Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contractor Assurance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

SE and I system testability: The key to space system FDIR and verification testing

The key to implementing self-diagnosing design is a systems engineering task focused on design for testability concurrent with design for functionality. The design for testability process described here is the product of several years of DOD study and experience. Its application to the space station has begun on Work Package II under NASA and McDonnell direction. Other work package teams are being briefed by Harris Corporation with the hope of convincing them to embrace the process. For the purpose of this discussion the term testability is used to describe the systems engineering process by which designers can assure themselves and their reviewers that their designs are TESTABLE, that is they will support the downstream process of determining their functionality. Due to the complexity and density of present-day state-of-the-art designs, such as pipeline processors and high-speed integrated circuit technology, testability feature design is a critical requirement of the functional design process. A systematic approach to Space systems test and checkout as well as fault detection fault isolation reconfiguration (FDFIR) will minimize operational costs and maximize operational efficiency. An effective design for the testability program must be implemented by all contractors to insure meeting this objective. The process is well understood and technology is here to support it.

Barry, Thomas↗

High-Lift Flight Tunnel - Phase II Report

The High-Lift Flight Tunnel (HiLiFT) concept is a revolutionary approach to aerodynamic ground testing. This concept utilizes magnetic levitation and linear motors to propel an aerodynamic model through a tube containing a quiescent test medium. This medium (nitrogen) is cryogenic and pressurized to achieve full flight Reynolds numbers higher than any existing ground test facility world-wide for the range of 0.05 to 0.50 Mach. The results of the Phase II study provide excellent assurance that the HiLiFT concept will provide a valuable low-speed, high Reynolds number ground test facility. The design studies concluded that the HiLiFT facility is feasible to build and operate and the analytical studies revealed no insurmountable difficulties to realizing a practical high Reynolds number ground test facility. It was determined that a national HiLiFT facility, including development, would cost approximately $400M and could be operational by 2013 if fully funded. Study participants included National Aeronautics and Space Administration Langley Research Center as the Program Manager and MSE Technology Applications, Inc., (MSE) of Butte, Montana as the prime contractor and study integrator. MSE#s subcontractors included the University of Texas at Arlington for aerodynamic analyses and the Argonne National Laboratory for magnetic levitation and linear motor technology support.

Lofftus, David↗

Community Engagement - A Citizen-Centric Approach to Seeking a Social License - 20017

The long regulatory road has finally been completed-after years of effort a Record of Decision has been signed and a Permit to Construct has been granted or a Permit to Operate has been obtained. But what about the other road that should be taken in parallel-community engagement? Working with the public is not a sequential activity, rather it is a consequential one and needs to be integrated with overall project planning. Unless you have effectively, meaningfully, and patiently engaged with the project's communities of impact, you may find your project trying to obtain a social license or a social license to operate (SLO). The SLO has its origins in the mining industry and its roots in the business model of corporate social responsibility and sustainability. These latter practices are well known to the US DOE and its contractor community. Aspects of the SLO are emerging as individuals and communities are becoming more informed and have increased expectations for being able to influence and shape decisions. When local community issues are not sought out, listened to, or addressed early, and questions are left unanswered, they can become agenda items for larger unaffiliated groups, and project loss (through delays and/or cancellation) can occur. Issues can transition from resolvable to intractable, a type of SLO face-off. Social media campaigns, serial negative media coverage, and protest signs at project sites opposing regulatory decisions already made are no longer anomalies. These types of incidents demonstrate the increasingly delicate relationship between approved regulatory/technical decisions and public acceptance of those decisions. A SLO is not a requirement. However, the building-blocks of a SLO - working with members of affected communities to build understanding, potentially to obtain and maintain community acceptance or even gain approval or support - are evidence of leadership by project sponsors. Actions taken, or not taken, by project sponsors truly have the ability to influence an outcome. While projects are not assured of success or failure, engaging the community in an empowered process is an investment of time and resources toward success for the project and thus for the communities of impact. Authors Note: Extensive literature searches were performed in developing this paper. The majority of the published literature on SLO as a 'movement' was found from sources in Canada, the European Union (Germany and France in particular), South Asia, South Korea, and many Latin American countries. The literature addressed resource development (mining), infrastructure, and energy projects. Articles written by US sources often spoke to origins and structural theory, specific project issues such as Not in My Back Yard (NIMBY) and to protests/demonstrations related to those projects, rather than systemic opposition/conflict phenomena. For these reasons many international SLO experiences and sources are cited in the discussion. The authors recognize these non-US experiences with SLO as having a 'forecast' value to US projects, especially those related to nuclear projects of any type, waste treatment and disposal, energy development (especially fossil fuels as well as alternative sources), mining, and infrastructure. The body of future SLO experiences in the US will shape the future responses to it. (authors)

