Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contingency Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Improved Evaluation of Large Network Matrices for Linear Power Flow Within Optimization Problems: Preprint

This work discusses methods for evaluating the Power Transfer Distribution Factor (PTDF) and Line Outage Distribution Factor (LODF) matrices by employing sparse linear algebra for large-scale computing applications. These matrices are critical in many power systems applications, such as the Unit Commitment Problem (UC), pre- and post-contingency power flow analysis, and transmission expansion. These matrices are typically dense, which means they require a significant amount of time and memory to be computed for large networks. However, by analyzing the structure of the matrices and their computation method, it is possible to use reduced memory methods based on sparse matrix operations. This paper shows that sparse linear algebra algorithms are faster and require less memory and time than traditional dense approaches. Additionally, we explore the effect of matrix sparsification by eliminating trailing digits on power flow calculations.

ENERGY PLANNING, POLICY, AND ECONOMY↗

Computing contingency statistics in parallel.

Statistical analysis is typically used to reduce the dimensionality of and infer meaning from data. A key challenge of any statistical analysis package aimed at large-scale, distributed data is to address the orthogonal issues of parallel scalability and numerical stability. Many statistical techniques, e.g., descriptive statistics or principal component analysis, are based on moments and co-moments and, using robust online update formulas, can be computed in an embarrassingly parallel manner, amenable to a map-reduce style implementation. In this paper we focus on contingency tables, through which numerous derived statistics such as joint and marginal probability, point-wise mutual information, information entropy, and {chi}{sup 2} independence statistics can be directly obtained. However, contingency tables can become large as data size increases, requiring a correspondingly large amount of communication between processors. This potential increase in communication prevents optimal parallel speedup and is the main difference with moment-based statistics where the amount of inter-processor communication is independent of data size. Here we present the design trade-offs which we made to implement the computation of contingency tables in parallel.We also study the parallel speedup and scalability properties of our open source implementation. In particular, we observe optimal speed-up and scalability when the contingency statistics are used in their appropriate context, namely, when the data input is not quasi-diffuse.

99 GENERAL AND MISCELLANEOUS↗

Topological Machine Learning Methods for Power System Responses to Contingencies

While deep learning tools, coupled with the emerging machinery of topological data analysis, are proven to deliver various performance gains in a broad range of applications, from image classification to biosurveillance to blockchain fraud detection, their utility in areas of high societal importance such as power system modeling and, particularly, resilience quantification in the energy sector yet remains untapped. To provide fast acting synthetic regulation and contingency reserve services to the grid while having minimal disruptions on customer quality of service, we propose a new topology-based system that depends on a neural network architecture for impact metric classification and prediction in power systems. This novel topology-based system allows one to evaluate the impact of three power system contingency types, in conjunction with transmission lines, transformers, and transmission lines combined with transformers. We show that the proposed new neural network architecture equipped with local topological measures facilitates more accurate classification of unserved load as well as the amount of unserved load. In addition, we are able to learn more about the complex relationships between electrical properties and local topological measurements on their simulated response to contingencies for the NREL-SIIP power system.

contingency analysis↗

Rooftop Photovoltaics and Electric Vehicle Co-Adoption: Attitudes, Norms, Diffusion, and Economics

The overall objectives of the project were to (1) Identify personal and social norms, peer effects, demographics and contextual factors (such as household energy expenditures, experience with outages, charging infrastructure availability) that may facilitate or hinder Solar-EV co-adoption; (2) outline strategies for the design of programs and practices that will enable reasoned RPV and EV adoption and their co-adoption; and (3) assemble a dataset comprised of survey responses of RPV-EV co-adopters, RPV-only adopters, EV-only adopters, and non-adopters. These objectives were only partially fulfilled given the decision to terminate the project. The research team was able to complete the semi-structured interviews, the core BY1 task and summarize the results below. As well, once the team learned of the research project’s fate, it sought and obtained the DOE SETO Technical Manager’s approval to repurpose funds for BY2 tasks to the extent feasible. Rather than invest further resources in expanding the pool of potential survey respondents and having no budget to survey, the research team repurposed funds subject and undertook a more limited (geographically) survey, but also expanded to it to include contingent valuation questions. The analysis of the survey data will necessarily be delayed given the lack of budget support, although some information on the respondent sample is in the results. Given a lack of attention to co-adoption previously, the insights generated in this project should assist decision-makers and industry actors in the development of programs and practices that enable reasoned RPV adoption and EV adoption and their co-adoption.

