Technical Condition of Earthen Dams at Nizhegorodskaya HPP After 60 Years of Operation

The complex of hydraulic engineering installations includes five earthen dams. All facilities are of Class I. The diagnostic parameters of dam operation and technical condition monitored via in-situ observation for seepage mode, seepage strength, settlement, static stability, etc. generally meet design assumptions and safety criteria. Despite individual defects and signs of “aging” identified over the period of earthen dam operation, these are currently in a satisfactory and operable state. The long, 60-year operating period of the dams with no serious overhauls or emergencies has demonstrated the high reliability of the facilities, the correctness of the design and technological solutions adopted and implemented in the construction, and the high professional level of their operation in close cooperation with science.

42 ENGINEERING↗

Mission planning for photogrammetry-based autonomous 3D Mapping of Dams using a commercial UAV

The application of autonomous unmanned aerial vehicles (UAVs) for conducting inspections of dams represents an innovative approach aimed at enhancing safety, efficiency, and cost-effectiveness. In this context, this paper presents algorithms for UAV mission design in autonomous dam inspections that include the creation of a 3D map based on photogrammetry. The algorithms were systematically developed to incorporate a comprehensive set of parameters that account for the geometric characteristics of the dam and adhere to photogrammetry specifications. To validate the proposed methodology, we utilized a commercial programmable quadrotor, specifically the Parrot Anafi USA Gov drone, which is equipped with high-quality cameras and can be programmed with the help of a software development kit (SDK) provided by the manufacturer. Our results demonstrate the efficacy of our method, highlighting how the generated maps can be used for hazard detection in the downstream slope of dams.

42 ENGINEERING↗

Multi-Resolution UAV Path Replanning for Inspection of Tailings Dams

Autonomous inspection of large and complex structures with a commercial unmanned aerial vehicle (UAV) is a challenging problem that has been addressed in recent years. In this paper, we address the global motion planning problem of creating autonomous inspection missions for UAVs considering photogrammetry constraints. We focus on the inspection of large tailings dams, which are dam structures used to store waste byproducts of mining. Our method uses a prior sparse point cloud of the dam to generate a voxel grid, where paths satisfying photogrammetry constraints are tested for collisions. We then apply the A* algorithm as a local planner to avoid obstacles within the global mission. Moreover, we address the problem of changing routes online by using octree-based multi-resolution grids for efficient and fast pathfinding. Our results, obtained using tridimensional maps of an actual coal mine tailings dam, show that using octrees for multi-resolution motion planning is faster than using a fixed voxel grid in online missions while inspecting large structures.

42 ENGINEERING↗

Enhancing Grid Resilience during Wildfires in Socioeconomic Vulnerable Regions using Powered and Non-Powered Hydro Dams

In many regions around the world, wildfires have become a growing threat, exacerbated by factors such as climate change, droughts, and urban sprawl. These wildfires often wreak havoc on power infrastructure, leading to extended power outages, which can have devastating consequences for communities, especially in socioeconomically vulnerable areas. Ensuring grid resiliency in the face of these challenges is of paramount importance. One innovative approach to mitigating the impact of wildfires on the power grid is the utilization of hydropower facilities including both powered and non-powered hydro dams. While powered hydro dams along with additional infrastructure like energy storage and solar photovoltaic can provide resilience during wildfire-related outages, non-powered dams, originally constructed for purposes other than electricity generation, also offer a unique opportunity to bolster grid resilience. In this paper, we aim to explore the efficacy of hydro-dams in general to provide resiliency during wildfire-induced outages.

Wildfires, Resilience, Grid Resiliency, Hydropower↗

Acoustic Doppler Current Profiler Surveys of Velocity Downstream of Albeni Falls Dam

The U.S. Army Corps of Engineers (USACE), Seattle District, is studying the potential to locate fish bypass systems at Albeni Falls Dam. The USACE requested Pacific Northwest National Laboratory (PNNL) to survey velocity magnitude and direction in the dam tailrace. The empirical data collected will be used to support future numerical modeling, physical modeling, and evaluation of fish bypass system alternatives. In May 2010, PNNL conducted velocity surveys of the Albeni Falls Dam using a boat-mounted acoustic Doppler current profiler. The surveys were conducted over three days (May 25 through 27). During the survey period, total river discharge at the dam varied between 30.2 and 31.0 kcfs. A small amount of spill discharge, 2 kcfs, was present on two days (May 26 and 27). This report presents data plots showing measured velocity direction and magnitude averaged over the entire depth and over 5-ft depth increments from 5 to 30 ft.

