Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Crane”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

A Modular, Reusable Latch and Decking System for Securing Payloads During Launch and Planetary Surface Transport

Efficient handling of payloads destined for a planetary surface, such as the moon or mars, requires robust systems to secure the payloads during transport on the ground, in space and on the planetary surface. In addition, mechanisms to release the payloads need to be reliable to ensure successful transfer from one vehicle to another. An efficient payload handling strategy must also consider the devices available to support payload handling. Cranes used for overhead lifting are common to all phases of payload handling on Earth. Similarly, both recent and past studies have demonstrated that devices with comparable functionality will be needed to support lunar outpost operations. A first generation test-bed of a new high performance device that provides the capabilities of both a crane and a robotic manipulator, the Lunar Surface Manipulation System (LSMS), has been designed, built and field tested and is available for use in evaluating a system to secure payloads to transportation vehicles. A payload handling approach must address all phases of payload management including: ground transportation, launch, planetary transfer and installation in the final system. In addition, storage may be required during any phase of operations. Each of these phases requires the payload to be lifted and secured to a vehicle, transported, released and lifted in preparation for the next transportation or storage phase. A critical component of a successful payload handling approach is a latch and associated carrier system. The latch and carrier system should minimize requirements on the: payload, carrier support structure and payload handling devices as well as be able to accommodate a wide range of payload sizes. In addition, the latch should; be small and lightweight, support a method to apply preload, be reusable, integrate into a minimal set of hard-points and have manual interfaces to actuate the latch should a problem occur. A latching system which meets these requirements has been designed and fabricated and will be described in detail. This latching system works in conjunction with a payload handling device such as the LSMS, and the LSMS has been used to test first generation latch and carrier hardware. All tests have been successful during the first phase of operational evaluations. Plans for future tests of first generation latch and carrier hardware with the LSMS are also described.

Doggett, William R.↗

JWST Lifting System

A document describes designing, building, testing, and certifying a customized crane (Lifting Device LD) with a strong back (cradle) to facilitate the installation of long wall panels and short door panels for the GHe phase of the James Webb Space Telescope (JWST). The LD controls are variable-frequency drive controls designed to be adjustable for very slow and very-short-distance movements throughout the installation. The LD has a lift beam with an electric actuator attached at the end. The actuator attaches to a rectangular strong back (cradle) for lifting the long wall panels and short door panels from a lower angle into the vertical position inside the chamber, and then rotating around the chamber for installation onto the existing ceiling and floor. The LD rotates 360 (in very small increments) in both clockwise and counterclockwise directions. Eight lifting pads are on the top ring with 2-in. (.5-cm) eye holes spaced evenly around the ring to allow for the device to be suspended by three crane hoists from the top of the chamber. The LD is operated by remote controls that allow for a single, slow mode for booming the load in and out, with slow and very slow modes for rotating the load.

Tolleson, William↗

Radial Internal Material Handling System (RIMS) for Circular Habitat Volumes

On planetary surfaces, pressurized human habitable volumes will require a means to carry equipment around within the volume of the habitat, regardless of the partial gravity (Earth, Moon, Mars, etc.). On the NASA Habitat Demonstration Unit (HDU), a vertical cylindrical volume, it was determined that a variety of heavy items would need to be carried back and forth from deployed locations to the General Maintenance Work Station (GMWS) when in need of repair, and other equipment may need to be carried inside for repairs, such as rover parts and other external equipment. The vertical cylindrical volume of the HDU lent itself to a circular overhead track and hoist system that allows lifting of heavy objects from anywhere in the habitat to any other point in the habitat interior. In addition, the system is able to hand-off lifted items to other material handling systems through the side hatches, such as through an airlock. The overhead system consists of two concentric circle tracks that have a movable beam between them. The beam has a hoist carriage that can move back and forth on the beam. Therefore, the entire system acts like a bridge crane curved around to meet itself in a circle. The novelty of the system is in its configuration, and how it interfaces with the volume of the HDU habitat. Similar to how a bridge crane allows coverage for an entire rectangular volume, the RIMS system covers a circular volume. The RIMS system is the first generation of what may be applied to future planetary surface vertical cylinder habitats on the Moon or on Mars.

