Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Distributed Scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

NASA Instrument Cost/Schedule Model

NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

JCL↗

Optimal pumping schedule with high-viscosity gel for uniform distribution of proppant in unconventional reservoirs

Hydrocarbon recovery from a hydraulic-fractured unconventional reservoir can be enhanced by replacing slickwater with non-Newtonian high-viscosity gel as a fracturing fluid. However, in the literature, the role of gel rheology on hydrocarbon production from a fractured reservoir is not very well understood. This lack of understanding makes it difficult for the industry to choose appropriate viscosity parameters of fracturing gels. Motivated by these limitations, first, we have developed a high-fidelity model of non-Newtonian fluid flow to simulate fracture propagation, fluid leak-off, and gel flowback processes to predict the oil production from a hydraulic fractured reservoir. Simulation results of the high-fidelity model show how fracture geometry, formation damage, and gel cleanup process varies with the fracturing fluid rheology. Therefore, the developed model is used to understand the effect of gel rheology on hydrocarbon production via a sensitivity analysis, which provides a set of rheological parameters that maximize the cumulative amount of oil production. Finally, utilizing this optimal high-viscosity gel, a model predictive controller is designed to obtain an optimal pumping schedule necessary for producing a target fracture geometry and proppant concentration. The closed-loop simulation results demonstrate that the obtained pumping schedule successfully achieved the desired fracture geometry and proppant concentration at the end of pumping, leading to the maximum oil production from an unconventional reservoir.

13 HYDRO ENERGY↗

Cost and schedule estimation study report

This report describes the analysis performed and the findings of a study of the software development cost and schedule estimation models used by the Flight Dynamics Division (FDD), Goddard Space Flight Center. The study analyzes typical FDD projects, focusing primarily on those developed since 1982. The study reconfirms the standard SEL effort estimation model that is based on size adjusted for reuse; however, guidelines for the productivity and growth parameters in the baseline effort model have been updated. The study also produced a schedule prediction model based on empirical data that varies depending on application type. Models for the distribution of effort and schedule by life-cycle phase are also presented. Finally, this report explains how to use these models to plan SEL projects.

Condon, Steve↗

Distributed Schemes for Integrated Arrival Departure Surface (IADS) Scheduling

The objective of the NRA is to investigate and develop integrated scheduling solutions for arrival, departure and surface operations. The option year briefing summarizes simulation-based analyses of the departure metering process to investigate strategic queue management strategies and their robustness to uncertainty, assess the impact of delaying departures at their gates on blocking the arrivals destined for the same gates, and evaluate the effects and benefits of relaxing current-day MIT constraints when ATD-2 is in operation.

ATD-2↗

On the Feasibility of Simulation-Driven Portfolio Scheduling for Cyberinfrastructure Runtime Systems

Runtime systems that automate the execution of applications on distributed cyberinfrastructures need to make scheduling decisions. Researchers have proposed many scheduling algorithms, but most of them are designed based on analytical models and assumptions that may not hold in practice. The literature is thus rife with algorithms that have been evaluated only within the scope of their underlying assumptions but whose practical effectiveness is unclear. It is thus difficult for developers to decide which algorithm to implement in their runtime systems.To obviate the above difficulty, we propose an approach by which the runtime system executes, throughout application execution, simulations of this very execution. Each simulation is for a different algorithm in a scheduling algorithm portfolio, and the best algorithm is selected based on simulation results. The main objective of this work is to evaluate the feasibility and potential merit of this portfolio scheduling approach, even in the presence of simulation inaccuracy, when compared to the traditional one-algorithm approach. We perform this evaluation via a case study in the context of scientific workflows. Our main finding is that portfolio scheduling can outperform the best one-algorithm approach even in the presence of relatively large simulation inaccuracies.

Casanova, Henri↗

User interface issues in supporting human-computer integrated scheduling

The topics are presented in view graph form and include the following: characteristics of Operations Mission Planner (OMP) schedule domain; OMP architecture; definition of a schedule; user interface dimensions; functional distribution; types of users; interpreting user interaction; dynamic overlays; reactive scheduling; and transitioning the interface.

Cooper, Lynne P.↗

Lessons Learned In Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

Lessons Learned in Developing Multiple Distributed Planning Systems for the International Space Station

The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.

