Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Execution Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Implementation of ISEE-3 trajectory control

Control of the trajectory and attitude for the International Sun-Earth Explorer-3 (ISEE-3) spacecraft is performed using an onboard hydrazine propulsion system. This paper describes the spacecraft hardware and operational limitations that were considered in the planning, execution, and evaluation of all ISEE-3 maneuvers performed to date. Propulsion system performance and spacecraft dynamics models as implemented in the maneuver support computer software are described. Examples are presented that show how maneuver goals are achieved while satisfying mission orbit and attitude constraints. Procedures used in the development of maneuver plans are detailed for the second midcourse correction maneuver which typifies maneuver operations in general.

Erickson, J. A.↗

NASA Agile Community of Practice

This 2023-2024 report provides a comprehensive summary of the products and activities executed by the NASA Agile Community of Practice over its first year from being formally stood up. The report highlights the community's ongoing efforts to advance Agile values and principles, improve practices, and foster innovation within teams across NASA centers. The report delves into key initiatives, including the development of a strategic plan, executive summary, and best practice guidelines; as well as the facilitation of knowledge-sharing events such as webinars with internal and external speakers, workshops, and technical interchange meeting.

Agile↗

NASA GRC UAS Project: Communications Modeling and Simulation Status

The integration of Unmanned Aircraft Systems (UAS) in the National Airspace represents new operational concepts required in civil aviation. These new concepts are evolving as the nation moves toward the Next Generation Air Transportation System (NextGen) under the leadership of the Joint Planning and Development Office (JPDO), and through ongoing work by the Federal Aviation Administration (FAA). The desire and ability to fly UAS in the National Air Space (NAS) in the near term has increased dramatically, and this multi-agency effort to develop and implement a national plan to successfully address the challenges of UAS access to the NAS in a safe and timely manner is well underway. As part of the effort to integrate UAS in the National Airspace, NASA Glenn Research Center is currently involved with providing research into Communications systems and Communication system operations in order to assist with developing requirements for this implementation. In order to provide data and information regarding communication systems performance that will be necessary, NASA GRC is tasked with developing and executing plans for simulations of candidate future UAS command and control communications, in line with architectures and communications technologies being developed and/or proposed by NASA and relevant aviation organizations (in particular, RTCA SC-203). The simulations and related analyses will provide insight into the ability of proposed communications technologies and system architectures to enable safe operation of UAS, meeting UAS in the NAS project goals (including performance requirements, scalability, and interoperability), and ultimately leading to a determination of the ability of NextGen communication systems to accommodate UAS. This presentation, compiled by the NASA GRC team, will provide a view of the overall planned simulation effort and objectives, a description of the simulation concept and status of the design and development that has occurred to date.

Kubat, Greg↗

NASA GRC UAS Project - Communications Modeling and Simulation Development Status

The integration of Unmanned Aircraft Systems (UAS) in the National Airspace represents new operational concepts required in civil aviation. These new concepts are evolving as the nation moves toward the Next Generation Air Transportation System (NextGen) under the leadership of the Joint Planning and Development Office (JPDO), and through ongoing work by the Federal Aviation Administration (FAA). The desire and ability to fly UAS in the National Air Space (NAS) in the near term has increased dramatically, and this multi-agency effort to develop and implement a national plan to successfully address the challenges of UAS access to the NAS in a safe and timely manner is well underway. As part of the effort to integrate UAS in the National Airspace, NASA Glenn Research Center is currently involved with providing research into Communications systems and Communication system operations in order to assist with developing requirements for this implementation. In order to provide data and information regarding communication systems performance that will be necessary, NASA GRC is tasked with developing and executing plans for simulations of candidate future UAS command and control communications, in line with architectures and communications technologies being developed and or proposed by NASA and relevant aviation organizations (in particular, RTCA SC-203). The simulations and related analyses will provide insight into the ability of proposed communications technologies and system architectures to enable safe operation of UAS, meeting UAS in the NAS project goals (including performance requirements, scalability, and interoperability), and ultimately leading to a determination of the ability of NextGen communication systems to accommodate UAS. This presentation, compiled by the NASA GRC Modeling and Simulation team, will provide an update to this ongoing effort at NASA GRC as follow-up to the overview of the planned simulation effort presented at ICNS in 2013. The objective of presentation will be to describe the progress made in developing both a NAS-Wide simulation architecture application and the detailed radiocomm system models for this research, and will present interim data and information compiled in the process of developing these simulation capabilities to date.

