Using ROS for Robotic Control [Slides]

The use of robots is important, to help prevent people from being exposed to hazardous materials within a glovebox. The research proposal for the summer was to make a pick and place demo for a seven degrees-of-freedom Motoman Sia5d robot. The Robot Operating System (ROS) was used and the knowledge of C++ and Linux had to be applied. The robot was used to pick up and sort four objects (cylinder, sphere, rectangular prism, and cone) within a virtual environment.

42 ENGINEERING↗

Demonstration of CFD to support the coupled analysis of a reactor pressure vessel subjected to pressurized thermal shock

The structural components that comprise nuclear reactors and their supporting structures are subjected to harsh operating environments that can challenge their integrity, especially after exposure for extended duration or under accident condition. As one of the most significant components of a reactor, the Reactor Pressure Vessel (RPV) is exposed to an aggressive environment during the operation time (e.g. more than 40 years). Aging degradation mechanisms (e.g. thermo-fatigue) could grow initial defects up to a critical size, increasing the susceptibility to failure in the RPV. The conventional methods are mostly based on simple crack and structure geometries. Very limited studies consider the real conditions of the RPV subjected to a thermal shock due to a Loss of Coolant Accident (LOCA). During a LOCA event, the most severe conditions take place when the emergency core cooling (ECC) water is injected inside the cold legs filled initially with hotter water and/or steam. The rapid cooling of the down-comer and the internal RPV surface followed probably by re-pressurization of the RPV causes large temperature gradients and variation of pressure which induces thermal-mechanical stresses. In order to develop the model for integrity assessment of a reactor pressure vessel (RPV) subjected to pressurized thermal shock (PTS), a multi-physics simulation, which includes the thermo-hydraulic, thermo-mechanical and fracture mechanics analyses is necessary. The prediction of the temperature field is achieved by using computational fluid dynamics (CFD) simulation. In this report, a demonstration CFD standalone simulation is performed to support coupled analysis for Reactor Pressure Vessel (RPV) subjected to Pressurized Thermal Shock (PTS). The study use a simplified computational domain to represents a real RPV. The purpose of the study is to demonstrate the transient temperature response of RPV to ECC injection. The CFD model is built in a robust and efficient way for further coupled calculation. The next steps of this work, including the coupled thermal and tensor mechanics capabilities using Cardinal are expected to be complete by the end of FY21 for the demo problem. After this, into FY22, the capability will be demonstrated for a realistic RPV.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Scalable Process for Upcycling Carbon Dioxide (CO 2 ) and Coal Combustion Residues into Construction Products

Anthropogenic sources of carbon dioxide are generated from a number of sources, but the key among these are ordinary Portland cement (OPC) production and combustion of fossil fuels. Cement production is the largest global CO 2 source from the mineral decomposition of carbonates. Combination of the limestone decomposition and thermal requirements of the clinkering process causes cement production to contribute 8-9% of annual global CO 2 emissions. Combustion of fossil fuels (coal, oil and gas) was shown to contribute a much larger portion of global CO 2 emissions. As of 2018, combustion of fossil fuels accounted for 65% of global CO 2 , where 41% was derived from stationary sources for electricity and heat generation and the other 24% was related to transport. To reduce these contributions, key steps forward in CO 2 utilization technologies are required. The purpose of this project is to demonstrate the feasibility of the Reversa process evolving from a TRL-3 technology at the bench-scale up to TRL-6 technology at the pilot-scale. The reliability of the Reversa technology was tested to prove the effective production of concrete masonry units (CMUs) at bench scale, where the units exceeded the required 13.8 MPa compressive strength requirements. The overall goal of this project was to accelerate the development of a CO 2 mineralization process that synergistically utilizes CO 2 in flue gas and coal combustion residues (CCRs) to synthesize carbonated concrete, a functional replacement for traditional concrete. The culmination of this work resulted in 12 successful production runs at the Integrated Test Center (ITC), Gillette, WY using coal flue gas as a CO 2 source. This was followed by 6 production runs which were completed at the National Carbon Capture Center (NCCC), Wilsonville, AL, using coal-fired and natural gas (NG) flue gas as the CO 2 source. Over the course of the production runs at NCCC and ITC, the CO 2 utilization as a function of time, 24-h CO 2 uptake, electricity usage, and 28-d net area compressive strength recorded for each run. The ITC and NCCC demonstrations achieved an average of 0.19 and 0.1 g CO 2 /g reactant, respectively. Both demonstrations exceeded the project’s target goals of uptake > 0.05 g CO 2 /g reactant. Average compressive strength of the ITC blocks was 18.24 MPa at 28-days. This exceeded the target strength of 13.8 MPa specified by ASTM C90. ITC and NCCC produced an average CO 2 utilization efficiency of 74.9 and 57.9%, respectively. Both demonstration averages were within the target range of 50 to 90% utilization efficiency. For some production runs the NCCC demo did exceeded the a CO 2 utilization efficiency of 75%. An LCA of the Reversa process compared to an industry standard product revealed a net CO 2 reduction of 39% to 42%. This exceeded the target requirement of >25% net CO 2 reduction. Collection of this data was used to determine that the project was successful as the demonstration goals were achieved: (1) achieving in excess of 75% CO 2 utilization efficiency, (2) utilizing greater than 250 kg of CO 2 per production batch/run, and (3) ensuring compliance of carbonated blocks with industry standard specifications (ASTM C90).

