Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DOD”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Microbial Monitoring from the Frontlines to Space: Department of Defense Small Business Innovation Research Technology Aboard the International Space Station

The RAZOR (trademark) EX, a quantitative Polymerase Chain Reaction (qPCR) instrument, is a portable, ruggedized unit that was designed for the Department of Defense (DoD) with its reagent chemistries traceable to a Small Business Innovation Research (SBIR) contract beginning in 2002. The PCR instrument's primary function post 9/11 was to enable frontline soldiers and first responders to detect biological threat agents and bioterrorism activities in remote locations to include field environments. With its success for DoD, the instrument has also been employed by other governmental agencies including Department of Homeland Security (DHS). The RAZOR (Trademark) EX underwent stringent testing by the vendor, as well as through the DoD, and was certified in 2005. In addition, the RAZOR (trademark) EX passed DHS security sponsored Stakeholder Panel on Agent Detection Assays (SPADA) rigorous evaluation in 2011. The identification and quantitation of microbial pathogens is necessary both on the ground as well as during spaceflight to maintain the health of astronauts and to prevent biofouling of equipment. Currently, culture-based monitoring technology has been adequate for short-term spaceflight missions but may not be robust enough to meet the requirements for long-duration missions. During a NASA-sponsored workshop in 2011, it was determined that the more traditional culture-based method should be replaced or supplemented with more robust technologies. NASA scientists began investigating innovative molecular technologies for future space exploration and as a result, PCR was recommended. Shortly after, NASA sponsored market research in 2012 to identify and review current, commercial, cutting edge PCR technologies for potential applicability to spaceflight operations. Scientists identified and extensively evaluated three candidate technologies with the potential to function in microgravity. After a thorough voice-of-the-customer trade study and extensive functional and safety evaluations, the RAZOR (trademark) EX PCR instrument(Bio-Fire Defense, Salt Lake City, UT) was selected as the most promising current technology for spaceflight monitoring applications.

Cherie M Oubre↗

Critical Ablative TPS Capabilities Sustainment - An Approach to Playing the Long Game

Historically, we have been pound foolish and penny wise for decades, and it is time to reverse this. We present an approach that will maintain critical NASA ablative TPS capabilities through small, sustained, smart and targeted investment. NASA’s ablative TPS history is one of developing new capabilities and letting them atrophy. When needed, there are two options: (1) revive the capability at considerable cost impact or (2) develop an alternate capability with considerable schedule impact. Either of these options have had considerable mission impact. The third alternate is to maintain proven capabilities in a cost effective manner to allow the science community to propose missions with confidence. NASA and DoD have had a working group to periodically assess and make recommendations on at-risk items. This working group typically focuses on raw materials availability. While we agree that at-risk raw materials are an important and necessary part of the overall capability, focus solely on them is not sufficient. Instead, we advocate for a broader focus on the critical “technology capability” that includes not only raw material but also industrial manufacturing and processing capabilities and in-house expertise in design, testing and flight hardware certification. In this proposed presentation, we will highlight a case study related to PICA capability. We will present the rationale for sustaining PICA and HEEET as two minimum essential ablative TPS capabilities for future NASA missions. We will present an approach for how small investment could lead to maintaining mission critical capabilities over a longer period. While HEEET and PICA are NASA unique, the raw material and some of the vendor capabilities involved also support DoD TPS. Hence a partnership between NASA and DoD is recommended for broader benefit.

