Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECONTAMINATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Decontamination of Plutonium from Fluoride and Chloride during Oxalate Precipitation, Filtration and Calcination Processes

Due to analytical limitations for the determination of fluoride (F) and chloride (Cl) in a previous anion exchange study, an additional study of the decontamination of Pu from F and Cl by oxalate precipitation, filtration and calcination was performed. Anion product solution from the previous impurity study was precipitated as an oxalate, filtered, and calcined to produce an oxide for analysis by pyrohydrolysis for total Cl and F. Analysis of samples from this experiment achieved the purity specification for Cl and F for the proposed AFS-2 process. Decontamination factors (DF's) for the overall process (including anion exchange) achieved a DF of ~5000 for F and a DF of ~100 for Cl. Similar experiments where both HF and HCl were spiked into the anion product solution to a ~5000 μg /g Pu concentration showed a DF of 5 for F and a DF of 35 for Cl across the combined precipitation-filtration-calcination process steps.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of Ammonium and Iodine Decontamination Factors for Hanford's Waste Treatment and Immobilization Plant Feed in the Effluent Treatment Facility

Savannah River National Laboratory (SRNL) reviewed the unit operations in the Effluent Treatment Facility (FTP) at the Hanford site to estimate the partitioning of iodine and ammonia when processing Waste Treatments and Immobilization Plant (WTP) feed. The evaluation consisted of literature and vendor data reviews and no experiments were performed. A list of the unit operations reviewed, along with estimated decontamination factors (DFs) for both iodine and ammonium are shown in the table below. With the exception of the Peroxide Decomposer, reasonable estimations of the decontamination factors for all operations are provided.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Full-Scale Drinking Water System Decontamination at the Water Security Test Bed

The US Environmental Protection Agency's (USEPA's) Water Security Test Bed (WSTB) facility is a full-scale representation of a drinking water distribution system. In collaboration with the Idaho National Laboratory, USEPA designed the WSTB facility to support full-scale evaluations of water infrastructure, premise plumbing, and appliance decontamination. Thus far, USEPA's research has focused on decontamination of Bacillus globigii (BG) spores, a nonpathogenic surrogate for Bacillus anthracis, and Bakken crude oil. Flushing and disinfection effectively removed 7–8 log 10 BG spores from the bulk water, but only 2–3 log 10 from the pipe wall coupons. Bakken crude oil components were then removed from distribution pipe and premise plumbing water by flushing, although 55% of the injected oil components persisted in the dishwasher and refrigerator water dispenser. Using the WSTB facility allows USEPA to test contaminants without any human health or ecological risk and to inform water systems on effective methodologies for responding to contamination incidents.

42 ENGINEERING↗

MSW Decontamination: Methods to Improve Biofuel Yields

MSW is usually contaminated with a variety of undesirable materials (food, chemicals, glass, metal) that can impact downstream applications such as conversion to biofuels. This presentation will showcase two decontamination methods using either a detergent wash or an organic solvent extraction to demonstrate up to 30% increase in biofuel precursor yields for plastic and paper MSW. The economics of the two decontamination methods will also be presented.

09 BIOMASS FUELS↗

Proceedings of the 2007 ANS Topical Meeting on Decommissioning, Decontamination, and Reutilization - DD and R 2007

The American Nuclear Society (ANS) Topical Meeting on Decommissioning, Decontamination, and Reutilization (DD and R 2007), 'Capturing Decommissioning Lessons Learned', is sponsored by the ANS Decommissioning, Decontamination and Reutilization; Environmental Sciences; and Fuel Cycle and Waste Management Divisions. This meeting provides a forum for an international exchange of technical knowledge and project management experience gained from the ongoing process of decommissioning nuclear facilities. Of particular note is the number of projects that are approaching completion. This document gathers 113 presentations given at this meeting.