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Time-Sensitive Quantum Key Distribution (TSQKD)

This is the final report for the Time-Sensitive Quantum Key Distribution (TSQKD) project and summarizes the demonstration and longer-term field testing at an electric utility, EPB of Chattanooga, in Chattanooga, TN. The demonstration was held virtually (due to the COVID pandemic) and successfully executed the tests outlined in a prior report, “Task 10: Develop a QKD Time-Sensitive Networking Test Suite” submitted 9/30/2020. The portable test equipment explained in Task 10 and earlier task reports was tested at GE Research remotely connected with Qubitekk’s QKD equipment in San Diego, CA. Then the equipment was shipped to Qubitekk for physical integration with Qubitekk’s Quantum DataLoc™ Key Server 1570nm (http://qubitekk.com/products/qkd-for-industrial-control-systems-ics/). The portable test equipment was shipped from Qubitekk to EPB for demonstration and extended field testing. A summary of the demonstration and test results are described in this report. The demo and extended field test results are enabled by the NETCONF/YANG IEEE P1913 data management model developed as part of this project (Task 5). The NETCONF/YANG IEEE P1913 data management model demonstrated significant practical utility in providing a common means of monitoring and configuring the QKD system. All data in this report comes from the IEEE P1913 data management model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ARDP Natrium Neutronic Methodology: Argonne Neutronic Assessment of ABR-1000

The Natrium Sodium-cooled Fast Reactor (SFR) concept developed by TerraPower, LLC was selected as one of the advanced reactor designs for demonstration under the Advanced Reactor Demonstration Program Natrium Demo project. In collaboration with TerraPower, the Argonne National Laboratory (ANL) team provide independent reviews of the neutronic methodology being used for the Natrium design. As part of this activity, both the TerraPower and ANL teams agreed to perform independent neutronics analyses of the ABR-1000 reactor problem as a demonstration on the usage of the neutronics methodologies. Comparison of the results from TerraPower and ANL would expose any methodological differences in the modeling approaches. This report describes and presents the Argonne analysis work on the ABR-1000, and will be provided to TerraPower, along with data files, to complete the comparison study. The comparison will cover the methodology to evaluate the reactivity coefficients for a safety analysis, the shutdown margin, and the reconstructed pin power distribution. The methods and models used to calculate the kinetic parameters and the reactivity coefficients (density, Doppler, axial/radial expansion, etc.) are described in detail with recommendations of specific method options and modelling techniques. The control system reactivity worth and the excess reactivity due to temperature defect are calculated for the shutdown margin analysis. The method to evaluate the excess reactivity is discussed in detail. The pin power reconstruction methodology used in SE2ANL, SE2RCT, and DASSH are discussed in this report. The pin power distribution evaluated by different methods are compared and discussed in the report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Diagnosing an IFE Power Plant