Howe, Alan S.↗

U.S. Coast Guard Boat Recovery Simulation at the NASA Ames Vertical Motion Simulator

The U.S. Coast Guard routinely uses the Over-The-Horizon (OTH-IV), a cutter deployed, rigid-hulled inflatable boat for rescue and law enforcement operations. The term "cutter" refers to a Coast Guard vessel 65 feet in length or greater with accommodations for crew to live aboard and the ability to deploy smaller boats including the OTH-IV. A deployment method employed by some cutter class vessels is a davit crane system and specialized hook mechanism to connect the smaller boat. The launch and recovery operation requires several crewmembers, where one is tasked with releasing and connecting the hook to the small boat. Manipulating the hook can pose a risk to the crewmember depending on sea conditions combined with fatigue level or task expertise. Equipment and crewmembers are tested extensively due to the inherent risk of the task, but the sea conditions cannot be controlled. To address the sea condition variable, the U.S. Coast Guard and NASA leveraged the Vertical Motion Simulator (VMS) as a platform to test new equipment or train crewmembers in varying sea conditions. With 6 degrees of freedom and a vertical displacement of +/- 22ft, the VMS is capable of simulating conditions up to sea-state 5. The proof of concept experiment took place in September 2018 and demonstrated that the VMS can accurately simulate varying sea-states, collect performance data, and design a reliable and safe system for participants. The U.S. Coast Guard provided boat displacement data from the Large Amplitude Motion Program (LAMP). The program generates multi-directional waves with a cosine squared spreading function which produced a time history response of displacement data (surge, sway, heave, roll, pitch, yaw) of the OTH-IV's center of gravity (C.G). The displacement data was differentiated into acceleration evaluated at the crewmember's position at the front (bow) of the boat. Those accelerations were transformed to the VMS coordinate system and used as command inputs to the motion system's washout filters. The VMS uses Interchangeable Cabs (ICab) to perform flight simulations on a variety of aircraft or spacecraft configurations. An ICab typically contains seats, restraints, pilot controls, instrument panel, and out-the-window projectors all enclosed in a familiar cockpit configuration. To replicate the launch and recovery of a small boat, all the conventional features of a flight simulator and canopy were removed to be replaced with a to-scale OTH-IV bow mockup. The bow section was constructed from aluminum, and a connection point known as the davit ring. Additionally, a hook replica was suspended by a cable from the ceiling as if it were hanging from a davit crane aboard a cutter vessel. The last step was providing an auxiliary control to close the distance between suspended hook and the davit ring on the bow mockup. Without control the boat would simulate the wave motion, but with no guarantee that the crewmember will be in reach of the hook. Since the wave motion was repeatable, an additional acceleration command sent to the washout filters to move the simulator in the surge, sway, and heave directions, independently. The commands were rate limited such that the additional movement was not detectable with respect to the wave motion. The results showed that for each wave profile, a unique set of acceleration commands provided opportunities for crewmembers to gain control of the hook and connect it to the davit ring.

Riccobono, Nicholas S.↗

Green Run Modal Test of the NASA Space Launch System Core Stage

The Core Stage of the new NASA Space Launch System (SLS) is a 212-foot tall rocket assembly—consisting primarily of two fuel tanks, an engine section, and four RS-25 rocket engines—capable of sending crew and large payloads to the moon and beyond with 1.6 million pounds of thrust. Currently, the Core Stage is in the B2 Test Stand at Stennis Space Center, undergoing a series of structural and functional tests, designated the Green Run test series. The ultimate goal of Green Run is to verify analytical models and confirm proper subsystem operation of the Core Stage. In January 2020, Green Run testing began with an experimental modal analysis test performed by the Marshal Space Flight Center modal test team. The desired free boundary condition of the Core Stage was achieved by suspending the massive spacecraft from the B2 Test Stand crane. Modal excitation was provided by a pair of 250-lb electro-dynamic shakers for multi-shaker random vibration testing, as well as a 12-pound impact hammer for impact testing. Modal response was measured with 550 accelerometers channels distributed on both the Core Stage and the B2 Test Stand crane. Following one very long night of testing, frequency response functions were calculated from the measured time histories in the target mode frequency range of 2.5 Hz to 15 Hz, and mode shapes, frequencies, and damping values were successfully extracted. The case-study presented in this paper will discuss the SLS Core Stage, the modal test setup and procedure, as well as a brief overview of the test results. Challenges associated with testing such a large, suspended structure in an outdoor environment will be discussed as well.