Ethiraj Venkatapathy↗

Modular Open Systems Approach (MOSA) for a Robust Commercial Lunar Ecosystem

Modular Open Systems Approaches (MOSAs) have been adopted worldwide to solve a myriad of challenges. Open systems by their nature maximize accessibility, reduce barriers to entry, and prevent vendor lock. Similarly, modularity speeds innovation, fosters design re-use, and enables incremental development & growth. Architectures developed using a MOSA synergize the benefits of modularity and open systems to produce better products at lower developmental cost and risk, saving the consumer money while allowing greater developer profit margins. Specific to the challenge of lunar exploration, a MOSA will ensure interoperability among diverse commercial, government, and international partners. Complex spaceflight systems can be assembled, upgraded, and serviced far more easily and with greater commercial involvement with the use of a MOSA. By allowing partners to self-limit their scope to key strengths, they can focus on producing premier components without carrying the high risk and associated cost of auxiliary tasks they don’t specialize in. We survey commercial and Department of Defense (DoD) lessons learned in past decades, discuss DoD robotics’ experience in Iraq and Afghanistan (first without then with MOSAs), and analyze the flourishing commercial ecosystem that has resulted from DoD MOSA adoption. We explore the future of lunar operations to demonstrate the criticality of MOSA adoption in key areas at the right time. Two specific lunar technical fields are studied as examples: Power and In-Situ Resource Utilization (ISRU). Finally, recognizing that the lunar ISRU campaign will be an eminently collaborative operation requiring seamless partnering among diverse commercial, government, and international partners, a comprehensive technology development ecosystem is explored aimed at enabling ISRU in a way that systems and components are affordable for commercial partners to design, build, and sustain.

Mathew DeMinico↗

Preliminary Modeling of Potential Interstellar Bolide (08 Jan 2014) Suggests Further Examination is Worthwhile

The purpose of this abstract is to share data from preliminary modeling of meteor dynamics of the 08 Jan 2014 bolide which occurred north of Papua New Guinea as reported by US Department of Defense (DoD) sensors. A hypothesis has been proposed that this event was of interstellar origin. DoD data indicate that this bolide was produced by a meteor moving 44.8 km/s at only 18.7 km altitude, which describes a velocity profile that is exceptional in velocity, much less at such a low altitude. The Jörmungandr model developed by the author for dark flight modeling was adapted to estimate the luminous flight profile of this body. While this model has significant limits in use for luminous flight and all results must be viewed as preliminary, analysis indicates there is a compelling need for further investigation. Calculation of ram pressure by this object indicate that an iron or iron-rich meteorite 0.5m in diameter is a possible explanation for the reported DoD data.

M Fries↗

The 1973 NASA mission model

The April 1973 NASA Mission Model and NASA estimate of the April 1973 Non-NASA/ Non-DoD Mission Model for calendar years 1973 through 1991 are presented along with summary Mission Model totals for NASA, Non-NASA/Non-DoD, and DoD for calendar years 1980 through 1991.

Source record↗

The October 1973 space shuttle traffic model, revision 2

Traffic model data for the space shuttle for calendar years 1980 through 1991 are presented along with some supporting and summary data. This model was developed from the 1973 NASA Payload Model, dated October 1973, and the NASA estimate of the 1973 Non-NASA/Non-DoD Payload Model. The estimates for the DoD flights included are based on the 1971 DoD Mission Model.

Source record↗

The October 1973 expendable launch vehicle traffic model, revision 2

Traffic model data for current expendable launch vehicles (assuming no space shuttle) for calendar years 1980 through 1991 are presented along with some supporting and summary data. This model was based on a payload program equivalent in scientific return to the October 1973 NASA Payload Model, the NASA estimated non NASA/non DoD Payload Model, and the 1971 DoD Mission Model.

Source record↗

Programmatic effects of utilizing various space tug options

The results are summarized of the computerized (DORCA) analyses of a number of NASA/Non-NASA and DoD payload mission models that have been used in conjunction with studies of the Space Transportation System (STS). The first analysis performed was on the 1971 NASA/Non-NASA and DoD mission models. Subsequent to that, analyses of the June 1972 excursion to the 1971 NASA/Non-NASA mission models were performed. The mission models have two basic versions; i.e., one employing expendable payloads and another employing a best mix of expendable and reusable payloads. Both versions of the models have the same payload deployment schedule. However, in the best mix version, payloads are retrieved from orbit and whenever possible, refurbished payloads are deployed. The analyses were performed to determine the relative merits to different Tug configurations and of Tug combinations employed in several phased development schemes.

