Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Deployable”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Deployment Technology of a Heliogyro Solar Sail for Long Duration Propulsion

Interplanetary, multi-mission, station-keeping capabilities will require that a spacecraft employ a highly efficient propulsion-navigation system. The majority of space propulsion systems are fuel-based and require the vehicle to carry and consume fuel as part of the mission. Once the fuel is consumed, the mission is set, thereby limiting the potential capability. Alternatively, a method that derives its acceleration and direction from solar photon pressure using a solar sail would eliminate the requirement of onboard fuel to meet mission objectives. MacNeal theorized that the heliogyro-configured solar sail architecture would be lighter, less complex, cheaper, and less risky to deploy a large sail area versus a masted sail. As sail size increases, the masted sail requires longer booms resulting in increased mass, and chaotic uncontrollable deployment. With a heliogyro, the sail membrane is stowed as a roll of thin film forming a blade when deployed that can extend up to kilometers. Thus, a benefit of using a heliogyro-configured solar sail propulsion technology is the mission scalability as compared to masted versions, which are size constrained. Studies have shown that interplanetary travel is achievable by the heliogyro solar sail concept. Heliogyro solar sail concept also enables multi-mission missions such as sample returns, and supply transportation from Earth to Mars as well as station-keeping missions to provide enhanced warning of solar storm. This paper describes deployment technology being developed at NASA Langley Research Center to deploy and control the center-of-mass/center-of-pressure using a twin bladed heliogyro solar sail 6-unit (6U) CubeSat. The 6U comprises 2x2U blade deployers and 2U for payload. The 2U blade deployers can be mounted to 6U or larger scaled systems to serve as a non-chemical in-space propulsion system. A single solar sail blade length is estimated to be 2.4 km with a total area from two blades of 720 m2; total allowable weight of a 6U CubeSat is approximately 8 kg. This makes the theoretical characteristic acceleration of approximately 0.75 mm/s2 at I AU (astronomical unit), when compared to IKAROS (0.005 mm/s2) and NanoSail-D (0.02 mm/s2).

Peerawan, Wiwattananon↗

The Adaptable, Deployable, Entry and Placement Technology (ADEPT) Enabling Advanced Entry, Descent, and Landing Capabilities for SmallSat Missions

The Adaptable, Deployable Entry and Placement Technology (ADEPT) is a mechanically deployable low-ballistic coefficient aeroshell entry system which performs entry, descent, and landing (EDL) functions for a broad range of planetary destinations including Mars, Venus, Titan and Earth. The deployable system allows mission planners to develop an aeroshell design that is stowed like a folded umbrella, and yet prior to the EDL mission segment, transforms into a deployed, near-rigid low ballistic coefficient configuration. The ADEPT architecture is scalable from a sub-1m class to 6m diameter entry vehicles for Venus and and it has been studied at up to 15m – 20m scale for human exploration class missions. There has been growing interest in performing interplanetary missions with small spacecraft as secondary payloads and ADEPT offers small satellite mission designers the ability to consider Aeroassist technologies to expand mission applications. The ADEPT architecture introduces a new approach for entry vehicle design. It deploys a flexible 3D woven carbon fabric as the primary drag surface. It is capable of surviving high aerothermal heating during entry, while maintaining a robust impermeable membrane that provides high drag for vehicle deceleration. The ADEPT project team has advanced this decelerator technology via systems-level testing at the one meter diameter (nano-ADEPT) scale. A subsonic aeroloads test (May 2015) and a pathfinder arc-jet aeroheating test (Sept 2015) and a successful sounding rocket flight (SR-1) launch of a 0.7 meter deployed diameter ADEPT (September 2018). The SR-1 flight experiment demonstrated most of the primary end-to-end mission stages including: launch in a stowed configuration, separation and deployment in zero-g, exo-atmospheric conditions, and passive ballistic re-entry of a 70 degree half-angle cone geometry. The ADEPT SR-1 sounding rocket flight experiment had to address challenges such as stowing within the constrained payload envelope, fabric folding, and packaging concerns.