This white paper for the Basic Research Needs for Plasma Diagnostics workshop lists a selected set of measurements required for normal and off-normal operation of an Inertial Fusion Energy power plant. An Inertial Fusion Energy (IFE) power plant will require instruments that record how well it is performing and, more importantly, sufficient instruments to diagnose failures during routine operation. It is assumed in this white paper that operating specifications and tolerances have been established before the plant begins operation so that only a minimal set of instruments is required. A pilot plant (a DEMO) would require more instrumentation in order to set those requirements and tolerances. This white paper assumes a laser-based IFE plant that operates at up to 20 Hz. Two scenarios are considered below. One is for routine, nominal operation and the other is when an implosion fails to produce energy.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Development of Surface Treatment Solutions for Stamping Tools Fabricated via Additive Manufacturing

Oak Ridge National Laboratory (ORNL) and H.E.F. USA, Inc. (HEF) partnered to develop wear resistant surface treatment of additive manufactured steels for stamping die applications under CRADA agreement NFE-19-07909. This project aimed at evaluating the ARCOR® process, developed by HEF, to improve the surface behavior of 410SS (stainless steel), 410NiMo SS, 630 SS, and Maraging 250 steel coupons and demo components, fabricated via wire arc additive manufacturing (WAAM), with and without post print heat treatment. The peak hardness achieved was ~1000 HV and above (Up to 1300 HV) for all materials under proper processing parameters, and far exceeded the target hardness of 746 HV (60 HRC). Finally, stamping tools were printed and nitrocarburized with the optimum parameters, and then went through 500 fabrication cycles. Characterization of the used 17-4PH stamping tool discovered no crack or delamination in the nitrocarburized layer and the interface between the nitrocarburized layer and substrate.

36 MATERIALS SCIENCE↗

Multi-Source Machine Learning and Thermoplastics Enhanced Aerostructure Manufacturing (mTEAM)

RTX Technology Research Center (RTRC), together with Collins Aerospace (Collins) and Oak Ridge National Laboratory (ORNL) has developed an Artificial Intelligence (AI) / Machine Learning (ML) guided solution to advance the manufacturing and assembly of high performance and lightweight thermoplastic composite (TPC) aerospace products. The solution aims to lower risk, cost and lead time for induction heating based welding and consolidation processes for TPC structure. The cost and lead time of part and material specific process development for induction welding (IW) and induction consolidation will be reduced by replacing traditional empirical methods with optimization methods that merge AI/ML and physics-based process simulations and process experiments with sensing and controls. TPC-IW process development is empirical in nature, and uncertainties in material & process behavior exist near & far from the induction coil. Physics-based simulations can be leveraged directly for process optimization but can be too computationally expensive to run in high fidelity and real time to do robust process optimization. The key impact of successful TPC induction consolidation and welding is cost & lead time reduction for part & material specific consolidation and welding recipes. This is an enabler for more rapid deployment of TPC structures via joining assembly, which can reduce energy & cost intensive usage of autoclaves & ovens. The solution aimed to advance the U.S. Department of Energy’s interests in using thermoplastics and automation in composite manufacturing for improvement of products for existing markets via increased production speeds, reduced costs, and lowered use of energy. Welded TPC structures can offer significant weight & energy savings for high-value commercial aerospace & industrial applications compared to metal & thermoset composite structures assembled by mechanical fastening and/or adhesive bonding. The project was organized into two Budget Periods. Budget Period 1 (BP1) was 15 months and its goal was to perform ML process optimization framework development & deployment on lab-coupon aerostructure components. A Go/No-Go Review was performed at the end of BP1 to verify fulfilment of key tasks & milestones to justify a Go Decision to move into the next Budget Period. Budget Period 2 (BP2) was 12 months and its goal was the deployment of the ML framework for ML process optimization of pilot industrial scale aerostructure components. The overall project aim was to develop & demonstrate ML-enhanced modeling framework that learns process-property mapping from multiple data sources at different fidelities. During BP1, the team accomplished key tasks & milestones to demonstrate the concept of multi-source ML for TPC aerostructure consolidation and assembly. First, the team completed documentation of induction based TPC heating requirements including baseline metrics to compare measured results against. Next the team completed demonstration of data generation from physics-based simulations for ML surrogate model generation and demonstrated the integration of physics-based simulation data into multi-source AI/ML algorithms. In parallel, the team established the lab-coupon scale induction welding system and completed a process to label and reduce generated data from physics-based simulation and experiments for ML surrogate models to enable multi-source ML model training & testing. To complete BP1, the team integrated physics-based simulation data and experimental data into multi-source ML algorithms. This was based on the team completing ML deployment of the induction welding on a lab system at RTRC and AI/ML deployment on existing induction welding line at Collins. ORNL visited both Collins and RTRC sites to witness the TPC induction welding process. Then, ORNL designed and constructed a new version of their vision-based sensing system better adapted to acquire process signals of the TPC induction welding process for process anomaly and defect detection. In BP2, the team accomplished key tasks & milestones to scale up multi-source ML for TPC aerostructure consolidation and assembly from the lab-coupon scale to the pilot-industrial scale. In BP2, the team demonstrated real time anomaly & defect detection via experiments performed by ORNL & RTRC. The team completed ML-optimization heating trials for TPC induction consolidation at Collins, and the team confirmed pilot industrial scale experimental data from Collins was compatible with the developed ML pipeline from RTRC. The team completed sub-element scale ML process optimization demonstration at RTRC, where the team leveraged RTRC’s robotic TPC welding setup to de-risk the ML process optimization by performing ML analysis of recorded temperatures to account for complex part features. Then, the team applied its ML-derived control strategies and ML process optimization framework at Collins to the pilot-industrial scale on a demo skin-stiffener part representative of a nacelle aerostructure fan cowl section. The key innovation is the AI/ML framework enabling effective process development of high performance, lightweight, energy efficient TPCs for composite aircraft structures.