13 HYDRO ENERGY↗

Assessment of Natural Stream Sites for Hydroelectric Dams in the Pacific Northwest Region

This pilot study presents a methodology for modeling project characteristics using a development model of a stream obstructing dam. The model is applied to all individual stream reaches in hydrologic region 17, which encompasses nearly all of Idaho, Oregon, and Washington. Project site characteristics produced by the modeling technique include: capacity potential, principal dam dimensions, number of required auxiliary dams, total extent of the constructed impoundment boundary, and the surface area of the resulting reservoir. Aggregated capacity potential values for the region are presented in capacity categories including total, that at existing dams, within federal and environmentally sensitive exclusion zones, and the balance which is consider available for greenfield development within the limits of the study. Distributions of site characteristics for small hydropower sites are presented and discussed. These sites are screened to identify candidate small hydropower sites and distributions of the site characteristics of this site population are presented and discussed. Recommendations are made for upgrading the methodology and extensions to make the results more accessible and available on a larger scale.

13 HYDRO ENERGY↗

Assessing the Costs of Hydropower at Non-Powered Dams Using a Reference Site Model

Hydropower capacity in the United States currently stands at approximately 103 GW, and there are remaining water resources that could help meet the rapidly increasing demand for electricity and ancillary grid services. Existing dams that do not generate power, known as non-powered dams, are a near-term solution to enhance the contribution of hydropower to the US power grid. However, there are thousands of such sites, and the lack of detailed information about their specific characteristics and associated costs presents significant challenges for stakeholders. This study addresses these challenges by developing a reference site model to evaluate the potential costs of hydropower at non-powered dams using currently available technologies. An application of the model reveals a wide range of estimates for capacity, capital costs, levelized cost of electricity, and cost components. While many sites are competitive with current technologies, the majority would need cost-reducing innovations to be viable. Despite the limited available information, the model offers valuable insights into the relative competitiveness of hydropower projects at non-powered dams. The simulation results highlight the need for continued technological advancements in hydropower and provide a basis for evaluating the benefits of new innovations.

cost drivers↗

Design Tools to Assess Hydro-Turbine Biological Performance: Priest Rapids Dam Turbine Replacement Project

Over the past two decades, there have been many studies describing injury mechanisms associated with turbine passage, the response of various fish species to these mechanisms, and the probability of survival through dams. Although developing tools to design turbines that improve passage survival has been difficult and slow, a more robust quantification of the turbine environment has emerged through integrating physical model data, fish survival data, and computational fluid dynamics (CFD) studies. Grant County Public Utility District (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now almost 50 years old. The Utility District plans to refit all of these aging turbines with new turbines. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when replacing the turbines. In this presentation, a method for turbine biological performance assessment (BioPA) is introduced. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We will present application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.

CFD↗

Dam Construction in Lancang-Mekong River Basin Could Mitigate Future Flood Risk From Warming-Induced Intensified Rainfall

Water resources management, in particular flood control, in the Mekong River Basin (MRB) faces two key challenges in the 21st century: climate change and dam construction. Herein, a large scale distributed Geomorphology-Based Hydrological Model coupled with a simple reservoir regulation model (GBHM-MK-SOP) is used to investigate the relative effects of climate change and dam construction on the flood characteristics in the MRB. Results suggest an increase in both flood magnitude and frequency under climate change, which is more severe in the upstream basin and increases over time. However, dam construction and stream regulation reduce flood risk consistently throughout this century, with more obvious effects in the upstream basin where larger reservoirs will be located. The flood mitigation effect of dam regulation dominates over the flood intensification effect of climate change before 2060, but the latter emerges more prominently after 2060 and dominates the flood risk especially in the lower basin.

54 ENVIRONMENTAL SCIENCES↗

Estimation of placental and lactational transfer and tissue distribution of atrazine and its main metabolites in rodent dams, fetuses, and neonates with physiologically based pharmacokinetic modeling

Atrazine (ATR) is a widely used chlorotriazine herbicide, a ubiquitous environmental contaminant, and a potential developmental toxicant. To quantitatively evaluate placental/lactational transfer and fetal/neonatal tissue dosimetry of ATR and its major metabolites, physiologically based pharmacokinetic models were developed for rat dams, fetuses and neonates. These models were calibrated using pharmacokinetic data from rat dams repeatedly exposed (oral gavage; 5 mg/kg) to ATR followed by model evaluation against other available rat data. Model simulations corresponded well to the majority of available experimental data and suggest that: (1) the fetus is exposed to both ATR and its major metabolite didealkylatrazine (DACT) at levels similar to maternal plasma levels, (2) the neonate is exposed mostly to DACT at levels two-thirds lower than maternal plasma or fetal levels, while lactational exposure to ATR is minimal, and (3) gestational carryover of DACT greatly affects its neonatal dosimetry up until mid-lactation. To test the model's cross-species extrapolation capability, a pharmacokinetic study was conducted with pregnant C57BL/6 mice exposed (oral gavage; 5 mg/kg) to ATR from gestational day 12 to 18. By using mouse-specific parameters, the model predictions fitted well with the measured data, including placental ATR/DACT levels. However, fetal concentrations of DACT were overestimated by the model (10-fold). This overestimation suggests that only around 10% of the DACT that reaches the fetus is tissue-bound. These rodent models could be used in fetal/neonatal tissue dosimetry predictions to help design/interpret early life toxicity/pharmacokinetic studies with ATR and as a foundation for scaling to humans. - Highlights: • We developed PBPK models for atrazine in rat dams, fetuses, and neonates. • We conducted pharmacokinetic (PK) study with atrazine in pregnant mice. • Model predictions were in good agreement with experimental rat and mouse PK data. • The fetus is exposed to atrazine/its main metabolite at levels similar to the dam. • The nursing neonate is exposed primarily to atrazine's main metabolite DACT.

