Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Cost Model”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Update on Parametric Cost Models for Space Telescopes

Since the June 2010 Astronomy Conference, an independent review of our cost data base discovered some inaccuracies and inconsistencies which can modify our previously reported results. This paper will review changes to the data base, our confidence in those changes and their effect on various parametric cost models

Stahl. H. Philip↗

Long-range planning cost model for support of future space missions by the deep space network

A simple model is suggested to do long-range planning cost estimates for Deep Space Network (DSP) support of future space missions. The model estimates total DSN preparation costs and the annual distribution of these costs for long-range budgetary planning. The cost model is based on actual DSN preparation costs from four space missions: Galileo, Voyager (Uranus), Voyager (Neptune), and Magellan. The model was tested against the four projects and gave cost estimates that range from 18 percent above the actual total preparation costs of the projects to 25 percent below. The model was also compared to two other independent projects: Viking and Mariner Jupiter/Saturn (MJS later became Voyager). The model gave cost estimates that range from 2 percent (for Viking) to 10 percent (for MJS) below the actual total preparation costs of these missions.

Sherif, J. S.↗

Valuation of Hydrogen Technology on the Electric Grid Using Production Cost Modeling: Cooperative Research and Development Final Report, CRADA Number CRD-18-00736

This research project will estimate the value to the United States electric grid of deploying hydrogen technology (such as electrolyzers and hydrogen-fueled generation) under projected conditions of high renewable penetration. The analysis will advance the state of the art in systems-level cost-benefit analysis of hydrogen technology for the electric grid by incorporating production cost modeling results in the analysis. Large-scale grid simulation tools will be used to evaluate total system production cost and grid operation when hydrogen technology is deployed for applications such as energy storage and demand response. Scenarios will include one or more future grid mixes in the Western Interconnect (WI) with a high proportion of intermittent renewables. Electric Power Research Institute (EPRI) will work with four utility companies to refine scenarios. Results of the analysis will include comparing the net cost of hydrogen to other technologies for long duration storage, and of power-to-gas (P2G) scenarios including merchant hydrogen sale and hydrogen-fueled generation.

08 HYDROGEN↗

Parametric Cost Modeling of a Mid-Lift-to-Drag Ratio Vehicle for Human Mars Entry, Descent, and Landing

Cost is one of the biggest obstacles to sending humans to Mars. However, spacecraft costs are typically estimated after the preliminary vehicle and mission concepts have been designed. By automating the cost estimation process, the effect of any change in vehicle or mission design on the mission cost can be determined more rapidly. This paper uses the tool SAPE-C (Systems Analysis for Planetary Entry, Descent, and Landing-Cost). SAPE-C integrates the cost modeling software SEER-H (System Estimation and Evaluation of Resources-Hardware) with a number of systems analysis tools and enables large design tradespace exploration early in the design process. SAPE-C is used to analyze several tradespaces of the Mid-Lift-to-Drag ratio rigid entry vehicle for human Mars missions. Key findings include quantifying the impacts of payload, vehicle length, and main engine specific impulse on the overall cost of the vehicle, and how the payload per lander and number of landers affects the cost of a campaign to Mars.

Paul D Friz↗

Parametric Cost Modeling of a Mid-Lift-to-Drag Ratio Vehicle for Human Mars Entry, Descent, and Landing

Cost is one of the biggest obstacles to sending humans to Mars. However, spacecraft costs are typically estimated after the preliminary vehicle and mission concepts have been designed. By automating the cost estimation process, the effect of any change in vehicle or mission design on the mission cost can be determined more rapidly. This paper uses the tool SAPE-C (Systems Analysis for Planetary Entry, Descent, and Landing-Cost). SAPE-C integrates the cost modeling software SEER-H (System Estimation and Evaluation of Resources-Hardware) with a number of systems analysis tools and enables large design tradespace exploration early in the design process. SAPE-C is used to analyze several tradespaces of the Mid-Lift-to-Drag ratio rigid entry vehicle for human Mars missions. Key findings include quantifying the impacts of payload, vehicle length, and main engine specific impulse on the overall cost of the vehicle, and how the payload per lander and number of landers affects the cost of a campaign to Mars.

Paul D Friz↗

Transmission Constraint Screening for Production Cost Modeling at Scale

Transmission constraint calculation and screening, for both unit commitment and economic dispatch, is a critical feature of a performant solution method, but one that is often overlooked in the literature. In this talk, we will discuss the transmission constraint calculation and screening algorithm implemented in the open-source Egret package for electrical grid optimization and compare it against the more straightforward approach Egret originally implemented. Finally, we discuss the implications for transmission constraint sharing within a production cost modeling simulation.

