Hydrogen Energy California (Final Scientific and Technical Report)

Hydrogen Energy California ("HECA") is an Integrated Gasification Combined-Cycle (IGCC) “polygeneration” project. The Project gasifies a 75 percent coal and 25 percent petroleum coke (petcoke) fuel blend to produce synthesis gas (syngas). Syngas produced via gasification is purified to hydrogen-rich fuel, which is used to generate low-carbon baseload electricity in a Combined Cycle Power Block, low-carbon nitrogen-based products in an integrated manufacturing Complex, and carbon dioxide (CO 2 ) for use in enhanced oil recovery (EOR). The power and products produced by HECA have a lower carbon footprint compared to power and products produced from more traditional fossil fuel facilities. This low-carbon footprint is achieved by capturing more than 90 percent of the CO 2 in the production of the hydrogen fuel and transporting it for use in EOR, which results in simultaneous sequestration (storage) of the CO 2 in a secure geologic formation in the adjacent Elk Hills Oil Field (EHOF), a hydrocarbon producing area. Highlights of HECA as conceived during the execution of FEED are as follows: The Project is designed to operate on a fuel blend consisting of 75 percent western subbituminous coal and 25 percent California petcoke based on thermal input to the gasifier on a higher heating value (HHV) basis; The feedstocks are gasified to produce syngas that is further processed and cleaned to produce hydrogen-rich fuel; More than 90 percent of the carbon in the raw syngas is captured in a high-purity CO 2 stream during steady-state operation; High purity CO 2 is compressed and transported by pipeline to the EHOF for injection into deep underground hydrocarbon reservoirs for CO 2 EOR; The Combined Cycle Power Block produces over 420 megawatts (MW) of gross power, which yields during periods of maximum power production over 270 MW of low-carbon baseload electricity to the grid; An integrated Manufacturing Complex produces approximately 1 million tons per year of low-carbon nitrogen-based products, including urea, urea ammonium nitrate (UAN), and anhydrous ammonia, to be used in agricultural, transportation, and industrial applications.

01 COAL, LIGNITE, AND PEAT↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The National Carbon Capture Center at the Power Systems Development Facility

The National Carbon Capture Center (NCCC) at the Power Systems Development Facility supports the Department of Energy (DOE) goal of promoting the United States’ energy security through reliable, clean, and affordable energy produced from coal. Work at the NCCC supports the development of new power technologies and the continued operation of conventional power plants under CO 2 emission constraints. The NCCC includes adaptable slipstreams that allow technology development of CO 2 capture concepts using coal-derived syngas and flue gas in industrial settings. Because of the ability to operate under a wide range of flow rates and process conditions, research at the NCCC can effectively evaluate technologies at various levels of maturity and accelerate their development path to commercialization. During its first contract period, from October 1, 2008, through December 30, 2014, the NCCC designed, constructed, and began operation of the Post-Combustion Carbon Capture Center (PC4). Testing of CO 2 capture technologies commenced in 2011, and through the end of the contract period, more than 25,000 hours of testing had been achieved, supporting a variety of technology developers. Technologies tested included advanced solvents, enzymes, membranes, sorbents, and associated systems. The NCCC continued operation of the existing gasification facilities, which have been in operation since 1996, to support the advancement of technologies for next-generation gasification processes and pre-combustion CO 2 capture. The gasification process operated for 13 test runs, supporting over 30,000 hours combined of both gasification and pre-combustion technology developer testing. Throughout the contract period, the NCCC incorporated numerous modifications to the facilities to accommodate technology developers and increase test capabilities. Preparations for further testing were ongoing to continue advancement of the most promising technologies for future power generation processes.

01 COAL, LIGNITE, AND PEAT↗

Profile of Resource Adequacy in the MISO Region

MISO is facing a number of generation resource challenges, ranging from large amounts of retirements, behind schedule retrofit projects, and internal resources committed to exporting power to PJM's capacity market. This report identifies potential issues with generator retirements and retrofits, as well as potential transmission issues, including the impact of imports and exports in a short-term outlook for resource adequacy in the MISO region, including specific concerns with the generation capacity expected to be available in the MISO North and Central regions from 2014 to 2016, as well as additional risks from proposed environmental regulations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Repurposing Fossil-Fueled Assets For Energy Storage

