Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FACILITY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Core–shell PdPb@Pd aerogels with multiply-twinned intermetallic nanostructures: facile synthesis with accelerated gelation kinetics and their enhanced electrocatalytic properties

Delicately engineering well-defined noble metal aerogels with favorable structural and compositional features is of vital importance for wide applications. Here, we reported a one-pot and facile method for synthesizing core–shell PdPb@Pd hydrogels/aerogels with multiply-twinned grains and an ordered intermetallic phase using sodium hypophosphite as a multifunctional reducing agent. Due to the accelerated gelation kinetics induced by increased reaction temperature and the specific function of sodium hypophosphite, the formation of hydrogels can be completed within 4 h. As a result, owing to their unique porous structure and favorable geometric and electronic effects, the optimized PdPb@Pd aerogels exhibit enhanced electrochemical performance towards ethylene glycol oxidation with a mass activity of 5.8 times higher than Pd black.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Signal and background considerations for the MRSt on the National Ignition Facility (NIF)

A Magnetic Recoil Spectrometer (MRSt) has been conceptually designed for time-resolved measurements of the neutron spectrum at the National Ignition Facility. Using the MRSt, the goals are to measure the time-evolution of the spectrum with a time resolution of ∼20-ps and absolute accuracy better than 5%. To meet these goals, a detailed understanding and optimization of the signal and background characteristics are required. Through ion-optics, MCNP simulations, and detector-response calculations, it is demonstrated that the goals and a signal-to background >5–10 for the down-scattered neutron measurement are met if the background, consisting of ambient neutrons and gammas, at the MRSt is reduced 50–100 times.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The magnetic recoil spectrometer (MRSt) for time-resolved measurements of the neutron spectrum at the National Ignition Facility (NIF)

The next-generation magnetic recoil spectrometer for time-resolved measurements of the neutron spectrum has been conceptually designed for the National Ignition Facility. This spectrometer, called MRSt, represents a paradigm shift in our thinking about neutron spectrometry for inertial confinement fusion applications, as it will provide simultaneously information about the burn history and time evolution of areal density (ρR), apparent ion temperature (T{sub i}), yield (Y{sub n}), and macroscopic flows during burn. From this type of data, an assessment of the evolution of the fuel assembly, hotspot, and alpha heating can be made. According to simulations, the MRSt will provide accurate data with a time resolution of ∼20 ps and energy resolution of ∼100 keV for total neutron yields above ∼10{sup 16}. At lower yields, the diagnostic will be operated at a higher-efficiency, lower-energy-resolution mode to provide a time resolution of ∼20 ps.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design of the polar neutron-imaging aperture for use at the National Ignition Facility

The installation of a neutron imaging diagnostic with a polar view at the National Ignition Facility (NIF) required design of a new aperture, an extended pinhole array (PHA). This PHA is different from the pinhole array for the existing equatorial system due to significant changes in the alignment and recording systems. The complex set of component requirements, as well as significant space constraints in its intended location, makes the design of this aperture challenging. In addition, lessons learned from development of prior apertures mandate careful aperture metrology prior to first use. This paper discusses the PHA requirements, constraints, and the final design. The PHA design is complex due to size constraints, machining precision, assembly tolerances, and design requirements. When fully assembled, the aperture is a 15 mm × 15 mm × 200 mm tungsten and gold assembly. The PHA body is made from 2 layers of tungsten and 11 layers of gold. The gold layers include 4 layers containing penumbral openings, 4 layers containing pinholes and 3 spacer layers. In total, there are 64 individual, triangular pinholes with a field of view (FOV) of 200 μm and 6 penumbral apertures. Each pinhole is pointed to a slightly different location in the target plane, making the effective FOV of this PHA a 700 μm square in the target plane. The large FOV of the PHA reduces the alignment requirements both for the PHA and the target, allowing for alignment with a laser tracking system at NIF.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A recoverable gas-cell diagnostic for the National Ignition Facility

The high-fluence neutron spectrum produced by the National Ignition Facility (NIF) provides an opportunity to measure the activation of materials by fast-spectrum neutrons. A new large-volume gas-cell diagnostic has been designed and qualified to measure the activation of gaseous substances at the NIF. This in-chamber diagnostic is recoverable, reusable and has been successfully fielded. Data from the qualification of the diagnostic have been used to benchmark an Monte Carlo N-Particle Transport Code simulation describing the downscattered neutron spectrum seen by the gas cell. We present early results from the use of this diagnostic to measure the activation of {sup nat}Xe and discuss future work to study the strength of interactions between plasma and nuclei.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The design of the optical Thomson scattering diagnostic for the National Ignition Facility [The preliminary design of the optical Thomson scattering diagnostic for the National Ignition Facility]

