Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contingency Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Preliminary Criticality and Radiation Shielding Analysis for the Storage and Transfer of MARVEL Reactor Spent Nuclear Fuel

This report documents the results of preliminary nuclear criticality and radiation shielding assessments during transfer and dry storage of irradiated Microreactor Applications Research Validation and Evaluation (MARVEL) reactor fuel at Idaho National Laboratory (INL). The assessments focus on transfer casks and storage canisters that are currently in use at INL, which may be compatible with the irradiated MARVEL reactor fuel. The criticality assessments were performed using the radiation transport code MCNP6 with 37 MARVEL reactor fuel elements in various configurations and scenarios. All transfer and storage configurations under dry conditions were below the assumed criticality safety limit of 0.93. Some storage and transfer configurations under wet conditions exceeded the criticality safety limit. This suggests that the appropriate administrative and engineering controls, in addition to reducing the number of MARVEL reactor fuel elements per transfer cask or storage canister, can be expected to ensure criticality safety under all scenarios. The radiation shielding assessments were performed by generating conservative neutron and photon source terms using the ORIGEN module in the SCALE suite of codes. These source spectra were used to estimate the dose equivalent rates using the radiation transport code MCNP6, both on contact and 1 m away from the fuel and transfer casks. The maximum estimated dose equivalent rate of 37 unshielded MARVEL reactor fuel elements on contact is approximately 42000 R/hr. The maximum estimated dose equivalent rates on contact to the ATR transfer cask, HFEF-5 transfer cask, and high load charger were approximately 233 mR/hr, 171 mR/hr, and 201 mR/hr, respectively. This suggests that with the appropriate administrative and engineering controls, all three transfer casks analyzed can be expected to provide sufficient radiation shielding to workers during transfer of irradiated MARVEL reactor fuel. These calculations are performed to support the planning and strategy for the MARVEL project and will demonstrate the technical viability of the different configurations discussed and help identify where engineered or administrative controls may be necessary. A complete criticality safety analysis and radiation shielding analysis, including validation and contingency and accident analysis must be completed by licensed and authorized personnel before any transfer or storage of MARVEL reactor nuclear fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Relaxing USOS Solar Array Constraints for Russian Vehicle Undocking

With the retirement of Space Shuttle cargo delivery capability and the ten year life extension of the International Space Station (ISS) more emphasis is being put on preservation of the service life of ISS critical components. Current restrictions on the United States Orbital Segment (USOS) Solar Array (SA) positioning during Russian Vehicle (RV) departure from ISS nadir and zenith ports cause SA to be positioned in the plume field of Service Module thrusters and lead to degradation of SAs as well as potential damage to Sun tracking Beta Gimbal Assemblies (BGA). These restrictions are imposed because of the single fault tolerant RV Motion Control System (MCS), which does not meet ISS Safety requirements for catastrophic hazards and dictates 16 degree Solar Array Rotary Joint position, which ensures that ISS and RV relative motion post separation, does lead to collision. The purpose of this paper is to describe a methodology and the analysis that was performed to determine relative motion trajectories of the ISS and separating RV for nominal and contingency cases. Analysis was performed in three phases that included ISS free drift prior to Visiting Vehicle separation, ISS and Visiting Vehicle relative motion analysis and clearance analysis. First, the ISS free drift analysis determined the worst case attitude and attitude rate excursions prior to RV separation based on a series of different configurations and mass properties. Next, the relative motion analysis calculated the separation trajectories while varying the initial conditions, such as docking mechanism performance, Visiting Vehicle MCS failure, departure port location, ISS attitude and attitude rates at the time of separation, etc. The analysis employed both orbital mechanics and rigid body rotation calculations while accounting for various atmospheric conditions and gravity gradient effects. The resulting relative motion trajectories were then used to determine the worst case separation envelopes during the clearance analysis. Analytical models were developed individually for each stage and the results were used to build initial conditions for the following stages. In addition to the analysis approach, this paper also discusses the analysis results, showing worst case relative motion envelopes, the recommendations for ISS appendage positioning and the suggested approach for future analyses.

