Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “ERCOT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Utility-Scale Solar: Empirical Trends in Project Technology, Cost, Performance, and PPA Pricing in the United States – 2018 Edition

The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2017, the utility-scale sector accounted for nearly 60% of all new solar capacity, and is expected to maintain its market-leading position for at least another six years. Two-thirds of all states, representing all regions of the country, are now home to one or more utility-scale solar projects. This report—the sixth in an ongoing annual series—provides in-depth data-driven analysis of the utility-scale solar project fleet in the United States. Drawing on empirical project-level data from a wide range of sources, this report analyzes technology trends, installed project prices, operating costs, capacity factors, power purchase agreement ("PPA") prices, the levelized cost of solar energy (LCOE), and the market value of solar. Given its current preeminence in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are also presented where appropriate. Highlights from this year's edition include: -Installation and Technology Trends: The use of solar trackers dominated 2017 installations with nearly 80% of all new capacity. In a reflection of the ongoing geographic expansion of the market beyond California and the high-insolation Southwest, the median insolation level at newly built project sites declined again in 2017. While new fixed-tilt projects are now seen predominantly in less-sunny regions, tracking projects are increasingly pushing into these same regions. The median inverter loading ratio grew to 1.32 in 2017, allowing the inverters to operate closer to full capacity for a greater percentage of the day. -Installed Prices: Median installed PV project prices have steadily fallen by two-thirds since the 2007-2009 period, to $2.0/WAC (or $1.6/WDC) for projects completed in 2017. The lowest 20th percentile of projects within our 2017 sample were priced at or below $1.8/WAC, with the lowest-priced projects around $0.9/WAC. Overall price dispersion across the entire sample has decreased steadily every year since 2013; similarly, price variation across regions decreased in 2017. -Operation and Maintenance ("O&M") Costs: PV O&M costs were in the neighborhood of $16/kWAC-year, or $8/MWh, in 2017. These numbers include only those costs incurred to directly operate and maintain the generating plant. -Capacity Factors: The cumulative net AC capacity factors of individual projects vary widely, from 14.3% to 35.2%, with a sample median of 26.3%. This project-level variation is based on a number of factors, including the strength of the solar resource at the project site, whether the array is mounted at a fixed tilt or on a tracking mechanism, the inverter loading ratio, degradation, and curtailment. Changes in at least the first three of these factors drove mean capacity factors higher from 2010-vintage to 2013-vintage projects, where they've remained fairly steady among more-recent project vintages as an ongoing increase in the prevalence of tracking has been offset by a build-out of lower resource sites. -PPA Prices and LCOE: Driven by lower installed project prices and improving capacity factors, levelized PPA prices for utility-scale PV have fallen dramatically over time, by $20-$30/MWh per year on average from 2006 through 2012, with a smaller price decline of ~$10/MWh per year evident from 2013 through 2016. Most recent PPAs in our sample—including many outside of California and the Southwest—are priced at or below $40/MWh levelized (in real 2017 dollars), with a few priced as aggressively as ~$20/MWh. The median LCOE among operational PV projects in our sample has followed PPA prices lower, suggesting a relatively competitive market for PPAs. -Solar's Wholesale Energy Market Value: Falling PPA prices have been offset to some degree by a decline in the wholesale energy market value of solar within higher-penetration markets like California, where solar earned just 79% of the average price across all hours within CAISO's real-time wholesale energy market in 2017 (down from 125% back in 2012). In other markets with less solar penetration, however, solar's hourly generation profile still earns more than the average wholesale price (e.g., 127% in ERCOT, 112% in PJM). -Solar+Storage: Adding battery storage is one way to at least partially restore the value of solar, and three recent PV+storage PPAs in Nevada (each using 4-hour batteries sized at 25% of PV nameplate capacity) suggest that the incremental PPA price adder for storage has fallen to ~$5/MWh, down from ~$15/MWh just a year ago for a similarly configured project. As PV plus battery storage becomes more cost-effective, a number of developers are regularly offering it as a viable upgrade to standalone PV. At the end of 2017, there were at least 188.5 GW of utility-scale solar power capacity within the interconnection queues across the nation. The 2017 growth within these queues is widely distributed across all regions of the country, but is most pronounced in the up-and-coming Midwest region, which accounts for 27% of the 99.2 GW of new queue capacity. The widening geographic distribution is as clear of a sign as any that the utility-scale market is maturing and expanding outside of its traditional high-insolation comfort zones.