Here, the National Ignition Facility (NIF) is a 192 laser beam facility designed to support the Stockpile Stewardship, High Energy Density and Inertial Confinement Fusion (ICF) programs. We report on the design of an Optical Thomson Scattering (OTS) diagnostic that has the potential to transform the community’s understanding of NIF hohlraum physics by providing first principle, local, time-resolved measurements of under-dense plasma conditions. The system design allows operation with different probe laser wavelengths by manual selection of the appropriate beam splitter and gratings before the shot. A deep-UV probe beam (λ 0 -210 nm) will be used to optimize the scattered signal for plasma densities of 5 × 10 20 electrons/cm 3 while a 3ω probe will be used for experiments investigating lower density plasmas of 1 × 10 19 electrons/cm 3 . We report the phase I design of a two phase design strategy. Phase I includes the OTS telescope, spectrometer, and streak camera; these will be used to assess the background levels at NIF. Phase II will include the design and installation of a probe laser.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

First demonstration of ARC-accelerated proton beams at the National Ignition Facility

New short-pulse kilojoule, Petawatt-class lasers, which have recently come online and are coupled to large-scale, many-beam long-pulse facilities, undoubtedly serve as very exciting tools to capture transformational science opportunities in high energy density physics. These short-pulse lasers also happen to reside in a unique laser regime: very high-energy (kilojoule), relatively long (multi-picosecond) pulse-lengths, and large (10s of micron) focal spots, where their use in driving energetic particle beams is largely unexplored. Proton acceleration via Target Normal Sheath Acceleration (TNSA) using the Advanced Radiographic Capability (ARC) short-pulse laser at the National Ignition Facility in the Lawrence Livermore National Laboratory is demonstrated for the first time, and protons of up to 18 MeV are measured using laser irradiation of >1 ps pulse-lengths and quasi-relativistic (10 18 W/cm 2 ) intensities. This is indicative of a super-ponderomotive electron acceleration mechanism that sustains acceleration over long (multi-picosecond) time-scales and allows for proton energies to be achieved far beyond what the well-established scalings of proton acceleration via TNSA would predict at these modest intensities. Furthermore, the characteristics of the ARC laser (large ~100 μ m diameter focal spot, flat spatial profile, multi-picosecond, relatively low prepulse) provide acceleration conditions that allow for the investigation of 1D-like particle acceleration. A high flux ~50 J of laser-accelerated protons is experimentally demonstrated. In conclusion, a new capability in multi-picosecond particle-in-cell simulation is applied to model the data, corroborating the high proton energies and elucidating the physics of multi-picosecond particle acceleration.

43 PARTICLE ACCELERATORS↗

Development of a compact magnetic spectrometer for use at the OMEGA Laser Facility and the National Ignition Facility

Measurement of proton spectra is an important diagnostic for a variety of high energy density physics experiments. Current diagnostics are either not designed to capture the spectrum of low-energy protons or are unsuitable for high debris experiments. To bridge the gap, a new CR-39 based compact magnetic spectrometer (MagSpec) has been developed to measure proton spectra in the 1–20 MeV energy range, with a particular focus on the low-energy (1–6 MeV) spectrum, for use in experiments at the OMEGA Laser Facility and the National Ignition Facility (NIF). In the MagSpec diagnostic, protons of different energies are dispersed as they pass through a magnetic field before impinging on a differentially filtered CR-39 surface, resulting in a spatial distribution of CR-39 tracks that corresponds to the energy spectrum. In this paper, we discuss details of the design and implementation of MagSpec on the NIF and OMEGA.

47 OTHER INSTRUMENTATION↗

Commissioning and Testing of a new 4.5K Cold Box for JLab Cryogenic Test Facility

A new 4.5K cold box at Jefferson Lab (JLab) Cryogenic Test Facility (CTF) was recently installed and commissioned to upgrade the existing 4.5 K refrigeration system and work in parallel with the existing 4.5 K cold box. This new 4.5 K cold box is equipped with two turbo-expanders and, at its maximum capacity condition, it is expected to support at least 6.6 g/s of helium liquefaction or 650 W of refrigeration at 4.5 K. It can also handle up to 10 g/s 30 K return flow for 2 K refrigeration recovery that supports cryo-module and superconducting cavity testing. Performances of the cold box at its maximum capacity conditions as well as several other operating modes were tested for acceptance. Finally, we will briefly review the new 4.5 K cold box design features and discuss the commissioning and performance testing results.