Menkin, Evgeny↗

Information analysis of a spatial database for ecological land classification

An ecological land classification was developed for a complex region in southern California using geographic information system techniques of map overlay and contingency table analysis. Land classes were identified by mutual information analysis of vegetation pattern in relation to other mapped environmental variables. The analysis was weakened by map errors, especially errors in the digital elevation data. Nevertheless, the resulting land classification was ecologically reasonable and performed well when tested with higher quality data from the region.

Davis, Frank W.↗

The LSBmax algorithm for boosting resilience of electric grids post (N‐2) contingencies

Abstract A computationally improved algorithm is presented to find the best transmission switching (TS) candidate for boosting resilience of electricity grids subject to ( N ‐2) contingencies. Here, resilience is computed as the reduction in load shed after the above‐mentioned ( N‐ ) contingencies. TS is a planned line outage, and past research shows that changing the transmission system's topology changes the power flow and removes post contingency violations. Finding the best TS candidate in a computationally suitable time for effectively boosting resilience is a challenge. The best TS candidate is found using a novel heuristic method by decreasing the search space based on proximity to the bus with the maximum load shedding (LSB). The LSB algorithm is faster than existing algorithms in the literature; and, it is compatible with both the AC and DC optimal power flow formulations. To validate the authors' claims of speedup and accuracy, two metrics are used to analyze the results from the IEEE 39‐bus and 118‐bus systems. Finally, the inherent parallelism of the LSB algorithm is leveraged on a high‐performance computing platform and applied to the large‐scale Polish 2383‐bus test system to validate scalability in both size and speedup in computation time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Down-Selection of Four Common Habitat Variants

The Common Habitat is a large habitat developed as an alternative architecture study, not part of the current NASA baseline, that uses the SLS core stage liquid oxygen tank as its primary structure. It has a gravity-independent internal architecture, such that identical units can be used on the lunar surface, Mars surface, and in microgravity. In developing the habitat, two key architectural questions emerged. Should the internal layout use a vertical or horizontal orientation of the tank? Should the crew size be four or eight? This led to the design of four variants: a four-crew horizontal, four-crew vertical, eight-crew horizontal, and eight-crew vertical. The four-crew variants use a shortened version of the tank while the eight-crew variants use the entire tank. The primary consideration applied for down-selection is the crew experience living and working in the habitat, inclusive of crew productivity, well-being, and survivability. Based on this consideration, a series of seven assessments were performed to compare the variants. This analysis was performed as an unfunded, volunteer activity leveraging civil servants across multiple field centers, most with expertise working in various Artemis teams. Additionally, the evaluation was limited to the use of CAD models, images, and spreadsheet data, with no resources available for mockups or Virtual Reality. A logistics analysis developed a standard logistics module and then estimated how much stowage could be carried onboard each Common Habitat and how many logistics modules are required by each variant for a given mission duration. It also considered the amounts of water to be stored in each variant. A functional analysis identified and compared the living and working functions across the habitats, ranking them relative to each other. A crew time assessment first estimated the total crew time, building a weekly crew timeline for both four and eight-person crews. It then allocated time to activities linked to living and working functions, comparing how much time was available for each function in each variant. A science productivity assessment developed a relative metric using crew time, science stowage, and assumed rates of experiment consumables use to analytically compare the four variants. It also comparatively ranked the habitats with respect to a number of subjective parameters and a workstation acceptability rating. A maintenance capacity assessment identified and compared eleven generic maintenance capabilities across the variants and also ranked them for their predicted ability to complete twelve fabrication, maintenance, and repair scenarios. A contingency responsiveness analysis examined twelve serious in-flight contingencies. For each scenario, the number of crew needed to respond were predicted and acceptability of various aspects of contingency response were evaluated, comparing the variants against each other. Finally, in a habitability assessment, 120 habitability characteristics reflecting 13 major categories were evaluated for each habitat. These results were compared to identify the most acceptable habitat in each category. Ultimately, the data favored the horizontal orientation over the vertical and an eight-person crew over four. Implications of selecting this variant are discussed, including specific architectural challenges that result from the use of the full tank.