Paul Wercinski↗

Characterizing the Aging of Alphasense NO2 Sensors in Long-term Field Deployments

Low-cost NO2 sensors have been widely deployed for atmospheric sampling. While their initial performance has been characterized, few studies have examined their long-term degradation. This study focused on the performance of Alphasense low-cost NO2 sensors (NO2-B42F and NO2-B43F) over 4 years (2016–2020). A total of 29 NO2 sensors from 10 batches were collocated 78 times at two sites with reference instruments. Raw signals from “functional” NO2 sensors correlated linearly with reference NO2 concentrations. After long-term deployment, sensor raw signals started to deviate from reference NO2 concentrations due to sensor aging, an accumulated effect after sensor unpacking. Several sensors eventually became “non-functional” as sensor raw signals showed no correlation with reference NO2 concentrations. Sensor aging and non-functionality may be primarily caused by expiration of the ozone (O3) scrubber built into these sensors so that sensors responded to both ambient NO2 and O3. The influence of O3 on sensor response is quantified through the permutation importance method. Most of the sensors are non-functional after approximately 200–400 days of deployment, and no sensor was functional after 400 days of deployment. This result agrees well with the estimated lifetime of the built-in ozone scrubbers considering the ambient ozone concentration in the Pittsburgh area where these sensors were deployed. To ensure reliable data quality in long-term field deployments, we recommend collocating NO2 sensors with reference instruments regularly after 200–400 days of deployment to identify and replace non-functional sensors in a timely manner.

NO2sensors↗

A Concept for the Deployment of a Large Lunar Crater Radio Telescope Using Teams of Tethered Robots

Kilometer-scale craters on the far side of the Moon have unique potential as future locations for large radio telescopes, which can observe the universe at wavelengths and frequencies (> 10 m, < 30 MHz) not possible with conventional Earth or orbital-based approaches. Distinct advantages of building a Lunar Crater Radio Telescope (LCRT) on the far side include i) isolation from radio noise due to the Earth’s ionosphere, orbiting satellites, and the Sun, ii) days of uninterrupted dark/cold sky viewing during lunar night, and iii) terrain geometry naturally suited for constructing the largest mesh antenna structure in the Solar System. A key challenge to constructing LCRT on the Moon is related to the complexity of deploying a 1-km diameter antenna and hanging receiver within a lunar crater whose diameter, depth, and slope are 3-5 km, 1 km, and ~30 degrees respectively. In this paper, we first evaluate the trade space for deploying a large, complex structure within a crater, and then provide a more detailed concept evaluation of our favored approach, which employs coordinated teams of tethered rovers to extract and suspend a folded antenna from a lander at the base of a crater. NASA’s Jet Propulsion Laboratory in collaboration with California Institute of Technology (Caltech) have developed a novel robotic system for accessing extremely steep terrains; the Axel rover is a two-wheeled rugged terrain vehicle that is supported by an electro-mechanical tether that provides power, data, and tensile support from a top-side anchor location. Recently, a pair of Axel robots have been used in a DuAxel configuration that allows for four-wheel driving and repeated passive anchoring at different locations. The DuAxel system has unique advantages for deploying an LCRT antenna, including the ability to deploy from a lander near a crater, drive a distance to the crater rim to deploy an Axel, and later, retract the deployed Axel in order to sequentially lift up sections of the antenna. Our proposed concept involves delivering a packaged antenna and receiver to the bottom-center of a crater floor on a lander, then later sending a team of multiple DuAxel rovers to retrieve guide wires from the lander, which are pulled to the top of the crater. We explore this concept in detail and provide some initial quantitative analysis to demonstrate the feasibility of our system with respect to the spatial and mass properties of the antenna as juxtaposed to DuAxel capabilities. Finally, we outline next steps towards validating our concept on the way to a future lunar deployment opportunity.

Hallinan, Greg↗

A Survey of CubeSat Deployable Structures: The First Decade

In the past decade CubeSats have made their way into the spotlight. They have evolved from small, university educational opportunities, to industry and governments using them make new discoveries and monetize space. However, with the small, constrained CubeSat form factor; there is often a need to expand the CubeSat through deployable mechanisms once the satellite is in space. This paper is a survey of deployable structures and their actuating mechanisms for CubeSats. The goal of this paper is to provide the applications within which deployable structures have been used in the past for CubeSats, the mechanisms with regards to how they deploy, the lessons learned, and limitations of the various types of deployables. The inputs to this paper come from a relational database in development to track launched CubeSat missions with deployable structures. From this database we can find insightful trends. This paper specifically focuses on the first decade of CubeSat deployables, from 2000 to 2010.