42 ENGINEERING↗

Impacts to Project from {sup 99}Tc Contamination on the K-25 / K-27 Decontamination and Decommissioning Project

Like so many good ideas that evolved as the U.S. was learning about nuclear materials, the introduction of recovered uranium from the fuel reprocessing efforts is causing additional headaches in the decontamination and decommissioning (D and D) of the gaseous diffusion plants at the East Tennessee Technology Park in Oak Ridge, Tennessee. Technetium-99 ({sup 99}Tc) is a low-energy beta emitter that is a product of the fission reaction. Its introduction into the in an operating gaseous diffusion plant is of little or no operational or dose concern but creates many issues when planning and conducting the D and D of those facilities. These issues include control of contamination and beta exposure to workers and significant waste management issues when trying to ship and dispose of the waste materials. Technetium-99 is very long lived and mobile in the environment and is therefore has very restrictive concentration limits in wastes going to disposal facilities. The gaseous diffusion process was developed for isotopic enrichment of uranium. Gaseous uranium hexafluoride (UF{sub 6}) was passed through a series of stages to affect the separation of the fissionable U-235 from U-238. Because of the low concentration of U-235 in naturally occurring uranium ({approx}0.711%), the number of separation stages required to enrich the uranium to a level usable for reactor fuels or nuclear weapons was quite large. For instance, the K-25 Building, where uranium was enriched, is a U-shaped structure approximately one mile in length. Similar sizes of stages were grouped in cells, and up to 14 cells were contained in a single building unit. Multiple building units were arranged in series to process the uranium, with the capability of isolation and bypass of each cell. This arrangement of multiple stages was referred to as the cascades. Since UF{sub 6} is a heavy molecule, lighter gases that were contained in the process gas stream moved at a higher rate than UF{sub 6}. These gases tended to quickly flow to the latter stages of the cascade (also known as the 'top of the cascade'). The removal of certain undesired lighter gases was done in the purge cascades. Technetium forms volatile fluoride compounds under the conditions used to chemically convert uranium oxide (UO{sub 2}) in reactor tails to UF{sub 6}. Thus, Tc vaporized and flowed with the process gas in the cascade. However, because Tc is much lighter than U, it rapidly migrated to the top of the cascade and into the purge cascades. Most of the Tc is thought to be located in the purge cascade equipment. The purge cascade equipment is generally located in Area 1 of K-25 and Areas 7 and 8 in K-27. Fourteen building units are now known or believed to be contaminated with {sup 99}Tc. During the demolition activities, the equipment used is expected to become contaminated. To prevent cross-contamination of other wastes with {sup 99}Tc, separate equipment will be used for the southern end of the K-25 east wing. This same demolition equipment will be employed in K-27 to help minimize equipment decontamination efforts at the end of the project. However, because of this sequential schedule, any delays for demolition of the K-25 Building will adversely impact the schedule for K-27. The {sup 99}Tc contamination of the K-25 and K-27 D and D Project is now better known, but considerable planning will still be needed to control migration of this material to meet radiological controls and waste management limits. Since {sup 99}Tc has been an emerging issue over the last decade, the measurement, controls, and ultimately the impacts (e.g., cost and schedule) to the project have caused a significant increase in the planning effort for the D and D of these facilities and are expected to increase the ultimate cost of remediation. The cost increase will not be known until the planning effort is restarted (probably in FY 08-09). The contamination controls to be put in place to minimize the spread of this contaminant are not expected to be fully demonstrated until the demolition of the affected areas later in the project.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Optimized Integration of the Decontamination Plan and the Radwaste Management Plan into Decommissioning Plan to the VVR-S Research Reactor from Romania

