Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DAMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Design Tools to Assess Hydro-Turbine Biological Performance: Priest Rapids Dam Turbine Replacement Project

Over the past two decades, there have been many studies describing injury mechanisms associated with turbine passage, the response of various fish species to these mechanisms, and the probability of survival through dams. Although developing tools to design turbines that improve passage survival has been difficult and slow, a more robust quantification of the turbine environment has emerged through integrating physical model data, fish survival data, and computational fluid dynamics (CFD) studies. Grant County Public Utility District (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now almost 50 years old. The Utility District plans to refit all of these aging turbines with new turbines. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when replacing the turbines. In this presentation, a method for turbine biological performance assessment (BioPA) is introduced. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We will present application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.

CFD↗

Dam Construction in Lancang-Mekong River Basin Could Mitigate Future Flood Risk From Warming-Induced Intensified Rainfall

Water resources management, in particular flood control, in the Mekong River Basin (MRB) faces two key challenges in the 21st century: climate change and dam construction. Herein, a large scale distributed Geomorphology-Based Hydrological Model coupled with a simple reservoir regulation model (GBHM-MK-SOP) is used to investigate the relative effects of climate change and dam construction on the flood characteristics in the MRB. Results suggest an increase in both flood magnitude and frequency under climate change, which is more severe in the upstream basin and increases over time. However, dam construction and stream regulation reduce flood risk consistently throughout this century, with more obvious effects in the upstream basin where larger reservoirs will be located. The flood mitigation effect of dam regulation dominates over the flood intensification effect of climate change before 2060, but the latter emerges more prominently after 2060 and dominates the flood risk especially in the lower basin.

54 ENVIRONMENTAL SCIENCES↗

Estimation of placental and lactational transfer and tissue distribution of atrazine and its main metabolites in rodent dams, fetuses, and neonates with physiologically based pharmacokinetic modeling

Atrazine (ATR) is a widely used chlorotriazine herbicide, a ubiquitous environmental contaminant, and a potential developmental toxicant. To quantitatively evaluate placental/lactational transfer and fetal/neonatal tissue dosimetry of ATR and its major metabolites, physiologically based pharmacokinetic models were developed for rat dams, fetuses and neonates. These models were calibrated using pharmacokinetic data from rat dams repeatedly exposed (oral gavage; 5 mg/kg) to ATR followed by model evaluation against other available rat data. Model simulations corresponded well to the majority of available experimental data and suggest that: (1) the fetus is exposed to both ATR and its major metabolite didealkylatrazine (DACT) at levels similar to maternal plasma levels, (2) the neonate is exposed mostly to DACT at levels two-thirds lower than maternal plasma or fetal levels, while lactational exposure to ATR is minimal, and (3) gestational carryover of DACT greatly affects its neonatal dosimetry up until mid-lactation. To test the model's cross-species extrapolation capability, a pharmacokinetic study was conducted with pregnant C57BL/6 mice exposed (oral gavage; 5 mg/kg) to ATR from gestational day 12 to 18. By using mouse-specific parameters, the model predictions fitted well with the measured data, including placental ATR/DACT levels. However, fetal concentrations of DACT were overestimated by the model (10-fold). This overestimation suggests that only around 10% of the DACT that reaches the fetus is tissue-bound. These rodent models could be used in fetal/neonatal tissue dosimetry predictions to help design/interpret early life toxicity/pharmacokinetic studies with ATR and as a foundation for scaling to humans. - Highlights: • We developed PBPK models for atrazine in rat dams, fetuses, and neonates. • We conducted pharmacokinetic (PK) study with atrazine in pregnant mice. • Model predictions were in good agreement with experimental rat and mouse PK data. • The fetus is exposed to atrazine/its main metabolite at levels similar to the dam. • The nursing neonate is exposed primarily to atrazine's main metabolite DACT.