42 ENGINEERING↗

Partial defect verification of spent fuel assemblies by PDET: Principle and field testing in Interim Spent fuel Storage Facility (CLAB) in Sweden

Here, the need for the development of a credible method and instrument for partial defect verification of spent fuel has been emphasized over a few decades in the safeguards communities as the diverted spent fuel pins can be the source of nuclear terrorism or devices. The need is increasingly more important and even urgent as many countries have started to transfer spent fuel to so called "difficult-to-access" areas such as dry storage casks, reprocessing or geological repositories. Partial defect verification is required by IAEA before spent fuel is placed into "difficult-to-access" areas. Earlier, Lawrence Livermore National Laboratory (LLNL) has reported the successful development of a new, credible partial defect verification method for pressurized water reactor (PWR) spent fuel assemblies without use of operator data, and further reported the validation experiments using commercial spent fuel assemblies with some missing fuel pins. The method was found to be robust as the method is relatively invariant to the characteristic variations of spent fuel assemblies such as initial fuel enrichment, cooling time, and burn-up. Since then, the PDET system has been designed and prototyped for 17×17 PWR spent fuel assemblies, complete with data acquisition software and acquisition electronics. In this paper, a summary description of the PDET development followed by results of the first successful field testing using the integrated PDET system and actual spent fuel assemblies performed in a commercial spent fuel storage site, known as Central Interim Spent fuel Storage Facility (CLAB) in Sweden will be presented. In addition to partial defect detection initial studies have determined that the tool can be used to verify the operator declared average burnup of the assembly as well as intra-assembly bunrup levels.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

APOLLO: a facility-scale differentiable virtual accelerator at Fermilab FAST/IOTA

As the design complexity of modern accelerators grows, there is more interest in using advanced simulations that have fast execution time or yield additional insights like gradients. The FAST/IOTA facility has been working on implementing and experimentally validating an end-to-end digital twin that is both fast and gradient-aware, allowing for rapid prototyping of new software and experiments with minimal beam time costs. Our framework integrates physics and ML codes for linac and ring simulation through a set of generic interfaces between surrogate and physics-based sections. To reproduce device inputs and outputs, system state is exposed as a deterministic event loop in a specialized discrete event simulator architecture. Because Fermilab is undergoing control system transition, several APIs were implemented as final user interfaces - a fully asynchronous EPICS soft IOC, a gRPC-based Data Pool Manager (DPM), and legacy ACNET protocols. We discuss implementation details as well as challenges handling live data assimilation and future plans to extend modelling to main complex proton accelerators like PIPII and Booster.

Kuklev, Nikita [Fermilab]↗

A Proposed Beam-Beam Test Facility COMBINE

The COmpact Machine for Beam-beam Interactions in Non-Equilibrium systems (COMBINE) is a proposed, dedicated, beam-beam test facility. This is currently a joint effort between Jefferson Lab and Old Dominion University to create a small, low energy pair of collider rings that would be used to study beam-beam interactions, as well as act as a teaching tool for students. The base design would make use of a pair of identical rings (2.5 meters per side) one rotated 180 degrees from the other, meeting at their common interaction point. These would be fed by an electron gun producing up to 125 keV electrons. The low energy will allow for beam-beam tune shifts commensurate with existing colliders, and will also allow for an exploration of the predicted effects of gear-changing, which would be performed using a variable pathlength scheme. Finally, this machine can also test linac-ring type systems.