Habitability↗

Down-Selection of Four Common Habitat Variants

The Common Habitat is a large habitat that uses the Space Launch System core stage liquid oxygen tank as its primary structure. It has a gravity-independent internal architecture, such that identical units can be used on the lunar surface, Mars surface, and in microgravity. In developing the habitat, two key architectural questions emerged. Should the internal layout use a vertical or horizontal orientation of the tank? Should the crew size be four or eight? This led to the design of four variants: a four-crew horizontal, four-crew vertical, eight-crew horizontal, and eight-crew vertical. The primary consideration applied for down-selection was the crew experience living and working in the habitat, inclusive of crew productivity, well-being, and survivability. Based on this consideration, a series of seven assessments was performed to compare the four variants. A stowage assessment developed a standard logistics module and then considered the amounts of water to be stored in each variant. It then estimated how much stowage could be carried onboard each Common Habitat and how many logistics modules are required by each variant for a given mission duration. A functional analysis identified and compared the living and working functions across the four habitat, ranking them relative to each other. A crew time assessment first estimated the total crew time, building a weekly crew timeline for both four and eight-person crews. It then allocated time to activities linked to living and working functions, comparing how much time was available for each function in each variant. A science productivity assessment developed a relative metric using crew time, science stowage, and assumed rates of experiment consumables use to analytically compare the four variants. It also comparatively ranked the habitats with respect to a number of subjective parameters and a workstation acceptability rating. A maintenance capacity assessment identified and compared eleven generic maintenance capabilities across the four variants and also ranked the variants for their predicted ability to complete twelve fabrication, maintenance, and repair scenarios. A contingency responsiveness analysis examined twelve serious in-flight contingencies. For each scenario, the number of crew needed to respond was predicted and acceptability of various aspects of contingency response was evaluated, comparing the four variants against each other. Finally, in a habitability assessment, 120 habitability characteristics reflecting 13 major categories were evaluated for each habitat. These results were compared to identify the most acceptable habitat in each category. Ultimately, the data was shown to favor the horizontal orientation over the vertical and an eight-person crew over four. Implications of selecting this variant are discussed, including specific architectural challenges that result from the use of the full SLS liquid oxygen tank.

Habitability↗

Hybrid Cascading Outage Analysis of Extreme Events with Optimized Corrective Actions

Power system are vulnerable to extreme contingencies (like an outage of a major generating substation) that can cause significant generation and load loss and can lead to further cascading outages of other transmission facilities and generators in the system. Some cascading outages are seen within minutes following a major contingency, which may not be captured exclusively using the dynamic simulation of the power system. The utilities plan for contingencies either based on dynamic or steady state analysis separately which may not accurately capture the impact of one process on the other. We address this gap in cascading outage analysis by developing Dynamic Contingency Analysis Tool (DCAT) that can analyze hybrid dynamic and steady state behavior of the power system, including protection system models in dynamic simulations, and simulating corrective actions in post-transient steady state conditions. One of the important implemented steady state processes is to mimic operator corrective actions to mitigate aggravated states caused by dynamic cascading. This paper presents an Optimal Power Flow (OPF) based formulation for selecting corrective actions that utility operators can take during major contingency and thus automate the hybrid dynamic-steady state cascading outage process. The improved DCAT framework with OPF based corrective actions is demonstrated on IEEE 300 bus test system.

Cascading outage↗

Scalable k-means statistics with Titan.

This report summarizes existing statistical engines in VTK/Titan and presents both the serial and parallel k-means statistics engines. It is a sequel to [PT08], [BPRT09], and [PT09] which studied the parallel descriptive, correlative, multi-correlative, principal component analysis, and contingency engines. The ease of use of the new parallel k-means engine is illustrated by the means of C++ code snippets and algorithm verification is provided. This report justifies the design of the statistics engines with parallel scalability in mind, and provides scalability and speed-up analysis results for the k-means engine.