60 APPLIED LIFE SCIENCES↗

Sluiceway Operations to Pass Juvenile Salmonids at The Dalles Dam, Columbia River, USA

Existing ice and trash sluiceways are commonly used to pass juvenile salmonids downstream at hydropower dams through a benign, non-turbine route. At The Dalles Dam on the Columbia River, managers undertook optimizing operations of sluiceway weirs to maximize survival of juvenile salmonids at the powerhouse. We applied fixed-location hydroacoustic methods to compare fish passage rates and sluiceway efficiencies for two weir configurations during 2004 and 2005: three weirs versus six weirs, located at the mid- versus east powerhouse, respectively. We also analyzed horizontal distributions of passage at the sluiceway and turbines and the effects of operating turbines beneath open sluiceway gates to provide supporting data relevant to operations optimization. Based on the findings, we recommend the following for long-term operations for the sluiceway at The Dalles Dam: open six rather than three sluiceway weirs to take advantage of the maximum hydraulic capacity of the sluiceway; open the three weirs above the western-most operating main turbine unit (MU) and the three weirs at MU 8 where turbine passage rates are relatively high; operate the turbine units below open sluiceway weirs as a standard procedure; operate the sluiceway 24 h/d year-round to maximize its benefits to juvenile salmonids; and use the same operations for spring and summer emigrants. These operational concepts are transferable to dams where sluiceway surface flow outlets are used protect downstream migrating fishes.

juvenile salmonid passage↗

Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012

The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

Skalski, J. R.↗

Monitoring of Juvenile Subyearling Chinook Salmon Survival and Passage at John Day Dam, Summer 2010

The purpose of this study was to evaluate dam passage survival of subyearling Chinook salmon (Oncorhynchus tshawytscha; CH0) at John Day Dam (JDA) during summer 2010. This study was conducted by researchers from the Pacific Northwest National Laboratory (PNNL) in collaboration with the Pacific States Marine Fisheries Commission (PSMFC) and the University of Washington (UW). The study was designed to estimate the effects of 30% and 40% spill treatment levels on single release survival rates of CH0 passing through two reaches: (1) the dam, and 40 km of tailwater, (2) the forebay, dam, and 40 km of tailwater. The study also estimated additional passage performance measures which are stipulated in the Columbia Basin Fish Accords.

Weiland, Mark A.↗

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at John Day Dam, Spring 2010

The purpose of this study was to compare dam passage survival, at two spill treatment levels, of yearling Chinook salmon and steelhead smolts at John Day Dam during spring 2010. The two treatments were 30% and 40% spill out of total project discharge. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated forebay residence time, tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. However, by agreement among the stakeholders, this study was not an official BiOp compliance test because the long-term passage measures at John Day Dam have yet to be finalized and another year of spill-treatment testing was desired.

Weiland, Mark A.↗

Non-Powered Dam Retrofit Exemplary Design for Hydropower Applications

Non-powered dams (NPDs) represent complex systems, situated at the intersection of natural stream environments and the built environment. The presence and operations of NPDs affect stream constituents (e.g., fish, recreational craft, sediment, water) and serve one or more engineered purposes (e.g., recreation, flood control, water supply, irrigation, tailings and debris control, navigation). By definition, NPDs do not provide hydropower generation. However, every NPD contains some untapped hydropower resource potential, represented by the pre-existing hydraulic head created by the dam and presence of flowing water. Adding power generation to an NPD requires retrofitting the NPD, which could involve the addition of any new component or function beyond that currently installed. Because this research is funded by the US Department of Energy Water Power Technologies Office, adding hydropower to NPDs is among the primary objectives for research investment. However, NPD retrofitting extends beyond the purview of hydropower additions. This report provides background information regarding NPD development in the United States, including an overview of the US NPD population, development potential, and recent development. It also summarizes challenges and opportunities facing NPD retrofit development, highlights the importance of maintaining or improving stream and dam functionality, notes key NPD characteristics, describes NPD retrofit methods, and identifies innovation areas for spurring future NPD retrofit development. Section 4 describes retrofit exemplary design principles and concepts that could apply to a wide range of NPD projects. These principles and concepts inform an NPD Retrofit Exemplary Design Specification (REDS), as included in Appendix A. The NPD REDS is heavily influenced by prior work under the standard modular hydropower technology acceleration research initiative, especially the work documented in the Exemplary Design Envelope Specification for Standard Modular Hydropower Technology (Witt et al., 2017). Whereas this prior work focuses on a particular technology class that applies most intentionally for new stream-reach development (i.e., greenfield sites), the NPD REDS contained herein applies more broadly to the NPD resource class and is technology-agnostic (i.e., the specific technologies intended to be described are not explicitly prescribed). This report serves as a part of early-phase research on NPD retrofit development, aimed toward spurring additional, follow-on efforts to specifically address development challenges, capitalize on development opportunities, and inspire innovation. As documented in the landmark “Hydropower Vision” report (DOE 2016), “transformative technical innovations able to meet the co-objectives of environmental sustainability and low-carbon energy will be critical to enabling additional hydropower growth.” This report serves as an important step in steering transformation of US non-powered dam infrastructure.