36 MATERIALS SCIENCE↗

Fusion Fuel Cycle Technology Downselection Methodology

Tritium Start-up Inventory Requirements Current consensus has full inventory coming from CANDU reactors. • Assumes continued operation through 2035, yielding ~30 kg tritium. • Produced in the form of DTO, which requires separation for tritium extraction. • ITER will take between 10-20 kg. • DEMO will require ~15 kg. • Fuel cycle design requires minimum volume to fill plumbing in system beyond inventory necessary to reach break even. • With ~45 current private ventures, need massive uptick in tritium production to meet global need.

Malone, Collin↗

WBG-Enabled Current-Source Inverters for Integrated PM Motor Drives

This project takes advantage of the special capabilities of wide-bandgap (WBG) power semiconductor devices to develop innovative power electronics in the form of new current-source inverters (CSIs) that offer promising advantages over the dominant voltage-source inverter (VSI) topology. These CSIs, in turn, are extremely well-suited for integration into the housings of permanent magnet synchronous machines (PMSMs) to form integrated motor drives (IMDs). These new IMDs offer great promise for achieving major energy savings in a wide variety of applications that benefit from adjustable-speed control, including air conditioners, laundry appliances, industrial pumps/compressors, electric vehicles, and aerospace drives. WBG devices play a critical enabling role in these new IMDs because of their transformative features including much higher switching frequencies, lower losses, and compatibility with high operating temperatures. When incorporated into new CSI-based IMDs with PM machines, these WBG switches open the door to achieving major increases in power density, drive system efficiency, and fault tolerance, as well as substantial reductions in electromagnetic interference (EMI), manufacturing cost, and temperature-induced failures. The higher operating temperature capability of WBG devices compared to conventional silicon power devices is very appealing in IMD applications because the power electronics is mounted in close proximity to the motors which typically operate at temperatures well above the maximum limits of today’s silicon-based power electronics. This project has succeeded in designing, building, and testing multiple prototype versions of this CSI-IMD that have overcome many technical challenges in order to demonstrate the impressive performance improvements that can be achieved by the WBG-enabled CSI-IMD. The preliminary demo and bench-top versions of the current-source inverter developed during the first two years of the project were critical to laying the technical foundations for the 3 kW prototype CSI-IMD unit that was successfully built and tested during the third year. This prototype CSI-IMD unit was designed to fit within the housing envelope of the original permanent magnet (PM) synchronous machine in order to meet the demanding power density requirements that were set at the beginning of the project. All of the remaining performance objectives set for the prototype CSI-IMD unit including efficiency and electromagnetic interference (EMI) were also met. The last 18 months of the project were devoted to developing further enhancements of the WBG-enabled CSI-IMD technology that better prepare it for commercial production. More specifically, an upgraded version of the prototype CSI-IMD unit was developed that moved the power electronics into the same machine housing chamber as the motor, substantially raising the thermal demands on the power electronics. Tests with five different combinations of motor enclosure types and air cooling configurations were evaluated. Importantly, this work confirmed that the power electronics can deliver its full rated power and still operate well within its maximum temperature limits even for worst-case conditions when the housing is “totally-enclosed” without any openings for air to enter or exit the enclosure, and no blower/fan is provided to blow air over the outside surface of the enclosure. Reaching the full performance and energy-savings potential of this disruptive CSI-IMD motor drive technology is highly consistent with ARPA-E’s stated mission to “enhance the economic and energy security of the United States” while also supporting its commitment to “ensure that the U.S. maintains a technological lead in developing and deploying advanced energy technologies”. Follow-on projects are under way to explore the scalability of WBG-enabled CSI-IMD technology to 100 kW (peak) electric vehicle traction drives and fault-tolerant modular motor drives for future electrified aircraft propulsion applications.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