Arya, Manan↗

Detection and Mitigation of Transient Instabilities in Deployable Booms

Deployable space structures offer versatile uses in many space applications, as they can create very large space structures from a single space launch. However, they usually present important dynamical challenges during the critical deployment phase. In this paper, we focus on the dynamical behavior of deployable booms and the important challenge of avoiding collisions between boom’s structural elements or with other parts of the spacecraft, that can potentially have serious consequences. We define this kind of collisions as “transient instabilities” in deployable booms. A new paradigm to tackle these issues is presented in this paper, using techniques from multi-agent/swarm literature like transient instability prevention methods that avoid inter-agent collisions. We have adapted these techniques to deployable booms to guarantee safe deployment of booms and avoid collisions. We also present computational simulations of boom deployment in order to validate our techniques and demonstrate its use for future space missions.

Balas, Mark↗

International Space Station Satellite Deployment: Jettison Policy and Best Practices for Satellite Payload Developers

The International Space Station (ISS) deploys dozens of small satellites into Low Earth Orbit (LEO) each year. This presentation and associated paper cover the ISS Jettison Policy requirements and review/approval process, as well as best practices for satellite Payload Developers who have satellites manifested for deployment from ISS. Specifically, topics will include ISS Jettison Policy requirements to limit generation of orbital debris, limit risk of collision with ISS, and limit risk of collision with ISS visiting vehicles. The paper will include details on the ISS Program jettison candidate analysis and approval process, timelines for data submittal to ISS Program, resources for small satellite developers, and design & analysis recommendations for small satellite developers to maximize their likelihood of successful deployment from ISS. New Station deploy capabilities and ways the ISS Program addresses and facilitates innovations in small satellite technology, including propulsion systems, deorbit devices, constellation development, and novel tech demos, will also be explored. The 2024 session topic that best fits this abstract is Orbital Debris, SSA & STM. The ISS Jettison Policy intends to quantify and control the risks of deploying and operating small satellites, not only to ensure the safety of the humans flying in space, but also to preserve the orbital environment for world space activities and enable the significant benefits brought by such utilization. The ISS Program is committed to working with smallsat providers to address their challenges and enable safe, accessible, innovative missions. The Policy has grown with the industry, with each deploy yielding hard-earned lessons learned that improve our process – not only for the next deploy campaign, but with applicability and adaptability for future applications in LEO and beyond.

Jettison Policy↗

Impact of the deployment schedule of fast breeding reactors in the frame of French act for nuclear materials and radioactive waste management

In the frame of the French Act of June 28, 2006 on 'a sustainable management of nuclear materials and radioactive waste' EDF R and D assesses various research scenarios of transition between the actual French fleet and a Generation IV fleet with a closed fuel cycle where plutonium is multi-recycled. The basic scenarios simulate a deployment of 60 GWe of Sodium-cooled Fast Reactors (SFRs) in two steps: one third from 2040 to 2050 and the rest from 2080 to 2100 (scenarios 2040). These research scenarios assume that SFR technology will be ready for industrial deployment in 2040. One of the many sensitivity analyses that EDF, as a nuclear power plant operator, must evaluate is the impact of a delay of SFR technology in terms of uranium consumptions, plutonium needs and fuel cycle utilities gauging. The sensitivity scenarios use the same assumptions as scenarios 2040 but they simulate a different transition phase: SFRs are deployed in one step between 2080 and 2110 (scenarios 2080). As the French Act states to conduct research on minor actinides (MA) management, we studied different options for 2040 and 2080 scenarios: no MA transmutation, americium transmutation in heterogeneous mode based on americium Bearing Blankets (AmBB) in SFRs and all MA transmutation in heterogeneous mode based on MA Bearing Blankets (MABB). Moreover, we studied multiple parameters that could impact the deployment of these reactors (SFR load factor, increase of the use of MOX in Light Water Reactors, increase of the cooling time in spent nuclear fuel storage...). Each scenario has been computed with the EDF R and D fuel cycle simulation code TIRELIRE-STRATEGIE and optimized to meet various fuel cycle constraints such as using the reprocessing facility with long period of constant capacity, keeping the temporary stored mass of plutonium and MA under imposed limits, recycling older assemblies first... These research scenarios show that the transition from the current PWR fleet to an equivalent fleet of Generation IV SFR can follow different courses. The design of SFR-V2B that we used in our studies needs a high inventory of plutonium resulting in tension on this resource. Several options can be used in order to loosen this tension: our results lead to favour the use of axial breeding blanket in SFR. Load factor of upcoming reactors has to be regarded with attention as it has a high impact on plutonium resource for a given production of electricity. The deployment of SFRs beginning in 2080 instead of 2040 following the scenarios we described creates higher tensions on reprocessing capacity, separated plutonium storage and spent fuel storage. In the frame of the French Act, we studied minor actinides transmutation. The flux of MA in all fuel cycle plants is really high, which will lead to decay heat, a and neutron emission related problems. In terms of reduction of MA inventories, the deployment of MA transmutation cycle must not delay the installation of SFRs. The plutonium production in MABB and AmBB does not allow reducing the use of axial breeding blankets. The impact of MA or Am transmutation over the high level waste disposal is more important if the SFRs are deployed later. Transmutation option (americium or all MA) does not have a significant impact on the number of canister produced nor on its long-term thermal properties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2021 Thermal Energy Storage Systems for Buildings Workshop: Priorities and Pathways to Widespread Deployment of Thermal Energy Storage in Buildings