Green Run↗

Embedded passives emulator FY2003 interim report

The National Aeronautics and Space Administration Electronic Parts and Packaging (NEPP) Program has been evaluating state-of-the-art Embedded Passive Technology for the printed circuit board (PCB) industry for the past several years and has conducted its own testing on embedded passive coupons (resistors and capacitors). This document is a progress report of the work performed through fiscal year 2008 by NASA and the Navy to convert an existing PWB (printed wiring board) design to a design that incorporates embedded passive components. The work is being performed through a memorandum of understanding (MOU) between the NEPP Program (NASA) and the Naval Surface Warfare Center (NSWC) Crane Emerging Critical Interconnect Technology (ECIT) Program. NSWC Crane’s ECIT Program has funding to convert two PCB designs from the military and aerospace industry to a PCB design with embedded passives. ECIT will provide a design team that will take a well characterized design and convert it to an embedded design. They will also provide electrical modeling and layout expertise as well as build the PWB in their facility in Indiana. NEPP, through the Jet Propulsion Laboratory (JPL), will assemble any passives deemed not suitable for embedding and the active components and electrically test the new design to the existing (non-embedded) design

Gerke, David↗

High-capacity ATHLETE Offloader Mobility Constructor Concept for Human Surface Exploration

Using cross-cabled, winch-tendon four-bar frames, a new Artemis-class ATHLETE system is a multi-limbed robotic mobility platform that is designed for surface traverse, precision placement, and offloading of heavy habitats and other large human exploration payloads from high-decked landers. Building upon lessons learned from the All-Terrain Hex-Limbed Extra-Terrestrial Explorer (ATHLETE) robotic mobility system developed for Constellation Lunar Surface Systems and Evolvable Mars Campaign, a high-capacity articulated crane / lift vehicle concept has been devised that would be equipped with multi-limb six-degree-of-freedom dexterity for a variety of tasks supporting planetary surface human exploration missions and outposts. The Artemis-class ATHLETE vehicle would use any combination of three to six wheel-onlimb combinations to provide a wide “outrigger” stance to transfer loads from a high center-of-gravity on sloped terrain to low stable carry configurations for long-distance traverses, and be capable of precision docking of payloads to previously positioned elements. The new vehicle concept improves upon previous Constellation-class ATHLETE versions by allowing modular hot-swapping of individual limbs to improve maintenance and flexibility. The extreme-capacity independent limbs can individually function as single cranes, and can be delivered separately via multiple lander manifests for later congregation into self-driving “Tri-ATHLETE” vehicles after delivery to the surface. This paper provides mission architecture targets and vehicle masses for stepped payload capacity values in Earth, Mars, and Lunar gravity environments, and discusses a variety of swappable tools, including wheeled mobility attachments, grippers, excavation tools, repair fixtures, ISRU extraction, winches, block & tackle rigging combinations, 3D printheads, and construction aids.

Wilcox, Brian↗

New Retropropulsion Concept with NTAC Power for Mars Entry

Since the initial deployments of probes, orbiters, and rovers on Mars, there have been many ideas and concepts on how to perform an entry, descent, and landing (EDL) process efficiently and safely through the Martian atmosphere to place payloads onto the surface of Mars. Among the missions sent to perform EDL on Mars, only roughly sixty percent of the missions have been successful. The 5 minutes to 20 minutes of communication gap due to long-range telecommunications to Earth, described as seven minutes of terror, add to the complexity of EDL missions to Mars. As the payloads have become larger, the method of EDL has become more complex. To place an automobile-size science rover on the Martian surface requires the use of retrorockets mounted on a Sky Crane during the final subsonic stage of EDL. Larger payloads will require more propellant and more and/or larger retropropulsion engines during the earlier supersonic stage of EDL. The Sky Crane concept may not be scalable for these larger payloads and during supersonic flight; hence, new approaches are sought. A new power technology invented at NASA called Nuclear Thermionic Avalanche Cell (NTAC) may offer an additional solution. Powered by NTAC, the newly invented retropropulsion concept would ingest carbon dioxide gas, heat it up and blast it out as a new feature of the EDL process. NTAC would be reusable as a primary power source for payloads such as excavators, three-dimensional (3D) printers, or mobile equipment for mining, construction, and additive manufacturing tasks. Since NTAC would need to be landed with its host payload or as a standalone power package, assessing its ability to assist in its own EDL seems reasonable. The purpose of this Technical Memorandum (TM) is to examine the performance of NTAC in the context of EDL at Mars for motivating studies for integrating NTAC into future Mars mission architectures.

