Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Dewatering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Solidification of spent ion exchange resins into the SIAL matrix at the Dukovany NPP, Czech Republic

Based on the decision of the State Office for Nuclear Safety, the Dukovany NPP has been obliged to secure the efficient capacities for the disposal of spent ion exchange resins. Therefore, in September 2010, based on the contract with supplier company AMEC Nuclear Slovakia s.r.o. has begun with pumping and treatment of ion exchange resins from the storage tank 0TW30B02, situated in the auxiliary building. The SIAL{sup R} technology, developed in AMEC Nuclear Slovakia, has been used for the solidification purposes. This technology allows an on-site treatment of various special radioactive waste streams (resins, sludge, sludge/resins and borates) at the room temperature. The SIAL{sup R} matrix and technology were licensed by the Czech State Office for Nuclear Safety in 2007. On-site treatment and solidification of spent ion exchange resins at Dukovany NPP involves process of resin removal from tank using remotely operated manipulator, resin transportation, resin separation from free water, resin filling into 200 dm{sup 3} drums and solidification into SIAL{sup R} matrix in 200 dm{sup 3} drums using the FIZA S 200 facility. The final product is observed for compressive strength, leachability, radionuclide composition, dose rate, solids and total weight. After meeting the requirements for final disposal and consolidation, the drums are being transported for the final disposal to the Repository at Dukovany site. During the 3 month's trial operation in 2010, and the normal operation in 2011 and 2012, 189 tons of dewatered resins have been treated into 1960 drums, with total activity higher than 920 GBq. At the end of trial run (2010), 22 tons of dewatered resins were treated into 235 drums. During standard operation approximately 91 tons in 960 drums (2011) and 76 tons in 765 drums (2012) were treated. The weights of resins in the drum ware in the range from 89 - 106 kg and compressive strength limit (10 MPa) has already been achieved 24 hours after fixation. The final measured strength values ranged from 19.0 - 34.7 MPa and real leachability values ranged from 0.03 - 0.65%, far below the 4% limit value. Collective effective dose of all workers in 2012 was 7.7 mSv (12.6 mSv in 2011, 6.2 mSv in 2010). Average individual effective dose in 2012 was 0.55 mSv (14 workers), and maximal individual effective dose was 2.25 mSv. This approach allows fast, safe and cost effective immobilization and transformation of dangerous radioactive waste such as sludge and resins into the solid form, which is suitable for long term storage or disposal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Confined-unconfined changes above longwall coal mining due to increases in fracture porosity

Subsidence and strata movement above longwall (total extraction) coal mines produce complex hydrologic responses that can occur independently of drainage to the mine. One response is dewatering from confined to unconfined conditions in bedrock aquifers as a result of loss of water into new void space created by fracture and bedding separations. This dewatering process has been little studied but accounts for several hydraulic and geochemical effects of longwall mining. This article presents a conceptual model of the process and reviews evidence from case studies. Confined bedrock aquifers in subsiding zones exhibit dramatically steep head drops because of the low value of confined storage coefficients relative to the volume of water drained into the new fracture void space. The aquifer changes rapidly to an unconfined condition. Tight units to which air entry is restricted may even develop negative water pressures. In the unconfined state, sulfide minerals present in the strata readily oxidize to soluble hydrated sulfates. When the aquifer re-saturates, these salts are rapidly mobilized and produce a flush of increased sulfate and total dissolved solids (TDS) levels. Observations made in our previous studies in Illinois are consistent with the confined-unconfined model and include rapid head drops, changes to unconfined conditions, and increases in sulfate and TDS during re-saturation of a sandstone aquifer. Studies reported from the Appalachian coalfield show aspects consistent with the model, but in this high-relief fractured setting it is often difficult to distinguish aquifers from aquitards, confined from unconfined states, and the fracture-porosity cause of head drops from several others that occur during mine subsidence.