Nissen, Edith↗

High-Pressure, High-Temperature Thermal Hydraulic Test Facility for Nuclear-Renewable Hybrid Energy System Studies; Facility Design Description and Status Report

A high-pressure, high-temperature water flow loop has been designed at Idaho National Laboratory (INL) for deployment in the INL Dynamic Energy Transport and Integration Laboratory (DETAIL) within the Energy Systems Laboratory (ESL) D100 northwest high bay. This loop is the first of three thermally coupled flow loops that will comprise the Advanced Reactor Technology Integral System Test (ARTIST) facility. The ARTIST facility will ultimately include a high temperature helium loop and a liquid salt loop, in addition to the PWR loop. The high-pressure water loop will operate at Pressurized Water Reactor (PWR) conditions. It will support experimental research on nuclear-renewable hybrid energy systems as well as advanced reactor technology topics. Within DETAIL, the water flow loop will also serve as a thermal energy source, emulating a reactor system. The loop will be thermally integrated with co-located energy systems including a thermal energy transport loop, thermal energy storage system, and a 25 kW high-temperature electrolysis system for hydrogen production. DETAIL will include additional energy systems such as an integrated microgrid and renewable energy systems including solar photovoltaics. The electrically heated flow loop will be dynamically controlled to simulate nuclear fuel behavior under normal and off-normal operating conditions. DETAIL will be designed for characterization of complex system dynamics. The various components will be interfaced with Digital Real-Time Simulators for supervisory control and dynamic simulation of complete systems. The design and assembly of the high-pressure water flow loop and supporting systems has been subdivided into two Phases. Phase 1, which will be completed by the end of FY17, includes installation of cable trays and supports, electrical conduit, DI water system, drain lift station and the concrete pad for the chiller located outside of the laboratory. Phase 2 includes the detailed design and final assembly of the flow loop, supporting structures and personnel platforms, the chiller and associated piping. As of September, 2017, the final detailed design of the flow loop is complete. Funding for Phase 2 procurement, assembly, system operability checkout, shakedown testing and initial operation of the flow loop is requested for FY18.

42 ENGINEERING↗

Atmospheric Radiation Measurement (ARM) User Facility: ARM Mobile Facility Workshop Report

The U.S. Department of Energy (DOE) held a workshop for the Atmospheric Radiation Measurement (ARM) user facility ARM Mobile Facility (AMF) in August 2018 to bring together representatives of the scientific community to discuss critical climate challenges where ARM observations could impact and improve earth system models (ESM). White papers were requested from attendees and the broader scientific community and the workshop discussions were organized around the primary regions or regimes identified in the white papers. The discussions for each region or regime focused on which scientific challenges could be addressed in each region, how these would impact models, and what deployment duration, spatial coverage, combination of ARM assets, and collaborations would be critical to addressing these challenges. The workshop also included sessions on how to increase the scientific impact of the AMFs and how to make better connections between ARM observations and the ESM community.

54 ENVIRONMENTAL SCIENCES↗

National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan

Ensuring the reliability of the NIF, including its support systems, laser systems, target diagnostic systems, and utilities, is essential to the availability of the NIF in its support of NNSA missions. NIF is a key capability in the DOE Stockpile Stewardship Program and supports high energy physics experiments for nuclear weapons, energy, and astrophysics applications. High system reliability provides opportunities for shots and scientific discoveries with opportunities to enhance and upgrade capabilities. This Maintenance Plan (MP) identifies the policies and procedures used to perform and support asset management of the NIF Facility and Infrastructure Systems (FInS), NIF Lasers & Alignment (LASE), NIF Target Experimental Operations (TOPS), NIF Target Area Science and Engineering (TASE), and NIF&PS Control Systems (NCS). The FInS systems include the facility, HVAC, contamination control, beampath, and Line Replaceable Units (LRUs) as well as utilities which create the beampath environments, such as vacuum, argon, or clean dry air. The LASE systems are Programmatic systems which include laser diagnostics, alignment, power conditioning, pulsed power, and input laser systems. The TOPS and TASE systems are also Programmatic systems which include target and diagnostic delivery systems and positioners, many different insertable and fixed target diagnostics, and cryogenic and target gas fill systems. Finally, the NCS systems include both software and hardware for industrial and shot operation control systems. Policies governing administrative and operational practices related to maintenance of FInS, LASE, TOPS, TASE, and NCS systems are described in this plan. In addition, the plan provides processes and procedures for managing, tracking, and documenting the work. This document, the NIF Operations Management Plan, NIF-5020544 (Ref. 1), and NIF Shot Operations Plan, NIF-5018506 (Ref. 2), together satisfy the requirements of the Conduct of Operations. Duties, responsibilities, and reporting requirements of the various positions associated with FInS, LASE, and TOPS maintenance are detailed in this plan. The FInS systems include both Real Property systems with asset management requirements specified in DOE Order 430.1C (Ref. 3) and Programmatic systems. In addition, for FInS, there is a list of the System Level Maintenance Plans (SLMPs) in NIF-1007419198 (Ref. 4) which provide the system descriptions and maintenance plan and schedule. In addition, the list includes the Reliability Centered Maintenance (RCM) and Experience Centered Maintenance (ECM) evaluations that have been performed for applicable FInS systems as well as reliability criticality per Section 3.5. The -AM version of the NIF Maintenance Plan focuses on the reliability program for FInS, LASE, TOPS, TASE, and NCS within the context of the overall NIF Reliability, Availability, and Maintainability (RAM) program and incorporates changes since the -AL version from August 2011 and has been updated to be fully consistent with the updates to Ref. 1. It also includes asset management considerations, updates to the Work Order (WO) process within the NIF Computerized Maintenance Management System (CMMS) which is EAM infor® System Maintenance and Reliability Tracking (SMaRT) (Ref. 5), and updates to metrics and key performance indicators (KPIs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