13 HYDRO ENERGY↗

A methodology for dam inventory and inspection with remotely sensed data

A methodology is presented to increase the efficiency and accuracy of dam inspection by incorporating remote sensing techniques into field-based monitoring programs. The methodology focuses on New York State and places emphasis on readily available remotely sensed data aerial photographs and Landsat data. Aerial photographs are employed in establishing a state-wide data base, referenced on county highway and U.S. Geological Survey 1:24,000 scale, topographic maps. Data base updates are conducted by county or region, using aerial photographs or Landsat as a primary source of information. Field investigations are generally limited to high-hazard or special problem dams, or to dams which cannot be assessed adequately with aerial photographs. Although emphasis is placed on available data, parameters for acquiring new aircraft data for assessing dam condition are outlined. Large scale (1:10,000) vertical, stereoscopic, color-infrared photography, flown during the spring or fall, is recommended.

Berger, J. P.↗

Geophysics Methods in Electrometric Assessment of Dams

The safety assessment of hydraulic structures is proposed to be conducted via geoelectric measurements, which are capable of assessing the health of earth dams in their natural bedding without intervention in their structure. Geoelectric measurements are shown as being capable of pinpointing hazardous parts of a dam, including areas of elevated seepage. Applications of such methods are shown for a number of mini-dams in the Sverdlovsk region. Aparameter (effective longitudinal conductivity) that may be used to monitor the safety of hydraulic structures is proposed. Quantitative estimates of this parameter are given in terms of the degree of safely.

42 ENGINEERING↗

Mathematical Modeling in Systems for Operational Evaluation of the Stress-Strain State of the Arch-Gravity Dam at the Sayano-Shushenskaya Hydroelectric Power Plant

Current studies of the stress-strain state of the dam at the Sayano-Shushenskaya Hydroelectric Power Plant at VNIIG based on mathematical modeling including full scale and experimental data are described. Applications and programs intended for automatic operational evaluation of the stress-strain state of the dam for optimizing control of the upper race level in the course of the annual filling-drawdown cycle and during seismic events are examined. Improvements in systems for monitoring the stress-strain state of concrete dams are proposed.

42 ENGINEERING↗

Fish Migration, Dams, and Loss of Ecosystem Services in the Mekong Basin

The past decade has seen increased international recognition of the importance of the services provided by natural ecosystems. It is unclear however whether such international awareness will lead to improved environmental management in many regions. We explore this issue by examining the specific case of fish migration and dams on the Mekong river. We determine that dams on the Mekong mainstem and major tributaries will have a major impact on the basin's fisheries and the people who depend upon them for food and income. We find no evidence that current moves towards dam construction will stop, and consider two scenarios for the future of the fisheries and other ecosystems of the basin. We conclude that major investment is required in innovative technology to reduce the loss of ecosystem services, and alternative livelihood strategies to cope with the losses that do occur