97 MATHEMATICS AND COMPUTING↗

IMPACT 1.0—Task Impairment: A Novel Approach for Assessing Impairment during Exploration-Class Missions

Exploration-class and International Space Station (ISS) missions have significantly different levels of associated medical risk for crewmembers. The Integrated Medical Model (IMM), the probabilistic risk assessment tool used for ISS medical trade-space analyses, uses a Functional Impairment (FI) metric to determine quality time lost should a crewmember be afflicted with a medical condition. While IMM-based FI has been successful for ISS operations, it has limitations when applied to exploration-class missions. As the National Aeronautics and Space Administration (NASA) looks ahead to Gateway, Artemis, and Martian missions, a novel, dynamic, and mission-appropriate impairment paradigm is necessary for accurate contingency planning. This paradigm, Task Impairment (TI), fulfills that need by utilizing mission-specific tasks. TI will allow future capability for a loss of mission metric, previously not available with IMM. TI serves as a replacement metric for FI within IMPACT, the next-generation trade-space analysis tool suite created to replace the IMM. IMPACT significantly increases the fidelity of probabilistic risk assessment for exploration-class missions. The Human Exploration of Mars Preliminary List of Crew Tasks (MTL, a source of 1100+ exploration-class mission-specific tasks for crewmembers) was used to calculate TI. Using the Task List, 18 individual Human System Categories were identified as being required to perform each task (e.g., Cardiopulmonary, Cognitive, etc.). Each of the 1200+ tasks were mapped to the Human System categories listed in the Task List. The total number of tasks in each category were tallied to determine how many tasks required each Human System. Lastly, each of the 120 medical conditions from the IMPACT condition list were mapped to the Human System categories to complete the TI calculation. NASA subject matter experts across five medical specialties established consensus for the mapping of each condition. The resulting total tasks impaired by each condition were used to calculate discrete TI values. This process was repeated for each of the four severity/resource utilization variants of each condition, and for each of the three phases of clinical care. Through this process, discrete TI values were calculated for each of the 120 IMPACT medical conditions and their variants. The Task Impairment metric provides higher fidelity, dynamic utility, and quicker analysis of medical impairment compared to the previous Functional Impairment metric used for the Integrated Medical Model. TI will be used for higher fidelity medical impairment analysis and contingency planning during Lunar, Martian, and other long-term exploration-class missions.

William L Fernandez↗

High-Performance Computing for Advanced Smart Grid Applications

The power grid is becoming far more complex as a result of the grid evolution meeting an information revolution. Due to the penetration of smart grid technologies, the grid is evolving as an unprecedented speed and the information infrastructure is fundamentally improved with a large number of smart meters and sensors that produce several orders of magnitude larger amounts of data. How to pull data in, perform analysis, and put information out in a real-time manner is a fundamental challenge in smart grid operation and planning. The future power grid requires high performance computing to be one of the foundational technologies in developing the algorithms and tools for the significantly increased complexity. New techniques and computational capabilities are required to meet the demands for higher reliability and better asset utilization, including advanced algorithms and computing hardware for large-scale modeling, simulation, and analysis. This chapter summarizes the computational challenges in smart grid and the need for high performance computing, and present examples of how high performance computing might be used for future smart grid operation and planning.