14 SOLAR ENERGY↗

Simulation and Postmortem Analysis of Angeles Forest Disturbance Event

Multiple unexpected solar photovoltaic (PV) plant responses in the California region following contingencies in recent years warrant postmortem analysis leveraging digital fault recorder (DFR) data for a better understanding of such events and preventing similar events in the future. Most utilities in US, in general, possess transient stability (TS) phasor-domain models of the power grid. Since traditional phasor-based transient stability planning models cannot perform such analysis, this paper presents an approach to extract a region of such models and convert it to Electromagnetic transient (EMT) models. The approach is based on the determination of the minimum impedance-weighted spanning tree between the fault location and affected PV plants in a Western Electricity Coordinating Council (WECC) planning model followed by conversion of this region into an EMT model. The accuracy of the proposed approach is validated against DFR records obtained from the 2018 Angeles Forest disturbance event.

Samanta, Sayan↗

UK regulatory review of the double contingency principle in criticality safety - 14379

The UK's regulatory regime is based on Licence Conditions (LCs) attached to a Nuclear Site Licence (NSL) and is non-prescriptive in nature. The law requires licensees to reduce health and safety risks to workers and the public 'so far as is reasonability practicable' (SFAIRP), and this framework provides licensees with flexibility to achieve this. Guidance for inspectors on the assessment of nuclear safety cases has been published in Office for Nuclear Regulation's (ONR) Safety Assessment Principles (SAPs) and supporting Technical Assessment Guides (TAGs). These guidance documents have recently been reviewed in the light of the Fukushima accident. The opportunity has also been taken to reconsider the use of the Double Contingency Principle used in criticality safety cases, an approach commonly regarded as the preferred means of criticality control internationally and featured in the SAPs and TAGs. Licensees in the UK have adopted several approaches in nuclear criticality safety cases based upon a combination of deterministic and probabilistic safety cases using the Double Contingency Principle and Design Basis Analysis. ONR has developed a targeted intervention to sample a number of nuclear safety cases in order to test the adequacy of methodologies used to secure nuclear criticality safety. This paper reports the results of this intervention and considers the need to review the advice currently given by the UK nuclear regulator, including on use of the Double Contingency Principle. (authors)

42 ENGINEERING↗

Reducing Contingency through Sampling at the Luckey FUSRAP Site - 13186

Typically, the greatest risk in developing accurate cost estimates for the remediation of hazardous, toxic, and radioactive waste sites is the uncertainty in the estimated volume of contaminated media requiring remediation. Efforts to address this risk in the remediation cost estimate can result in large cost contingencies that are often considered unacceptable when budgeting for site cleanups. Such was the case for the Luckey Formerly Utilized Sites Remedial Action Program (FUSRAP) site near Luckey, Ohio, which had significant uncertainty surrounding the estimated volume of site soils contaminated with radium, uranium, thorium, beryllium, and lead. Funding provided by the American Recovery and Reinvestment Act (ARRA) allowed the U.S. Army Corps of Engineers (USACE) to conduct additional environmental sampling and analysis at the Luckey Site between November 2009 and April 2010, with the objective to further delineate the horizontal and vertical extent of contaminated soils in order to reduce the uncertainty in the soil volume estimate. Investigative work included radiological, geophysical, and topographic field surveys, subsurface borings, and soil sampling. Results from the investigative sampling were used in conjunction with Argonne National Laboratory's Bayesian Approaches for Adaptive Spatial Sampling (BAASS) software to update the contaminated soil volume estimate for the site. This updated volume estimate was then used to update the project cost-to-complete estimate using the USACE Cost and Schedule Risk Analysis process, which develops cost contingencies based on project risks. An investment of $1.1 M of ARRA funds for additional investigative work resulted in a reduction of 135,000 in-situ cubic meters (177,000 in-situ cubic yards) in the estimated base volume estimate. This refinement of the estimated soil volume resulted in a $64.3 M reduction in the estimated project cost-to-complete, through a reduction in the uncertainty in the contaminated soil volume estimate and the associated contingency costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Scale and the representation of human agency in the modeling of agroecosystems