Stricker, L. T.↗

The MATHEMATICA economic analysis of the Space Shuttle System

Detailed economic analysis shows the Thrust Assisted Orbiter Space Shuttle System (TAOS) to be the most economic Space Shuttle configuration among the systems studied. The development of a TAOS Shuttle system is economically justified within a level of space activities between 300 and 360 Shuttle flights in the 1979-1990 period, or about 25 to 30 flights per year, well within the U.S. Space Program including NASA and DoD missions. If the NASA and DoD models are taken at face value (624 flights), the benefits of the Shuttle system are estimated to be $13.9 billion with a standard deviation of plus or minus $1.45 billion in 1970 dollars (at a 10% social rate of discount). If the expected program is modified to 514 flights (in the 1979-1990 period), the estimated benefits of the Shuttle system are $10.2 billion, with a standard deviation of $940 million (at a 10% social rate of discount).

Heiss, K. P.↗

Current and future opportunities in aeronautical engineering

Current demand for aeronautical engineers is approximately balanced with supply, with some shortfall in certain specialties. In the near term (5 years), demand will exceed supply of new graduates. A number of factors have brought on the state of imbalance: (1) the cyclic nature of the demand of our defense requirements; (2) drastic changes in DOD aircraft procurement; (3) the emergence of the space age; (4) evolution of social attitudes toward technology with resultant decline in enrollments; and (5) the universities themselves through their influences in the direction of careers selected by engineers. These factors have been counteracted somewhat by increased DOD emphasis on aircraft development programs but more importantly by the favorable growth in civil aircraft requirements.

Brizendine, J. C.↗

Advanced space system concepts and their orbital support needs (1980 - 2000). Volume 4: Detailed data. Part 2: Program plans and common support needs (a study of the commonality of space vehicle applications to future national needs

The methodology of alternate world future scenarios is utilized for selecting a plausible, though not advocated, set of future scenarios each of which results in a program plan appropriate for the respective environment. Each such program plan gives rise to different building block and technology requirements, which are analyzed for common need between the NASA and the DoD for each of the alternate world scenarios. An essentially invariant set of system, building block, and technology development plans is presented at the conclusion, intended to allow protection of most of the options for system concepts regardless of what the actual future world environment turns out to be. Thus, building block and technology needs are derived which support: (1) each specific world scenario; (2) all the world scenarios identified in this study; or (3) generalized scenarios applicable to almost any future environment. The output included in this volume consists of the building blocks, i.e.: transportation vehicles, orbital support vehicles, and orbital support facilities; the technology required to support the program plans; identification of their features which could support the DoD and NASA in common; and a complete discussion of the planning methodology.

Bekey, I.↗

Advanced space program studies. Overall executive summary

NASA and DoD requirements and planning data were used in multidiscipline advanced planning investigations of space operations and associated elements (including man), identification of potential low cost approaches, vehicle design, cost synthesis techniques, technology forecasting and opportunities for DoD technology transfer, and the development near-, mid-, and far-term space initiatives and development plans with emphasis on domestic and military commonality. An overview of objectives and results are presented for the following studies: advanced space planning and conceptual analysis, shuttle users, technology assessment and new opportunities, standardization and program practice, integrated STS operations planning, solid spinning upper stage, and integrated planning support functions.

Wolfe, M. G.↗

Joint DOD/NASA study: Consolidation of expendable launch vehicles during transition to the space transportation system

A considerable amount of data is presented which was needed to compare consolidation options. The study shows that there is no clean-cut DOD/NASA advantage for consolidation. However, for DOD uses, the technical advantage of using the Titan III/IUS for the Titan IIIC in the transition era, coupled with a possible cost-push in converting to the Titan III/IUS, warrants serious DOD consideration.