99 GENERAL AND MISCELLANEOUS↗

Plasma contactor research - 1991

A report describing the operating principles of hollow-cathode-based plasma contactors emitting or collecting electrons from an ambient plasma is summarized. Preliminary experiments conducted to determine the noise generated by these plasma contactors in the emission-current return line and in the plasma near it are described. These noise data are measured as current fluctuations in the return line and to the Langmuir probe and then analyzed using a fast Fourier transform technique. The spectral compositions of the data are characterized using power spectral density plots which are examined to identify possible noise source(s) and production mechanism(s). The precautions taken in the construction and calibration of the instrumentation to assure adequate frequency response are described. Experimental results show that line-current noise levels are typically 2 percent of the electron current being emitted or collected. However, noise levels increase to as much as 20 percent of the electron current at a few electron-collection operating conditions. The frequencies associated with most of the noise were harmonics of the 60 Hz input to system power supplies. Plasma noise had characteristics similar in magnitude and frequency to those for the return-line noise, but they contained additional features at frequencies considered to be related to ion-acoustic instabilities. Also discussed is a new probe positioning system built to facilitate future plasma-contractor research.

Buchholtz, Brett↗

Johnson Space Center's Risk and Reliability Analysis Group 2008 Annual Report

The Johnson Space Center (JSC) Safety & Mission Assurance (S&MA) Directorate s Risk and Reliability Analysis Group provides both mathematical and engineering analysis expertise in the areas of Probabilistic Risk Assessment (PRA), Reliability and Maintainability (R&M) analysis, and data collection and analysis. The fundamental goal of this group is to provide National Aeronautics and Space Administration (NASA) decisionmakers with the necessary information to make informed decisions when evaluating personnel, flight hardware, and public safety concerns associated with current operating systems as well as with any future systems. The Analysis Group includes a staff of statistical and reliability experts with valuable backgrounds in the statistical, reliability, and engineering fields. This group includes JSC S&MA Analysis Branch personnel as well as S&MA support services contractors, such as Science Applications International Corporation (SAIC) and SoHaR. The Analysis Group s experience base includes nuclear power (both commercial and navy), manufacturing, Department of Defense, chemical, and shipping industries, as well as significant aerospace experience specifically in the Shuttle, International Space Station (ISS), and Constellation Programs. The Analysis Group partners with project and program offices, other NASA centers, NASA contractors, and universities to provide additional resources or information to the group when performing various analysis tasks. The JSC S&MA Analysis Group is recognized as a leader in risk and reliability analysis within the NASA community. Therefore, the Analysis Group is in high demand to help the Space Shuttle Program (SSP) continue to fly safely, assist in designing the next generation spacecraft for the Constellation Program (CxP), and promote advanced analytical techniques. The Analysis Section s tasks include teaching classes and instituting personnel qualification processes to enhance the professional abilities of our analysts as well as performing major probabilistic assessments used to support flight rationale and help establish program requirements. During 2008, the Analysis Group performed more than 70 assessments. Although all these assessments were important, some were instrumental in the decisionmaking processes for the Shuttle and Constellation Programs. Two of the more significant tasks were the Space Transportation System (STS)-122 Low Level Cutoff PRA for the SSP and the Orion Pad Abort One (PA-1) PRA for the CxP. These two activities, along with the numerous other tasks the Analysis Group performed in 2008, are summarized in this report. This report also highlights several ongoing and upcoming efforts to provide crucial statistical and probabilistic assessments, such as the Extravehicular Activity (EVA) PRA for the Hubble Space Telescope service mission and the first fully integrated PRAs for the CxP's Lunar Sortie and ISS missions.