The paper presents the progress of the Decontamination Plan and Radioactive Waste Management Plan which accompanies the Decommissioning Plan for research reactor VVR-S located in Magurele, Ilfov, near Bucharest, Romania. The new variant of the Decommissioning Plan was elaborated taking into account the IAEA recommendation concerning radioactive waste management. A new feasibility study for VVR-S decommissioning was also elaborated. The preferred safe management strategy for radioactive wastes produced by reactor decommissioning is outlined. The strategy must account for reactor decommissioning, as well as rehabilitation of the existing Radioactive Waste Treatment Plant and the upgrade of the Radioactive Waste Disposal Facility at Baita-Bihor. Furthermore, the final rehabilitation of the laboratories and reusing of cleaned reactor building is envisaged. An inventory of each type of radioactive waste is presented. The proposed waste management strategy is selected in accordance with the IAEA assistance. Environmental concerns are a part of the radioactive waste management strategy. In conclusion: The current version 8 of the Draft Decommissioning Plan which include the Integrated concept of Decontamination and Decommissioning and Radwaste Management, reflects the substantial work that has been incorporated by IFIN-HH in collaboration with SITON, which has resulted in substantial improvement in document The decommissioning strategy must take into account costs for VVR-S Reactor decommissioning, as well as costs for much needed refurbishments to the radioactive waste treatment plant and the Baita-Bihor waste disposal repository. Several improvements to the Baita-Bihor repository and IFIN-HH waste treatment facility were proposed. The quantities and composition of the radioactive waste generated by VVR-S Reactor dismantling were again estimated by streams and the best demonstrated practicable processing solution was proposed. The estimated quantities of materials to be managed in the near future raise some issues that need to be solved swiftly, such as treatment of aluminum and lead and graphite management. It is envisaged that these materials to be treated to Subsidiary for Nuclear Research (SCN) Pitesti. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decontamination of the Plum Brook Reactor Facility Hot Cells

The NASA Plum Brook Reactor Facility decommissioning project recently completed a major milestone with the successful decontamination of seven hot cells. The cells included thick concrete walls and leaded glass windows, manipulator arms, inter cell dividing walls, and roof slabs. There was also a significant amount of embedded conduit and piping that had to be cleaned and surveyed. Prior to work starting evaluation studies were performed to determine whether it was more cost effective to do this work using a full up removal approach (rip and ship) or to decontaminate the cells to below required clean up levels, leaving the bulk of the material in place. This paper looks at that decision process, how it was implemented, and the results of that effort including the huge volume of material that can now be used as fill during site restoration rather than being disposed of as LLRW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On-Site Decontamination System for Liquid Low Level Radioactive Waste - 13010

This study is based on an evaluation of purification methods for liquid low-level radioactive waste (LLLW) by using natural zeolite. Generally the volume of liquid low-level waste is relatively large and the specific activity is rather low when compared to other radioactive waste types. In this study, a pilot scale column was used with natural zeolite as an ion exchanger media. Decontamination and minimization of LLLW especially at the generation site decrease operational cost in waste management operations. Portable pilot scale column was constructed for decontamination of LLW on site. Effect of temperature on the radionuclide adsorption of the zeolite was determined to optimize the waste solution temperature for the plant scale operations. In addition, effect of pH on the radionuclide uptake of the zeolite column was determined to optimize the waste solution pH for the plant scale operations. The advantages of this method used for the processing of LLLW are discussed in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Planning Tool for Estimating Waste Generated by a Radiological Incident and Subsequent Decontamination Efforts - 13569

Management of debris and waste from a wide-area radiological incident would probably constitute a significant percentage of the total remediation cost and effort. The U.S. Environmental Protection Agency's (EPA's) Waste Estimation Support Tool (WEST) is a unique planning tool for estimating the potential volume and radioactivity levels of waste generated by a radiological incident and subsequent decontamination efforts. The WEST was developed to support planners and decision makers by generating a first-order estimate of the quantity and characteristics of waste resulting from a radiological incident. The tool then allows the user to evaluate the impact of various decontamination/demolition strategies on the waste types and volumes generated. WEST consists of a suite of standalone applications and Esri{sup R} ArcGIS{sup R} scripts for rapidly estimating waste inventories and levels of radioactivity generated from a radiological contamination incident as a function of user-defined decontamination and demolition approaches. WEST accepts Geographic Information System (GIS) shape-files defining contaminated areas and extent of contamination. Building stock information, including square footage, building counts, and building composition estimates are then generated using the Federal Emergency Management Agency's (FEMA's) Hazus{sup R}-MH software. WEST then identifies outdoor surfaces based on the application of pattern recognition to overhead aerial imagery. The results from the GIS calculations are then fed into a Microsoft Excel{sup R} 2007 spreadsheet with a custom graphical user interface where the user can examine the impact of various decontamination/demolition scenarios on the quantity, characteristics, and residual radioactivity of the resulting waste streams. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Surface Decontamination Using Laser Ablation Process - 12032