The annual retirement of U.S. coal-fired electricity generation units (CF-EGU) is at an all-time high and is expected to continue. This loss of reliable baseload generation, combined with predicted growth of variable renewable energy (VRE) generation, is expected to stress grid reliability as the number of load-following resources drops below the experienced load variability. Many regions are already experiencing challenges, and fossil retirement-related warnings by the North American Electric Reliability Corp. are becoming more dire. All CF-EGU retirements pose significant challenges to asset owners, local workforces, and their communities. Repurposing a retiring CF-EGU as a long-duration energy storage plant can address these challenges and offer a suite of additional benefits to asset owners, the grid, and society. This project performed a techno-economic evaluation and assessment of repurposing a Duke Energy fossil-fueled asset (in particular, a coal plant) into an energy storage system by integrating the retiring asset with a Malta long duration Pumped Heat Energy Storage (PHES) system. The project validated the technoeconomic benefits of repurposing retiring coal plants into long-duration energy storage using Malta’s PHES. Key findings for this project are summarized below: (1) Technical: (a) Retiring coal plants (and other steam turbine fossil generation) can be repurposed to enable the clean energy transition using Malta’s technology. (b) For older retiring coal plants, repurposing the site and electrical interconnection for a standalone PHES plant is the most economically favorable option. (c) For newer coal plants where there is also a local peaking capacity need, repowering the steam cycle into a hybrid integration with PHES is attractive. (d) A process was developed to assist fossil generation owners in choosing the best path for each plant’s circumstances. (2) Economic (a) Communities facing economic challenges caused by the retirement of fossil generation would benefit from repurposing the plant as long-duration energy storage using Malta’s PHES. (b) On a $/MW basis, repowering retiring coal units into Malta PHES plants can maintain the same number and types of jobs and economic activity. (c) For a 70% carbon reduction scenario, a 10-hour Malta PHES plant is more economic for the asset owner than similar-power 4-hour batteries. This project showed that repurposing a retiring coal unit into thermal energy storage, by integrating it with a Malta PHES system, makes techno-economic sense. At least two integration options are available, with the optimal solution depending on the coal plant and its location. Repurposing retiring coal plant into energy storage results in economic benefits for the plant owner and local communities.

20 FOSSIL-FUELED POWER PLANTS↗

Operation and Process Control Development for a Pilot-Scale Leaching and Solvent Extraction Circuit Recovering Rare Earth Elements from Coal-Based Sources

The US Department of Energy in 2010 has identified several rare earth elements as critical materials to clean technologies. As part of ongoing research in REEs recovery from coal sources, the University of Kentucky has designed, developed and is demonstrating a ¼ ton/hour pilot-scale processing plant to produce high grade REEs from coal sources. To accomplish process control, PLC systems design/deployment, overall operational design and the utilization of Six Sigma design methodology by the team will be presented. Furthermore, application of the controls design, both procedural and electronic, team’s utilization of data analysis and integration for database decision-making will be discussed.

Leaching↗

Activated Carbon Injection

History of the Clean Air Act and how the injection of carbon into a coal power plant's flu smoke can reduce the amount of mercury in the smoke.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Molten Salt Assisted Low-Temperature Electro-Catalytic Graphitization of Coal Chars

A great effort has been centered around developing clean energy technologies (energy storage devices) to curtail burning fossil fuels' deleterious environmental effects. Rechargeable batteries [lithium-ion batteries (LIBs)] are among the most invested and investigated storage devices showing potential to transform fossil fuel-powered mobility to next-generation safe electromobility. However, LIBs powered electric vehicles (EV) are expensive due to the high-cost graphite anode associated with LIBs. Herein, the synthesis of low-cost, highly crystalline nano-graphite with a tunable microstructural architecture has been demonstrated via molten salt assisted low-temperature electro-catalytic graphitization of coal chars, traditionally non-graphitizable carbon. Thus, graphite derived from coal chars exhibited nanoflake architecture and delivered high reversible capacity, stable long cycle life, and excellent electrochemical performance under fast charging/discharging conditions (5C, ~12 min charge/discharge time). This finding paves the way to manufacture cost-effective high-energy-density batteries using as-synthesized graphite from readily available coal sources that could propel the EVs to the next level.

25 ENERGY STORAGE↗

Design of a Coal-Based Allam Cycle Large Pilot Plant

Conference presentation at 44th International Technical Conference on Clean Energy (Clearwater Clean Energy Conference), Clearwater, Florida, June 16–21, 2019. This presentation describes a proposed pilot project to demonstrate a coal-based Allam Cycle power system, which uses supercritical CO₂ to generate electricity with high efficiency and near-zero emissions. It outlines the technology concept, pilot plant scale, potential sites, costs, and next steps toward detailed design and construction.

01 COAL, LIGNITE, AND PEAT↗

Communities in energy transition: exploring best practices and decision support tools to provide equitable outcomes

Abstract The U.S. coal industry has been in a state of decline for the past decade, a trend ushered by flat electricity demand, increased regulatory pressure, and market competition from cost-competitive clean energy sources. The receding economic viability of the coal industry has been acutely felt by the communities with immediate economic ties to coal-fired generation. With the energy transition underway, the question of how to engage communities as stakeholders in the decision-making process and address their needs through an equitable and just transition remains unresolved. To that end, this paper explores the economic, environmental, and social challenges presented by the energy transition at the community level, highlighting four case studies from transitioning coal-dependent communities across the United States to ultimately identify best practices in coal plant decommissioning processes. This paper weaves these community-identified best practices into two support tools—a decommissioning checklist and a redevelopment decision-making framework—that can be used to engage communities in the power plant retirement decision, the site reclamation phase, and eventual redevelopment of the site and revitalization of the surrounding community.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Development of an innovative process for post-combustion CO 2 capture to produce high-value NaHCO 3 nanomaterials