Valentine, Mark↗

Safety-Class Uninterruptable Power Supply General Contractor for the TA-55 TRP II Project: REQUEST FOR QUALIFICATION No. ADPM-002 - PREQUALIFICATION CRITERIA

LANS is seeking to establish qualified suppliers for the procurement and construction of a Safety-Class Uninterruptable Power Supply (UPS) facility in accordance with ASME NQA-1 2008 and 2009 addenda. This scope includes Work required to construct a new UPS facility at Technical Area (TA)-55 including procurement, construction, installation, and post installation testing of all structures, systems, and equipment (e.g., foundations, concrete, structural steel, building components, HVAC, fire protection, site utilities) excluding the UPS system itself. Design of the facility and associated infrastructure are provided by LANL. Final design of the UPS system will be provided by the UPS Integrator under separate contract. Procurement of all safety-related components (specified by LANL) must be in accordance with NQA-1 and must be purchased from qualified suppliers that have an NQA-1 program or through Commercial Grade Dedication (CGD) in accordance with NQA-1a-2009, Subpart 2.14. The SUBCONTRACTOR shall plan, schedule, coordinate, test, inspect and assure effective performance of all aspects of the Work as described herein.

42 ENGINEERING↗

Assured crew return capability Crew Emergency Return Vehicle (CERV) avionics

The Crew Emergency Return Vehicle (CERV) is being defined to provide Assured Crew Return Capability (ACRC) for Space Station Freedom. The CERV, in providing the standby lifeboat capability, would remain in a dormat mode over long periods of time as would a lifeboat on a ship at sea. The vehicle must be simple, reliable, and constantly available to assure the crew's safety. The CERV must also provide this capability in a cost effective and affordable manner. The CERV Project philosophy of a simple vehicle is to maximize its useability by a physically deconditioned crew. The vehicle reliability goes unquestioned since, when needed, it is the vehicle of last resort. Therefore, its systems and subsystems must be simple, proven, state-of-the-art technology with sufficient redundancy to make it available for use as required for the life of the program. The CERV Project Phase 1'/2 Request for Proposal (RFP) is currently scheduled for release on October 2, 1989. The Phase 1'/2 effort will affirm the existing project requirements or amend and modify them based on a thorough evaluation of the contractor(s) recommendations. The system definition phase, Phase 2, will serve to define CERV systems and subsystems. The current CERV Project schedule has Phase 2 scheduled to begin October 1990. Since a firm CERV avionics design is not in place at this time, the treatment of the CERV avionics complement for the reference configuration is not intended to express a preference with regard to a system or subsystem.

Myers, Harvey Dean↗

New health and safety initiatives at the Department of Energy (DOE)

This document touches on some of the more important lessons learned and the more noteworthy initiatives DOE has put into motion in the last three years to protect the health and safety of our contractor employees. What we have learned in the process should come as no surprise to those of you who have been working in the field: (1) that management commitment to safety and health is critical to a successful program; (2) that meaningful employee participation in all aspects of the program enhances its effectiveness at every level; and (3) that the dedication and expertise of medical and occupational safety and health professionals are needed if the challenging problems presented by the complex and technologically advanced environment at DOE facilities are to be overcome. I believe that we have made a good beginning in the long and arduous task of building an Occupational Safety and Health Program that will serve as a model for others, and I can assure you that we intend to continue our efforts to protect every worker within the complex from occupational injury and disease.

Ziemer, Paul L.↗

EVMS Self-Surveillance of Remote Handled Low Level Waste (RHLLW) Project

DOE G 413.3-10A, Section 3.a states: “The Contractor has primary responsibility for implementing and maintaining a surveillance program to ensure continued compliance of the system with ANSI/EIA-748B. DOE O 413.3B requires the FPD to ensure the contractor conducts a Self-Surveillance annually. This annual Self-Surveillance,…should cover all 32 guidelines of the ANSI/EIA748B. Documentation of the Self-Surveillance is sent to the CO and the PMSO (copy to OECM) confirming the continued compliance of their EVMS ANSI/EIA748B...” This review, and the associated report, is deemed to satisfy this requirement.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An examination of anticipated g-jitter on Space Station and its effects on materials processes

This study is concerned with the effects of g-jitter, the residual acceleration aboard spacecraft, on selected classes of materials processes. In particular, the anticipated acceleration environment aboard Space Station Freedom (SSF) and its potential effects are analyzed, but the topic is covered with a sufficient level of generality as to apply to other processes and to other vehicles as well. Some of the key findings of this study include: The present acceleration specifications for SSF are inadequate to assure a quality level low-g environment. The local g vector orientation is an extremely sensitive parameter for certain key processes, but can not be controlled to within the desired tolerance. Therefore, less emphasis should be placed upon achieving a tight control of SSF attitude, but more emphasis should be focused on reducing the overall level of the g-jitter magnitude. Melt-based crystal growth may not be successfully processed in the relatively noisy environment of a large inhabited space structure. Growth from vapor or from solution appears more favorable. A smaller space structure and/or a free flyer can provide better alternatives in terms of g-jitter considerations. A high priority (including budgetary) should be given to coordinated efforts among researchers, SSF designers, and equipment contractors, to develop practical experiment-specific sensitivity requirements. Combined focused numerical simulations and experiments with well-resolved acceleration measurements should be vigorously pursued for developing reliable experiment-specific sensitivity data. Appendices provide an extensive cross-referenced bibliography, a discussion of the merits offered by g-jitter analysis techniques, as well as definitions of relevant nondimensional quantities and a brief description of available accelerometry hardware.