A new decontamination method has been investigated and used during two demonstration stages by the Clean-Up Business Unit of AREVA. This new method is based on the use of a Laser beam to remove the contaminants present on a base metal surface. In this paper will be presented the type of Laser used during those tests but also information regarding the efficiency obtained on non-contaminated (simulated contamination) and contaminated samples (from the CEA and La Hague facilities). Regarding the contaminated samples, in the first case, the contamination was a quite thick oxide layer. In the second case, most of the contamination was trapped in dust and thin grease layer. Some information such as scanning electron microscopy (SEM), X-Ray scattering spectroscopy and decontamination factors (DF) will be provided in this paper. Laser technology appears to be an interesting one for the future of the D and D applications. As shown in this paper, the results in terms of efficiency are really promising and in many cases, higher than those obtained with conventional techniques. One of the most important advantages is that all those results have been obtained with no generation of secondary wastes such as abrasives, chemicals, or disks... Moreover, as mentioned in introduction, the Laser ablation process can be defined as a 'dry' process. This technology does not produce any liquid waste (as it can be the case with chemical process or HP water process...). Finally, the addition of a vacuum system allows to trap the contamination onto filters and thus avoiding any dissemination in the room where the process takes place. The next step is going to be a commercial use in 2012 in one of the La Hague buildings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decontamination of Nuclear Liquid Wastes Status of CEA and AREVA R and D: Application to Fukushima Waste Waters - 12312

Liquid wastes decontamination processes are mainly based on two techniques: Bulk processes and the so called Cartridges processes. The first technique has been developed for the French nuclear fuel reprocessing industry since the 60's in Marcoule and La Hague. It is a proven and mature technology which has been successfully and quickly implemented by AREVA at Fukushima site for the processing of contaminated waters. The second technique, involving cartridges processes, offers new opportunities for the use of innovative adsorbents. The AREVA process developed for Fukushima and some results obtained on site will be presented as well as laboratory scale results obtained in CEA laboratories. Examples of new adsorbents development for liquid wastes decontamination are also given. A chemical process unit based on co-precipitation technique has been successfully and quickly implemented by AREVA at Fukushima site for the processing of contaminated waters. The asset of this technique is its ability to process large volumes in a continuous mode. Several chemical products can be used to address specific radioelements such as: Cs, Sr, Ru. Its drawback is the production of sludge (about 1% in volume of initial liquid volume). CEA developed strategies to model the co-precipitation phenomena in order to firstly minimize the quantity of added chemical reactants and secondly, minimize the size of co-precipitation units. We are on the way to design compact units that could be mobilized very quickly and efficiently in case of an accidental situation. Addressing the problem of sludge conditioning, cementation appears to be a very attractive solution. Fukushima accident has focused attention on optimizations that should be taken into account in future studies: - To better take account for non-typical aqueous matrixes like seawater; - To enlarge the spectrum of radioelements that can be efficiently processed and especially short lives radioelements that are usually less present in standard effluents resulting from nuclear activities; - To develop reversible solid adsorbents for cartridge-type applications in order to minimize wastes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PaR Tensile Truss for Nuclear Decontamination and Decommissioning - 12467