Source record↗

Advanced space power requirements and techniques. Task 1: Mission projections and requirements. Volume 1: Technical report

The objectives of this study were to: (1) develop projections of the NASA, DoD, and civil space power requirements for the 1980-1995 time period; (2) identify specific areas of application and space power subsystem type needs for each prospective user; (3) document the supporting and historical base, including relevant cost related measures of performance; and (4) quantify the benefits of specific technology projection advancements. The initial scope of the study included: (1) construction of likely models for NASA, DoD, and civil space systems; (2) generation of a number of future scenarios; (3) extraction of time phased technology requirements based on the scenarios; and (4) cost/benefit analyses of some of the technologies identified.

Wolfe, M. G.↗

The 100 kW space station

Solar array power systems for the space construction base are discussed. Nickel cadmium and nickel hydrogen batteries are equally attractive relative to regenerative fuel cell systems at 5 years life. Further evaluation of energy storage system life (low orbit conditions) is required. Shuttle and solid polymer electrolyte fuel cell technology appears adequate; large units (approximately four times shuttle) are most appropriate and should be studied for a 100 KWe SCB system. A conservative NiH2 battery DOD (18.6%) was elected due to lack of test data and offers considerable improvement potential. Multiorbit load averaging and reserve capacity requirements limit nominal DOD to 30% to 50% maximum, independent of life considerations.

Mckhann, G.↗

Initial guidelines and estimates for a power system with inertial (flywheel) energy storage

The starting point for the assessment of a spacecraft power system utilizing inertial (flywheel) energy storage. Both general and specific guidelines are defined for the assessment of a modular flywheel system, operationally similar to but with significantly greater capability than the multimission modular spacecraft (MMS) power system. Goals for the flywheel system are defined in terms of efficiently train estimates and mass estimates for the system components. The inertial storage power system uses a 5 kw-hr flywheel storage component at 50 percent depth of discharge (DOD). It is capable of supporting an average load of 3 kw, including a peak load of 7.5 kw for 10 percent of the duty cycle, in low earth orbit operation. The specific power goal for the system is 10 w/kg, consisting of a 56w/kg (end of life) solar array, a 21.7 w-hr/kg (at 50 percent DOD) flywheel, and 43 w/kg power processing (conditioning, control and distribution).

Slifer, L. W., Jr.↗

Study for analysis of benefit versus cost of low thrust propulsion system

The benefits and costs associated with placing large space systems (LSS) in operational orbits were investigated, and a flexible computer model for analyzing these benefits and costs was developed. A mission model for LSS was identified that included both NASA/Commercial and DOD missions. This model included a total of 68 STS launches for the NASA/Commercial missions and 202 launches for the DOD missions. The mission catalog was of sufficient depth to define the structure type, mass and acceleration limits of each LSS. Conceptual primary propulsion stages (PPS) designs for orbital transfer were developed for three low thrust LO2/LH2 engines baselined for the study. The performance characteristics for each of these PPS was compared to the LSS mission catalog to create a mission capture. The costs involved in placing the LSS in their operational orbits were identified. The two primary costs were that of the PPS and of the STS launch. The cost of the LSS was not included as it is not a function of the PPS performance. The basic relationships and algorithms that could be used to describe the costs were established. The benefit criteria for the mission model were also defined. These included mission capture, reliability, technical risk, development time, and growth potential. Rating guidelines were established for each parameter. For flexibility, each parameter is assigned a weighting factor.

Hamlyn, K. M.↗

Battery model for electrical power system energy balance

A model to simulate nickel-cadmium battery performance and response in a spacecraft electrical power system energy balance calculation was developed. The voltage of the battery is given as a function of temperature, operating depth-of-charge (DOD), and battery state-of-charge. Also accounted for is charge inefficiency. A battery is modeled by analysis of the results of a multiparameter battery cycling test at various temperatures and DOD's.

Hafen, D. P.↗