Nelson, Emily S.↗

DOE Hanford Tank Side Cesium Removal System (TSCR) Update: Fabrication and Factory Acceptance Testing - 20300

The Tank Side Cesium Removal (TSCR) System is a modular, quickly-deployable, and passively safe system for efficiently removing solids and cesium from alkaline liquid waste raffinate created by fuel processing on the Hanford site. This paper provides an overview of the project with particular emphasis on completion of fabrication and factory acceptance testing (FAT). All TSCR System components are inside three enclosures known as the Process Enclosure, Ancillary Enclosure, and Control Enclosure. The Process Enclosure is seismic design category II (SDC-II) and built to withstand the rigors of transportation and lifting, high winds, volcanic ash fall, and heavy precipitation (snow) over a temperature range of -25 to 115 deg. F. The Process Enclosure and Control Enclosure were fabricated in AVANTech's Columbia, SC facility, while the Ancillary Enclosure was fabricated in AVANTech's Richland, WA facility. The design and preliminary documented safety analysis were completed in December 2019, with all work being performed in accordance with ASME NQA-1 quality assurance requirements. The Process Enclosure, Ion Exchange Columns (IXCs), and several other TSCR components have a nuclear safety function and are designated as safety significant structures, systems, and components (SS-SSCs). The NQA-1 Commercial Grade Dedication (CGD) process was used to identify critical characteristics in order to accept materials and items used for fabrication of several safety significant TSCR components. This paper also addresses unique aspects and challenges of implementing CGD in DOE facilities and systems. After fabrication and preliminary testing, the Process and Control Enclosures were shipped to AVANTech's Richland facility where the complete TSCR System was setup and connected in a represented layout and configuration that will be used on the Hanford site. Test tanks and pumps were put in place and connected to the TSCR Process Enclosure in a manner that mimicked interfacing Double Shell Tanks in the 241-AP Tank Farm. The TSCR System was then tested/operated under conditions equivalent to those planned for onsite operation. Testing was separated into five separate phases as defined below: - Phase 1: Confirmation of TSCR System readiness for the FAT; - Phase 2: Verification of TSCR System operation under standard conditions; - Phase 3: Demonstration of TSCR System operation under non-standard conditions; - Phase 4: Demonstration of ion exchange media removal from an IXC; and - Phase 5: Completion of TSCR System lift plans and site mobilization. The Hanford Tank Operations Contractor, Washington River Protection Solutions (WRPS), participated in all phases of testing. Testing at AVANTech's Richland Facility allowed WRPS personnel to familiarize themselves with TSCR operations in a radiologically clean facility prior to onsite mobilization. Engineering and operations personnel gained valuable experience that allowed them to better refine onsite operational protocols and procedures - including handling and movement of IXCs with a forklift. This paper describes the technologies used by the TSCR System as well as how these technologies are deployed and operated to advance the Hanford mission of safely, efficiently, and effectively treating tank waste. It also provides detailed information on fabrication and FAT, including operational data from simulated tank waste runs. A project schedule for WRPS' planned construction acceptance testing, operational acceptance testing, and actual tank waste treatment is provided. This presentation should be of great interest to parties responsible for the design, testing, and mobilization of modular NQA-1 technologies for the treatment of raffinate and similar liquid wastes containing high concentrations of radioactive cesium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Total Quality Management: Analysis, Evaluation and Implementation Within ACRV Project Teams

Total quality management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The Assured Crew Return Vehicle (ACRV) Project Office was identified as an excellent project in which to demonstrate the applications and benefits of TQM processes. As the ACRV Program moves through its various stages of development, it is vital that effectiveness and efficiency be maintained in order to provide the Space Station Freedom (SSF) crew an affordable, on-time assured return to Earth. A critical factor for the success of the ACRV is attaining the maximum benefit from the resources applied to the program. Through a series of four tutorials on various quality improvement techniques, and numerous one-on-one sessions during the SSF's 10-week term in the project office, results were obtained which are aiding the ACRV Office in implementing a disciplined, ongoing process for generating fundamental decisions and actions that shape and guide the organization. Significant advances were made in improving the processes for two particular groups - the correspondence distribution team and the WATER Test team. Numerous people from across JSC were a part of the various team activities including engineering, man systems, and safety. The work also included significant interaction with the support contractor to the ACRV Project. The results of the improvement activities can be used as models for other organizations desiring to operate under a system of continuous improvement. In particular, they have advanced the ACRV Project Teams further down the path of continuous improvement, in support of a working philosophy of TQM.

