Cost estimating methods for advanced space systems

The development of parametric cost estimating methods for advanced space systems in the conceptual design phase is discussed. The process of identifying variables which drive cost and the relationship between weight and cost are discussed. A theoretical model of cost is developed and tested using a historical data base of research and development projects.

Cyr, Kelley↗

Detailed Design and Cost Estimation of a 300 MWe Oxy-Fuel sCO2 Turbine

The detailed design of a 300 MWe, utility scale oxy-fuel turbine has been completed for purposed operation in the sCO2 direct fired Allam-Fetvedt cycle, targeting near-zero emissions and a 50% LHV system efficiency. The turbine and its supporting plant aim to offer a lower levelized cost of energy than a natural gas combined cycle plant employing carbon capture. The oxy-fuel turbine conditions include an inlet temperature of 1150°C and inlet pressure of 305 bar, representing temperatures near that of a gas turbine simultaneously with pressures near an ultra-supercritical steam turbine. The combustor housing and turbine designs were completed according to the ASME BPVC; the turbine case specifically incorporates a multi-body design with inner high-pressure barrel case and low-pressure (30 bar) horizontally split outer case of low-chromium steel material. Lateral rotordynamic evaluation demonstrated acceptable vibration response for a range of imbalance conditions per API standards. The cooling flow required in the six-stage turbine flowpath for 30,000 hr. blade and stator lifetime is predicted through thermal and structural modeling of the first stage. The provided cost estimate of the turbine is formed through a combination of scaled up-costs from procured 10 MWe scale sCO2 turbomachinery hardware, and vendor provided budgetary quotes of larger components including the turbine case requiring casting, welding, and final machining processes. The performance and cost estimation of the oxy-fuel turbine predicted for the completed detailed design provides important information towards future development needs for market penetration of utility scale direct fired sCO2 power cycles.

Marshall, Michael [Southwest Research Institute, S↗

Progress Toward Automated Cost Estimation

Report discusses efforts to develop standard system of automated cost estimation (ACE) and computer-aided design (CAD). Advantage of system is time saved and accuracy enhanced by automating extraction of quantities from design drawings, consultation of price lists, and application of cost and markup formulas.

Brown, Joseph A.↗

Parametric Cost Estimates of Four 20 Ton Payload Mars EDL Vehicle Concepts

Cost is one of the biggest obstacles to sending humans to Mars. Many studies have examined various vehicles and/or technologies which could be used to send humans to Mars. However, nearly all of these studies have either ignored cost or have used the mass of the vehicles as a surrogate for cost. This work presents parametric cost estimates of four Mars Entry, Descent, and Landing vehicle concepts capable of landing 20 tons of payload on the surface of Mars. The concepts are the Co-Optimization Blunt-body Re-entry Analysis-Mid lift to drag ratio Rigid Vehicle (Cobra–MRV), Adaptive Deployable Entry and Placement Technology (ADEPT), Hypersonic Inflatable Aerodynamic Decelerator (HIAD), and Capsule concepts. Two variants of the HIAD concept are studied, one with a single HIAD heatshield and one with two HIADs. The study presents the development and production cost of each vehicle and the total cost to build five flight units and fifteen flight units. Five flight units is representative of a single mission, or a "Flags and Footprints" style campaign, whereas fifteen flight units is representative of multiple missions going to multiple sites on Mars. All costs presented in this work are normalized to the average of the first unit production cost of the lander concepts. There is a large amount of uncertainty both in the design of the vehicles and the cost of the vehicles and it is impossible to claim with certainty which vehicle will cost the least. However, it is likely that the total cost to produce five flight units will be in the following ranking from least costly to most costly, Single HIAD, Capsule, Dual HIAD, Cobra, ADEPT. The ranking for fifteen units is similar but with the positions of the Dual HIAD and Cobra reversed. This study only considers the cost of the entry vehicle and does not take into account the effect of the entry vehicle’s mass on the cost of the in-space propulsion stage or launch vehicle.