14 SOLAR ENERGY↗

Nuclear Technology R&D Strategies in an Era of Energy Price Uncertainty

This project assessed technology strategies for nuclear power plants that could improve economic competitiveness in uncertain future electricity markets. Heat storage is a promising class of technologies that would allow reactors to produce steam at maximum power while giving the plant operator the flexibility to sell more electricity at higher prices. We used the Texas (ERCOT) and New England (ISO-NE) electricity markets to evaluate future market scenarios for heat storage. Hourly unit commitment and capacity change models were used to model short- and long-term market dynamics. Three heat storage technologies were identified as the most promising for nearterm deployment with existing light-water reactors: steam accumulators, twotank molten salt storage, and high-temperature-compatible concrete. We developed technoeconomic models for each of these technologies to estimate direct, overnight capital costs based on the output power [MW], energy storage capacity [MWh or GJ th ], and heat loss rate [%/hr]. Our modeling results found that adding heat storage to a nuclear power plant could increase net revenue in some cases. The greatest improvements were seen when increasing the heat storage power output with a separate steam turbine. Increasing energy storage capacity was beneficial through 12 hours of full-output storage time, but there was little to no benefit for higher energy/ power ratios. High natural gas prices as well as increasing amounts of solar PV and wind were both beneficial to storage economics, while high demand and load growth and a carbon tax were helpful in some scenarios. We recommend that heat storage systems for nuclear power plants be developed with multiple future markets in mind, namely electricity generation, operating reserves, long-term capacity, and industrial heat. Heat storage system Integration risk should be mitigated early in the development process to accelerate deployments.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An Evaluation of Electricity Net Load Profiles and the Baseload Generation Concept

This paper investigates the amount of baseload generation that would be displaced due to renewable resources being implemented to meet state renewable portfolio standards (RPS) in the following regions: the Midwest Independent System Operator (MISO), the PJM regional transmission organization (RTO), the Electric Reliability Council of Texas (ERCOT), and the California ISO (CAISO). Modeling of these regions was done in Promod, a security constrained economic dispatch (SCED) model, for the years 2016-2030, to compare scenarios with and without the two primary intermittent renewable resources (solar and wind) attributable to the RPS regulations implemented in each state. In addition, a new statistical approach was developed for evaluating the variability in net load shapes caused by these two intermittent resources. The load variability index (LVI) was developed to apply to the hourly net load profiles for each day as a means of comparing variability in net loads.

14 SOLAR ENERGY↗

Impacts of High Variable Renewable Energy Futures on Electric-Sector Decision Making: Demand-Side Effects

Previous work by the Berkeley Lab describes how high shares of variable renewable energy (VRE) such as wind and solar power could change wholesale electricity price dynamics. These include the timing of when electricity is cheap or expensive, locational differences in the cost of electricity, and the degree of regularity or predictability in those costs. Many decentralized decision-makers on the demand-side may not yet have considered the implications of these possible future changes. In this report, we evaluate the sensitivity of a set of demand-side decisions to different levels of VRE penetration ranging from a low of 5-20% to a high of 40-50%. The analysis builds on hourly wholesale energy and capacity prices in different VRE scenarios for four wholesale markets in the United States for the year 2030 (CAISO, ERCOT, NYISO, and SPP). The principal question for this exploration is whether private and public electric-sector decisions that are made based on assumptions reflecting low VRE levels still achieve their intended objective in a high VRE scenario with 40-50% wind and solar? This scoping report evaluates the impacts of changing patterns of peak system needs on the benefits of demand reductions by examining the altered value of different energy efficiency (EE) measures. Similarly, we investigate new opportunities for large energy consumers that may arise from periods with very low wholesale electricity prices. We calculate the value of new process investments (e.g., hydrogen production and other generalized electro-commodities), showcase the varying value of new product storage investments (such as reservoir extensions at a desalination plant), and estimate the benefits of increased process flexibility that uses electricity as a process-input in addition to traditional fossil fuels (e.g., district energy systems). Finally, many decentralized decision-makers and end-use customers are not directly exposed to wholesale electricity prices but instead receive price signals from their retail electricity rates. As wind and solar shares increase, we compare the economic efficiency of flat retail rates relative to more dynamic time-of-use tariffs with and without critical peak-pricing events.