Raiman, Laura B.↗

Site Environmental Report for 2010 Sandia National Laboratories, California.

Sandia National Laboratories, California (SNL/CA) is a government-owned/contractor-operated laboratory. Sandia Corporation, a Lockheed Martin Company, manages and operates the laboratory for the Department of Energy's National Nuclear Security Administration (NNSA). The NNSA Sandia Site Office administers the contract and oversees contractor operations at the site. This Site Environmental Report for 2010 was prepared in accordance with DOE Order 231.1A (DOE 2004a). The report provides a summary of environmental monitoring information and compliance activities that occurred at SNL/CA during calendar year 2010. General site and environmental program information is also included. The Site Environmental Report is divided into ten chapters. Chapter 1, the Executive Summary, highlights compliance and monitoring results obtained in 2010. Chapter 2 provides a brief introduction to SNL/CA and the existing environment found on site. Chapter 3 summarizes SNL/CA's compliance activities with the major environmental requirements applicable to site operations. Chapter 4 presents information on environmental management, performance measures, and environmental programs. Chapter 5 presents the results of monitoring and surveillance activities in 2010. Chapter 6 discusses quality assurance. Chapters 7 through 9 provide supporting information for the report and Chapter 10 is the report distribution list.

54 ENVIRONMENTAL SCIENCES↗

Initial Criticality Assessments to Guide FMEAs on Rocket Engine Hot Fire Testing

Presented is an explanation of the use of the Initial Criticality Assessment (ICA) technique, a triage process for prioritizing required Failure Modes and Effects Analysis (FMEAs), for the European Service Module's main propulsion system's hot-fire test bed at White Sands New Mexico. Rather than instinctively performing many FMEAs of subsystems, or one large system level FMEA where every subcomponent is analyzed, the ICA guided an informed analysis of only the hardware that had a large impact to hazards. The low criticality hardware was documented via the ICA and no FMEA was performed; the work could then focus on the high criticality hardware. Thus a savings of Program resources was achieved. The experiences gained in creating these ICAs for this international collaborative project confirmed that the need for continuous communication across the technical teams is one of the greatest areas of emphasis. The European Space Agency (ESA) is developing the European Service Module (ESM), with its primary contractor, Airbus Defence and Space in Germany, for delivery to the National Aeronautics and Space Administration (NASA). The module will be equipped with a total of 21 engines to support NASA’s Orion spacecraft: one U.S. Space Shuttle Orbital Maneuvering System-Engine (OMS-E), eight auxiliary thrusters and 12 smaller RCS (Reaction Control System) thrusters. The main ESM propulsion system, used for large translational maneuvers, consists of one OMS-E... To qualify the design of the ESM propulsion subsystem (PSS) an all-steel Propulsion Qualification Module (PQM) structure is used to test the propulsion systems on Orion, including “hot firing” of the OMS engine, thrusters, and RCS. The PQM has been developed as a hot-fire test bed to be tested at the NASA White Sands Test Facility (WSTF). One of the objectives of the testing is to assure that the OMS-E can be safely operated with the PQM. Testing will also demonstrate that the PQM can set the proper upstream pressures and temperatures for the OMS-E to operate nominally given the PQM has never been tested in hot-fire operation with OMS-E before. In order to safely conduct the test campaign, hardware such as the engine subassembly, fluid feed lines, valves, electrical power lines, instrumentation, stiff links, installation Ground Support Equipment (GSE), and diffuser [whose objectives are to collect the exhaust of the OMS-E to actively cool down the exhaust gases, reduce thermal exchanges, and create a vacuum at OMS-E level before igniting], had to be analyzed for any hazards and failure modes.