computational challenges↗

Conceptual Launch Vehicle and Spacecraft Design for Risk Assessment

One of the most challenging aspects of developing human space launch and exploration systems is minimizing and mitigating the many potential risk factors to ensure the safest possible design while also meeting the required cost, weight, and performance criteria. In order to accomplish this, effective risk analyses and trade studies are needed to identify key risk drivers, dependencies, and sensitivities as the design evolves. The Engineering Risk Assessment (ERA) team at NASA Ames Research Center (ARC) develops advanced risk analysis approaches, models, and tools to provide such meaningful risk and reliability data throughout vehicle development. The goal of the project presented in this memorandum is to design a generic launch 7 vehicle and spacecraft architecture that can be used to develop and demonstrate these new risk analysis techniques without relying on other proprietary or sensitive vehicle designs. To accomplish this, initial spacecraft and launch vehicle (LV) designs were established using historical sizing relationships for a mission delivering four crewmembers and equipment to the International Space Station (ISS). Mass-estimating relationships (MERs) were used to size the crew capsule and launch vehicle, and a combination of optimization techniques and iterative design processes were employed to determine a possible two-stage-to-orbit (TSTO) launch trajectory into a 350-kilometer orbit. Primary subsystems were also designed for the crewed capsule architecture, based on a 24-hour on-orbit mission with a 7-day contingency. Safety analysis was also performed to identify major risks to crew survivability and assess the system's overall reliability. These procedures and analyses validate that the architecture's basic design and performance are reasonable to be used for risk trade studies. While the vehicle designs presented are not intended to represent a viable architecture, they will provide a valuable initial platform for developing and demonstrating innovative risk assessment capabilities.

Launch Vehicle↗

Contingency Trajectory Design for a Lunar Orbit Insertion Maneuver Failure by the LADEE Spacecraft

This paper presents results from a contingency trajectory analysis performed for the Lunar Atmosphere & Dust Environment Explorer (LADEE) mission in the event of a missed lunar-orbit insertion (LOI) maneuver by the LADEE spacecraft. The effects of varying solar perturbations in the vicinity of the weak stability boundary (WSB) in the Sun-Earth system on the trajectory design are analyzed and discussed. It is shown that geocentric recovery trajectory options existed for the LADEE spacecraft, depending on the spacecraft's recovery time to perform an Earth escape-prevention maneuver after the hypothetical LOI maneuver failure and subsequent path traveled through the Sun-Earth WSB. If Earth-escape occurred, a heliocentric recovery option existed, but with reduced science capacapability for the spacecraft in an eccentric, not circular near-equatorial retrograde lunar orbit.

LADEE↗

Load Shed Recovery With Transmission Switching and Intentional Islanding Methods After (N-2) Line Contingencies

Changing power system configuration may result in load shed recovery (LSR) because topology change can provide power flow control in meshed network. Some topologies may favor generation redispatch as compared to others and can eliminate line congestion which leads to LSR. One of the known methods for topology change is called transmission switching (TS) and research conducted in the past showed that TS is an effective means of mitigating load shedding. Another method of topology control is intentional islanding (IIS). In this manuscript, we explore IIS as a potential solution for LSR. IIS based on generator coherency has been presented in literature for mitigating cascading failures. However, IIS has not been explored solely as a LSR mechanism. In this paper, we compare the LSR based on IIS with well known LSR algorithm based on TS. The comparison is performed for IEEE 39-bus system and IEEE 118- bus system. The results show that IIS has a potential to perform better than TS in terms of computational efficiency and LSR.

42 ENGINEERING↗

Computerized quantitative evaluation of mammographic accreditation phantom images

Purpose: The objective was to develop and investigate an automated scoring scheme of the American College of Radiology (ACR) mammographic accreditation phantom (RMI 156, Middleton, WI) images. Methods: The developed method consisted of background subtraction, determination of region of interest, classification of fiber and mass objects by Mahalanobis distance, detection of specks by template matching, and rule-based scoring. Fifty-one phantom images were collected from 51 facilities for this study (one facility provided one image). A medical physicist and two radiologic technologists also scored the images. The human and computerized scores were compared. Results: In terms of meeting the ACR's criteria, the accuracies of the developed method for computerized evaluation of fiber, mass, and speck were 90%, 80%, and 98%, respectively. Contingency table analysis revealed significant association between observer and computer scores for microcalcifications (p<5%) but not for masses and fibers. Conclusions: The developed method may achieve a stable assessment of visibility for test objects in mammographic accreditation phantom image in whether the phantom image meets the ACR's criteria in the evaluation test, although there is room left for improvement in the approach for fiber and mass objects.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Sci—Thur AM: YIS - 02: Radiogenomic Modeling of Normal Tissue Toxicities in Prostate Cancer Patients Receiving Hypofractionated Radiotherapy