Maxwell, Theresa G.↗

A Modified Maximum Entropy Inverse Reinforcement Learning Approach for Microgrid Energy Scheduling

Increasing popularity of integrating distributed energy resources (DERs) into the power system brings a challenge to optimize the microgrid dispatch policy. The reinforcement learning methods suffer from a long-time problem with the theoretical assumption of the objective/reward function for the microgrid system. Although the traditional inverse reinforcement learning (IRL) approaches can solve this problem to some extent, they encounter a limitation of complex computations for state visitation frequency in the large and continuous state space. To alleviate this limitation, we propose a modified maximum entropy IRL (MMIRL) method to extract the reward function from the expert demonstrations for solving the microgrid energy scheduling problem. The proposed MMIRL algorithm is promising in recovering the reward function and learning the dispatch policy compared to conventional approaches. Case studies are performed in an energy arbitrage problem and a microgrid system with DERs. Results substantiate that the proposed MMIRL approach can learn the dispatch policy with more than 99% efficiency and outperforms other comparative methods.

artificial intelligence, reinforcement learning, m↗

An exploration of online-simulation-driven portfolio scheduling in Workflow Management Systems

Workflow Management Systems used to automate the execution of scientific workflow applications on parallel and distributed computing platforms must make scheduling decisions at runtime. A large number of workflow scheduling algorithms have been proposed in the literature, but often these algorithms are evaluated based on simplifying assumptions that may not hold in practice. Furthermore, published algorithm evaluation and/or comparison results are necessarily only for a subset of all possible scenarios, and thus may not include scenarios relevant to particular use-cases. Consequently, it is difficult for Workflow Management Systems (WMSs) developers to decide which scheduling algorithm should be implemented. To obviate this difficulty, one possible approach is to implement a portfolio of scheduling algorithms and select the most effective algorithm at runtime. One method for performing this selection is to run an online simulation for each algorithm in the portfolio. The algorithm that leads to the best performance, in simulation, is selected for future use. The above simulation-driven portfolio scheduling (SDPS) approach has been proposed in a few parallel and distributed computing contexts. The main objective of this work is to evaluate the feasibility and potential merit of SDPS if implemented in WMSs. Here we perform this evaluation using simulated WMS executions, where the simulations are instantiated from real-world platform and workflow configurations. Our main finding is that SDPS is on par with or outperforms an approach in which a single algorithm is used, where this algorithm is the one that performs best on average across all our experimental scenarios. Furthermore, we find that SDPS remains an attractive proposition even in the presence of high levels of simulation error and for simulators with relatively low levels of sophistication. In many of our experimental scenarios we find that mitigating simulation error at runtime can further improve performance. Finally, we show that simulation overhead can be made sufficiently low for SDPS to be feasible in practice.

97 MATHEMATICS AND COMPUTING↗

Augmentation of the space station module power management and distribution breadboard

The space station module power management and distribution (SSM/PMAD) breadboard models power distribution and management, including scheduling, load prioritization, and a fault detection, identification, and recovery (FDIR) system within a Space Station Freedom habitation or laboratory module. This 120 VDC system is capable of distributing up to 30 kW of power among more than 25 loads. In addition to the power distribution hardware, the system includes computer control through a hierarchy of processes. The lowest level consists of fast, simple (from a computing standpoint) switchgear that is capable of quickly safing the system. At the next level are local load center processors, (LLP's) which execute load scheduling, perform redundant switching, and shed loads which use more than scheduled power. Above the LLP's are three cooperating artificial intelligence (AI) systems which manage load prioritizations, load scheduling, load shedding, and fault recovery and management. Recent upgrades to hardware and modifications to software at both the LLP and AI system levels promise a drastic increase in speed, a significant increase in functionality and reliability, and potential for further examination of advanced automation techniques. The background, SSM/PMAD, interface to the Lewis Research Center test bed, the large autonomous spacecraft electrical power system, and future plans are discussed.