Fault Tolerance↗

NASA total quality management 1989 accomplishments report

NASA and contractor employees achieved many notable improvements in 1989. The highlights of those improvements, described in this seventh annual Accomplishments Report, demonstrate that the people who support NASA's activities are getting more involved in quality and continuous improvement efforts. Their gains solidly support NASA's and this Nation's goal to remain a leader in space exploration and in world-wide market competition, and, when communicated to others through avenues such as this report, foster improvement efforts across government and industry. The principles in practice which led to these process refinements are important cultural elements to any organization's productivity and quality efforts. The categories in this report reflect NASA principles set forth in the 1980's and are more commonly known today as Total Quality Management (TQM): top management leadership and support; strategic planning; focus on the customer; employee training and recognition; employee empowerment and teamwork; measurement and analysis; and quality assurance.

Tai, Betty P.↗

Lightning Protection and Structural Bonding for the B2 Test Stand

With the privatization of the space industry, NASA has entered a new era. To explore deeper parts of the solar system, NASA is developing a new spacecraft, the Space Launch System (SLS), capable of reaching these destinations, such as an asteroid or Mars. However, the test stand that is capable of testing the stage has been unused for many years. In addition to the updating/repair of the stand, more steel is being added to fully support the SLS. With all these modifications, the lightning protection system must be brought up to code to assure the protection of all personnel and assets. Structural bonding is a part of the lightning protection system. The focus of this project was to assure proper structural bonding. To begin, all relevant technical standards and the construction specifications were reviewed. This included both the specifications for the lightning protection and for general construction. The drawings were reviewed as well. From the drawings, bolted structural joints were reviewed to determine whether bonding was necessary. Several bolted joints were determined to need bonding according to the notes in the drawings. This exceeds the industry standards. The bolted joints are an electrically continuous joint. During tests, the stand experiences heavy vibration that may weaken the continuity of the bolted joint. Therefore, the secondary bonding is implemented to ensure that the structural joint has low resistance. If the structural joint has a high resistance because of corrosion, a potential gradient can occur that can cause a side flash. Damage, injury, or death can occur from a side flash so they are to be prevented. A list of the identified structural joints was compiled and sent to the contractor to be bonded. That covers the scope of this project.

Kinard, Brandon↗

Environmental Requirements Management

CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

Cusack, Laura J.↗

Process Knowledge Data Gathering and Reporting in Support of Decommissioning [Slides]

Summary of recent ORAU decommissioning activities at the Oak Ridge National Laboratory (ORNL) and the East Tennessee Technology Park (ETTP). Project objective was to generate approved Waste Lot Profiles for legacy facilities scheduled for demolition and shipment to the Environmental Management Waste Management Facility (EMWMF) or appropriate alternate facility. The form and content of process knowledge (PK) reports were developed with input from the EMWMF Waste Acceptance Criteria (WAC) Attainment Team and regulators. PK may be defined as the knowledge of the design and the history of operations that occurs during the life cycle of a facility (paraphrased from SRNL guidance) - similar to the MARSSIM historical site assessment. Some types of PK data used to decommission ORNL and ETTP facilities include: (1) Design drawings; (2) Historical documents [e.g., History of the Oak Ridge National Laboratory by Thomas (1963) and A Brief History of the Chemical Technical Division (ORNL/M-2733)]; (3) Historical photographs; (4) Radiological survey reports; (5) Facility-specific databases - (a) Spill history, (b) Waste Information Tracking System (WITS), and (c) Hazardous Materials Management Information System (HMMIS); (6) Facility walkdown summary reports; and (7) Living memory data. Facility walkdowns are critical for worker safety planning and to assure on-the-ground-conditions match historical descriptions. For Oak Ridge operations, investigators also document the nature and number of items requiring special handling or disposition planning, such as the following: (1) Items containing polychlorinated biphenyls, asbestos, lead, or refrigerants; (2) Items with physical WAC restriction (e.g., large items, pipes, and concrete); and (3) Too 'hot' for EMWMF. Special emphasis was made to interview facility managers, scientists, technicians, or anyone with direct knowledge of process-related activities. Interviews often led to more contact names and reports but also offered anecdotal accounts of releases, process-related operations, maintenance activities, and other relevant information not addressed in the written record. 'Fun' part of PK data gathering. Often got not-so-useful information such as, 'The operations manager was a jerk and we all hated him.' PK data are used to indicate the presence or absence of contaminants. Multiple lines of investigation are necessary for characterization planning and to help determine which disposal facility is best suited for targeted wastes. The model used by ORAU assisted remediation contractors and EMWMF managers by identifying anomalous waste and items requiring special handling.

54 ENVIRONMENTAL SCIENCES↗