WAVES-CAE: Release 0.1.0

Demo problem for running WAVES workflows with CAE files. May eventually become part of the WAVES “supplemental” lessons.

97 MATHEMATICS AND COMPUTING↗

Leveraging Existing Assets for Long Duration Energy Storage

Increased renewables penetration to electrical grid is necessary to reduce overall emissions from the electrical power generation sector. Nonetheless, its integration creates challenges to grid operators who must match the power being generated by intermittent renewables and other traditional energy sources with the demand from consumers, while ensuring the reliability and power quality for the entire system. Energy storage has been proposed as an alternative to natural gas peaking plants and a form to deliver excess renewable energy generation at times of peak demand. For energy storage to provide benefits to end customers (energy consumers), it must be reliable, efficient, and cost effective. The Illinois Sustainable Technology Center (ISTC), one of the surveys that integrate the Prairie Research Institute (PRI), aims to develop a Center for Energy Storage at Existing Assets (CESEA) at UIUC with the participation of Waste Pressure Corp and Ecotek Engineering USA LLC. CESEA will focus on LDES systems that can integrate to existing infrastructure in a manner that reduces the initial capital expenditure and demonstrates the ability to repurpose fossil assets that would otherwise become stranded, to serve the energy transition. CESEA aims to leverage UIUC’s unique facilities to validate LDES systems performance at a relevant operating environment. UIUC’s facilities include a 85-MW combined heat and power (CHP) power plant, two (2) solar PV plants totaling over 18 MWdc of installed capacity, an electrical grid along with a substation at transmission and distribution voltages, a 22-mile gas pipeline network operating at two pressure levels, along with steam and chilled water distribution networks. The new LDES systems will connect to the existing UIUC grid through a new test electrical station, which will have the capacity to accommodate additional connections to test new devices and technologies as part of future CESEA R&D activities. The test electrical station will contain meters, instrumentation, and controls to accurately capture data and allow optimization of control algorithms. CESEA will initially focus on technologies that: i) utilize existing equipment or facilities to perform at least one of the process steps in LDES (charging, storage, or discharging), ii) leverage mature or commercially available components or controls, iii) show potential for cost-leadership in 10+ hour storage at a commercial scale. Initial technologies that were identified to meet these criteria include Compressed Gas Energy Storage (CGES), and TES. CGES stores electricity by raising the pressure of a compressible gas inside a control volume and converting the stored energy to electricity via expansion-generation. CGES is a generalization of CAES that covers any working gas (not just air). A successful CGES demo will help to circumvent many challenges faced by CAES (long development times due to site prospecting, high cost of compression and storage, heat recovery management, etc.) by: 1) utilizing existing infrastructure (compressors, pipelines, underground storage or pressure vessels) used in the transportation and storage of industrial gases for LDES charging and storage; 2) deploying over sites already-developed for industrial applications with minor additional work; 3) leveraging the price structure of commercial industrial gas to cover the costs of electricity used during charging. A previous DOE-sponsored conceptual study (DE-FE-0032018) estimated the levelized cost of energy of a 1.1 MW / 17 MWh CGES system at $0.08/kWh, with a commercial 10x scale system cost estimated at <$0.04/kWh (Giardinella, 2022). The pilot-sized system was estimated to avoid up to 2693 tons of CO2/year.