Paul D Friz↗

Advanced Transportation System Studies. Technical Area 3: Alternate Propulsion Subsystems Concepts: Program Cost Estimates - Volume 3

The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F- IA Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results , and the program cost estimates are described in more detail in Volume I - Executive Summary and in individual Final Task Reports.

Levack, Daniel J. H.↗

Thermal & Electrochemical Power Plant Design and Cost Estimation

Public textbook for "Thermal & Electrochemical Power Plant Design and Cost Estimation: Version#1" This public textbook is an extension of class notes from Carnegie Mellon University courses: Energy System Modeling (24-722) and Fuel Cell Systems (24-262), taught by Dr. Nicholas Siefert between 2010-2021. Textbook includes some references to class notes from Dr. Shawn Litster, Department of Mechanical Engineering, Carnegie Mellon University. Textbook covers the equilibrium and nonequilibrium thermodynamics of power systems as well as an overview of system and economic modeling of these systems. There is in-depth coverage of (a) entropy generation, (b) exergy and (c) the redox state of molecules in equilibrium with the natural environment. This textbook is integrated with other materials (such as lecture slides, solved homeworks, and solved exams) that will be posted to the PowerShare: Energy Systems Modeling group on EDX. Publication Number: DOE/NETL-2023/3913

30 DIRECT ENERGY CONVERSION↗

Preliminary weight and cost estimates for transport aircraft composite structural design concepts

Preliminary weight and cost estimates have been prepared for design concepts utilized for a transonic long range transport airframe with extensive applications of advanced composite materials. The design concepts, manufacturing approach, and anticipated details of manufacturing cost reflected in the composite airframe are substantially different from those found in conventional metal structure and offer further evidence of the advantages of advanced composite materials.

Source record↗

Civil Service Workforce Market Supply and the Effect on the Cost Estimating Relationships (CERs) that may effect the Productivity Factors for Future NASA Missions

The upcoming retirement of the Baby Boomers on the horizon will leave a performance gap between younger generation (the future NASA decision makers) and the gray beards. This paper will reflect on the average age of workforce across NASA Centers, the Aerospace Industry and other Government Agencies, like DoD. This papers will dig into Productivity and Realization Factors and how they get applied to bimonthly (payroll data) for true FTE calculations that could be used at each of the NASA Centers and other business systems that are on the forefront in being implemented. This paper offers some comparative costs solutions, from simple - full time equivalent (FTE) cost estimating relationships CERs, to complex - CERs for monthly time-phasing activities for small research projects that start and get completed within a government fiscal year. This paper will present the results of a parametric study investigating the cost-effectiveness of different alternatives performance based cost estimating relationships (CERs) and how they get applied into the Center s forward pricing rate proposals (FPRP). True CERs based on the relationship of a younger aged workforce will have some effects on labor rates used in both commercial cost models and internal home-grown cost models which may impact the productivity factors for future NASA missions.

Sterk, Steve↗

High Temperature Steam Electrolysis Process Performance and Cost Estimates - DOE Hydrogen Program AMR Presentation