14 SOLAR ENERGY↗

Opportunities for Industry to Provide Flexibility While Increasing Profitability

Supply and demand flexibility will both be needed to ensure the electricity system functions properly as the share from variable renewable generation continues to grow. Industrial manufacturing currently consumes about a third of primary energy worldwide, and electricity is projected to supply an increasing share of this demand as the global economy decarbonizes. Therefore, the ability for industry to flex demand poses an enticing opportunity to enable grid flexibility. However, large capital outlays prevent industry from voluntarily altering demand. Here we show that as battery costs continue to fall, industry will soon be able to profitably alter demand in accordance with electricity price variations. Focusing on two established industries– chlor-alkali and electric arc furnaces – and two industries with large future potential – methane pyrolysis and atmospheric CO 2 capture, we use a linear program (LP) optimization to assess the technoeconomic feasibility of flexible industrial demand across both historical and future-looking wholesale day-ahead marginal prices for the Electricity Reliability Council of Texas (ERCOT). We find positive net present values (NPV) from $\$$400K to $\$$50M using projected 2050 battery prices for industrial purchase of behind-the-meter batteries, using only arbitrage as a source of value. These results indicate that, with projected battery prices, profit-seeking industrial players could voluntarily play a future role in stabilizing a high-renewables grid where electricity prices act as accurate signals of grid needs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Machine Learning Guided Operational Intelligence from Synchrophasors (Final Report)

Schweitzer Engineering Laboratories (SEL) and Oregon State University (OSU) received over 27 terabytes of electrical power system phasor measurement unit (PMU) data for the Eastern, Western, and ERCOT interconnections. The dataset includes measurements spread across 446 PMUs from early 2016 to mid 2018 depending on the interconnect. The full dataset was split into a training and test (holdout) dataset by PNNL. All data was received in the Apache Parquet format. The overarching goal of this project is to develop and execute a strategy to mitigate data anomalies, perform analysis on the dataset, and detect anomalous events in the data.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Front-End Engineering Design (FEED) Study for a Carbon Capture Plant Retrofit to a Natural Gas-Fired Gas Turbine Combined Cycle Power Plant (2x2x1 Duct-Fired 758-MWe Facility with F Class Turbines)

A comprehensive front-end engineering design (FEED) study has been undertaken by Bechtel National Inc. (Bechtel) for locating a post-combustion capture and compression (PCC) unit at Panda’s Sherman natural gas–combined cycle (NGCC) power plant in Sherman, Texas. This is described in the unredacted FEED Study report (Attachment 1) with all supporting documents, numbering over 150. The Study Report is publicly available. Sizing of the PCC plant is based on treating an amount of flue gas equivalent to that produced when generating 420 MW, which is approximately 68% of the total flue gas emitted by the NGCC power plant operating at guarantee condition with duct burners off. A reduced power plant capacity factor was used for sizing the PCC plant because the gas turbines at the site often operate at reduced load due to the high penetration of renewable power in the ERCOT region. The cost of carbon capture is primarily driven by capital cost (and therefore is highly sensitive to capacity factor). Sizing the capture unit so that when used it is nearly always operating at full capacity is critical to the economic viability of the proposed investment.