60 APPLIED LIFE SCIENCES↗

Sluiceway Operations to Pass Juvenile Salmonids at The Dalles Dam, Columbia River, USA

Existing ice and trash sluiceways are commonly used to pass juvenile salmonids downstream at hydropower dams through a benign, non-turbine route. At The Dalles Dam on the Columbia River, managers undertook optimizing operations of sluiceway weirs to maximize survival of juvenile salmonids at the powerhouse. We applied fixed-location hydroacoustic methods to compare fish passage rates and sluiceway efficiencies for two weir configurations during 2004 and 2005: three weirs versus six weirs, located at the mid- versus east powerhouse, respectively. We also analyzed horizontal distributions of passage at the sluiceway and turbines and the effects of operating turbines beneath open sluiceway gates to provide supporting data relevant to operations optimization. Based on the findings, we recommend the following for long-term operations for the sluiceway at The Dalles Dam: open six rather than three sluiceway weirs to take advantage of the maximum hydraulic capacity of the sluiceway; open the three weirs above the western-most operating main turbine unit (MU) and the three weirs at MU 8 where turbine passage rates are relatively high; operate the turbine units below open sluiceway weirs as a standard procedure; operate the sluiceway 24 h/d year-round to maximize its benefits to juvenile salmonids; and use the same operations for spring and summer emigrants. These operational concepts are transferable to dams where sluiceway surface flow outlets are used protect downstream migrating fishes.

juvenile salmonid passage↗

Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012

The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

Skalski, J. R.↗

Monitoring of Juvenile Subyearling Chinook Salmon Survival and Passage at John Day Dam, Summer 2010

The purpose of this study was to evaluate dam passage survival of subyearling Chinook salmon (Oncorhynchus tshawytscha; CH0) at John Day Dam (JDA) during summer 2010. This study was conducted by researchers from the Pacific Northwest National Laboratory (PNNL) in collaboration with the Pacific States Marine Fisheries Commission (PSMFC) and the University of Washington (UW). The study was designed to estimate the effects of 30% and 40% spill treatment levels on single release survival rates of CH0 passing through two reaches: (1) the dam, and 40 km of tailwater, (2) the forebay, dam, and 40 km of tailwater. The study also estimated additional passage performance measures which are stipulated in the Columbia Basin Fish Accords.

Weiland, Mark A.↗

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at John Day Dam, Spring 2010

The purpose of this study was to compare dam passage survival, at two spill treatment levels, of yearling Chinook salmon and steelhead smolts at John Day Dam during spring 2010. The two treatments were 30% and 40% spill out of total project discharge. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated forebay residence time, tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. However, by agreement among the stakeholders, this study was not an official BiOp compliance test because the long-term passage measures at John Day Dam have yet to be finalized and another year of spill-treatment testing was desired.