The 2021 U.S. Department of Energy's (DOE) "Thermal Energy Storage Systems for Buildings Workshop: Priorities and Pathways to Widespread Deployment of Thermal Energy Storage in Buildings" was hosted virtually on May 11 and 12, 2021. This report provides an overview of the workshop proceedings. Organized by DOE's Building Technologies Office (BTO), the National Renewable Energy Laboratory, Lawrence Berkeley National Laboratory, and Oak Ridge National Laboratory, the workshop convened more than 600 stakeholders from around the world to discuss the need for advancing the deployment of thermal energy storage (TES) in buildings. This workshop was designed to build on BTO's webinar series and 2019 workshop. The goals of this workshop were to promote discussion on TES related to: 1. Market adoption and deployment barriers, 2. Key applications and value drivers, 3. System cost, performance, and market requirements, and 4. End-use specific needs. The workshop took place over two days and consisted of keynote presentations, moderated panels, breakout sessions, and open discussion forums. The keynote presentations introduced opportunities for building TES, barriers to widespread deployment, and future visions. Moderated panel discussions presented diverse perspectives, breakout sessions provided opportunities for more intimate conversations, and open discussions captured feedback from the entire workshop group. Over the course of the two days, attendees exchanged experiences and ideas surrounding multiple aspects of TES in buildings. The first section of this report provides background on the motivations behind advancing TES for residential and commercial buildings and elaborates on the workshop objectives. The second section details the workshop structure and participant demographics. The third section provides key findings of the discussions that took place during the breakout sessions. Finally, this report details recommendations and actions to increase the TES deployment. Several recommendations from workshop attendees are presented in Table ES-1. TES holds significant potential to help increase building efficiency, grid-interactivity, and energy resilience, as well as reduce associated carbon emissions. The outputs generated from this workshop will aid stakeholders in advancing TES in buildings through a deeper understanding of the opportunities and barriers surrounding widespread deployment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Equitable Demonstration and Deployment Roundtable Report

The National Renewable Energy Laboratory (NREL) hosted the Equitable Demonstration and Deployment Roundtable on August 25, 2021. The roundtable brought together experts in climate and energy justice, demonstration projects, and renewable energy deployment to explore issues that will lead to greater understanding of the barriers to equity at scale and the role that the U.S. Department of Energy (DOE) can play to reduce and mitigate them. A large percentage of the participants included experts in energy equity issues from national and local organizations across multiple sectors, both public and private. These individuals engaged with DOE and national laboratory researchers to identify community-based challenges and propose opportunities for DOE to address those challenges to energy demonstration and deployment. The roundtable examined equity considerations for two phases of the energy development process: demonstration and deployment. These two pathways were selected for discussion during the same workshop because they are inextricably linked within the energy ecosystem. Ensuring the deployment of safe, affordable, and reliable energy deployment is DOE's primary goal and energy demonstration projects are a key driver moving technologies from the laboratory to market to achieve this result.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

On Efficient Deployment of Wireless Sensors for Coverage and Connectivity in Constrained 3D Space

Sensor networks have been used in a rapidly increasing number of applications in many fields. This work generalizes a sensor deployment problem to place a minimum set of wireless sensors at candidate locations in constrained 3D space to k-cover a given set of target objects. By exhausting the combinations of discreteness/continuousness constraints on either sensor locations or target objects, we formulate four classes of sensor deployment problems in 3D space: deploy sensors at Discrete/Continuous Locations (D/CL) to cover Discrete/Continuous Targets (D/CT). We begin with the design of an approximate algorithm for DLDT and then reduce DLCT, CLDT, and CLCT to DLDT by discretizing continuous sensor locations or target objects into a set of divisions without sacrificing sensing precision. Furthermore, we consider a connected version of each problem where the deployed sensors must form a connected network, and design an approximation algorithm to minimize the number of deployed sensors with connectivity guarantee. For performance comparison, we design and implement an optimal solution and a genetic algorithm (GA)-based approach. Extensive simulation results show that the proposed deployment algorithms consistently outperform the GA-based heuristic and achieve a close-to-optimal performance in small-scale problem instances and a significantly superior overall performance than the theoretical upper bound.