25 ENERGY STORAGE↗

Muon Detector Visualization in Unreal Engine

This presentation will describe recent efforts to visualize muon collider detector geometries and col- lision events with modern 3D game development tools, particularly Unreal Engine 5. The workflow from HEP-specific tools to industry standard formats will be described, and an interactive demo will be available.

Lee, Lawrence↗

Microbial Analysis of 100-N Borehole Samples: Estimation of Diesel and BTEX Degrading Bacterial Populations

Historical unplanned releases at the UPR-100-N-17 166-N Diesel Oil Supply Line Leak waste site located within the 100-NR-1 OU resulted in diesel fuel contamination of the unsaturated vadose zone and site groundwater. Enhanced in situ bioremediation of the deep vadose zone was the final remedy decision for the 100-NR-1 Operable Unit (OU) and the full-scale bioventing demo began in 2012. For this remedy, oxygen is actively supplied to the deep vadose zone to stimulate aerobic hydrocarbon degrading microorganisms to metabolize petroleum contamination. Degradation rate calculations based on vadose zone respirometry measurements, however, have indicated declining activity over recent years, though the precise reason for this apparent decline has not been determined. In this investigation 100-NR-1 OU sediment cores were analyzed for total microbial biomass, as well as enumeration of diesel and BTEX degrading bacteria to determine if these microbial populations have declined relative to previous measurements taken in 2009.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated qualification data tool for high temperature metallic materials

This report describes a framework for storing, processing, and displaying qualification data for high temperature mechanical properties. The framework automates the process of generating design data from mechanical test results, for example for a data qualification report for the ASME Boiler \& Pressure Vessel Code. The framework has three parts: a data storage model with common formats for several types of typical mechanical property tests, a backend based on the \pycreep Python library for correlating and extrapolating the data to generate design material properties and allowable stresses, and a demonstration user interface for displaying, sorting, and filtering the data and exploring different options for modeling the design mechanical properties. The report discusses the options available for data processing, with illustrations from real test data on Alloy 617, Alloy 709, Alloy 740H, and Laser-Powder Bed Fusion 316H. The framework is complete for ASME type data analysis and will be used to store test data generated by the Department of Energy, Office of Nuclear Energy, Advanced Materials and Manufacturing Technologies sponsored qualification programs. Future work could extend the tool to other types of material properties and/or expand the demo user interface to make it accessible across the AMMT program.

36 MATERIALS SCIENCE↗

DOE Challenges and Opportunities Associated with Accountable Nuclear Material Needs for Development and Commercialization of Fusion Nuclear Energy