DCOPF↗

A Component-Level Bottom-Up Cost Model for Pumped Storage Hydropower

Pumped Storage Hydropower (PSH) is currently the largest source of utility-scale electricity storage in the U.S. and worldwide. As the accelerating deployment of variable renewable technologies creates opportunity and value for energy storage, it has become increasingly important to characterize PSH costs to understand how it competes. Site-specific considerations and limited cost data in the public domain make it difficult to estimate capital costs for potential new PSH sites. This report documents a spreadsheet-based tool that addresses this challenge and creates a component-level bottom-up cost model for PSH that can be made publicly available for widespread use. It uses detailed site-level physical characteristics and design specifications to calculate key performance and cost parameters for individual components and the project as a whole. The model was developed in consultation with HDR, Inc. and Small Hydro Consulting to ensure it aligns with industry expectations. It enables PSH cost exploration across a wide range of system assumptions and could be customized or extended for the needs of a variety of users.

cost model↗

FECM/NETL CO 2 Transport Cost Model (2024): Description and User’s Manual

This is the user's manual for the 2024 version of the FECM/NETL CO 2 Transport Cost Model (CO2_T_COM). CO2_T_COM is an Excel-based tool that estimates revenues and capital, operating, and financing costs for transporting liquid phase CO 2 by pipeline. It is assumed that the CO 2 delivered to the pipeline meets pipeline specifications for purity. Costs are estimated for a single point-to-point pipeline, which may have pumps along the pipeline to boost the pressure. The model can be accessed here: https://www.netl.doe.gov/energy-analysis/details?id=42e3c409-b88f-467f-bff0-fadb92a68676 .

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Offshore Wind Balance-of-System Cost Modeling

Offshore wind balance-of-system (BOS) costs contribute up to 70% of installed capital costs. Thus, it is imperative to understand the impact of these costs on project economics as well as potential cost trends for new offshore wind technology developments. As a result, the National Renewable Energy Laboratory (NREL) developed and recently updated a BOS techno-economic model using project cost estimates created from wind energy industry sources.

17 WIND ENERGY↗

Vehicle Lightweighting: Mass Reduction Spectrum Analysis and Process Cost Modeling

The U.S. Department of Energy’s Vehicle Technologies Office, Materials area commissioned a study to model and assess manufacturing economics of alternative design and production strategies for a series of lightweight vehicle concepts. In the first two phases of this effort examined combinations of strategies aimed at achieving strategic targets of 40% and a 45% mass reduction relative to a standard North American midsize passenger sedan at an effective cost of $3.42 per pound (lb) saved. These results have been reported in the Idaho National Laboratory report INL/EXT-14-33863 entitled Vehicle Lightweighting: 40% and 45% Weight Savings Analysis: Technical Cost Modeling for Vehicle Lightweighting published in March 2015. The data for these strategies were drawn from many sources, including Lotus Engineering Limited and FEV, Inc. lightweighting studies, U.S. Department of Energy-funded Vehma International of America, Inc./Ford Motor Company Multi-Material Lightweight Prototype Vehicle Demonstration Project, the Aluminum Association Transportation Group, many United States Council for Automotive Research’s/United States Automotive Materials Partnership LLC lightweight materials programs, and IBIS Associates, Inc.’s decades of experience in automotive lightweighting and materials substitution analyses.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Improving the Representation of Hydropower in Production Cost Models

One of the challenges of a high-renewable, low-carbon system is that grid operators will no longer be able to count on fossil-fired generation should wind miss its forecast or modeling errors create shortage issues, and this change has operational and reliability implications that affect variable renewable energy integration. Hydropower can help in that it can provide many of the services that have been traditionally provided by fossil generation. However, getting the most from hydropower can be challenging in that its capabilities vary with time and are affected by other water users' needs, two complexities that are not well represented in most of today's production cost models (PCMs). This work is an early step in addressing these gaps and making the most of hydropower's capabilities.

cost model↗

A comparison of price-taker and production cost models for determining system value, revenue, and scheduling of concentrating solar power plants