Modeling and Simulation↗

Miniature Telerobots in Space Applications

Ground controlled telerobots can be used to reduce astronaut workload while retaining much of the human capabilities of planning, execution, and error recovery for specific tasks. Miniature robots can be used for delicate and time consuming tasks such as biological experiment servicing without incurring the significant mass and power penalties associated with larger robot systems. However, questions remain regarding the technical and economic effectiveness of such mini-telerobotic systems. This paper address some of these open issues and the details of two projects which will provide some of the needed answers. The Microtrex project is a joint University of Washington/NASA project which plans on flying a miniature robot as a Space Shuttle experiment to evaluate the effects of microgravity on ground-controlled manipulation while subject to variable time-delay communications. A related project involving the University of Washington and Boeing Defense and Space will evaluate the effectiveness f using a minirobot to service biological experiments in a space station experiment 'glove-box' rack mock-up, again while subject to realistic communications constraints.

Venema, S. C.↗

WATCHMAN: A Data Warehouse Intelligent Cache Manager

Data warehouses store large volumes of data which are used frequently by decision support applications. Such applications involve complex queries. Query performance in such an environment is critical because decision support applications often require interactive query response time. Because data warehouses are updated infrequently, it becomes possible to improve query performance by caching sets retrieved by queries in addition to query execution plans. In this paper we report on the design of an intelligent cache manager for sets retrieved by queries called WATCHMAN, which is particularly well suited for data warehousing environment. Our cache manager employs two novel, complementary algorithms for cache replacement and for cache admission. WATCHMAN aims at minimizing query response time and its cache replacement policy swaps out entire retrieved sets of queries instead of individual pages. The cache replacement and admission algorithms make use of a profit metric, which considers for each retrieved set its average rate of reference, its size, and execution cost of the associated query. We report on a performance evaluation based on the TPC-D and Set Query benchmarks. These experiments show that WATCHMAN achieves a substantial performance improvement in a decision support environment when compared to a traditional LRU replacement algorithm.

Scheuermann, Peter↗

Landsat Data Continuity Mission (LDCM) Flight Dynamics System (FDS)

The Landsat Data Continuity Mission (LDCM) will be launched in January 2013 to continue the legacy of Landsat land imagery collection that has been on-going for the past 40 years. While the overall mission and science goals are designed to produce the SAME data over the years, the ground systems designed to support the mission objectives have evolved immensely. The LDCM Flight Dynamics System (FDS) currently being tested and deployed for operations is highly automated and well integrated with the other ground system elements. The FDS encompasses the full suite of flight dynamics functional areas, including orbit and attitude determination and prediction, orbit and attitude maneuver planning and execution, and planning product generation. The integration of the orbit, attitude, maneuver, and products functions allows a very smooth flow for daily operations support with minimal input needed from the operator. The system also provides a valuable real-time component that monitors the on-board orbit and attitude during every ground contact and will autonomously alert the Flight Operations Team (FOT) personnel when any violations are found. This paper provides an overview of the LDCM Flight Dynamics System and a detailed description of how it is used to support space operations. For the first time on a Goddard Space Flight Center (GSFC)-managed mission, the ground attitude and orbits systems are fully integrated into a cohesive package. The executive engine of the FDS permits three levels of automation: low, medium, and high. The high-level, which will be the standard mode for LDCM, represents nearly lights-out operations. The paper provides an in-depth look at these processes within the FDS in support of LDCM in all mission phases.