Mars entry↗

Green Run Modal Test of the NASA Space Launch System Core Stage

The Core Stage of the new NASA Space Launch System (SLS) is a 212-foot-tall rocket assembly—consisting primarily of two cryogenic propellant tanks, an engine section, and four RS-25 rocket engines—that will send crew and large payloads to the moon and beyond for NASA’s Artemis program. Prior to SLS assembly, the Core Stage completed a series of structural and functional tests in the B-2 Test Stand at Stennis Space Center, designated Green Run. The goal of Green Run was to verify analytical models, confirm proper subsystem operation, and test-fire all four RS-25 engines of the Core Stage. In January 2020, Green Run testing began with an experimental modal analysis test, performed by the Marshal Space Flight Center modal test team. A free-boundary test condition of the Core Stage was simulated as close as possible by suspending the massive launch vehicle from the B-2 Test Stand crane. Modal excitation was provided by a pair of 250-lb electro-dynamic shakers for multi-shaker random vibration testing, as well as a 12-pound instrumented hammer for impact testing. Modal response was measured with 550 accelerometer channels distributed on both the Core Stage and the B-2 Test Stand derrick crane. Following one very long day of testing, frequency response functions were calculated from the measured time histories in the target mode frequency range of 5 Hz to 15 Hz, and mode shapes, frequencies, and damping values were successfully estimated. The case-study presented in this paper will discuss Green Run, the SLS Core Stage, the modal test setup and execution, as well as a brief overview of the test results. Challenges associated with testing such a large, suspended structure in an outdoor environment will be discussed as well.

Space Launch System↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

Interference by rain scatter

The data from Japan and the U.S. (the Virginia Precipitation Scatter Experiment) show excellent agreement between the two-component rain scatter model predictions and bistatic scatter measurements. In employing the model, all the scattering geometries should be classified as backscattering as defined by Crane (1974). The forward scatter model should only be used for great circle paths with both antennas pointed at the horizon and at each other in a typical troposcatter communication system geometry. The forward scatter model can also be used for main-lobe, side-lobe coupling when one antenna is pointed toward the other along the great circle path. The forward scatter observations made over the Prospect Hill - Mt Tug path show that the two-component model is incomplete. Much stronger signals were observed at Ku-band than expected based on simultaneous C-band measurements. The discrepancies may be due to: (1) scattering by ice/snow at height (posssible in April) at the 1 km height of the scattering volume), (2) the coherent effects of turbulent fluctuations in the hydrometeor number densities and (3) errors in the modeling of the statistical relationship between attenuation along the path and scattering in the common volume.

Crane, Robert K.↗

Rain-rate data base development and rain-rate climate analysis

The single-year rain-rate distribution data available within the archives of Consultative Committee for International Radio (CCIR) Study Group 5 were compiled into a data base for use in rain-rate climate modeling and for the preparation of predictions of attenuation statistics. The four year set of tip-time sequences provided by J. Goldhirsh for locations near Wallops Island were processed to compile monthly and annual distributions of rain rate and of event durations for intervals above and below preset thresholds. A four-year data set of tropical rain-rate tip-time sequences were acquired from the NASA TRMM program for 30 gauges near Darwin, Australia. They were also processed for inclusion in the CCIR data base and the expanded data base for monthly observations at the University of Oklahoma. The empirical rain-rate distributions (edfs) accepted for inclusion in the CCIR data base were used to estimate parameters for several rain-rate distribution models: the lognormal model, the Crane two-component model, and the three parameter model proposed by Moupfuma. The intent of this segment of the study is to obtain a limited set of parameters that can be mapped globally for use in rain attenuation predictions. If the form of the distribution can be established, then perhaps available climatological data can be used to estimate the parameters rather than requiring years of rain-rate observations to set the parameters. The two-component model provided the best fit to the Wallops Island data but the Moupfuma model provided the best fit to the Darwin data.

Crane, Robert K.↗

Team Training and Retention of Skills Acquired Above Real Time Training on a Flight Simulator