03 NATURAL GAS↗

DSO+T: Integrated System Simulation (DSO+T Study: Volume 2)

This report summarizes an integrated co-simulation model used by the Distribution System Operator with Transactive (DSO+T) study to represent an electrical generation, delivery, and end-load systems for the purposes of assessing the viability and value proposition of transactive energy coordination of flexible assets versus a business-as-usual case. The integrated co-simulation model includes the bulk generation and transmission system, including the day-ahead and real-time scheduling and dispatch of thermal generators. Forty distribution system operators were modelled in detail, including tens of thousands of residential and commercial buildings and their flexible end-loads. These included HVAC systems, residential water heaters, electric vehicles, and stationary, behind-the-meter, batteries. Both wholesale market and end-load results for the business-as-usual case are presented and compared to actual ERCOT system data to assess the accuracy and representativeness of the resulting model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Flexible Service Contracting for Risk Management within Integrated Transmission and Distribution Systems

The general objective of our project has been to investigate the ability of Independent Distribution System Operators (IDSOs), functioning as linkage agents for Integrated Transmission and Distribution (ITD) systems, to facilitate the flexible availability and usage of reserve in support of ITD system operations. This general objective is in accordance with Order 2222 of the U.S. Federal Energy Regulatory Commission (FERC), titled “Participation of Distributed Energy Resource Aggregations in Markets Operated by Regional Transmission Organizations and Independent System Operators”. The Final Rule for FERC Order 2222 was issued on September 17, 2020. The primary contribution of our project is that we have formulated an innovative energy management Transactive Energy Design (TES) approach for ITD systems that provides promising support for our project objective. Specifically, we have developed a new type of IDSO-managed TES design for distribution system operations, as well as new types of swing contracts permitting IDSOs to participate in transmission system operations as providers of reserve harnessed from distribution system resources in return for appropriate compensation. Together, these design elements constitute a scalable market-based approach facilitating efficient reserve procurement for ITD system operations from a fuller range of power resources. The efficacy of our approach has been demonstrated by means of detailed conceptual analyses as well as test case simulations. To implement the latter, we have developed the ITD TES Platform V2.0, a computational platform that permits the modeling and software implementation of ITD system operations over time. The Electric Reliability Council of Texas (ERCOT) energy region has been used as the empirical anchor for the development of this platform. Our conceptual and test-case work has been reported in a Wiley/IEEE Press book, two refereed book chapters, and seven refereed journal articles. The key components comprising the ITD TES Platform V2.0 have been released as documented open-source software at online GitHub repositories.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Big Data Synchrophasor Monitoring and Analytics for Resiliency Tracking (BDSMART)

This report contains key findings from a project titled Big Data Synchrophasor Monitoring and Analytics for Resiliency Tracking (BDSMART), which was carried out through a collaborative effort of a team of researchers from Texas A&M Engineering Experiment Station, Temple University, and Quanta Technology, LLC. The in-kind support came from OSIsoft (acquired by AVEVA), which provided their PI Historian software to demonstrate the use case of streaming PMU data. The first section of the report describes the project goals and objectives related to the development of Machine Learning (ML) models capable of detecting and classifying events by processing phasor measurements captured in the field by Phasor Measurement Units (PMUs). The data for this study was contributed by the utilities/ISOs from the Western and Eastern interconnects and ERCOT, further referred to as Interconnect B (IC B), Interconnect A (IC A), and Interconnect C (IC C), respectively. The approach that the BDSMART Research Team proposed and the key research tasks defined by the team are outlined in this section. The next section describes the technical approach. We first discuss the data constraints related to the PMU measurements and data interpretation constraints imposed by the data contributors. They provided neither the topological information of the grid nor PMU placement locations and captured recorded data at very few locations in the system with the reporting rate of either 30 or 60 fps. The recordings are mostly positive sequence voltage, frequency, and ROCOF, and in some limited cases, three-phase voltages and currents. We then reflect on the bad data issues that stem from poor recording practices and vague definitions of the PMU status bits to supposedly be used for bad data identification. Finally, the data discovery points to imprecise time stamps with incomplete event start/end time, as well as inconsistent and incomplete event labeling, which combined make the implementation of the data models using supervising learning quite challenging. Following the data discovery study, we hypothesize that because the IC B data has the most complete labels, we should focus our model development on that data and then test it on data from other interconnects. We also define the common metrics used to evaluate the results from the ML algorithm tests. We concluded this section by summarizing the common ML models we used and explaining how we implemented and tested them. The issues from this section are expanded in the Training Dataset Report from this project. The final section of this report deals with the accomplishments and conclusions. As the accomplishments, we formulate the problem we are solving and what is achieved by solving the problem. We then reflect on each of the analytics tools we developed and point out the performance of each tool when applied to solving the mentioned problems. We reference this work for further details to the papers we published on each tool. In the conclusions, we give recommendations on how to improve future PMU recording practices to facilitate the ML algorithm implementation and guidance for the future standardization work aimed at clarifying the ambiguities associated with the PMU status bits. We finally list future tasks that can bring about further improvements in the proposed algorithms. The issues from this section are expanded in the Training, and Test Dataset Report filed at the project completion date.