Human agency is an essential determinant of the dynamics of agroecosystems. However, the manner in which agency is represented within different approaches to agroecosystem modeling is largely contingent on the scales of analysis and the conceptualization of the system of interest. While appropriate at times, narrow conceptualizations of agroecosystems can preclude consideration for how agency manifests at different scales, thereby marginalizing processes, feedbacks, and constraints that would otherwise affect model results. Modifications to the existing modeling toolkit may therefore enable more holistic representations of human agency. Model integration can assist with the development of multi-scale agroecosystem modeling frameworks that capture different aspects of agency. In addition, expanding the use of socioeconomic scenarios and stakeholder participation can assist in explicitly defining context-dependent elements of scale and agency. Finally, such approaches, however, should be accompanied by greater recognition of the meta agency of model users and the need for more critical evaluation of model selection and application.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

DeepGrid: Robust Deep Reinforcement Learning-based Contingency Management

Increasing uncertainty raised by the integration of renewable energy resources requires an enormous number of simulations to be carried out for the security assessment of the power grid. However, it is challenging to assess the steady-state and dynamic security indices for different system contingency events by doing an exhaustive analysis in real-time due to the computational and communication constraints. One promising solution is using data-driven techniques along with the system models to train an intelligent contingency management framework to better handle the contingencies in real-time. Nevertheless, implementing a data-driven technique to obtain the best remedial actions necessitates to account for the effect of the measurement noise on the performance of the contingency management. To tackle these challenges, we leverage a robust deep reinforcement learning (DRL) algorithm called Double Deep Q-Network (DDQN) to design a recommender system capable of prescribing optimal control actions with the help of the real-time digital simulator (RTDS). The use of RTDS system in combination with the advanced DRL algorithm allows to explore a wide variety of system contingencies in order to derive better remedial actions. The performance of the proposed algorithm is evaluated in IEEE 9-bus system under different loading conditions, and different network configurations in presence of noisy measurements.

Ghasemkhani, Amir↗

Data Privacy for the Grid: Toward a Data Privacy Standard for Inverter-Based and Distributed Energy Resources

The traditional approach to planning the distribution grid has focused on reliability in the context of gradual and reasonably predictable load growth. Forecasts of load growth, combined with asset management practices, were used by system planners to identify upgrades to the system to maintain or improve reliability. The decisions, typically based within load flow analysis tools, included considerations about contingency scenarios and corporate forecasts (i.e., top-down predictions at a summary level of what would happen in a particular area that could impact load growth and behavior). As a result, today, this traditional approach no longer fits all purposes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evidence of Panmixia between Sympatric Life History Forms of Coastal Cutthroat Trout in Two Lower Columbia River Tributaries

Abstract Coastal cutthroat trout Oncorhynchus clarkii clarkii exhibit resident and migratory life history strategies that often occur sympatrically, but the relationship between these forms within a population is poorly characterized. Through use of passive integrated transponder technology, migratory and resident coastal cutthroat trout were identified in two lower Columbia River tributaries (Abernathy Creek and the Chinook River) separated by more than 80 km. Genetic data from 17 highly variable microsatellite loci were used to ascertain the genetic population structure of these life history forms within and between streams. No distinct genetic separation was observed between the life history forms within a stream, as assessed by four different statistical approaches: permutation tests based on the genetic differentiation index FST, principal components analysis of individuals, analysis of molecular variance, and contingency tests of allele frequency heterogeneity. Genetic differences were an order of magnitude higher between stream samples (FST > 0.03) than between life history forms within a stream (FST < 0.003). The contingency test detected allele frequency differences between migratory and resident life history forms in Abernathy Creek (P = 0.001), but this result was influenced more by age-class structure than by reproductive isolation between life history forms. Results are consistent with a single, randomly mating population in each stream producing both migratory and resident life history forms. These data suggest that individual life history strategy in coastal cutthroat trout is predominantly determined by phenotypic plasticity rather than genotype.