47 OTHER INSTRUMENTATION↗

Design and Testing of the BionicWingSat in a Zero-g Flight Campaign - A 2U-CubeSat with Deployable, Biologically-Inspired Wings

In this paper, recent developments in the design, manufacturing, and testing of a novel deployable structure with several potential applications in space will be described. Through a cooperative effort of the German Aerospace Center (DLR) and the National Aeronautics and Space Administration (NASA), a biologically inspired structurally integrated membrane featuring distributed functional elements has been developed and tested in a 2U CubeSat called BionicWingSat. Such a membrane structure could be useful for several applications in which a relatively flat area is desirable such as solar sails, drag sails, or solar shades. For SmallSats and CubeSats, the design proposed also has the desirable property of being self-deploying without the need for powered deployment mechanisms. Building on previous work inspired by the wings of earwigs, the research presented in this paper includes structural design of self-deploying hinges, a survey of various advanced additive layer manufacturing (ALM) methods for making hinges, mechanical characterization of the hinges, and finite element analysis (FEA) of the hinges. In this work, the conflicting goals of maximizing deployed structural stiffness, maximizing deployed area, maximizing stowed packaging efficiency, and maximizing resistance to creep when stowed must be considered. The resulting design concept is a gossamer structure that cannot support its own weight in gravity. For this reason, a focus in this paper is on a parabolic flight test campaign in which 24 fully integrated wings on two BionicWingSats were tested in a microgravity environment. From this test campaign, several lessons were learned regarding the wing design and procedures for carrying out microgravity tests of this manner.

CubeSat↗

Design and Testing of the BionicWingSat in a Zero-g Flight Campaign - A 2U-CubeSat with Deployable, Biologically-Inspired Wings

In this paper, recent developments in the design, manufacturing, and testing of a novel deployable structure with several potential applications in space will be described. Through a cooperative effort of the German Aerospace Center (DLR) and the National Aeronautics and Space Administration (NASA), a biologically inspired structurally integrated membrane featuring distributed functional elements has been developed and tested in a 2U CubeSat called BionicWingSat. Such a membrane structure could be useful for several applications in which a relatively flat area is desirable such as solar sails, drag sails, or solar shades. For SmallSats and CubeSats, the design proposed also has the desirable property of being self-deploying without the need for powered deployment mechanisms. Building on previous work inspired by the wings of earwigs, the research presented in this paper includes structural design of self-deploying hinges, a survey of various advanced additive layer manufacturing (ALM) methods for making hinges, mechanical characterization of the hinges, and finite element analysis (FEA) of the hinges. In this work, the conflicting goals of maximizing deployed structural stiffness, maximizing deployed area, maximizing stowed packaging efficiency, and maximizing resistance to creep when stowed must be considered. The resulting design concept is a gossamer structure that cannot support its own weight in gravity. For this reason, a focus in this paper is on a parabolic flight test campaign in which 24 fully integrated wings on two BionicWingSats were tested in a microgravity environment. From this test campaign, several lessons were learned regarding the wing design and procedures for carrying out microgravity tests of this manner.

CubeSat↗

Exploring the effects of policy on stakeholder adoption and deployment of agrivoltaics: A case study of Massachusetts

Further deployment of agrivoltaics is likely to require a better understanding of how policies and agreements can shape the outcomes of solar siting on farmland. This study evaluates the Massachusetts agrivoltaics policy in terms of its implications on deployment and stakeholder experiences in adoption. We present findings from interviews with 26 state policymakers, Extension agents, representatives of non-governmental organizations, farm owners and operators, and solar developers. Our findings demonstrate how the policy has mixed effects on deployment processes and outcomes—in some instances, the policy enables deployment by formalizing cross-sector collaboration, increasing farm owner and operator participation in development, and facilitating novel business models. In other instances, the policy constrains deployment by prescribing operational requirements, creating liability risk, and developing dependency on empirical data to inform eligibility decisions. Interviewees explained how these mixed policy effects create both benefits and burdens for adopters, particularly farm owners and operators. These insights indicate the value of cross-sector collaboration during all phases of agrivoltaic policy implementation and project development; the importance of coordination across policy, research, and commercial activities; and the significant role of regulators and policy design in deployment. The evidence presented in this paper can inform decision making for emerging agrivoltaic policies and markets, both in the United States and internationally.