01 COAL, LIGNITE, AND PEAT↗

Water Usage for In-Situ Oil Shale Retorting – A Systems Dynamics Model

A system dynamic model was construction to evaluate the water balance for in-situ oil shale conversion. The model is based on a systems dynamics approach and uses the Powersim Studio 9™ software package. Three phases of an insitu retort were consider; a construction phase primarily accounts for water needed for drilling and water produced during dewatering, an operation phase includes the production of water from the retorting process, and a remediation phase water to remove heat and solutes from the subsurface as well as return the ground surface to its natural state. Throughout these three phases, the water is consumed and produced. Consumption is account for through the drill process, dust control, returning the ground water to its initial level and make up water losses during the remedial flushing of the retort zone. Production of water is through the dewatering of the retort zone, and during chemical pyrolysis reaction of the kerogen conversion. The major water consumption was during the remediation of the insitu retorting zone.

02 PETROLEUM↗

Documentation of INL’s In Situ Oil Shale Retorting Water Usage System Dynamics Model

A system dynamic model was construction to evaluate the water balance for in-situ oil shale conversion. The model is based on a systems dynamics approach and uses the Powersim Studio 9™ software package. Three phases of an in situ retort were consider; a construction phase primarily accounts for water needed for drilling and water produced during dewatering, an operation phase includes the production of water from the retorting process, and a remediation phase water to remove heat and solutes from the subsurface as well as return the ground surface to its natural state. Throughout these three phases, the water is consumed and produced. Consumption is account for through the drill process, dust control, returning the ground water to its initial level and make up water losses during the remedial flushing of the retort zone. Production of water is through the dewatering of the retort zone, and during chemical pyrolysis reaction of the kerogen conversion. The document discusses each of the three phases used in the model.

02 PETROLEUM↗

Thermophysical properties of reconsolidating crushed salt.

Reconsolidated crushed salt is being considered as a backfilling material placed upon nuclear waste within a salt repository environment. In-depth knowledge of thermal and mechanical properties of the crushed salt as it reconsolidates is critical to thermal/mechanical modeling of the reconsolidation process. An experimental study was completed to quantitatively evaluate the thermal conductivity of reconsolidated crushed salt as a function of porosity and temperature. The crushed salt for this study came from the Waste Isolation Pilot Plant (WIPP). In this work the thermal conductivity of crushed salt with porosity ranging from 1% to 40% was determined from room temperature up to 300°C, using two different experimental methods. Thermal properties (including thermal conductivity, thermal diffusivity and specific heat) of single-crystal salt were determined for the same temperature range. The salt was observed to dewater during heating; weight loss from the dewatering was quantified. The thermal conductivity of reconsolidated crushed salt decreases with increasing porosity; conversely, thermal conductivity increases as the salt consolidates. The thermal conductivity of reconsolidated crushed salt for a given porosity decreases with increasing temperature. A simple mixture theory model is presented to predict and compare to the data developed in this study.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy Technologies Research and Education Initiative

For this project, the intended goal of the microgrid component was to investigate issues in policy and technology that would drive higher penetration of renewable energy, and to demonstrate implementation in a utility system. The work accomplished on modeling the dynamics of photovoltaic (PV) penetration can be expanded for practical application. Using such a tool those involved in public policy can examine what the effect of a particular policy initiative, e.g., renewable portfolio standards (RPS) requirements, might be in terms of the desired targets. The work in the area of microgrid design, protection, and operation is fundamental to the development of microgrids. In particular the “Energy Delivery” paradigm provides new opportunities and business models for utilities. Ultimately, Energy Delivery could accrue significant benefits in terms of costs and resiliency. The experimental microgrid will support continued research and allow the demonstration of technology for better integration of renewables. The algal biofuels component of the project was developed to enhance the test facility and to investigate the technical and economic feasibility of a commercial-scale geothermal algal biofuels operation for replication elsewhere in the arid Southwest. The project was housed at New Mexico State University’s (NMSU’s) Geothermal Aquaculture Facility (GAF) and a design for the inoculation train and algae grow-out process was developed. The facility was upgraded with modifications to existing electrical, plumbing and structural components on the GAF and surrounding grounds. The research work was conducted on biomass-processing, harvesting, dewatering, and extraction. Additionally, research was conducted to determine viability of using low-cost, wastewater from municipal treatment plants in the cultivation units as make-up water and as a source of nutrients, including nitrogen and soluble phosphorus. Data was collected on inputs and outputs, growth evaluation and chemical composition of algal biomass feedstock. Also, research was completed on evaluating inoculation train, algae grow-out units, indoor cultivation units and the algal biomass dewatering units to identify opportunities for recapturing waste energy, water and biomass in the individual units or any combination of these units. A preliminary economic analysis was conducted.

