Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMPLIANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Behind-the-Meter Solar Accounting in Renewable Portfolio Standards

If a behind-the-meter solar photovoltaic (BTM PV) system is adopted, how does that influence the total amount of renewable electricity in its state in the long run (i.e., after the existence of the generator is reflected in the relevant utility's generation mix)? Would we expect the total amount of renewable generation to increase on a 1:1 basis with the BTM PV's generation? Or could it be something more, or something less? We show in this paper that the answer can depend on two key elements of how BTM PV is accounted for in a state’s renewable portfolio standard (RPS): (1) whether renewable energy certificates (RECs) from BTM PV can be used for RPS compliance, and (2) whether load served by generation from BTM PV counts as load covered by the RPS. These two elements combine into four possible accounting options, and we characterize the implications of each under the simplifying assumptions that the RPS is binding and the BTM PV RECs are used for compliance when allowed. For example, if load served by BTM PV generation counts toward the RPS load and BTM PV RECs cannot be used for compliance, the presence of BTM does not change the amount of RECs that the utility is required to retire, and yet additional RECs will be retired by the BTM PV owner - therefore, the total amount of renewable generation would increase on a 1:1 basis with the BTM PV generation. In contrast, under a common RPS design in which BTM PV RECs can be used for compliance and the load served by BTM PV generation is not covered by the RPS, the presence of BTM PV and transfer of RECs for compliance can actually decrease the total amount of renewable generation in the state, relative to a situation in which there is no BTM PV.

14 SOLAR ENERGY↗

U.S. State Renewables Portfolio & Clean Electricity Standards: 2023 Status Update [Slides]

This report provides an overview and status update on U.S. state renewables portfolio standards (RPS) and has been expanded from previous editions to also cover 100% clean electricity standards (CES) adopted by a growing number of states. The report, published in slide-deck form along with accompanying data files, describes recent legislative revisions, key policy design features, compliance with interim targets, past and projected impacts on clean electricity development, and compliance costs. The 2023 edition presents historical data through year-end 2022 and projections out to 2050. Key trends from this edition of the report include the following: -Evolution of state RPS and CES programs: States continue to refine and revise their RPS policies, often by adopting higher targets and/or broader CES policies. Among the 29 states plus DC with an RPS, 16 states have RPS targets of at least 50% of retail sales, and 17 states have a 100% CES or RPS target. -Historical impacts on renewables development: Roughly half of all growth in U.S. renewable electricity (RE) generation and capacity since 2000 is associated with state RPS requirements, though that percentage has declined in recent years, representing 30% of all U.S. RE capacity additions in 2022. Within some regions, particularly the Northeast and Mid-Atlantic, RPS policies play a more central role in motivating RE growth. -Future RPS and CES demand and incremental needs: RPS and CES policies will require roughly 300 terawatt-hours (TWh) of additional clean electricity supply by 2030 and 800 TWh by 2050, requiring total U.S. non-hydro RE generation to reach 28% of electricity sales by 2050 (compared to 17% today). This amounts to roughly one-quarter of EIA’s projected RE growth through 2050. -RPS target achievement to-date: States have generally met their interim RPS targets in recent years, with only a few exceptions reflecting unique, state-specific issues. Most CES targets are not yet in force. -Renewable energy certificate (REC) pricing trends: Prices for NEPOOL Class I RECs remained at roughly $\$40$ /MWh over the past year, just below alternative compliance payment (ACP) rates in the larger state markets, while PJM Tier I REC prices continued to rise, reaching $\$30$ /MWh by year-end. Prices for solar RECs (or SRECs) remained relatively stable, and continue to exhibit wide variation across states, with the highest prices ($\$200-450$ /MWh) in NJ, MA, and DC. -RPS compliance costs: RPS compliance costs average roughly 3.5% of retail electricity bills across RPS states, though vary widely from state to state, with the highest costs (8-12% of retail bills) in states with solar carve-outs and high SREC prices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