14 SOLAR ENERGY↗

Deployment of ITS: A Summary of the 2010 National Survey Results (Final report)

This report presents summary results of the 2010 ITS Deployment Tracking survey, the most recent survey conducted by the ITS Deployment Tracking Project. The U.S. Department of Transportation and its member agencies, including the Research and Innovative Technology Administration, have pursued a research and development agenda, the Intelligent Transportation System (ITS) Program, designed to integrate the latest in information technologies to improve the safety, mobility, and reliability of surface transportation modes. Within metropolitan areas, implementation of these advanced technologies has been accomplished by a variety of state and local transportation and emergency management agencies as well as the private sector. In order to measure the rate of ITS deployment within the nation's largest metropolitan areas, the ITS Deployment Tracking Project has conducted a nationwide survey of state and local transportation and emergency management agencies nearly every year since 1997. The results presented in this report are intended to be a summary of the entire database from the 2010 survey. Access to the complete survey results and previous national surveys are available on-line at http://www.itsdeployment.its.dot.gov. The website also provides access to survey results in the form of downloadable reports, including a survey summary for each survey type and fact sheets. Nearly 1,600 surveys were distributed to state and local transportation agencies in 2010. A total of seven (7) survey types were distributed including: Freeway Management, Arterial Management, Transit Management, Transportation Management Center (TMC), Electronic Toll Collection (ETC), Public Safety Law Enforcement, and Public Safety Fire/Rescue. Among other things, the data collection results indicate that ITS has moved from being experimental to mainstream and interest in continuing investments in ITS continues to be very strong. When asked about future deployment plans, one-third to three-fourths of the different agency types report they will expand current deployments and about half are planning to invest in new technologies over the next three years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Net Metering and Market Feedback Loops: Exploring the Impact of Retail Rate Design on Distributed PV Deployment

The substantial increase in deployment of customer-sited solar photovoltaics (PV) in the United States has been driven by a combination of steeply declining costs, financing innovations, and supportive policies. Among those supportive policies is net metering, which in most states effectively allows customers to receive compensation for distributed PV generation at the full retail electricity price. The current design of retail electricity rates and the presence of net metering have elicited concerns that the possible under-recovery of fixed utility costs from PV system owners may lead to a feedback loop of increasing retail prices that accelerate PV adoption and further rate increases. However, a separate and opposing feedback loop could offset this effect: increased PV deployment may lead to a shift in the timing of peak-period electricity prices that could reduce the bill savings received under net metering where time-varying retail electricity rates are used, thereby dampening further PV adoption. In this paper, we examine the impacts of these two competing feedback dynamics on U.S. distributed PV deployment through 2050 for both residential and commercial customers, across states. Our results indicate that, at the aggregate national level, the two feedback effects nearly offset one another and therefore produce a modest net effect, although their magnitude and direction vary by customer segment and by state. We also model aggregate PV deployment trends under various rate designs and net-metering rules, accounting for feedback dynamics. Our results demonstrate that future adoption of distributed PV is highly sensitive to retail rate structures. Whereas flat, time-invariant rates with net metering lead to higher aggregate national deployment levels than the current mix of rate structures (+5% in 2050), rate structures with higher monthly fixed customer charges or PV compensation at levels lower than the full retail rate can dramatically erode aggregate customer adoption of PV (from -14% to -61%, depending on the design). Moving towards time-varying rates, on the other hand, may accelerate near- and medium-term deployment (through 2030), but is found to slow adoption in the longer term (-22% in 2050).