Technology readiness levels (TRLs) of electrolysis systems have dramatically increased in recent years as the interest in clean hydrogen production and decarbonization of transportation, industrial and other sectors increases across the globe. This is especially true of high temperature steam electrolysis (HTSE) / solid oxide electrolysis cell (SOEC) systems which show promise of much higher system efficiencies than other more developed electrolysis technologies. This possibility of higher efficiencies of HTSE / SOEC systems has been previously assumed to be theoretically possible but in recent years it has become less theoretical and more realistic as an increasing amount of suppliers complete lab and pilot tests showing very promising results. Research in the areas of manufacturing techniques, material selection, electrode and electrolyte compositions, and balance of plant size and integration continues at a fast pace as an increasing number of suppliers both internationally and domestically become involved. The advantages of HTSE become more pronounced when HTSE is coupled with nuclear power plants (NPPs). This is because thermal energy produced by the nuclear reactor can be used in a series of heat transfer loops and heat exchangers to vaporize HTSE feedwater, which drastically improves the economics of the process. Idaho National Laboratory (INL) has been very involved in the research and modeling of HTSE systems for a number of years, in collaboration with other national laboratories, academia, and industry stakeholders both on the hydrogen production as well as the hydrogen demand side. The modeling completed over the years on a large variety of projects has led to a wealth of knowledge at INL including in the area of the technoeconomic assessment (TEA) of HTSE systems. TEAs include process modeling of the HTSE systems to calculate system energy requirements and equipment sizing, followed by estimation of capital and operating costs to enable calculation of the levelized cost of hydrogen (LCOH). The TEA work performed has produced incremental improvements and tuning of the methods, assumptions, models, and results of the analyses as well as providing some opportunities for validating these results. The purpose of this document is to record the current baseline HTSE analyses led by INL to show the current status of assumptions and costs of these systems. Given the rapid development of this technology, the variety of suppliers entering the space, and the increasing attention government and industry are giving to such systems, this document may be updated on a periodic basis with updated analysis and assumptions. This document compiles various analyses results and approaches completed over a period of years into a single document to be used as a baseline going forward. It represents what the INL HTSE analysis group assumes to be the internal best estimate of the current operation, costs, and landscape of the HTSE industry state of the art capability for current SOEC technology in an Nth-of-a-Kind (NOAK) plant, which in this study is defined as existence of the manufacturing capacity to support previous deployment of N = 100 count of 25 MWe modular HTSE blocks (with modular equipment component cost reductions specified as following a 95% learning curve). That said, this is a public document and as such so no proprietary data was used or included in this report. There may be HTSE suppliers that have performance specifications, and cost estimates, and test data that differ from the analysis presented in this document. This document is meant to be a best conservative estimate of the technology and not an absolute reference.

08 HYDROGEN↗

High Temperature Steam Electrolysis Process Performance and Cost Estimates

Technology readiness levels (TRLs) of electrolysis systems have dramatically increased in recent years as the interest in clean hydrogen production and decarbonization of transportation, industrial and other sectors increases across the globe. This is especially true of high temperature steam electrolysis (HTSE) / solid oxide electrolysis cell (SOEC) systems which show promise of much higher system efficiencies than other more developed electrolysis technologies. This possibility of higher efficiencies of HTSE / SOEC systems has been previously assumed to be theoretically possible but in recent years it has become less theoretical and more realistic as an increasing amount of suppliers complete lab and pilot tests showing very promising results. Research in the areas of manufacturing techniques, material selection, electrode and electrolyte compositions, and balance of plant size and integration continues at a fast pace as an increasing number of suppliers both internationally and domestically become involved. The advantages of HTSE become more pronounced when HTSE is coupled with nuclear power plants (NPPs). This is because thermal energy produced by the nuclear reactor can be used in a series of heat transfer loops and heat exchangers to vaporize HTSE feedwater, which drastically improves the economics of the process. Idaho National Laboratory (INL) has been very involved in the research and modeling of HTSE systems for a number of years, in collaboration with other national laboratories, academia, and industry stakeholders both on the hydrogen production as well as the hydrogen demand side. The modeling completed over the years on a large variety of projects has led to a wealth of knowledge at INL including in the area of the technoeconomic assessment (TEA) of HTSE systems. TEAs include process modeling of the HTSE systems to calculate system energy requirements and equipment sizing, followed by estimation of capital and operating costs to enable calculation of the levelized cost of hydrogen (LCOH). The TEA work performed has produced incremental improvements and tuning of the methods, assumptions, models, and results of the analyses as well as providing some opportunities for validating these results. The purpose of this document is to record the current baseline HTSE analyses led by INL to show the current status of assumptions and costs of these systems. Given the rapid development of this technology, the variety of suppliers entering the space, and the increasing attention government and industry are giving to such systems, this document may be updated on a periodic basis with updated analysis and assumptions. This document compiles various analyses results and approaches completed over a period of years into a single document to be used as a baseline going forward. It represents what the INL HTSE analysis group assumes to be the internal best estimate of the current operation, costs, and landscape of the HTSE industry state of the art capability for current SOEC technology in an Nth-of-a-Kind (NOAK) plant, which in this study is defined as existence of the manufacturing capacity to support previous deployment of N = 100 count of 25 MWe modular HTSE blocks (with modular equipment component cost reductions specified as following a 95% learning curve). That said, This is a public document and as such so no proprietary data was used or included in this report. There may be HTSE suppliers that have performance specifications, and cost estimates, and test data that differ from the analysis presented in this document. This document is meant to be a best conservative estimate of the technology and not an absolute reference.