09 BIOMASS FUELS↗

Actual Waste Demonstration of the Nitric-Glycolic Flowsheet for Sludge Batch 9 Qualification

For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savannah River National Laboratory (SRNL) performs qualification testing to demonstrate that the sludge batch is processable. Testing performed by the Savannah River National Laboratory has shown glycolic acid to be effective in replacing the function of formic acid in the DWPF chemical process. The nitric-glycolic flowsheet reduces mercury, significantly lowers the catalytic generation of hydrogen and ammonia which could allow purge reduction in the Sludge Receipt and Adjustment Tank (SRAT), stabilizes the pH and chemistry in the SRAT and the Slurry Mix Evaporator (SME), allows for effective rheology adjustment, and is favorable with respect to melter flammability. In order to implement the new flowsheet, SRAT and SME cycles, designated SC-18, were performed using a Sludge Batch (SB) 9 slurry blended from SB8 Tank 40H and Tank 51H samples. The SRAT cycle involved adding nitric and glycolic acids to the sludge, refluxing to steam strip mercury, and dewatering to a targeted solids concentration. Data collected during the SRAT cycle included offgas analyses, process temperatures, heat transfer, and pH measurements. The SME cycle demonstrated the addition of glass frit and the replication of six canister decontamination additions. The demonstration concluded with dewatering to a targeted solids concentration. Data collected during the SME cycle included offgas analyses, process temperatures, heat transfer, and pH measurements. Slurry and condensate samples were collected for subsequent analysis

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Intensified Flue Gas Desulfurization Water Treatment for Reuse, Solidification, and Discharge

The goal of this final project report is to summarize the work conducted on project DE-FE0031555. In accordance with the Statement of Project Objectives (SOPO), the University of Kentucky Center for Applied Energy Research (UK CAER) (Recipient) developed a hybrid electrochemical-membrane technology for treating wet flue gas desulfurization (WFGD) blowdown from coal-fired power generation plants that (1) removes government-regulated species and total suspended solids (TSS) via electrocoagulation with solid/liquid separation to avoid further treatments by a biological method specifically for selenium, and (2) reduces total dissolved solids (TDS) in a nanofiltration unit to promote water recycle and reduce freshwater intake. Additional technological configurations were pursued, including (1) nanofiltration combined with zeolite dewatering for a near-zero liquid discharge (ZLD) scenario, and (2) polishing discharge from zeolite dewatering using capacitive deionization (CDI) with 90+% salt rejection to produce water with less than 100ppm TDS for more beneficial use. Project results verified that UK CAER’s hybrid approach addressed the complexities of WFGD blowdown with simplified unit operation at relatively low capital investment by demonstrating: (1) an effective in-situ generated solid sorbent material, green-rust (GR), that specifically removes regulated dissolved species in WFGD blowdown, including selenium, arsenic, and nitrates; (2) a low-cost, high flux nanofiltration treatment that removes both monovalent and divalent species at >80% rejection to adequately provide water recycle and extend the life of FGD equipment by mitigating chloride aided pitting corrosion mechanisms; and (3) a solidification and stabilization process using pozzolanic agents that retain regulated species and satisfy the Resource Conservation and Recovery Act (RCRA) leachate requirements. UK CAER proved electrocoagulation with GR to be an intensified solution for effluent limit guidelines (ELG), and based on preliminary techno-economic analysis (TEA), in comparison to DOE’s Case 1 for Biological Wastewater Treatment that had a purchased equipment cost (PEC) of $\$$5.26 million and a Total plant cost (TPC) of $\$$30.0 million, the EC process had a PEC of $\$$2.67 million and the TPC of $\$$17.0 million. While the electricity consumption for Case 1 was 53 kW, it was 110 kW for the EC process due to dissolving iron for a three-stage reaction design. However, electricity consumption for the EC process could be significantly reduced by adopting a counter-current reactor design for at least a 6-stage chemical reaction operation.