13 HYDRO ENERGY↗

Examining global electricity supply vulnerability to climate change using a high-fidelity hydropower dam model

Here, an important and plausible impact of a changing global climate is altered power generation from hydroelectric dams. Here we project 21st century global hydropower production by forcing a coupled, global hydrological and dam model with three General Circulation Model (GCM) projections run under two emissions scenarios. Dams are simulated using a detailed model that accounts for plant specifications, storage dynamics, reservoir bathymetry and realistic, optimized operations. We show that the inclusion of these features can have a non-trivial effect on the simulated response of hydropower production to changes in climate. Simulation results highlight substantial uncertainty in the direction of change in globally aggregated hydropower production (~–5 to + 5% change in mean global production by the 2080s under a high emissions scenario, depending on GCM). Several clearly impacted hotspots are identified, the most prominent of which encompasses the Mediterranean countries in southern Europe, northern Africa and the Middle East. In this region, hydropower production is projected to be reduced by approximately 40% on average by the end of the century under a high emissions scenario. After accounting for each country's dependence on hydropower for meeting its current electricity demands, the Balkans countries emerge as the most vulnerable (~ 5–20% loss in total national electricity generation depending on country). On the flipside, a handful of countries in Scandinavia and central Asia are projected to reap a significant increase in total electrical production (~ 5–15%) without investing in new power generation facilities.

13 HYDRO ENERGY↗

The effects of additive outliers on time Series Components and robust estimation: a case study on the oymapinar dam, turkey

In this paper, the behaviour of the body of the Oymapinar Dam (Antalya, Turkey) resulting from reservoir water level changes was investigated by time series analysis. First, the possible best fitting methods for determining the existing additive outliers in series were investigated. For this purpose, a time series with known parameters consisting of trend, periodical and stochastic components was obtained. Then, a new time series with additive outlier(s) was created by adding outlier(s) to series with known parameters. The parameters of the components were determined by the least squares method and it was seen that outlier(s) affect the components of the series. It was found that the correct data were contaminated by an outlier to a similar degree as the autoregressive model. The outliers affecting the components were determined by Andrews, Bisquare, Cauchy, Huber and Welsch estimators in trend analysis. The results show that the parameters of the trend were not affected by outliers and the results produced by the estimators are numerically close to each other. Thus, series of the outlier(s) of the Oymapinar Dam were determined by Bisquare estimator in a trend analysis. As a result of series analysis it was determined that the linear trend resulted from a long-term periodical of changes and the dam body responded periodically depending on the water level changes.

42 ENGINEERING↗

Hydroacoustic Evaluation of Overwintering Summer Steelhead Fallback and Kelt Passage at The Dalles Dam Turbines, Early Spring 2011

This report presents the results of an evaluation of overwintering summer steelhead (Oncorhynchus mykiss) fallback and early out-migrating steelhead kelts downstream passage at The Dalles Dam turbines during early spring 2011. The study was conducted by Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers, Portland District (USACE) to investigate whether adult steelhead are passing through turbines during early spring before annual sluiceway operations typically begin. The sluiceway surface flow outlet is the optimal non-turbine route for adult steelhead, although operating the sluiceway reduces hydropower production. This is a follow-up study to similar studies of adult steelhead passage at the sluiceway and turbines we conducted in the fall/winter 2008, early spring 2009, fall/winter 2009, and early spring 2010. The goal of the 2011 study was to characterize adult steelhead passage rates at the turbines while the sluiceway was closed so fisheries managers would have additional information to use in decision-making relative to sluiceway operations. Sluiceway operations were not scheduled to begin until April 10, 2011. However, based on a management decision in late February, sluiceway operations commenced on March 1, 2011. Therefore, this study provided estimates of fish passage rates through the turbines, and not the sluiceway, while the sluiceway was open. The study period was March 1 through April 10, 2011 (41 days total). The study objective was to estimate the number and distribution of adult steelhead and kelt-sized targets passing into turbine units. We obtained fish passage data using fixed-location hydroacoustics with transducers deployed at all 22 main turbine units at The Dalles Dam. Adult steelhead passage through the turbines occurred on 9 days during the study (March 9, 12, 30, and 31 and April 2, 3, 5, 7, and 9). We estimated a total of 215 ± 98 (95% confidence interval) adult steelhead targets passed through the turbines between March 1 and April 10, 2011. Horizontal distribution data indicated Main Unit 18 passed the majority of fish. Fish passage occurred throughout the day. We conclude that adult steelhead passed through turbines during early spring 2011 at The Dalles Dam.