U.S. State Renewables Portfolio & Clean Electricity Standards: 2024 Status Update [Slides]

This report provides an overview and status update on U.S. state renewables portfolio standards (RPS) and has been expanded from previous editions to also cover 100% clean electricity standards (CES) adopted by a growing number of states. The report, published in slide-deck form along with accompanying data files, describes recent legislative revisions, key policy design features, compliance with interim targets, past and projected impacts on clean electricity development, and compliance costs. The 2023 edition presents historical data through year-end 2023 and projections out to 2050. Key trends from this edition of the report include the following: -Evolution of state RPS and CES programs: States continue to refine and revise their RPS policies, often by adopting higher targets and/or broader CES policies. Among the 29 states plus DC with an RPS, 16 have RPS targets of at least 50% of retail sales, and 4 states have a 100% RPS. An additional 16 states have adopted a broader 100% CES. -Historical impacts on renewables development: Almost half of all growth in U.S. renewable electricity (RE) generation and capacity since 2000 is nominally associated with state RPS requirements. That percentage has declined over time to 35% of all U.S. RE capacity additions in 2023, though in certain regions RPS policies continue to play a dominant role in driving RE growth. -Future RPS and CES demand and incremental needs: The combined demand for clean electricity from RPS and CES policies will grow from roughly 500 TWh today to 1700 TWh by 2050. Accounting for current supplies—including existing nuclear and hydroelectric generation eligible for CES targets—RPS and CES policies will require 900 TWh of new clean electricity by 2050, equivalent to roughly 3x the historical rate of RPS-buildout. -RPS target achievement to-date: States have generally met their interim RPS targets in recent years, with only a few exceptions reflecting unique, state-specific issues. Most CES targets are not yet in force, and so little compliance experience to-date. -REC pricing trends: Prices for NEPOOL Class I RECs remained at roughly $\$40$/MWh over the past year, just below ACP rates in the larger state markets, while PJM Tier I REC prices continued to rise, reaching $\$35$/MWh by year-end 2023 and surpassing ACP levels in some states. Prices for solar RECs remained relatively stable, and continue to exhibit wide variation across states, with the highest prices ($200-450/MWh) in NJ, MA, and DC. -RPS compliance costs: RPS compliance costs average roughly 4% of retail electricity bills across RPS states, though vary widely from state to state, with the highest costs (11-12% of retail bills) in states with solar carve-outs and high SREC prices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Guidance for Monitoring Passive Groundwater Remedies Over Extended Time Scales

Passive remediation can be appropriate where natural processes and actions such as institutional controls mitigate exposure to contaminated groundwater, achieving remedial action objectives and protectiveness of human health and the environment. Monitored natural attenuation (MNA) is a prevalent passive remediation strategy supported by a regulatory framework and monitoring design guidance. However, long-term passive remedies are usually selected in combination with at least one active remedy, such as source removal, in situ treatment, or pump-and-treat, functioning as a complementary method for achieving remediation objectives and meeting the applicable statutory and regulatory requirements. However, MNA and existing monitoring guidance primarily target situations where the remedial action objectives are met within a few decades. When time scales for passive remediation extend to many decades (50 years or more), a corresponding change in monitoring strategy is needed to adapt to the extended time scale. This document provides guidance for implementing an extended-scale monitoring (ESM) approach appropriate for long-duration passive remediation. Extended-scale is defined in this document with respect to time (i.e., a long duration of remediation) and a large enough physical scale such that downstream receptors will not be impacted within the remediation timeframe. ESM applies to slow-moving groundwater contaminant plumes and emphasizes monitoring primarily for potential exposure pathways. For this approach, the primary monitoring objective is to demonstrate that the plume diminishes before reaching the receptor zone or point of compliance and/or a receptor does not receive concentrations above the compliance limit. While the overall objectives of protecting human health and the environment are the same as for plumes where remediation can occur over a shorter time period, the time scales between decisions are longer and the dynamics of plume evolution are slower. To this end, a scenario-based strategy is described for different plume and source conditions, defining a containment and receptor zones. The containment zone is the area where the risk of exposure to groundwater contamination can be mitigated (e.g., through institutional controls) during the remediation time period. The receptor zone is defined as the area where exposure to groundwater contamination cannot be mitigated and compliance concentration standards must be met. Within the containment zone, slow plume migration may occur, leading to concentrations that exceed compliance standards. However, where distance to the receptor zone is large relative to plume migration and attenuation rate, this approach can be protective of the receptor zone. Selection of a long-duration passive remedy needs to be based on sufficient understanding of contaminant sources, hydrogeology, and contaminant plumes. A strong technical basis, supported by predictive analysis, is recommended to substantiate that contamination is expected to stay within the containment zone during the active remediation and attainment phase of the remedy, and diminish to meet compliance standards within the extended timeframe prior to reaching the receptor zone (e.g., many decades or even centuries). The ESM approach is based on verification of plume behavior and not on detailed plume dynamics. Monitoring is conducted to confirm expected behavior with an emphasis on exposure pathways to verify that plumes remain contained in areas where the protectiveness objectives can be met. ESM should not be adopted if there is significant risk of the plume extending beyond the containment zone. Given the slow movement within the containment zone, less frequent sampling is required relative to approaches used for conventional-scale remediation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transmission Electron Microscopy Study on the Effect of Thermal and Electrical Stimuli on Ge2Te3 Based Memristor Devices