97 MATHEMATICS AND COMPUTING↗

Automated System-wide Event Detection and Classification Using Machine Learning on Synchrophasor Data

As the number of phasor measurement units (PMUs) deployed in a power system increases, and their data volume streamed to the control canter intensifies, operators are facing challenges related to the analysis of such data, which need to be observed and responded to as the measurements are displayed in the Control Room. Humans are generally unable to process such large amount of data efficiently and rapidly. There is an apparent need for automated ways to analyze the data, extract actionable information about occurrence of specific events, and characterize the events quickly and cost effectively. This paper discusses the use of machine learning (ML) to facilitate such tasks by providing automated, highly computationally efficient, and cost-effective ways of extracting actionable information from synchrophasor big data in real-time. We developed Big Data Smart (BDSmart) ML-based prototype tool for the Control Room use that automatically analyses data properties from synchrophasor system measurements taken across the three grid Interconnections in the USA (Western, Eastern and ERCOT). The data collected from several hundreds of PMUs located across the Interconnections over a period of two years have been made available for our extensive study. As a result, we were able to identify a number of big data properties that influence how ML methodology is applied to select, develop, train and test the data models that can eventually be used for the tool implementation. The resulting set of candidate algorithms spans unsupervised, supervised, semi-supervised and transfer-learning approaches. Many ML techniques, such as decision trees, multinomial logistic regression, feed-forward neural networks, K-nearest neighbor, multiclass support vector machine, and single and multi-channel convolutional neural networks, are implemented, and their performance is examined. We offer the results from testing the data models. The novelty of our study is in the approaches for bad data detection and mitigation, selection of a simplified feature for event detection, and data label improvements. As a result, we came up with a list of recommendations for the utilities on how to improve the PMU recording practices to cater to the future ML applications aimed at automating the analysis of synchrophasor data.

Synchrophasors, Machine Learning, System-wide Even↗

Impact of Transport Electrification Demand and Charging Schedules on Electricity Markets and Nuclear Generators

As the U.S. pursues deep decarbonization targets, electric vehicles (EVs) are likely to become a major driver of demand growth and a major determinant of daily demand patterns. This study analyzes a possible future ERCOT-like electricity grid, and examines the impact of different types of EV charging schedules on grid and market outcomes. This analysis demonstrates the significant impact of EV charging patterns on capacity expansion simulations. Even without EVs, the overall daily demand profile in a market can have significant impacts on prices and grid stability in that system, especially if non-dispatchable renewable generators (e.g. wind and solar) make up a significant fraction of the generation mix. EV demand will not necessarily follow this preexisting demand profile, so its daily trends may significantly change what generation portfolio would optimally serve the system. Furthermore, the effects of EV demand can alter the profitability of different types of units, by altering the frequency of market events like extreme-demand hours or zero-price hours. These effects are explored in this study. The EV demand levels were derived from MARKAL simulations of the West-South-Central North American Electric Reliability Corporation (NERC) region for the year 2050, using a carbon tax of $100/ton. The baseline MARKAL simulation forecasted that 23% of the region’s annual electricity demand in 2050 would be attributable to EVs, and broke out demand projections for EV and non-EV end-use in that year. To model lower EV penetration into the system, an additional case was explored which assumed that EVs only achieved 75% of the demand level projected by MARKAL.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Synthetic Electricity Market Data Generation and HERON Use Case Setup of Advanced Nuclear Reactors Coupled with Thermal Energy Storage Systems