Good, Susan M.↗

torch-einshard v1.0

torch-einshard is a Python library for describing local and distributed PyTorch tensor computations with compact, einsum-like notation. Its expressions name logical axes, specify how they are sharded across a PyTorch DeviceMesh, and represent partial reductions. The library automatically performs contractions, permutations, reshaping, splitting, gathering, reduction, reduce-scatter, and repartitioning while preserving autograd. Additional features include sharding-aware FFTs, tensor rolls, halo exchange, sliding windows, 1D–3D convolutions, uneven-shard handling, parameter initialization and gradient management, and cost-based execution planning. It is designed for scientific machine learning and large-model workloads, including tensor-, sequence-, and spatial-parallel MLPs, attention, convolutions, and spectral operations. Compared with manually combining torch.einsum and distributed collectives, torch-einshard expresses both the mathematical operation and data placement in one readable formula. This reduces boilerplate and synchronization errors, keeps forward and backward communication consistent, and allows the library to select optimized collective strategies without changing model code.

Morozov, Dmitriy [Lawrence Berkeley National Labor↗

Understanding the Costs and Barriers of Residential Electrical Panel and Service Upgrades

Upgrading electrical panels and services in U.S. homes represents a significant barrier to building modernization, imposing considerable costs, delays, and procedural uncertainties on homeowners, contractors, utilities, and building departments. Although cost databases document individual infrastructure activities, they rarely capture the integrated, whole-project perspective required to understand how electrical upgrades are planned, executed, and regulated. Existing research is often geographically constrained, narrowly scoped, or derived from limited samples, leaving significant knowledge gaps unaddressed. This study examines the timelines and costs associated with residential electrical panel and service upgrades using data from a national cross- sectional survey conducted in summer 2025. The survey captured responses from 140 stakeholders across 34 states, including building industry professionals, utility staff, and building department staff. Findings indicate that project duration and cost increase substantially with building size though patterns vary by infrastructure type. Most single-family and small multifamily projects were completed within 30 days, whereas medium and large multifamily buildings show longer and less predictable timelines. Service rating increases modestly extend project duration, but building type and size were the primary determinants of delays. Cost patterns were similar: customer-side equipment and panel replacements scale predictably with building size, while utility-side costs are highly variable, often triggered by threshold-driven infrastructure upgrades such as transformer replacements. Permit fees vary considerably between jurisdictions but generally represent a minor proportion of total project costs. These findings identify electrical upgrades as a significant barrier to residential building costs and highlight the need for improved stakeholder coordination, streamlined permitting, and strategies that reduce upgrade requirements while maintaining safety and code compliance.

Casquero-Modrego, Nuria↗

Proceedings of the Nimbus Program Review

The Nimbus program review was conducted at the George Washington Motor Lodge and at General Electric Missiles and Space Division, Valley Forge, Pennsylvania, on November 14, 15, and 16, 1962. The purpose of the review was twofold: first, to present to top management of the Goddard Space Flight Center (GSFC), National Aeronautics and Space Administration (NASA) Headquarters, other NASA elements, Joint Meteorological Satellite Advisory Committee (_MSAC), Weather Bureau, subsystem contractors, and others, a clear picture of the Nimbus program, its organization, its past accomplishments, current status, and remaining work, emphasizing the continuing need and opportunity for major contributions by the industrial community; second, to bring together project and contractor technical personnel responsible for the planning, execution, and support of the integration and test of the spacecraft to be initiated at General Electric shortly. This book is a compilation of the papers presented during the review and also contains a list of those attending.

SYSTEMS ANALYSIS↗

Robot learning and error correction

A model of robot learning is described that associates previously unknown perceptions with the sensed known consequences of robot actions. For these actions, both the categories of outcomes and the corresponding sensory patterns are incorporated in a knowledge base by the system designer. Thus the robot is able to predict the outcome of an action and compare the expectation with the experience. New knowledge about what to expect in the world may then be incorporated by the robot in a pre-existing structure whether it detects accordance or discrepancy between a predicted consequence and experience. Errors committed during plan execution are detected by the same type of comparison process and learning may be applied to avoiding the errors.