Johnson, Jeffrey R.↗

ER Line Phase II Project Risk Assessment Report

The purpose of this risk and opportunity assessment is to report the potential cost impacts from technical and programmatic risks (TPR) and opportunities. This analysis will determine the cost contingency for these TPR impacts. The approach taken to manage risk is consistent with risk and opportunity management guidance contained in DOE Order 413.3B, Project Management for the Acquisition of Capital Assets, the DOE Guide 413.3-7, Risk Management Guide and LANL’s Project Management Procedure AP-350-204 Risk and Opportunity Management.

Engineering(42)↗

An overview of the 2014 revision of ANSI/ANS-ANS-8.1-2014, 'Nuclear criticality safety in operations with Fissionable Materials Outside Reactors' - 14577

A revision to the American National Standards Institute (ANSI)/American Nuclear Society (ANS) standard, 'Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors' [ANSI/ANS-8.1 (ANS-8.1)], was completed and published in 2014. The approved scope for the 2014 revision included two major efforts: (1) an editorial revision to clarify the meaning of the process analysis requirement (PA) and the double contingency principle recommendation (DCP) and (2) the generation of new subcritical limits for uranium and uranium compounds for enrichments less than 10 wt % {sup 235}U. After a clarification request was submitted regarding the PA and DCP in 2009, the scope of the revision became focused almost entirely on the editorial revision. With approval from the ANS-8 subcommittee chairman, the computational effort was postponed until the editorial revision could be completed. The 2014 revision of ANS-8.1 involved nuclear criticality safety experts from 14 different sites, each with many years of experience, either maintaining the standard as a working group member or as a criticality safety practitioner. Many of the represented sites had implemented the PA with the language of the DCP to ensure that process operations with fissionable materials would be subcritical. However, the early working group deliberations made it clear that the general industry focus was on the DCP rather than the PA, which requires that 'all normal and credible abnormal conditions remain subcritical'. Over the course of the revision, two new definitions and a new appendix (Appendix B) were developed to enhance understanding of the PA and DCP. The emphasis of Appendix B is on the requirement for subcriticality (PA) rather than the DCP. The phrase 'credible abnormal conditions' in the PA is broader in meaning than 'changes in process conditions,' as recommended by the DCP. This is because a single credible abnormal condition can potentially affect multiple independent process conditions, and consequently, multiple process parameters, simultaneously. The DCP is a technical practice meant to support the PA and cannot be applied to all situations. However, when it can be properly applied, the DCP technical practice, in most cases, ensures compliance with the PA because two unlikely, independent, and concurrent changes in process conditions are generally judged not to be a credible abnormal condition, as specified in the PA. This paper elaborates on the intense working group discussions over the course of the ANSI/ANS-8.1 standard revision and summarizes the modifications made to the revised standard. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Computing contingency statistics in parallel : design trade-offs and limiting cases.

Statistical analysis is typically used to reduce the dimensionality of and infer meaning from data. A key challenge of any statistical analysis package aimed at large-scale, distributed data is to address the orthogonal issues of parallel scalability and numerical stability. Many statistical techniques, e.g., descriptive statistics or principal component analysis, are based on moments and co-moments and, using robust online update formulas, can be computed in an embarrassingly parallel manner, amenable to a map-reduce style implementation. In this paper we focus on contingency tables, through which numerous derived statistics such as joint and marginal probability, point-wise mutual information, information entropy, and X{sup 2} independence statistics can be directly obtained. However, contingency tables can become large as data size increases, requiring a correspondingly large amount of communication between processors. This potential increase in communication prevents optimal parallel speedup and is the main difference with moment-based statistics (which we discussed in [1]) where the amount of inter-processor communication is independent of data size. Here we present the design trade-offs which we made to implement the computation of contingency tables in parallel.We also study the parallel speedup and scalability properties of our open source implementation. In particular, we observe optimal speed-up and scalability when the contingency statistics are used in their appropriate context, namely, when the data input is not quasi-diffuse.