13 HYDRO ENERGY↗

American Recovery and Reinvestment Act: North Fork Skokomish Powerhouse at Cushman No. 2 Dam

The objective of this project was to add generating capacity on an in-stream flow release at Tacoma Power's Cushman hydroelectric project, Cushman No. 2 Dam, FERC Project P-460. The flow that is being used to generate additional electricity was being discharged from a valve at the base of the dam without recovery of the energy. A second objective to the project was to incorporate upstream fish passage by use of a fish collection structure attached to the draft tubes of the hydroelectric units. This will enable reintroduction of native anadromous fish above the dams which have blocked fish passage since the late 1920's. The project was funded in part by the American Recovery and Reinvestment Act through the Department of Energy, Office of Energy, Efficiency and Renewable Energy, Wind and Water Power Program.

13 HYDRO ENERGY↗

Non-Powered Dam Hydropower Development and Ranking Opportunity Tool

In pursuit of a net-zero-carbon emissions economy in the United States, non-powered dams (NPDs) represent a large opportunity to develop hydropower while leveraging existing infrastructure. With almost 600 NPD sites in the United States identified as having over 1 megawatt (MW) of potential capacity, only a small portion of the total potential capacity at these sites has been developed in recent years. , Conventional NPD retrofit feasibility analysis primarily focuses on the developer’s perspective but fails to consider the broader impacts of developing a dam, including on the neighboring communities. This tool, the Non-Powered Dam Hydropower Development and Ranking Opportunity Tool (NPD HYDRO), allows users to prioritize or rank NPD sites for future development based on user-defined priorities. Benefits can be evaluated in several categories: the grid, community, industry, and environment (referred to as the four impact scores in the tool as discussed in Section 2.2). In addition, the tool provides the user with a qualitative measure for the feasibility of adding energy storage during NPD conversion, specifically battery, hydrogen electrolysis, and pumped-storage hydropower (PSH). By taking a holistic approach to the potential range of benefits provided by NPD conversions with results tailored to the user’s priorities, NPD HYDRO provides the opportunity for national-level screening and enables users to focus on the sites that are most closely aligned with their interests.

13 HYDRO ENERGY↗

Cataloging and Quantifying Value Streams from Non-Powered Dam Conversion

Hydropower is a key resource in the United States’ renewable energy transition; however, only 3% of existing dams in the United States currently generate electricity. While many non-powered dams (NPDs) have the potential for energy generation, hydropower addition to these dams has been slow. This is likely due, in part, to perceptions that hydropower development has prohibitively long payback periods, especially in comparison to other renewable energy resources that have shorter development processes. On the other hand, powering some NPDs may unlock new value streams in addition to the value obtained from selling generated energy. There is a need to understand and quantify a wider range of additional value streams to help increase the feasibility of such hydropower projects. In this work, we catalog indirect value streams and difficult-to-quantify direct value streams from NPD retrofitting, specifying which stakeholders are affected, and what kind of impacts (positive or negative) might occur. We identify appropriate quantification methodologies for these indirect value streams and describe the best practices around their implementation for NPD site-level analysis. We also demonstrate the quantification of a few indirect value streams for a selected NPD site, allowing for easier integration of these value streams into future studies by providing basis and background for quantifying these elements.

13 HYDRO ENERGY↗