Inter-patient radiation sensitivity variability has recently been shown to have a genetic component. This genetic component may play a key role in explaining the fluctuating rates of radiation-induced toxicities (RITs). Single nucleotide polymorphisms (SNPs) have thus far yielded inconsistent results in delineating RITs while copy number variations (CNVs) have not yet been investigated for such purposes. We explore a radiogenomic modeling approach to investigate the association of CNVs and SNPs, along with clinical and dosimetric variables, in radiation induced rectal bleeding (RB) and erectile dysfunction (ED) in prostate cancer patients treated with curative hypofractionated irradiation. A cohort of 62 prostate cancer patients who underwent hypofractionated radiotherapy (66 Gy in 22 fractions) between 2002 to 2010 were retrospectively genotyped for CNV and SNP rs5489 in the xrcc1 DNA repair gene. Late toxicity rates for RB grade 2 and 3 and grade 3 alone were 29.0% and 12.9%, respectively. ED toxicity was found to be 62.9%. Radiogenomic model performance was evaluated using receiver operating characteristic area under the curve (AUC) and resampling by cross-validation. Binary variables were evaluated using Chi-squared contingency table analysis and multivariate models by Spearman's rank correlation coefficient (rs). Ten patients were found to have three copies of xrcc1 CNV (RB: χ{sup 2}=14.6, p<0.001 and ED: χ{sup 2}=4.88, p=0.0272) and twelve had heterozygous rs25489 SNP (RB: χ{sup 2}=0.278, p=0.599 and ED: χ{sup 2}=0.112, p=0.732). Radiogenomic modeling yielded significant, cross-validated NTCP models for RB (AUC=0.665) and ED (AUC=0.754). These results indicate that CNVs may be potential predictive biomarkers of both late ED and RB.

60 APPLIED LIFE SCIENCES↗

Using known map category marginal frequencies to improve estimates of thematic map accuracy

By means of two simple sampling plans suggested in the accuracy-assessment literature, it is shown how one can use knowledge of map-category relative sizes to improve estimates of various probabilities. The fact that maximum likelihood estimates of cell probabilities for the simple random sampling and map category-stratified sampling were identical has permitted a unified treatment of the contingency-table analysis. A rigorous analysis of the effect of sampling independently within map categories is made possible by results for the stratified case. It is noted that such matters as optimal sample size selection for the achievement of a desired level of precision in various estimators are irrelevant, since the estimators derived are valid irrespective of how sample sizes are chosen.

Card, D. H.↗

Mapping permafrost in the boreal forest with Thematic Mapper satellite data

A geographic data base incorporating Landsat TM data was used to develop and evaluate logistic discriminant functions for predicting the distribution of permafrost in a boreal forest watershed. The data base included both satellite-derived information and ancillary map data. Five permafrost classifications were developed from a stratified random sample of the data base and evaluated by comparison with a photo-interpreted permafrost map using contingency table analysis and soil temperatures recorded at sites within the watershed. A classification using a TM thermal band and a TM-derived vegetation map as independent variables yielded the highest mapping accuracy for all permafrost categories.

Morrissey, L. A.↗

Maneuver design for Galileo Jupiter approach and orbital operations

Following the successful release of the Galileo probe, the navigation efforts were focused on the implementation of the critical Io approach and the Jupiter orbit insertion strategy. The actual in-flight events on the approach phase affected the strategy. The most significant event was the onboard tape recorder anomaly, and it is shown that this anomaly affected the plans and assumptions of the navigation strategy for the approach and orbit insertion. The analysis, constraints, contingency planning and design evolution of trajectory correction maneuvers which enabled the continuation of the mission, are reported on. The Jupiter approach and initial orbit navigation strategy is presented in order to verify the viability of the strategy under nominal circumstances, and future mission operations plans are described.

Wilson, Michael G.↗