01 COAL, LIGNITE, AND PEAT↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Novel Algae Technology for CO2 Utilization

The United States, the world’s largest energy user and second largest CO2 emitter, is heavily dependent on fossil energy. In 2014, U.S. coal burning utilities emitted ~1562 million (MM) tons/year (TPY) of CO2 into the atmosphere, accounting for 76% of the total US power sector emissions1. Hence, reducing the CO2 emission footprint from coal plants is widely viewed as a key element in mitigating global warming. Despite significant interest, implementation of CO2 capture technologies has been constrained by the high capture cost which significantly increases the total cost of electricity. Not only is capturing CO2 with traditional technologies expensive, but generally the CO2 has little value and additional expense must be incurred for sequestration. This project funded by a SBIR grant from the U.S. D.O.E. to Helios-NRG in collaboration with the State University of New York at Buffalo (UB) and Membrane Technology and Research Inc. (MTR) aimed to develop a novel, algae based technology to capture CO2 from the effluent of coal-based power plants and convert it to renewable bio-fuels and higher value co-products such as animal feed and nutraceuticals with the potential to enable a substantial reduction in the net cost of carbon capture. The Phase 2 project was aimed at further demonstrating the technical feasibility of the proposed multi-stage continuous (MSC) flow CO2 capture system and the generation of high-value co-products to offset the CO2 capture cost. The project was completed and the project objectives were met and exceeded. A first-of-a-kind integrated, laboratory scale MSC process unit was fabricated and tested in a greenhouse. The tests were conducted with the preferred algae species identified in Phase I and simulated flue gas containing contaminants at levels typically present in the post flue gas desulfurization (FGD) stream, including ~12% CO2, acid gas (SOX, NOX), and a large number of heavy metals. The tests were successful and demonstrated a 25g/m2/day seasonal average algae productivity and an 80% CO2 capture efficiency. Two new algae species were identified for high-value nutraceutical production. Studies to improve growth rate and nutraceutical content of these algae species were performed and a pathway for further improvements was identified. A new dewatering technology called DeAqua was further advanced. Significant improvement in the performance index was achieved. The anti-fouling membrane was developed and fabricated into a module. The fabricated membrane module was tested with algae slurry and demonstrated improved fouling resistant properties, that can potentially reduce the cost and energy of the critical dewatering step. Test data were used to simulate operation of the overall process. The preliminary economic analysis was updated and modelled based on a 5000-acre algae farm. To the extent possible, the financial and operating assumptions used were the same as those used in the DOE’s 2022 projections for algae technology for CO2 capture and utilization. The results showed the proposed technology’s potential to significantly reduce the cost of CO2 capture compared to current options and that the high value products generated from the CO2 captured can make a step change in the cost of carbon capture. Plans to advance the technology to Phase 2B were developed and potential end-user partners were identified.

Maloney, James↗

Management of the Three Mile Island, Unit 2, Accident Corium and Severely Damaged Fuel Debris