Remote robotics and manipulators are commonly used in nuclear decontamination and decommissioning (D and D) processes. D and D robots are often deployed using rigid telescoping masts in order to apply and counteract side loads. However, for very long vertical reaches (15 meters or longer) and high lift capacities, a telescopic is usually not practical due to the large cross section and weight required to make the mast stiff and resist seismic forces. For those long vertical travel applications, PaR Systems has recently developed the Tensile Truss, a rigid, hoist-driven 'structure' that employs six independent wire rope hoists to achieve long vertical reaches. Like a mast, the Tensile Truss is typically attached to a bridge-mounted trolley and is used as a platform for robotic manipulators and other remotely operated tools. For suspended, rigid deployment of D and D tools with very long vertical reaches, the Tensile Truss can be a better alternative than a telescoping mast. Masts have length limitations that can make them impractical or unworkable as lengths increase. The Tensile Truss also has the added benefits of increased safety, ease of decontamination, superior stiffness and ability to withstand excessive side loading. A Tensile Truss system is currently being considered for D and D operations and spent fuel recovery at the Fukushima Daiichi Nuclear Power Plant in Japan. This system will deploy interchangeable tools such as underwater hydraulic manipulators, hydraulic shears and crushers, grippers and fuel grapples. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decontamination and Decommissioning Program of a Radiopharmaceuticals Production Facility - 17103

On May 2012, Best Medical Belgium (BMB) S.A., a manufacturer of pharmaceutical products located on the nuclear site of Fleurus, was declared bankrupt. According to the Belgian law, ONDRAF/NIRAS (Belgian Radioactive Waste Management Agency) was entrusted with the clean-up and the decommissioning operations of the former BMB facilities, nowadays known as 'ONDRAF/NIRAS Site Fleurus' (ONSF). In June 2015, ONSF launched a Decontamination and Decommissioning (D and D) program, for which Tractebel supports the definition of the clean-up and decommissioning strategies; the drafting of the Final Decommissioning Plan (FDP) and License Application for decommissioning; and the follow-up of the clean-up and upcoming D and D works on site. Four nuclear buildings are part of the clean-up and D and D activities. One of them, Building 14 (B14), represents the most challenging task with the clean-up of highly contaminated areas and their further decommissioning up to greenfield. Beside its two cyclotrons successively used for the production of radioisotopes, this building features hot cells and glove boxes used for the purification of radioisotopes and the conditioning of the final pharmaceutical product. The present paper aims at presenting the development of the D and D program in terms of modifications of existing facilities to allow carrying out the clean-up and D and D activities and the management of dismantled radioactive materials in a safe, efficient and cost-effective way as well as in terms of strategic options to be developed for the FDP. To support the clean-up and D and D activities, several workshops have been designed in order to treat radioactive materials removed from the building rooms. Those workshops feature an input buffer storage area, a common output buffer storage area and installations for the treatment of radioactive materials and waste (handling devices, cutting means, decontamination means, free release measurements means, etc.). Some modifications to the existing auxiliary systems will be required in order to dispose of appropriate systems to operate those workshops in a safe way. Activated concrete structures will constitute the most important part of radioactive materials that will arise from the decommissioning activities. To limit the total decommissioning costs, and especially the costs associated to radioactive waste management, two strategies have been developed in order to manage a part of activated concrete as candidate for free release with a certain decay period or as candidate for conventional landfill. Both strategies will have to be further detailed and discussed with the competent Authorities to ensure they can actually be implemented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robotic Grasp Assistance for Decontamination and Decommissioning Tasks: Initial Applications with RoboGlove - 17310