99 GENERAL AND MISCELLANEOUS↗

Computing contingency statistics in parallel : design trade-offs and limiting cases.

Statistical analysis is typically used to reduce the dimensionality of and infer meaning from data. A key challenge of any statistical analysis package aimed at large-scale, distributed data is to address the orthogonal issues of parallel scalability and numerical stability. Many statistical techniques, e.g., descriptive statistics or principal component analysis, are based on moments and co-moments and, using robust online update formulas, can be computed in an embarrassingly parallel manner, amenable to a map-reduce style implementation. In this paper we focus on contingency tables, through which numerous derived statistics such as joint and marginal probability, point-wise mutual information, information entropy, and {chi}{sup 2} independence statistics can be directly obtained. However, contingency tables can become large as data size increases, requiring a correspondingly large amount of communication between processors. This potential increase in communication prevents optimal parallel speedup and is the main difference with moment-based statistics (which we discussed in [1]) where the amount of inter-processor communication is independent of data size. Here we present the design trade-offs which we made to implement the computation of contingency tables in parallel. We also study the parallel speedup and scalability properties of our open source implementation. In particular, we observe optimal speed-up and scalability when the contingency statistics are used in their appropriate context, namely, when the data input is not quasi-diffuse.

99 GENERAL AND MISCELLANEOUS↗

PV Inverter Fault Response Including Momentary Cessation, Frequency-Watt, and Virtual Inertia

This paper presents two photovoltaic (PV) inverter control methods and an analysis of the two under a significant three-phase transmission line fault contingencies in the Hawaiian island of Oahu power system. Simulations are presented for the two control methods on the island power system with a high penetration of PV generation, approximately 40% of the total. The two control methods discussed are similar: one is a proportional frequency-watt controller, and the second is a proportional-derivative controller, a frequency-watt controller with virtual inertia. Both methods can be beneficial for fast frequency support. The inverter model also emulates inverter fault response including 'momentary cessation' and recovery during low voltage events. The study presented in this paper utilizes a validated power system model of the Hawaiian island of Oahu, modified to include PV resources with the two custom developed control models. Dynamic simulations with PSS/E are presented during a significant transmission line three-phase fault contingency. Simulations are presented with and without PV reserve margin. In addition, a parameter sensitivity analysis is presented for the control methods. Results indicate both methods can significantly improve system response during fault events. Findings indicate that transmission faults can produce severe frequency events, and that fast recovery from momentary cessation is crucial to mitigate severity.

14 SOLAR ENERGY↗

A Sparse Tableau Formulation for Node-Breaker Representations in Security-Constrained Optimal Power Flow

Realistic representations of contingencies in AC optimal power flow (ACOPF) often challenge traditional bus-branch network models. Derived from nodal analysis, such approaches represent network constraints in terms of the familiar bus admittance matrix, Ybus. A fixed Ybus is unable to represent common circuit breaker actions such as bus splitting. Work-arounds for Ybus-based analysis typically rely on topology processing, switching between different Ybus matrices depending on breaker settings. In this paper, we propose a very general node-breaker approach, employing multi-port element models and using a sparse tableau formulation (STF) for network constraints. Instead of treating breaker action as altering network topology, and hence changing the structure of Kirchhoff’s voltage law (KVL) and Kirchhoff’s current law (KCL) equations, this approach represents a breaker’s position as impacting only constraints associated with a single component, thereby maintaining fixed structure in the KVL and KCL constraints. While larger numbers of variables are required, STF proves sparser than Ybus formulations. Numerical case studies herein demonstrate that STF provides computational efficiency comparable to a Ybus-based ACOPF at the scale of several hundred buses, and lower computational cost in an example of over one thousand buses.

Park, Byungkwon (ORCID:000000033189816X)↗