Walls, Bryan↗

Study and Demonstration of Planning and Scheduling Concepts for the Earth Observing System Data and Information System

The University of Colorado's Laboratory for Atmospheric and Space Physics (CU/LASP) along with the Goddard Space Flight Center (GSFC) and the Jet Propulsion Laboratory (JPL) designed, implemented, tested, and demonstrated a prototype of the distributed, hierarchical planning and scheduling system comtemplated for the Earth Observing System (EOS) project. The planning and scheduling prototype made use of existing systems: CU/LASP's Operations and Science Instrument Support Planning and Scheduling (OASIS-PS) software package; GSFC's Request Oriented Scheduling Engine (ROSE); and JPL's Plan Integrated Timeliner 2 (Plan-It-2). Using these tools, four scheduling nodes were implemented and tied together using a new communications protocol for scheduling applications called the Scheduling Applications Interface Language (SAIL). An extensive and realistic scenario of EOS satellite operations was then developed and the prototype scheduling system was tested and demonstrated using the scenario. Two demonstrations of the system were given to NASA personnel and EOS core system (ECS) contractor personnel. A comprehensive volume of lessons learned was generated and a meeting was held with NASA and ECS representatives to review these lessons learned. A paper and presentation on the project's final results was given at the American Institute of Aeronautics and Astronautics Computing in Aerospace 9 conference.

Davis, Randal↗

Coordinating Shared Activities

Shared Activity Coordination (ShAC) is a computer program for planning and scheduling the activities of an autonomous team of interacting spacecraft and exploratory robots. ShAC could also be adapted to such terrestrial uses as helping multiple factory managers work toward competing goals while sharing such common resources as floor space, raw materials, and transports. ShAC iteratively invokes the Continuous Activity Scheduling Planning Execution and Replanning (CASPER) program to replan and propagate changes to other planning programs in an effort to resolve conflicts. A domain-expert specifies which activities and parameters thereof are shared and reports the expected conditions and effects of these activities on the environment. By specifying these conditions and effects differently for each planning program, the domain-expert subprogram defines roles that each spacecraft plays in a coordinated activity. The domain-expert subprogram also specifies which planning program has scheduling control over each shared activity. ShAC enables sharing of information, consensus over the scheduling of collaborative activities, and distributed conflict resolution. As the other planning programs incorporate new goals and alter their schedules in the changing environment, ShAC continually coordinates to respond to unexpected events.

Clement, Bradley↗

US 2023/0182605 A1 Network constraint energy management system for electric vehicle depot charging and scheduling

Network constraint energy management system for electric vehicle (EV) depot charging and scheduling. In an embodiment, a power schedule is received from an economic dispatch application for a charging depot comprising EV charging station(s) and distributed energy resource(s). The power schedule may be simulated on a distribution network model of the charging depot, according to load flow analysis, to determine whether any grid-code violations occur. In response to the detection of violation(s), a constraint may be generated for each violating node, and the economic dispatch application may be re-executed with the constraint(s) to produce a new power schedule, until no violations are detected. When not all load demand can be satisfied by the power schedule, a charging schedule may be adjusted to ensure that critical energy requirements are satisfied. The final power and charging schedules may be used to schedule and control power generation and charging in the charging depot.

Hafiz, Faeza↗

SMC 2021 : Analyzing Resource Utilization and User Behavior on Titan Supercomputer

Resource utilization statistics of submitted jobs on a supercomputer can help us understand how users from various scientific domains use HPC platforms and better design a job scheduler. We explore to generate insight regarding workload distribution and usage pattern domains from job scheduler trace, GPU failure information, and project-specific information collected from Titan supercomputer. Furthermore, we want to know how the scheduler performance varies over time and how the users' scheduling behavior changes following a system failure. These observations have the potential to provide valuable insight, which is helpful to prepare for system failures. These practices will help us develop and apply novel machine learning algorithms in understanding system behavior, requirement, and better scheduling of HPC systems. There are two datasets, RUR and GPU. RUR: This dataset is the job scheduler traces collected from the Titan supercomputerfrom 01/01/2015 to 07/31/2019 (2015.csv - 2019.csv). These were collected usingResource Utilization Report (RUR), a Cray-developed resource-usage data collectionand reporting system. It contains the usage information of its critical resources (CPU,Memory, GPU, and I/O) of each running job on Titan during that period [2]. ProjectAreas: Every job is associated with a project ID. TheProjectAreas.csvdatasetprovides a mapping of the project ID to its domain science. GPU: There have been some hardware-related issues in the GPUs in Titan that caused some GPUs to fail, sometimes irrecoverably during some job runs. This dataset provides information regarding these failures during the execution of the submitted jobs. GPUs on Titan are uniquely identified by a serial number (SN), and they are installed in a location. A GPU can be installed in a location, then removed from that location following a failure, and then re-installed in a different location after fixing the problem. If the failure can't be recovered, the GPU might be removed entirely from Titan. There are two prominent types of failures that resulted in the removal of GPUs from Titan: Double Bit Error (DBE) and Out of the Bus (OTB). The dataset (gc_full.csv) has the following fields: 1. SN : Serial number of a GPU 2. location : The location where it is installed 3. insert : The time when it was inserted into that location 4. remove : The time when it was removed from that location 5. duration : Amount of time the GPU spent in this location 6. out : If the device was taken out entirely w/o a re-installment into a new location. 7. event : If the GPU was taken out entirely, the reason for its removal. To learn more about this dataset, please refer to the git repositoryhttps://github.com/olcf/TitanGPULifeand the related publication [1]. References [1] George Ostrouchov, Don Maxwell, Rizwan A Ashraf, Christian Engelmann, MallikarjunShankar, and James H Rogers. Gpu lifetimes on titan supercomputer: Survival analysisand reliability. InSC20: International Conference for High Performance Computing,Networking, Storage and Analysis, pages 1-14. IEEE, 2020. [2] Feiyi Wang, Sarp Oral, Satyabrata Sen, and Neena Imam. Learning from five-yearresource-utilization data of titan system. In2019 IEEE International Conference onCluster Computing (CLUSTER), pages 1-6. IEEE, 2019.