Friedman, L.↗

Simulation of mission timelines for the Spacelab program

The paper describes the structure of the Special Purpose Simulation Language (SPSL) designed to overcome certain problems encountered in the use of the General Purpose Simulation Language (GPSL) when applied to simulation and validation of Spacelab mission timelines. The current analysis system is GROPE (Ground Resource Operations Planning Executive), the main data base models of which are the ground operations model, the mission model, the resource model, and the traffic model. Some of the simulation problem areas are mentioned, and unique features of the SPSL are highlighted.

Roberts, J. S.↗

Exceedance statistics of accelerations resulting from thruster firings on the Apollo-Soyuz mission

Spacecraft acceleration resulting from firings of vernier control system thrusters is an important consideration in the design, planning, execution and post-flight analysis of laboratory experiments in space. In particular, scientists and technologists involved with the development of experiments to be performed in space in many instances required statistical information on the magnitude and rate of occurrence of spacecraft accelerations. Typically, these accelerations are stochastic in nature, so that it is useful to characterize these accelerations in statistical terms. Statistics of spacecraft accelerations are summarized.

Fichtl, G. H.↗

Exceedance statistics of accelerations resulting from thruster firings on the Apollo-Soyuz mission

Spacecraft acceleration resulting from firings of vernier control system thrusters is an important consideration in the design, planning, execution and post-flight analysis of laboratory experiments in space. In particular, scientists and technologists involved with the development of experiments to be performed in space in many instances required statistical information on the magnitude and rate of occurrence of spacecraft accelerations. Typically, these accelerations are stochastic in nature, so that it is useful to characterize these accelerations in statistical terms. Statistics of spacecraft accelerations are summarized. Previously announced in STAR as N82-12127

Fichtl, G. H.↗

Planning activities in space

Three aspects of planning activities in space are presented. These include generating plans efficiently, coordinating actions among multiple agents, and recovering from plan execution errors. Each aspect is discussed separately.

Chang, Kai-Hsiung↗

Contingent plan structures for spacecraft

Most current AI planners build partially ordered plan structures which delay decisions on action ordering. Such structures cannot easily represent contingent actions. A representation which can is presented. The representation has some other useful features: it provides a good account of the causal structure of a plan, can be used to describe disjunctive actions, and it offers a planner the opportunity of even less commitment than the classical partial order on actions. The use of this representation is demonstrated in an on-board spacecraft activity sequencing problem. Contingent plan execution in a spacecraft context highlights the requirements for a fully disjunctive representation, since communication delays often prohibit extensive ground-based accounting for remotely sensed information and replanning on execution failure.

Drummond, M.↗

A strategy for Space Station user integration

An approach for the development of a flexible end-to-end user integration process for the Space Station is proposed. Users are assigned to an integration class based on the integration complexity of their payloads. The user, user sponsor, and payload accomodations manager develop an integration timeline for the user. The development of techniques to manage multiple payloads and increments over the life of the Space Station, while minimizing interactions between the integration flows of individual users is considered. The integration classes are defined and the strategic, tactical, and execution planning phases of the process are described.

Levitt, Paul A.↗

OMS FDIR: Initial prototyping

The Space Station Freedom Program (SSFP) Operations Management System (OMS) will automate major management functions which coordinate the operations of onboard systems, elements and payloads. The objectives of OMS are to improve safety, reliability and productivity while reducing maintenance and operations cost. This will be accomplished by using advanced automation techniques to automate much of the activity currently performed by the flight crew and ground personnel. OMS requirements have been organized into five task groups: (1) Planning, Execution and Replanning; (2) Data Gathering, Preprocessing and Storage; (3) Testing and Training; (4) Resource Management; and (5) Caution and Warning and Fault Management for onboard subsystems. The scope of this prototyping effort falls within the Fault Management requirements group. The prototyping will be performed in two phases. Phase 1 is the development of an onboard communications network fault detection, isolation, and reconfiguration (FDIR) system. Phase 2 will incorporate global FDIR for onboard systems. Research into the applicability of expert systems, object-oriented programming, fuzzy sets, neural networks and other advanced techniques will be conducted. The goals and technical approach for this new SSFP research project are discussed here.

Taylor, Eric W.↗