An innovative post-combustion process using aqueous sodium glycinates solutions (SGS) for CO 2 capture from a split flue gas stream emitted from the 600 MWe coal power plant, used in the Wolverine Clean Energy Venture (WCEV) project, was developed in Aspen Plus v.10. The flue gas flow rate used in the process was 12.43 kg/s (at 353.15 K and 101.33 kPa) and contained 0.0023 and 13.33 mol% of SO 2 and CO 2 , respectively. The overall process includes 5 main units designed to remove all SO 2 and capture more than 90 mol% of CO 2 in the flue gas stream, while producing high-value, salable sodium bicarbonate (NaHCO 3 ) nanomaterials to offset the total process costs. The hydraulics, mass transfer characteristics, and process performance obtained using Aspen Plus were discussed. Also, the capital expenditure (CAPEX), operating expenditure (OPEX), and Levelized cost of CO 2 capture (LCOC) were calculated to assess the feasibility of this process. Further, the hydraulics in the SO 2 washing and CO 2 capture units showed a pressure drop of 12 and 1 kPa, respectively, and the behaviors of the liquid holdup and normalized packing specific wetted surface area were similar in both units. The gas-side mass transfer coefficients were orders of magnitude greater than the liquid-side mass transfer coefficients. The process was able to capture 2.352 kg/s of CO 2 and produce 4.486 kg/s of valuable NaHCO 3 nanomaterials. Also, the calculated CAPEX, OPEX, and LCOC of the process for a 30-year plant lifetime were ($\$ $4,450,552), (233.00 $\$ $/h) and (35.49 $\$ $/ton of CO 2 captured), respectively.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Business Models for Coal Plant Decommissioning

Aging coal-fired power plants are retiring across the United States. Researchers at Pacific Northwest National Laboratory studied coal-fired power plant decommissioning business models to support program development for the Department of Energy’s Office of Energy Efficiency & Renewable Energy (EERE) to engage with communities affected by power plant retirement processes. Evaluating and reducing the impact on coal-dependent communities from phasing out coal production is a crucial piece of nationwide economic development and community-directed engagement in the clean energy future. This report describes the steps in the typical coal-fired power plant decommissioning process, including analysis of the following key factors: Drivers including policy and regulations, competition with other fuels, and corporate responsibility goals; Types of coal plant decommissioning including plant retirement without full decommissioning, repurposing with fuel switch, redeveloping to utilize existing transmission, and decommissioning and repurposing with other commercial activities; and, Costs of coal plant decommissioning, including variations across regulated and deregulated markets and the funding resources to support decommissioning activities. The details described in this report relied heavily on the availability of local news reports and communications regarding plant retirements, as the researchers identified a lack of formal literature surrounding business models for coal plant decommissioning and a need for a more robust source material collection. In addition, a lack of oversight entities responsible for decommissioning processes may have led to this shortfall of information. Future research regarding coal plant decommissioning can include quantitative studies on power plant retirement drivers, procedures, and costs, qualitative assessments on affects decommissioning has on surrounding communities, investors, and other stakeholders, and identifying best practices to engage community stakeholders in the decommissioning process.

01 COAL, LIGNITE, AND PEAT↗

H2-O2 combustion powered steam-MHD central power systems

Estimates are made for both the performance and the power costs of H2-O2 combustion powered steam-MHD central power systems. Hydrogen gas is assumed to be transmitted by pipe from a remote coal gasifier into the city and converted to electricity in a steam MHD plant having an integral gaseous oxygen plant. These steam MHD systems appear to offer an attractive alternative to both in-city clean fueled conventional steam power plants and to remote coal fired power plants with underground electric transmission into the city.

Seikel, G. R.↗

NASA Lewis H2-O2 MHD program

Performance and power costs of H2-O2 combustion powered steam-MHD central power systems are estimated. Hydrogen gas is assumed to be transmitted by pipe from a remote coal gasifier into the city and converted to electricity in a steam MHD plant having an integral gaseous oxygen plant. These steam MHD systems appear to offer an attractive alternative to both in-city clean fueled conventional steam power plants and to remote coal fired power plants with underground electric transmission into the city. Status and plans are outlined for an experimental evaluation of H2-O2 combustion-driven MHD power generators at NASA Lewis Research Center.

Smith, M.↗

H2-O2 combustion powered steam-MHD central power systems

Estimates are made for both the performance and the power costs of H2-O2 combustion powered steam-MHD central power systems. Hydrogen gas is assumed to be transmitted by pipe from a remote coal gasifier into the city and converted to electricity in a steam MHD plant having an integral gaseous oxygen plant. These steam MHD systems appear to offer an attractive alternative to both in-city clean fueled conventional steam power plants and to remote coal fired power plants with underground electric transmission into the city.

Seikel, G. R.↗