42 ENGINEERING↗

SMC 2021 Data Challenge: Analyzing Resource Utilization and User Behavior on Titan Supercomputer

Resource utilization statistics of submitted jobs on a supercomputer can help us understand how users from various scientific domains use HPC platforms and better design a job scheduler. We explore to generate insight regarding workload distribution and usage pattern domains from job scheduler trace, GPU failure information, and project-specific information collected from Titan supercomputer. Furthermore, we want to know how the scheduler performance varies over time and how the users' scheduling behavior changes following a system failure. These observations have the potential to provide valuable insight, which is helpful to prepare for system failures. These practices will help us develop and apply novel machine learning algorithms in understanding system behavior, requirement, and better scheduling of HPC systems. There are two datasets, RUR and GPU: RUR dataset is the job scheduler traces collected from the Titan supercomputer from 01/01/2015 to 07/31/2019 (2015.csv - 2019.csv). These were collected using resource Utilization Report (RUR), a Cray-developed resource-usage data collection and reporting system. It contains the usage information of its critical resources (CPU, Memory, GPU, and I/O) of each running job on Titan during that period (https://ieeexplore.ieee.org/abstract/document/8891001). It includes ProjectAreas as additional information, every job is associated with a project ID. TheProjectAreas.csv dataset provides a mapping of the project ID to its domain science. GPU dataset has information regarding GPU failure on Titan. There have been some hardware-related issues in the GPUs in Titan that caused some GPUs to fail, sometimes irrecoverably during some job runs. This dataset provides information regarding these failures during the execution of the submitted jobs. GPUs on Titan are uniquely identified by a serial number (SN), and they are installed in a location. A GPU can be installed in a location, then removed from that location following a failure, and then re-installed in a different location after fixing the problem. If the failure can't be recovered, the GPU might be removed entirely from Titan. There are two prominent types of failures that resulted in the removal of GPUs from Titan: Double Bit Error (DBE) and Out of the Bus (OTB). The dataset (gc_full.csv) has seven attributes, we provided a short description of these attributes in the ReadMe file. To learn more about this dataset, please refer to the git repository https://github.com/olcf/TitanGPULife and the related publication (https://ieeexplore.ieee.org/abstract/document/9355319).

42 ENGINEERING↗

Manned orbital systems concept study. Book 4: Programmatics for extended-duration missions

The cost estimates, schedule data, and funding distributions generated in the Manned Orbital Systems Concepts (MOSC) study are presented. The overall objectives were to examine the requirements for, and to describe, a cost-effective concept for an orbital facility capable of supporting manned operations in earth orbit beyond the 7-to-30-day mission duration provided by the Shuttle/Spacelab system. The cost, schedule, and other programmatic data were developed to provide information useful for their long-range planning activities. The major portion of the data documented and discussed consists of project- and system-level schedule and funding information and also project-, system-, and subsystem-level cost summaries.

Source record↗

Schedule-Organizer Computer Program

Schedule Organizer provides simple method for generating distribution lists. Contains readers' names for each task schedule defined by input files. Schedule Organizer (SO), Schedule Tracker (ST) (COSMIC program MSC-21526), and Schedule Report Generator (SRG) (COSMIC program MSC-21527) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

Collazo, Fernando F.↗