Above Real-Time Training (ARTT) is the training acquired on a real time simulator when it is modified to present events at a faster pace than normal. The experiments related to training of pilots performed by NASA engineers (Kolf in 1973, Hoey in 1976) and others (Guckenberger, Crane and their associates in the nineties) have shown that in comparison with the real time training (RTT), ARTT provides the following benefits: increased rate of skill acquisition, reduced simulator and aircraft training time, and more effective training for emergency procedures. Two sets of experiments have been performed; they are reported in professional conferences and the respective papers are included in this report. The retention of effects of ARTT has been studied in the first set of experiments and the use of ARTT as top-off training has been examined in the second set of experiments. In ARTT, the pace of events was 1.5 times the pace in RTT. In both sets of experiments, university students were trained to perform an aerial gunnery task. The training unit was equipped with a joystick and a throttle. The student acted as a nose gunner in a hypothetical two place attack aircraft. The flight simulation software was installed on a Universal Distributed Interactive Simulator platform supplied by ECC International of Orlando, Florida. In the first set of experiments, two training programs RTT or ART7 were used. Students were then tested in real time on more demanding scenarios: either immediately after training or two days later. The effects of ARTT did not decrease over a two day retention interval and ARTT was more time efficient than real time training. Therefore, equal test performance could be achieved with less clock-time spent in the simulator. In the second set of experiments three training programs RTT or ARTT or RARTT, were used. In RTT, students received 36 minutes of real time training. In ARTT, students received 36 minutes of above real time training. In RARTT, students received 18 minutes of real time training and 18 minutes of above real time training as top-off training. Students were then tested in real time on more demanding scenarios. The use of ARTT as top-off training after RTT offered better training than RTT alone or ARTT alone. It is, however, suggested that a similar experiment be conducted on a relatively more complex task with a larger sample of participants. Within the proposed duration of the research effort, the setting up of experiments and trial runs on using ARTT for team training were also scheduled but they could not be accomplished due to extra ordinary challenges faced in developing the required software configuration. Team training is, however, scheduled in a future study sponsored by NASA at Tuskegee University.

Ali, Syed Friasat↗

Complementary effects of supplemental feeding and straw retention on winter biodiversity in rice agroecosystems

Rice paddies are both major food-production systems and critical winter habitats for wildlife. In the Civilian Control Zone (CCZ) adjoining the Korean Demilitarized Zone (DMZ), post-harvest interventions such as supplementary grain feeding and straw retention are promoted through agronomic and conservation incentives. These measures differ in ecological scope: feeding provides direct, concentrated energetic subsidies, whereas straw management alters habitat structure and resource bases. We clarified whether these pathways function in complementary or substitutive ways to support resilient, long-term conservation strategies in rice agroecosystems. Using camera traps, we evaluated the effects of three straw treatments (chopped-straw, whole-straw, straw-removed) and supplemental feeding on winter bird and mammal communities across 48 rice fields in the CCZ. Our results demonstrate that feeding produced strong, localized increases in bird abundance and richness, driven mainly by cranes (Grus japonensis and Antigone vipio) and geese (Anser spp.), with limited effects on Shannon diversity or functional structure. Among non-feeding fields, chopped-straw paddies consistently supported higher richness and Shannon diversity than whole-straw or straw-removed fields, while centroid shifts in taxonomic and functional space were modest. Mammal abundance and diversity were largely insensitive to feeding or straw regimes, varying instead with road and forest distance and regional context. Supplemental feeding and straw retention are therefore not interchangeable tools: feeding concentrates a few avian guilds, whereas chopped-straw retention enhances baseline diversity across farmland. Collectively, our findings suggest integrating low-input straw retention with targeted feeding offers a more robust pathway for sustaining winter biodiversity in rice agroecosystems.

60 APPLIED LIFE SCIENCES↗

Lab-Scale Cable-Driven Parallel Robot Prototype for Automated Prefabricated Component Manipulation

This paper presents the design and evaluation of a lab-scale cable-driven parallel robot (CDPR) developed as a flexible platform for automated installation of prefabricated components onto exterior building envelopes. Traditional manual installation methods for prefabricated components, which depend on scaffolding, cranes, cherry pickers, and verbal coordination, are not only labor-intensive and error-prone but also face significant limitations in dense urban environments due to site access constraints. To address these challenges, we developed a lab-scale CDPR platform capable of autonomously transporting building envelope components from a designated pickup zone to their target installation location, minimizing the need for human intervention. This study describes the system’s mechanical design, actuation architecture, real-time feedback system, and control strategy of the CDPR, and evaluates its performance in a laboratory environment. The robot’s actuation system uses torque control for end-effector manipulation. The robot’s real-time pose feedback comes from a construction-grade total station and a wireless inertial measurement unit (IMU), which together support precise end-effector control. Experimental results demonstrate the successful integration of the hardware, sensing, state estimation, and control subsystems. Preliminary tests showed that our lab-scale prototype can position the end effector with an error of less than 3 mm, which is a level of precision not previously achieved by existing CDPRs in construction applications. The key findings are twofold: (1) torque-only control is necessary but not sufficient for minimizing final pose error, and (2) incorporating real-time pose feedback can achieve the desired placement accuracy.

Liu, Yifang [Oak Ridge National Laboratory (ORNL),↗