08 HYDROGEN↗

ICE Calculator 2: Final Report for Phase 1 and 2 of the National Initiative to Update the Interruption Cost Estimate (ICE) Calculator

ICE 2.0 Phase 2 Final Report In 2021, Berkeley Lab and Resource Innovations, Inc. launched the “ICE Calculator 2 Initiative” – a national study to refresh the underlying data and enhance the functionality of the ICE Calculator. The Initiative involves Berkeley Lab contracting with sponsoring utilities to administer identical, updated and comprehensive interruption cost surveys to statistically representative samples of each utility’s customers. Berkeley Lab and Resource Innovations then pool the survey results across the utilities and use them to update the analytical engines that drive the ICE Calculator. The ICE Calculator 2 Initiative is being conducted in phases. Each phase involves the administration of interruption cost surveys to the customers of sponsoring utilities, followed by an update to the ICE Calculator based on analysis of the pooled survey results. This report describes the activities and findings from Phase 1 and 2 of the ICE Calculator 2 Initiative. Phase 1 was sponsored by eight utilities: American Electric Power, Commonwealth Edison, Dominion Energy, Duke Energy, DTE Electric, Exelon, National Grid, and Puget Sound Energy. Phase 2 was sponsored by six utilities: Empire District Electric Company, Evergy Missouri, Pacific Gas & Electric, San Diego Gas & Electric, Southern California Edison, and Union Electric. Phase 1 and 2 involved 15 customer interruption cost survey activities representing a total of 30 electricity distribution service territories. ICE Calculator Version 2.0 and 2.2 Comparison This memorandum describes–at a high-level–the improvements in interruption cost estimates for the version 2.2 of the ICE Calculator (released February 2026) compared to version 2.0 (released in April 2025). Version 2.2 of the ICE Calculator corresponds to Phase 2 of the initiative, while version 2.0 corresponds to Phase 1. The improvements in version 2.2 result from both a significant increase in the number of customer responses that have been collected and the identification of seven additional factors that help estimate customer interruption costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2012 NASA Cost Estimating Handbook Highlights

The major goal is to ensure that appropriate policy is adopted and that best practices are being developed, communicated, and used across the Agency. -- Accomplished by engaging the NASA Cost Estimating Community representatives in the update. Scheduled to be complete by the end of FY 2012. Document has been through 3 detailed reviews across NASA.

cost estimation↗

Area-A Options Cost Estimate Report

Five options for re-establishing various configurations of beam to LANSCE Area A were considered. Bottoms up cost estimates to implement three of the options were developed. The two options not costed were considered too complex and too expensive compared with the other options based on their relative benefits to experimental programs at LANSCE.

43 PARTICLE ACCELERATORS↗

Simplified Life-Cycle Cost Estimation

Simple method for life-cycle cost (LCC) estimation avoids pitfalls inherent in formulations requiring separate estimates of inflation and interest rates. Method depends for validity observation that interest and inflation rates closely track each other.

Remer, D. S.↗

Characteristic features of determining the labor input and estimated cost of the development and manufacture of equipment

The difficulties in obtaining exact calculation data for the labor input and estimated cost are noted. The method of calculating the labor cost of the design work using the provisional normative indexes with respect to individual forms of operations is proposed. Values of certain coefficients recommended for use in the practical calculations of the labor input for the development of new scientific equipment for space research are presented.

Kurmanaliyev, T. I.↗