Memristor devices fabricated using the chalcogenide Ge 2 Te 3 phase change thin films in a metal-insulator-metal structure are characterized using thermal and electrical stimuli in this study. Once the thermal and electrical stimuli are applied, cross-sectional transmission electron microscopy (TEM) and X-ray energy-dispersive spectroscopy (XEDS) analyses are performed to determine structural and compositional changes in the devices. Electrical measurements on these devices showed a need for increasing compliance current between cycles to initiate switching from low resistance state (LRS) to high resistance state (HRS). The measured resistance in HRS also exhibited a steady decrease with increase in the compliance current. High resolution TEM studies on devices in HRS showed the presence of residual crystalline phase at the top-electrode/dielectric interface, which may explain the observed dependence on compliance current. XEDS study revealed diffusion related processes at dielectric-electrode interface characterized, by the separation of Ge 2 Te 3 into Ge- and Te- enriched interfacial layers. This was also accompanied by spikes in O level at these regions. Furthermore, in-situ heating experiments on as-grown thin films revealed a deleterious effect of Ti adhesive layer, wherein the in-diffusion of Ti leads to further degradation of the dielectric layer. This experimental physics-based study shows that the large HRS/LRS ratio below the current compliance limit of 1 mA and the ability to control the HRS and LRS by varying the compliance current are attractive for memristor and neuromorphic computing applications.

Shallcross, Austin↗

Panel Session 12: Effective Aspects of the 2016 Consent Order between DOE-EM-LA Field Office - NM Environment Department and Identifying Comparable Approaches

This panel focused on the extremely effective 2016 Compliance Order on Consent executed between the US Department of Energy (DOE) Office of Environmental Management - Los Alamos Field Office (EM-LA) and the New Mexico Environment Department (NMED) and highlights practices and concepts toward developing an environmental compliance agreement that is mutually productive to both the NMED and the DOE. To further demonstrate successful practices, the panel also highlighted another very effective compliance agreement with comparable approaches - the 1993 Savannah River Site (SRS) Federal Facility Agreement (FFA) executed between DOE, the South Carolina Department of Health and Environmental Control (SCDHEC), and the Environmental Protection Agency (EPA). EM-LA, NMED, SRS, and SCDHEC representatives provided attendees an opportunity to understand and compare extremely effective approaches to regulatory compliance across the complex.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Component-wise reduced order model lattice-type structure design

