriate notifications are made, and to assist in preparedness activities with the state, tribal, and local jurisdictions. In conclusion: The Office of Environmental Management will continue to address the preparedness issues from jurisdictions along its transportation corridors. This will be accomplished by providing planning information to the states and tribes on upcoming shipments, providing notification of a transportation incident to assure response assets are available, and continuing to offer the technical assistance and support of the Transportation Emergency Preparedness Program. (authors)

42 ENGINEERING↗

Solar Street Lighting: Highland Park Pathways to Power [Slides]

Through the Communities LEAP (Local Energy Action Program) Pilot, the National Renewable Energy Laboratory (NREL) engaged the Highland Park Stakeholder Coalition to scope four technical assistance work areas to address their energy needs and goals. This slide deck addresses the highlighted tasks under work area "A" related to the city's streetlights. Due to economic collapse, the City of Highland Park negotiated repossession of it's neighborhood streetlights to help pay its debt to its power provider, DTE. Without street lighting on residential streets, public safety was at risk. Local community-based-organization, Soulardarity, began installing off-grid solar street lights to improve visibility for vehicles and pedestrians in Highland Parks neighborhoods. Residents and leaders of the community who served on the Communities LEAP Coalition requested NREL review a financial model Soulardarity proposed to operate a city-wide solar streetlighting program on the City's behalf. The coalition also requested NREL identify examples of similar implemented city-wide solar street lighting programs.

14 SOLAR ENERGY↗

Planning for Future Implementation of Section 180(c) of the Nuclear Waste Policy Act: DOE's Policy Implementation Exercise - 16612

The Department of Energy (DOE) Office of Nuclear Energy, Nuclear Fuels Storage and Transportation Planning Project (NFST) is currently conducting a 2-year Section 180(c) Proposed Policy Implementation Exercise (the Exercise) with eight states and one Native American Tribe. Under Section 180(c) of the Nuclear Waste Policy Act of 1982 (NWPA), as amended, the DOE is responsible for providing technical and financial assistance to states and Tribes through whose jurisdictions the Secretary of Energy plans to transport spent nuclear fuel (SNF) or high-level radioactive waste to a NWPA-authorized facility for training of local public safety officials. In the 2000's, DOE staff worked closely with state and tribal representatives to develop a revised proposed policy to implement Section 180(c), including grants for assessment and planning activities, as well as training for public safety officials. This revised proposed policy was published in a Federal Register Notice in 2008 (2008 FRN) (73 Federal Register 64933, Oct. 31, 2008). The purpose of the current Exercise is to evaluate the efficacy of DOE's 2008 revised proposed policy for implementing Section 180(c), and identify and resolve outstanding issues. This paper describes how the Exercise was collaboratively designed between DOE and state and tribal stakeholders; how it is being conducted; the interim lessons learned from the first year of the Exercise; and how it may inform and improve future consultations between DOE and state, tribal, and local public safety officials. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Foundations of Off-Grid Solar in Haiti: 8. Financial Modeling for Off-Grid Solar

This training lends insight into key information and concepts for off-grid solar in Haiti, building foundational knowledge and an ability to catalyze interest in off-grid solar for rural electrification in Haiti. This self-paced course is offered in both English and French and covers a variety of topics related to energy access in Haiti including off-grid solar products, market potential in Haiti, supply and demand side considerations, system design, installation and maintenance, off-grid solar business models, financial modeling, gender and energy access, productive use of energy, and climate adaptation. The training is intended for university students, government partners, NGOs, funders, development partners, professionals, and more. No prior knowledge of off-grid solar or Haiti is required to benefit from this training. See NREL/PR-7A40-89262 for the French translation of this document.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