US Department of Energy, Office of Science High Performance Computing Facility Operational Assessment 2021: Oak Ridge Leadership Computing Facility

Oak Ridge National Laboratory’s (ORNL’s) Leadership Computing Facility (OLCF) continues to surpass its operational target goals of supporting users; delivering fast, reliable computational ecosystems; creating innovative solutions for high-performance computing (HPC) needs; contributing to the community to build the next generation HPC workforce, and managing risks, safety, and security associated with operating some of the most powerful computers in the world. The results can be seen in the cutting-edge science conducted by users and the praise from the research community. Calendar year (CY) 2021 saw continued excellence in research supported by the OLCF’s leadership-class computing resources, including Summit (the nation’s most powerful supercomputer), the global scratch file system Alpine, the Scalable Protected Infrastructure (SPI), the Exploratory Visualization Environment for Research in Science and Technology (EVEREST), and the archival mass-storage resource High-Performance Storage System (HPSS). While maintaining access and exceptional user support for Summit, the OLCF continued to make progress on the installation and deployment of Frontier, which will be the nation’s first exascale system when it comes online at the start of CY 2023. Users have already begun running and optimizing scientific codes on Crusher, the OLCF test and development system equipped with Frontier’s architecture. Throughout the year, the OLCF maintained a strong culture of operational excellence, including risk management, workplace safety, and cybersecurity. The OLCF’s rigorous risk management strategy anticipated and mitigated risks, and at this time there are no high-priority operational risks. Similarly, ORNL and the OLCF were committed to operating under the US Department of Energy’s (DOE’s) safety regulations that ensure a safe workplace. Technical staff tracked and monitored existing threats and vulnerabilities within the OLCF while continually developing tools and practices to enhance operations without increasing the facility’s risk. CY 2021 was filled with outstanding results and accomplishments, including a very high rating from users on overall satisfaction for the eighth consecutive year; a tremendous number of node hours delivered to 1,671 researchers on Summit; and the successful delivery of the allocation split of roughly 60%, 20%, and 20% of core-hours offered for the Innovative and Novel Computational Impact on Theory and Experiment (INCITE), Advanced Scientific Computing Research Leadership Computing Challenge (ALCC), and Director’s Discretionary (DD) programs, respectively (Section 2). COVID-19 research remained a focus in 2021, and the ALCC and DD programs allocated over 1 million Summit hours to the COVID-19 High Performance Computing Consortium. These accomplishments, coupled with the high utilization rates (i.e., overall and capability usage), represent the fulfillment of the promise of leadership class machines: efficient facilitation of leadership-class computational applications.

97 MATHEMATICS AND COMPUTING↗

The Fermilab Facility for Dark Matter Discovery (F2D2): A Conceptual PIP-II Beam Stop Facility for Dark Sector Physics

What do the accelerator target stations of the next decade look like? The NuMI beamline, fed by Fermilab s Main Injector, recently exceeded 1 MW beam power. Future experiments fed by the PIP-II superconducting linear accelerator might demand upwards of 2 MW in continuous-wave mode, compared to the pulsed beams typical of neutrino experiments. Looking further into the future, the Muon Collider front end includes a target station with even higher power 5 MW or beyond. How do we build a 2+ MW target facility? How does a high-power, low-energy, CW beam affect target design compared to conventional high-energy neutrino targets? How do we manage radiation and heat? How is the facility serviced? What is the current state of capability, and what technologies do we need to develop? These questions are answered in the context of F2D2, a conceptual target station design for dark sector physics experiments using beam from PIP-II.

Williams, Jonathan K.↗