Weiland, Mark A.↗

Non-Powered Dam Retrofit Exemplary Design for Hydropower Applications

Non-powered dams (NPDs) represent complex systems, situated at the intersection of natural stream environments and the built environment. The presence and operations of NPDs affect stream constituents (e.g., fish, recreational craft, sediment, water) and serve one or more engineered purposes (e.g., recreation, flood control, water supply, irrigation, tailings and debris control, navigation). By definition, NPDs do not provide hydropower generation. However, every NPD contains some untapped hydropower resource potential, represented by the pre-existing hydraulic head created by the dam and presence of flowing water. Adding power generation to an NPD requires retrofitting the NPD, which could involve the addition of any new component or function beyond that currently installed. Because this research is funded by the US Department of Energy Water Power Technologies Office, adding hydropower to NPDs is among the primary objectives for research investment. However, NPD retrofitting extends beyond the purview of hydropower additions. This report provides background information regarding NPD development in the United States, including an overview of the US NPD population, development potential, and recent development. It also summarizes challenges and opportunities facing NPD retrofit development, highlights the importance of maintaining or improving stream and dam functionality, notes key NPD characteristics, describes NPD retrofit methods, and identifies innovation areas for spurring future NPD retrofit development. Section 4 describes retrofit exemplary design principles and concepts that could apply to a wide range of NPD projects. These principles and concepts inform an NPD Retrofit Exemplary Design Specification (REDS), as included in Appendix A. The NPD REDS is heavily influenced by prior work under the standard modular hydropower technology acceleration research initiative, especially the work documented in the Exemplary Design Envelope Specification for Standard Modular Hydropower Technology (Witt et al., 2017). Whereas this prior work focuses on a particular technology class that applies most intentionally for new stream-reach development (i.e., greenfield sites), the NPD REDS contained herein applies more broadly to the NPD resource class and is technology-agnostic (i.e., the specific technologies intended to be described are not explicitly prescribed). This report serves as a part of early-phase research on NPD retrofit development, aimed toward spurring additional, follow-on efforts to specifically address development challenges, capitalize on development opportunities, and inspire innovation. As documented in the landmark “Hydropower Vision” report (DOE 2016), “transformative technical innovations able to meet the co-objectives of environmental sustainability and low-carbon energy will be critical to enabling additional hydropower growth.” This report serves as an important step in steering transformation of US non-powered dam infrastructure.

13 HYDRO ENERGY↗

A methodology for dam inventory and inspection with remotely sensed data

A methodology is presented to increase the efficiency and accuracy of dam inspection by incorporating remote sensing techniques into field-based monitoring programs. The methodology focuses on New York State and places emphasis on readily available remotely sensed data aerial photographs and Landsat data. Aerial photographs are employed in establishing a state-wide data base, referenced on county highway and U.S. Geological Survey 1:24,000 scale, topographic maps. Data base updates are conducted by county or region, using aerial photographs or Landsat as a primary source of information. Field investigations are generally limited to high-hazard or special problem dams, or to dams which cannot be assessed adequately with aerial photographs. Although emphasis is placed on available data, parameters for acquiring new aircraft data for assessing dam condition are outlined. Large scale (1:10,000) vertical, stereoscopic, color-infrared photography, flown during the spring or fall, is recommended.

Berger, J. P.↗

Outfall Site and Type Selection for a New Surface Flow Outlet to Pass Juvenile Salmonids at Bonneville Dam’s Second Powerhouse, Columbia River

A site near the downstream tip of Cascades Island with a mid-level chute outfall type was selected for the high flow (> 28.3 m3/s) outfall of the new surface flow outlet for juvenile salmonids at Bonneville Dam’s Second Powerhouse (B2). The new passage route and outfall are a result of modifications to the original ice and trash sluice chute to increase discharge capacity and improve passage conditions, including a new outfall type and site. Technical guidelines on high flow outfall location and design were established concurrently with the outfall development process. Critical design parameters for the new B2 outfall included discharge of 150 m3/s, jet entry velocities approaching 15.2 m/s, and a tailwater elevation range of 6.1 m. For outfall siting, the selection process began with identification of nine initial alternatives. Screening, evaluation, and selection stages narrowed the list to two outfall sites – “Range D” 122 m directly downstream from the existing sluice chute outfall and “Range F” 760 m downstream near the end of Cascades Island. For outfall type, the selection process was initiated with conceptualization of 13 alternatives. Following successive screening, evaluation, consolidation, and selection stages, two outfall types became finalists – “Adjustable Cantilever” and “Mid-Level Cantilever.” The four combinations of outfall site/type were evaluated in 1:30 and 1:100 scale physical hydraulic models and a Mid-Level Cantilever at the tip of Cascades Island in Range F was selected. During further engineering after our study, the cantilever was replaced with a monolith structure to reduce construction costs, resulting in a mid-level chute outfall that was installed in 2004. Post-construction evaluations indicated survival rates around 100% through the B2CC were the highest of all passage routes at Bonneville Dam. The B2CC surface flow outlet with its high flow outfall provided a major improvement to juvenile salmonid passage at Bonneville Dam.

13 HYDRO ENERGY↗

Geophysics Methods in Electrometric Assessment of Dams

The safety assessment of hydraulic structures is proposed to be conducted via geoelectric measurements, which are capable of assessing the health of earth dams in their natural bedding without intervention in their structure. Geoelectric measurements are shown as being capable of pinpointing hazardous parts of a dam, including areas of elevated seepage. Applications of such methods are shown for a number of mini-dams in the Sverdlovsk region. Aparameter (effective longitudinal conductivity) that may be used to monitor the safety of hydraulic structures is proposed. Quantitative estimates of this parameter are given in terms of the degree of safely.

42 ENGINEERING↗