RoboGlove, developed by NASA and General Motors, is a wearable robotic grasp assist device designed to augment human strength and endurance during manual tasks. Recent testing as part of the U.S. Department of Energy Office of Environmental Management's (DOE-EM's) Science of Safety Initiative has provided the opportunity to explore the glove's use within the context of decontamination and decommissioning work. Capable of providing a wearer with an additional 65-90 N (15-20 lb) of additional continuous grip strength, RoboGlove has the potential to decrease fatigue during long duration tasks, thereby reducing the risk of repetitive stress and other work related injuries. While current work at NASA focuses on integrating robotic grasp assistance with space suit gloves, the effort described herein focuses on the terrestrial application of RoboGlove to DOE-EM's cleanup mission. Following a brief technical description of RoboGlove, testing by United Steelworkers Union personnel at the Portsmouth Gaseous Diffusion Plant is described. Members of the workforce, in collaboration with NASA technologists, studied RoboGlove utility and performance while using tools common to the nuclear decontamination and decommissioning efforts at the plant. Results and feedback from this testing aim at identifying candidate activities for which RoboGlove holds particular promise as a workforce tool, in an effort to facilitate the infusion of robotic technology into routine workflow and processes across the DOE complex for the benefit of worker safety and health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium and Beryllium Decontamination and Decommissioning in a Developed Neighborhood - 17494

In September 2008, the United States Environmental Protection Agency (EPA), Region 1, issued an Administrative Order by Consent (AOC) that required the completion of a Non-Time-Critical Removal Action for the Nuclear Metals, Inc. Site (Site), which is located in Concord, Massachusetts. The AOC required decontamination and demolition of the site buildings and structures. The Site was originally used for radiological research and production, and included foundry equipment for melting metals, extrusion presses and metal working equipment, pickling and etching tanks, and electroplating equipment. In the 1970's, Nuclear Metals, Inc. developed a large scale depleted uranium manufacturing, operation, which included the manufacturing of penetrators, or bullets, from depleted uranium (DU) as a defense contractor for the U.S. Army. Later operations included production of beryllium alloy materials. The Site included a two-story, five-section interconnected building, a tank house, a hydrogen peroxide tank house, two gas cylinder storage huts, and four 'Butler' metal storage buildings, which had a combined footprint of approximately 17,000 square meters (185,000 square feet). The buildings were principally contaminated with DU and beryllium dust, along with asbestos, PCBs, lead and other constituents. The required removal action at the Site consisted of building stabilization activities to remove flammable materials, install temporary utilities and control dust to create a safe work environment within the buildings for site workers; removal of hazardous materials; demolition of all structures and equipment; and off-site disposal of waste materials. The Decontamination and Decommissioning (D and D) activities and highlights of some of the public involvement work required to complete building D and D work in a residential community are discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Characterisation and Removal of Water Droplets in High Pressure Water Jetting Nuclear Decontamination - 16036

The use of high pressure water jetting as a decontamination method has seen limited deployment within decommissioning operations in the UK. The full extent of secondary waste forms produced as a result of such operation has not been previously investigated. The aim of this investigation was to determine the process of water droplet formation within the decontamination area and subsequent air treatment pathway. Evaluating the potential security hazards associated with the most widely implemented air filters used as a radiological protection barrier. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Chemical and Foaming Stability of Foam Decontaminating Agents - 16137

This study conducted experiments to evaluate the stability of nano foaming agents by adding various types of surfactants, silica nanoparticles, and viscosifiers with the aim of enhancing the stability of foaming agents containing nanoparticles. Nonionic surfactants such as EM100 showed higher stability as compared to the Sodium Dodecyl Sulfate (SDS) anionic surfactant, and the foam stability decreased as the surfactant concentration increased. The co-surfactant addition did not significantly affect the foam stability, but the addition of Xantan gum-one of the various viscosifiers tested in this study-resulted in the highest foam stability. When silica nanoparticles were added to the surfactant EM100, the foam stability improved further. In particular, the foam stability of the nano foaming agent was observed to be the maximum when a partially hydrophobic nano-porous silica such as KAERI 1 was added, as compared to the addition of a hydrophilic dry silica such as M5. This is because the partially hydrophobic particles were distributed over the liquid film between the foams, thereby preventing drainage and increasing the stability of the foaming agent fluid. The manufactured nano foaming agent can be used not only for the effective decontamination of large-sized equipment or large facilities but also for overcoming the problem of production of a large amount of radioactive waste during chemical decontamination. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