14 SOLAR ENERGY↗

Feasibility and strategic implications of deploying nuclear power reactors in Africa

This report assesses the feasibility and strategic implications of deploying nuclear power reactors, including large-scale plants, advanced small modular reactors (SMRs), and microreactors, in African countries. Case studies focus on South Africa, Egypt, Kenya, Ghana, and Nigeria, examining nuclear energy’s role in Africa’s rapidly evolving energy landscape, marked by fast-growing demand, significant electricity access gaps, increasing renewable penetration, and strong policy commitments to industrialization and energy security. Several U.S. reactor technologies and designs are considered based on their development status and readiness for deployment. The analysis finds that nuclear power can provide reliable, clean baseload and flexible generation, as well as high-temperature process heat for desalination, hydrogen production, and industrial applications. However, suitability is highly country-specific, depending on grid size and stability, transmission capacity, cooling water availability, regulatory readiness, and fuel supply chains. Near-term deployment opportunities are strongest for light-water reactors (such as NuScale, BWRX-300, AP300, and SMR-300) that use low-enriched uranium and build on proven technology. More advanced concepts, including gas-cooled, sodium-cooled, molten-salt cooled reactors, and microreactors, will likely be relevant for African deployment in the 2030s or later, contingent on demonstration projects, high-assay low-enriched uranium (HALEU) fuel availability, and mature international licensing frameworks. Economic analysis shows that SMRs are capital-intensive, with projected overnight costs for 300 MWe units in 2025 ranging from approximately 1.4 to 2.6 billion USD per module. The levelized cost of electricity (LCOE) is highly sensitive to the weighted average cost of capital (WACC). Given typically higher financing costs and utility balance-sheet weaknesses in many African countries, bankable project structures will require sovereign guarantees, robust offtake arrangements, and layered financing from export credit agencies, development finance institutions, and vendor nations. Comparisons with recent large nuclear projects in the United Arab Emirates (UAE) and Egypt underscore the central role of state-backed loans, long tenors, and concessional terms. Country case studies illustrate a spectrum of readiness and opportunity. South Africa operates two 920 MWe pressurized light water reactors (totaling 1,840 MWe) at Koeberg and has the most mature regulatory and industrial base, positioning it as a prime candidate for both large reactors and SMRs to replace coal, support desalination, and anchor industrial hubs. Egypt is constructing four VVER-1200 units at El Dabaa with strong state leadership and could later complement this fleet with SMRs for coastal and industrial applications. Kenya and Ghana are advancing through IAEA Milestones with growing institutional capacity and clear interest in SMRs that match their smaller grids and industrialization plans. Nigeria has the largest demand potential but faces acute constraints in grid reliability, project bankability, and regulatory capacity; targeted deployments of large reactors and SMRs near coastal or industrial sites could have high impact if accompanied by major grid upgrades and institutional reforms. The report identifies cross-cutting challenges such as financing, political continuity, public acceptance, nonproliferation and security, waste and back-end management, regulatory capacity, grid adequacy, and long deployment timelines for first-of-a-kind designs, and ANL/NSE-26/3 ii proposes broad directions for resolution. These include stronger multifaceted financing for nuclear, long-term national energy strategies that transcend electoral cycles, proactive stakeholder engagement, strengthened regional and national regulators, and systematic workforce development through centers of excellence and expanded training. The United States should develop partnerships with African countries and offer end-to-end nuclear package similar to those used effectively by competitors: coordinated project development, state-backed financing, long-term fuel services, and durable in-country support through regional offices and sustained workforce/regulatory training. With timely planning, sustained political commitment, and appropriate financing and institutional support, nuclear energy, both large reactors and advanced SMRs, can become a meaningful, though not dominant, pillar of Africa’s future power mix, enhancing energy security, enabling industrial growth, and supporting climate goals.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Antenna deployment mechanism for use with a spacecraft

A mechanical system is disclosed to deploy an antenna on a support which may, for example, be a spacecraft. A series of telescoping tubes are nested one within the other when the antenna is in a retracted stowed position. The outermost tube is rigidly attached to the support and the inner tubes are latched in the stowed position by a caging mechanism. The antenna is driven toward a deployed position by a dual motor driven cable which is terminated in a driving tube at the lower end of the innermost tube, from whence the cable is trained about pulleys at the tops and bottoms of successively large tubes of the antenna. The cable is wound on a drum at the lower end of the antenna and coaxial therewith. During deployment of the antenna, the drum rotates, thereby reeling in the deployment cable. The initial movement of the cable causes cam releasing of the latches in the caging device. Thereafter, the antenna tubes are extended until the final deployed position of the antenna is reached. A ratchet attached to the drum prevents reverse rotation of the drum and locks the antenna in the deployed position until the ratchet is released.

Leavy, W. A.↗