This study evaluates and optimizes advanced nuclear reactors coupled with thermal energy storage (TES) systems in an Integrated Energy System (IES) architecture to enable advanced nuclear power plants (A NPP) to participate in multi-commodity markets, thus enhancing their economic competitiveness. Nuclear-TES coupling scenarios studied herein are designed attenuate the nuclear heat dynamics and defer energy delivery to a later time, enabling the nuclear reactor to continue operating at or near steady-state design conditions as usual while also enabling flexible generation. Three A-NPPs, namely, an advanced light-water reactor (A LWR), a high temperature gas-cooled reactor (HTGR) and a liquid-metal fast reactor (LMFR) were selected as the initial use cases for demonstrating the technoeconomic of thermally balanced energy storage coupling design for thermal power extraction. Each of the reactor technologies were evaluated in two different electricity markets. Stochastic optimization approach was adopted which included the evaluation of price signals from the Pennsylvania-New Jersey-Maryland (PJM) market, and Electric Reliability Council of Texas (ERCOT), using an autoregressive moving average (ARMA) model. Risk Analysis Virtual Environment (RAVEN) tool and its dispatch optimization plugin, the Holistic Energy Resource Optimization Network (HERON), were used to perform dispatch and capacity optimization, using the price data provided by the ARMA models. The results from the Nuclear-TES use cases will be used to design and characterize dynamic integrated system behavior and feedback.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Solar, Wind, and Load Forecasting Dataset for MISO, NYISO, and SPP Balancing Areas

The Performance-based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) program is an initiative intended to foster "a fundamental shift in grid management rooted in an understanding of asset risk and system risk" (ARPA-E 2020). Launched by the Advanced Research Projects Agency-Energy (ARPA-E), the program supports efforts to incorporate uncertainty in electric power decision making. In support of PERFORM, the National Renewable Energy Laboratory (NREL) has produced a set of time-coincident forecasts of solar, wind, and load profiles. As part of Phase I of the PERFORM effort, NREL created a dataset that consists of one year of time-coincident load, wind, and solar actuals and probabilistic forecasts based on data from the Electric Reliability Council of Texas (ERCOT) (Bryce et al. 2023). In Phase II, NREL developed similar datasets for three other U.S. Independent System Operators (ISO): the Midcontinent Independent System Operator (MISO), the New York Independent System Operator (NYISO), and the Southwest Power Pool (SPP).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Utility-Scale Solar, 2024 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2024 Edition” presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC (PV plants of 5 MWAC or less, including residential rooftop systems, are covered separately in Berkeley Lab’s companion annual report, Tracking the Sun). Key findings from this year’s report include: -18.5 GWAC of new utility-scale PV capacity came online in 2023, bringing cumulative installed capacity to more than 80.2 GWAC across 47 states. Installed costs continued to fall in 2023. Relative to 2022, capacity-weighted averages decreased by 8% to -$\$1.43$/WAC (or $\$1.08$/WDC). Costs, based on a 7.1 GWAC sample of 76 plants completed in 2023, have fallen by 75% (averaging 10% annually) since 2010. Plant-level capacity factors vary widely, from 6% to 36% (on an AC basis), with a sample median of 24%. -Levelized cost of energy (LCOE) of new 2023 projects increased slightly to $\$46$/MWh prior to the application of tax credits but continued to fall to $\$31$/MWh when accounting for federal incentives. PPA prices have largely followed the decline in solar’s LCOE over time, but newly signed longer-term PPA prices have increased since 2021, to an average of $\$35$/MWh (levelized, in 2023 dollars). -Solar’s average energy and capacity value (i.e., ability to offset costs of other power generation sources) across the U.S. was $\$45$/MWh in 2023. Solar’s average market value was lowest in CAISO ($\$27$/MWh), the market with the greatest solar generation share, and highest in ERCOT ($\$67$/MWh). -Newer solar projects had greater market value in 2023 than their generation costs, yielding $\$1.1$ billion in benefits. Projects built in 2022 delivered on average $\$15$/MWh more market value than their costs in 2023. -Solar’s combined value from wholesale electricity markets, public health and climate damage reduction were greater than generation costs and incentives, yielding $\$13.7$ billion in net benefits in 2023. We estimate U.S. health benefits of $\$24$/MWh and reduced global climate damages of $\$101$/MWh. -Adding battery storage is one way to increase the value of solar. Deployment of 52 new PV+battery hybrid plants set a record with 5.3 GW installed in 2023. Our public data file tracks metadata and PPA prices from more than 100 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -Looking ahead, a massive pipeline of at least 1,085 GW of solar capacity dominates the nation’s interconnection queues at the end of 2023. Nearly 571 GW, or 53%, of that total was paired with a battery – in CAISO it was a staggering 98%. Historically only 10% of the requested solar capacity is built. -For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Deer Park Energy Center Natural Gas Combined Cycle Carbon Capture System Front-End Engineering Design Study (Final Scientific/Technical Report – Unlimited)