The Three Mile Island, Unit Two (TMI-2) pressurized water reactor core melted down in 1979 due to an untimely combination of maintenance problems that led to a loss of feedwater, followed by a series of operational misunderstandings and errors. The melted core recovery process required development of a wide array of tools. After approximately three years of water management and other cleanup actions, the first views of the core revealed a much higher degree of damage than previously expected. Approximately 62 metric tons of the core had melted, leaving only 42 of the 177 fuel assemblies standing with a majority of rods intact. The core to be recovered was composed of loose debris and a solidified mass of formerly molten fuel. Robotic tools that had been designed for the task were of limited effectiveness due to the range of material types and phases. Over a period of several years, the central melt was broken up, primarily by use of a core-boring drill originally designed to acquire samples through the depth of the debris field. The broken pieces were loaded into specially designed debris canisters by use of long-handled pick-and-place tools and suctioned into baffled knockout canisters using an airlift vacuum system. A remotely operable underwater plasma arc torch was developed for removal of the lower core support structure to be able to retrieve the fuel pieces and secondary melt that had accumulated on the bottom reactor vessel head. Canister design played a central role in defining the initial retrieval process and later affected transportation, interim wet and its current interim dry storage. Due to concerns about the potential for radiolysis of residual water in the debris and other canister material, the canisters were fitted with hydrogen recombiner catalyst units to prevent a buildup of flammable gas and potential pressurization. To confirm the effectiveness of the recombiners during shipping, eight dewatered canisters were kept sealed for up to 205 days with periodic sampling of the headspace gas. The highest hydrogen value (9 vol%) was observed in a canister held for 147 days while the longest stored canister resulted in a 5% hydrogen concentration. The oxygen concentration never exceeded 0.5 %, and the primary backfill was >80% argon, meaning there was no flammability risk. Radiolytic hydrogen was also observed in wet pool storage, where the vented canisters discharged a portion of the water backfill as a result of gas production. The 344 canisters (268 fuel debris, 62 filter, and 12 knockout type) were dewatered, loaded in groups of seven into a double barrier shipping cask, and transported to the U.S. Department of Energy site in Idaho for 10 years of pool storage.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SLUDGE BATCH 5 SIMULANT FLOWSHEET STUDIES

The Defense Waste Processing Facility (DWPF) will transition from Sludge Batch 4 (SB4) processing to Sludge Batch 5 (SB5) processing in early fiscal year 2009. Tests were conducted using non-radioactive simulants of the expected SB5 composition to determine the impact of varying the acid stoichiometry during the Sludge Receipt and Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME) processes. The work was conducted to meet the Technical Task Request (TTR) HLW/DWPF/TTR-2007-0007, Rev. 1 and followed the guidelines of a Task Technical and Quality Assurance Plan (TT&QAP). The flowsheet studies are performed to evaluate the potential chemical processing issues, hydrogen generation rates, and process slurry rheological properties as a function of acid stoichiometry. Initial SB5 flowsheet studies were conducted to guide decisions during the sludge batch preparation process. These studies were conducted with the estimated SB5 composition at the time of the study. The composition has changed slightly since these studies were completed due to changes in the washing plan to prepare SB5 and the estimated SB4 heel mass. Nine DWPF process simulations were completed in 4-L laboratory-scale equipment using both a batch simulant (Tank 51 simulant after washing is complete) and a blend simulant (Tank 40 simulant after Tank 51 transfer is complete). Each simulant had a set of four SRAT and SME simulations at varying acid stoichiometry levels (115%, 130%, 145% and 160%). One additional run was made using blend simulant at 130% acid that included additions of the Actinide Removal Process (ARP) waste prior to acid addition and the Modular Caustic Side Solvent Extraction (CSSX) Unit (MCU) waste following SRAT dewatering. There are several parameters that are noteworthy concerning SB5 sludge: (1) This is the first batch DWPF will be processing that contains sludge that has had a significant fraction of aluminum removed through aluminum dissolution. (2) The sludge is high in mercury. (3) The sludge is high in noble metals. (4) The sludge is high in U and Pu--components that are not added in sludge simulants. Two SB5 processing issues were noted during testing. First, high hydrogen generation rates were measured during experiments with both the blend and batch simulant at high acid stoichiometry. Also, the reflux time was extended due to the high mercury concentration in both the batch and blend simulant. Adding ARP will extend processing times in DWPF. The ARP caustic boil took approximately six hours. The boiling time during the experiment with added MCU was 14 hours at the maximum DWPF steam flux rate. This is comparable to the DWPF processing time for dewatering plus reflux without MCU at a 5000 lbs/hr boil-up rate, but would require significantly more time at boiling at 2000-2500 lbs/hr boil-up rate. The addition of ARP and MCU did not cause any other processing issues, since foaming, rheology and hydrogen generation were less of an issue while processing with ARP/MCU.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Salmon Spawning Below Bonneville Dam Annual Report October 2006 - September 2007.