Concentrating solar power (CSP) plants convert solar energy into electricity and can be coupled with low-cost thermal energy storage to provide a dispatchable renewable resource. Maximizing the economic benefits of CSP systems requires deliberate selection of the timing of thermal energy dispatch to coincide with high-price or high-value periods. The performance and value of CSP systems have traditionally been evaluated using two distinct approaches: (1) production cost models (PCMs), which optimize commitment and dispatch schedules for an entire fleet of generators to minimize the cost of satisfying electricity demand; and (2) price-taker (PT) models, which optimize dispatch of the CSP system against historical or forecasted electricity prices to maximize revenue available to the CSP operator. The PCM approach is, in principle, superior because of the ability to capture system-level details such as transmission pathways and associated constraints, and feedback between CSP dispatch schedules and operation of other generators. The computationally simpler PT technique cannot explicitly address these concerns, but the comparative reduction in solution time is attractive for sensitivity analysis and rigorous optimization of CSP plant design and operation. In this work, we directly compare the dispatch profiles, net revenue, and operational value of CSP systems using implementations of each technique to assess how closely the solutions from the PT technique can approach those from the PCM for a specific market scenario. The PT implementation produced characteristically similar dispatch profiles as the PCM for both a large solar-multiple configuration and a small solar-multiple peaking configuration, while requiring only 1% of the computational time of the PCM. In addition, dispatching the CSP plant according to the self-scheduled PT solution - as opposed to the system-optimized PCM solution - only reduced the total CSP operational value by 1-5%, with consistent trends across CSP configurations and locations. This analysis validates the ability of the PT approach to substantially capture the economic benefits of CSP systems when pricing profiles are available, and indicates that the PT approach is suitable for initial design and optimization of CSP technologies.

14 SOLAR ENERGY↗

Methods for Translating ReEDS Solutions to Production Cost Modeling Tools

Capacity expansion modeling tools are increasingly being utilized to investigate a wide range of potential future scenarios, particularly with high penetrations of variable and energy-constrained resources that may be operated differently than current dispatch paradigms. While capacity expansion models are particularly adept at making investment decisions for future years, they must make compromises in operational aspects to maintain computational tractability. However, it is of high interest to determine if such future systems would be able to maintain reliability during a variety of grid conditions, and to identify any potential operational challenges for these systems at finer temporal resolution than is typically captured in CEMs. As such, there is value in having an automated tool that can convert many CEM investment pathways into inputs for a more detailed production cost model, in this case the PLEXOS commercial software package. This paper describes the methodology used to make that translation for the NREL-developed ReEDS model, making use of two internally developed tools - PIDG and beetle - along with a set of processing scripts. We describe the current assumptions, data sets, and important operational characteristics of these translations along with an example of the extended analyses that may be done through this connection.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Transactive System Program Communication System Cost Model

Transactive energy is an economics and controls technique that aims to dynamically manage the generation and consumption of electricity within the power system. Much research has been done in the area of demonstrating the capability and performance of transactive systems, as well as valuing the benefits a transactive system can provide. Significantly less research has been done in the area of estimating the costs of a transactive system. This work aimed to build a model that would estimate the costs of the communications system that would be necessary to support a transactive system and be realized by a local utility. Dynamic pricing, and a customer’s response to this pricing, is a key aspect of a transactive system; this would require a two-way communication system between utilities and customers. Since the system will vary based on many factors, the cost model was consequently designed for use in a wide variety of applications. The cost model requires some basic user inputs regarding the system being analyzed, such as location and size. The user also identifies one or more generic circuit models that best represent the system. Additionally, a user can, but is not required to, change assumed equipment and installation costs and equipment lifetime within the model. These inputs will result in 20 year cost estimates for three different communication technologies that are capable of supporting the bandwidth needs of a transactive energy system. The three communication systems included in the model are cellular, fiber optic and wireless mesh. Each vary significantly from one another and offer unique advantages and barriers. A cellular network avoids high upfront costs, but is limited to areas where there is coverage by the service provider and subject to the ongoing rate established with the service provider. A fiber optic system requires a large up-front cost, but it will provide a reliable system to areas where cellular and mesh may be unable to do so. Additionally, fiber provides more bandwidth than necessary for transactive systems and can offer additional business opportunities. A mesh system can be installed for less upfront costs than fiber and offers enough bandwidth to support a transactive system, but the ability to model this technology is done with less certainty than the other two options. The estimated costs include the communication system that connects the customers to their nearest substation, in addition to the smart meter and radio that would be required for each customer. The communications from the substation to the utility are not included in estimates, as the need for upgrading that system would be assessed on a case-by-case basis. Although the cost of the smart meter and radio is included, no other appliance specific cost is included in the estimate provided by the model. The communication system is a key aspect of the development of a transactive system. This work resulted in easily being able to estimate the costs of a communication system specific to the system being studied. This cost model will aid ongoing valuation and simulation work in the field of transactive energy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