Calpine Texas CCUS Holdings, LLC (Calpine), Shell Catalysts & Technologies (SCT), Technip Energies (TEN), and Sargent & Lundy, LLC (S&L) have conducted a Front-End Engineering Design (FEED) Study to integrate a new carbon capture system at Calpine’s Deer Park Energy Center (DKEC). The DKEC facility is a nominal 1200 MW gas-fired co-generation power plant situated at the Shell Chemical Manufacturing (Shell) Facility located in Deer Park, Texas. Steam is produced for use by the adjacent Shell Chemical Manufacturing Facility as well as by the onsite steam turbine for electrical generation. The power output from DKEC is provided to the Electric Reliability Council of Texas (ERCOT) operated power grid. DKEC provides power to industrial and commercial customers via this interconnection.

03 NATURAL GAS↗

How the U.S. Power Grid Kept the Lights on in Summer 2024

Maintaining the reliability of the bulk power system, which supplies and transmits electricity, is a critical priority of electric grid planners, operators, and regulators. As demand for electricity increases and the U.S. resource mix changes, how grid operators meet peak demand is changing. In summer 2024, grid operators in all regions maintained enough capacity to keep the lights and air conditioners on during periods of peak demand, even as older generators have been retired. And, an increasing number of regions used more solar and storage to meet peak demand. In this publication, we describe grid operations on the highest demand day in ERCOT and a few other regions and how solar and storage in particular worked together to help meet peak demand.

14 SOLAR ENERGY↗

Empirical Assessment of Interregional Coordination to Support Resource Adequacy [Slides]

This study examines where interregional transmission could most effectively support resource adequacy in the contiguous United States. We use hourly load, renewable generation, and real-time price data from 2016–2023 for 18 planning subregions to identify periods of elevated adequacy risk, defined as the top 100 annual hours of net load and wholesale prices in each region. We then measure the temporal coincidence of these peak periods between adjacent regions and compare price patterns to assess the potential for capacity sharing. Results show that NorthernGrid West, a winter-peaking region, has low coincidence of peak net load with its summer-peaking neighbors, indicating high potential for interregional support. In contrast, regions in the Northeast have highly coincident peak periods, suggesting limited adequacy benefits from additional transmission. Price-based analysis shows peak-hour differences in the Midwest and between ERCOT and neighboring regions, indicating potential economic benefits from increased transfers. The findings provide an empirical screening of where transmission may offer the greatest reliability benefits without adding new generation capacity.

24 POWER TRANSMISSION AND DISTRIBUTION↗