From 1999 through 2007, the Fish and Wildlife Program of the Bonneville Power Administration funded a project to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning areas, and the flows necessary to ensure their long-term survival. Data were collected to ensure that established flow guidelines are appropriate and provide adequate protection for the species of concern. The projects objectives are consistent with the high priority placed by the Northwest Power and Conservation Council Independent Scientific Advisory Board and the salmon managers on determining the importance of mainstem habitats to the production of salmon in the Columbia River Basin. Because of the influence of mainstem habitat on salmon production, there is a continued need to better understand the physical habitat variables used by mainstem fall Chinook and chum salmon populations and the effects of hydropower project operations on spawning and incubation. During FY 2007, Pacific Northwest National Laboratory focused on (1) locating and mapping deep-water fall Chinook salmon and chum salmon spawning areas, (2) investigating the interaction between groundwater and surface water near fall Chinook and chum salmon spawning areas, and (3) providing in-season hyporheic temperature and water surface elevation data to assist state agencies with emergence timing and redd dewatering estimates. This report documents the studies and tasks performed by PNNL during FY 2007. Chapter 1 provides a description of the searches conducted for deepwater redds-adjacent to Pierce and Ives islands for fall Chinook salmon and near the Interstate 205 bridge for chum salmon. The chapter also provides data on redd location, information about habitat associations, and estimates of total spawning populations. Chapter 2 documents the collection of data on riverbed and river temperatures and water surface elevations, from the onset of spawning to the end of emergence, and the provision of those data in-season to fisheries management agencies to assist with emergence timing estimates and evaluations of redd dewatering.

13 HYDRO ENERGY↗

Preliminary Economics for the Production of Pyrolysis Oil from Lignin in a Cellulosic Ethanol Biorefinery

Cellulosic ethanol biorefinery economics can be potentially improved by converting by-product lignin into high valued products. Cellulosic biomass is composed mainly of cellulose, hemicellulose and lignin. In a cellulosic ethanol biorefinery, cellulose and hemicellullose are converted to ethanol via fermentation. The raw lignin portion is the partially dewatered stream that is separated from the product ethanol and contains lignin, unconverted feed and other by-products. It can be burned as fuel for the plant or can be diverted into higher-value products. One such higher-valued product is pyrolysis oil, a fuel that can be further upgraded into motor gasoline fuels. While pyrolysis of pure lignin is not a good source of pyrolysis liquids, raw lignin containing unconverted feed and by-products may have potential as a feedstock. This report considers only the production of the pyrolysis oil and does not estimate the cost of upgrading that oil into synthetic crude oil or finished gasoline and diesel. A techno-economic analysis for the production of pyrolysis oil from raw lignin was conducted. comparing two cellulosic ethanol fermentation based biorefineries. The base case is the NREL 2002 cellulosic ethanol design report case where 2000 MTPD of corn stover is fermented to ethanol (NREL 2002). In the base case, lignin is separated from the ethanol product, dewatered, and burned to produce steam and power. The alternate case considered in this report dries the lignin, and then uses fast pyrolysis to generate a bio-oil product. Steam and power are generated in this alternate case by burning some of the corn stover feed, rather than fermenting it. This reduces the annual ethanol production rate from 69 to 54 million gallons/year. Assuming a pyrolysis oil value similar to Btu-adjusted residual oil, the estimated ethanol selling price ranges from $1.40 to $1.48 (2007 $) depending upon the yield of pyrolysis oil. This is considerably above the target minimum ethanol selling price of $1.33 for the 2012 goal case process as reported in the 2007 State of Technology Model (NREL 2008). Hence, pyrolysis oil does not appear to be an economically attractive product in this scenario. Further research regarding fast pyrolysis of raw lignin from a cellulosic plant as an end product is not recommended. Other processes, such as high-pressure liquefaction or wet gasification, and higher value products, such as gasoline and diesel from fast pyrolysis oil should be considered in future studies.