Fusion energy represents a transformative opportunity to deliver a safe, plentiful, and carbon-free source of reliable primary power. In recent years, fusion research and development have accelerated significantly, particularly within the US, driven by decades of foundational public investment. Notably, in 2024 the US Department of Energy (DOE) established a comprehensive Fusion Energy Strategy aimed at collaborating with industry partners to enable the deployment of fusion power plants and grid integration by the 2030s. This strategy is chiefly implemented through the DOE Office of Science (SC) Fusion Energy Sciences program. This project was initiated to identify potential approaches for the Office of Environment, Safety, and Health (NA-ESH-12) within DOE’s National Nuclear Security Administration to begin engagement with the fusion community on future accountable material needs. The goal of the project is to inform and influence the supply of and demand for accountable nuclear materials as fusion energy is developed and commercialized. NA-ESH-12 must proactively engage with the fusion community regarding the production and management of accountable nuclear materials. Given the complexity and scale of materials required for research, pilot projects, and eventual commercial reactors, early coordination is vital. The project’s objective is to provide insights that will shape the supply and demand landscape for critical nuclear materials, ensuring that DOE is prepared to effectively support fusion energy development and commercialization. In FY 2025, an initial limited review was conducted to identify the status of the fusion energy community’s progress toward full-scale energy production and the need for accountable nuclear material. This included communications with SC, NA-ESH-12, Savannah River National Laboratory, and Oak Ridge National Laboratory, and attending the Rutgers University–sponsored Supply Chain Workshop: Scaling the Fusion Industry and the International Atomic Energy Agency’s Ninth DEMO Programme Workshop. The review to date indicates that the amounts of tritium, lithium-6, and deuterium required by the fusion industry will be dependent on fuel type, breeding technology, blankets, and R&D improvements. One concern is that the commercial sector does not have a sufficient supply chain to meet the demand for development and commercialization for fusion energy production. The supply and demand estimates for these materials should be routinely reviewed as fusion technologies mature.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The Hydropower Game: An Interactive Learning Tool for the Future Hydropower Workforce

This report documents a Seedling project supported by the U.S. Department of Energy (DOE) Water Power Technologies Office (WPTO), conducted by Argonne National Laboratory (ANL) and the National Laboratory of the Rockies (NLR). The Seedling and Sapling Program provides small grants over short duration to enable early-stage research at national laboratories. This funding mechanism is intended to cultivate innovative ideas and expand research road maps in hydropower and marine energy technologies. Under this Seedling award, the project team developed an educational outreach tool, or “serious game”, built in Python and powered by the Pygame library, aimed at teaching fundamental hydropower concepts through an engaging, interactive learning experience. The game features multiple lessons covering several hydropower topics while allowing for expansion and customization in the instance of future funding availability: • Hydropower Plant Types: Players explore and compare the mechanics and applications of run-of-river, dam hydropower, and pumped-storage hydropower. • Flow Dynamics and Power Generation: Interactive tasks demonstrate how release rate and hydraulic head combine to determine power output. • Grid Operations and Load Following: Simulations illustrate how hydropower facilities respond to fluctuating electricity demand to balance the grid. • Market Integration: Levels scaffold understanding of how hydropower interfaces with the broader energy market, including operational and economic considerations. The tool was showcased at several science, technology, engineering, and mathematics (STEM) outreach events, where it was demoed to students, educators, and the general public. These events provided valuable opportunities to collect feedback on the gameplay, storyline, and educational objectives from a wide audience. The game was presented at STEMapalooza, Introduce a Girl to Engineering Day, STEMCON, and Clean Currents 2025. Insights gathered during these demonstrations informed refinements to the game’s user experience and strengthened its effectiveness as an educational tool for teaching hydropower concepts. This report outlines the game’s design philosophy, educational objectives, technical implementation, user experience insights, and potential for broader deployment within educational and workforce development contexts. It emphasizes how gamified learning can demystify complex hydropower science and inspire interest in water-power technologies. The project’s success demonstrates the value of Seedling funding in fostering creative, lowcost educational tools that support DOE’s mission to advance energy literacy and innovation. The report concludes with recommendations for expanding the tool by adding new levels, integrating assessment metrics, and exploring commercialization or deployment pathways through future Sapling funding. The official webpage of the Hydropower Game, which includes a link to the educational tool, can be accessed at www.anl.gov/hydropower/hydropower-game.

13 HYDRO ENERGY↗

UNIFI 1-MW Multi-Vendor Grid-Forming Inverter Test Updates

This presentation gives an update on UNIFI 1MW multi-vendor GFM inverter testing. The 1MW demo enters the last stage of the test, which is the integration test. And the main objectives of the integration tests include: 1) explore the interoperability of dispatching a future grid with energy mix (GFM inverters, GFL inverters and synchronous machine). The presentation highlights one example test, ROCOF, and summarizes all the key learning.