02 PETROLEUM↗

Cross-flow separation characteristics and piloting of graphene oxide nanofiltration membrane sheets and tubes for kraft black liquor concentration

Dewatering of weak black liquor (WBL) in the kraft cycle by evaporation is highly energy intensive. Membranes are an attractive alternative for energy-efficient dewatering, but existing commercial polymeric or ceramic membranes are either degraded in BL or have high capital costs. Our recent works have demonstrated the engineering of graphene oxide (GO) nanofiltration membranes, their stability and promising performance in BL conditions, and preliminary scale-up into sheets and tubes. Here, we describe in detail the separation characteristics of GO membrane sheets and tubes under real BL conditions and crossflow operation. Recycle-mode piloting of a GO tubular membrane showed average “production flux” of 16 L/m2/h (LMH) and high rejections of lignin (98.3%), total solids (66%), and total organic carbon (83%), with no signs of irreversible fouling identified. A corresponding GO sheet membrane produced an average flux of ~25 LMH and maintained high lignin rejection of ~97% during a slipstream pilot at a kraft mill site using WBL with ~16 wt% total solids (TS). Finally, we piloted a Dow/DuPont XUS1808 polyamide composite reverse osmosis (RO) membrane for last-mile processing of the GO nanofiltration membrane permeate. The RO membrane showed a steady state flux of 19 LMH at 65 bar and produced ~0.02 wt% TS water product, which is highly suitable for reuse in pulp washing operations in the kraft process. The results have strong positive implications for the industrial application of GO membranes in BL concentration and other related applications.

Materials Science↗

Microencapsulated Bioactive Agents and Method of Making

The invention is directed to microcapsules encapsulating an aqueous solution of a protein, drug or other bioactive substance inside a semi-permeable membrane. The microcapsules are formed by interfacial coacervation where shear forces are limited to 0-100 dynes per square centimeter. The resulting uniform microcapsules can then be subjected to dewatering in order to cause the internal solution to become supersaturated with the dissolved substance. This dewatering allows controlled nucleation and crystallization of the dissolved substance. The crystal-filled microcapsules can be stored, keeping the encapsulated crystals in good condition for further direct use in x-ray crystallography or as injectable formulations of the dissolved drug, protein or other bioactive substance.

Dennis R Morrison↗

Preliminary Feasibility Testing of the BRIC Brine Water Recovery Concept

The Brine Residual In-Containment (BRIC) concept was developed as a new technology to recover water from spacecraft wastewater brines. Such capability is considered critical to closing the water loop and achieving a sustained human presence in space. The intention of the BRIC concept is to increase the robustness and efficiency of the dewatering process by performing drying inside the container used for the final disposal of the residual brine solid. Recent efforts in the development of BRIC have focused on preliminary feasibility testing using a laboratory- assembled pre-prototype unit. Observations of the drying behavior of actual brine solutions processed under BRIC-like conditions has been of particular interest. To date, experiments conducted with three types of analogue spacecraft wastewater brines have confirmed the basic premise behind the proposed application of in-place drying for these solutions. Specifically, the dried residual mass from these solutions have tended to exhibit characteristics of adhesion and flow that are expected to continue to challenge process stream management in spacecraft brine dewatering system designs. Yet, these same characteristics may favor the development of capillary- and surface-tension-based approaches envisioned as part of an ultimate microgravity-compatible BRIC design. In addition, preliminary feasibility testing of the BRIC pre-prototype confirmed that high rates of water recovery, up to 98% of the available brine water, may be possible while still removing the majority of the brine contaminants from the influent brine stream. These and other observations from testing are reported.

Callahan, Michael R.↗

Ethanol extraction of phytosterols from corn fiber

The present invention provides a process for extracting sterols from a high solids, thermochemically hydrolyzed corn fiber using ethanol as the extractant. The process includes obtaining a corn fiber slurry having a moisture content from about 20 weight percent to about 50 weight percent solids (high solids content), thermochemically processing the corn fiber slurry having high solids content of 20 to 50% to produce a hydrolyzed corn fiber slurry, dewatering the hydrolyzed corn fiber slurry to achieve a residual corn fiber having a moisture content from about 30 to 80 weight percent solids, washing the residual corn fiber, dewatering the washed, hydrolyzed corn fiber slurry to achieve a residual corn fiber having a moisture content from about 30 to 80 weight percent solids, and extracting the residual corn fiber with ethanol and separating at least one sterol.

Abbas, Charles↗