Lattice-type structures can provide a combination of stiffness with light weight that is desirable in a variety of applications. Design optimization of these structures must rely on approximations of the governing physics to render solution of a mathematical model feasible. In this paper, we propose a topology optimization (TO) formulation that approximates the governing physics using component-wise reduced order modeling as introduced in Huynh et al. (2013); Eftang and Patera (2013), which can reduce solution time by multiple orders of magnitude over a full-order finite element model while providing a relative error in the solution of 1%. In addition, the offline training data set from such component-wise models is reusable, allowing its application to many design problems for only the cost of a single offline training phase, and the component-wise method is nearly embarrassingly parallel. We also show how the parameterization chosen in our optimization allows a simplification of the component-wise reduced order model (CWROM) not noted in previous literature, for further speedup of the optimization process. Furthermore, the sensitivity of the compliance with respect to the particular parameterization is derived solely at the component level. In numerical examples, we demonstrate a 1000x speedup over a full-order FEM model with relative error of 1% and show minimum compliance designs for two different cantilever beam examples, one smaller and one larger. Finally, error bounds for the displacement field, compliance, and compliance sensitivity of the CWROM are derived.

97 MATHEMATICS AND COMPUTING↗

What, why and when to go virtual: An international analysis of early adopters of virtual building energy codes inspections

To meet greenhouse gas reduction targets, several countries are pursuing more ambitious policies in their buildings and construction sectors, such as introducing zero net energy/carbon building codes. Countries often report not having enough qualified staff for performing building energy code inspections and many are exploring faster, easier, and more reliable methods to check the compliance of buildings with their codes. Building inspections are a critical element for ensuring code compliance and they have traditionally been performed in person. However, in-person inspections can be labor and travel intensive, costly, and prone to human error. In this paper, the authors explore how virtual inspections, particularly in light of the recent COVID-19 pandemic, have impacted processes for building code compliance checks in jurisdictions and communities around the world. Here, the authors collected data on four key parameters (time and financial savings, scope of inspections, changing practices and technological innovation, and benefits to consumers) from six jurisdictions and communities in five countries (Australia, Canada, Singapore, United Arab Emirates, and the United States) to analyze the impacts of virtual inspections on code compliance checks. The analysis found the greatest value from virtual inspections in geographically dispersed regions and for cities experiencing rapid building construction. The study also explored emerging technologies that are being piloted for virtual inspections. Although many of these technologies hold promise, more resources and capacity are needed to make them viable for use in building energy code inspections.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

How to design a zero-emissions vehicle mandate? Simulating impacts on sales, GHG emissions and cost-effectiveness using the AUtomaker-Consumer Model (AUM)

We report although numerous studies investigate the impacts of policy on zero-emissions vehicle (ZEV) sales, few address the impacts of a ZEV sales mandate and its particular design features. We use the AUtomaker-consumer Model (AUM) to simulate varying designs of a ZEV mandate in Canada's light-duty vehicle sector, requiring 30% ZEV sales by 2030. Design features include: different penalties for non-compliance, different allocations of credits per ZEV type, and the allowance of banking credits across years. For each policy design, we consider impacts on ZEV adoption, GHG emissions, consumer surplus, automaker profits, and overall policy cost-effectiveness. Results demonstrate trade-offs among the policy designs. Generally, ZEV mandate designs that are more effective at increasing ZEV adoption and decreasing GHG emissions also induce larger reductions in consumer surplus and automaker profits. To achieve the ZEV sales goal, simulations show that a higher non-compliance penalty (CDN$ 10k per credit) is needed. ZEV adoption and GHG reductions are also improved by a “One credit per ZEV” scheme, rather than a “California-style” scheme that gives multiple credits per battery-electric vehicle. Further, allowing automakers to bank credits softens the policy impact on profit and increases automaker compliance in initial years. Across these different design combinations, we find that the most cost-effective design ($CDN/tonne mitigated, including consumer surplus and automaker profits impacts) utilizes a $10k non-compliance penalty and “One credit per ZEV” system that allows banking. Our analysis demonstrates the importance of various ZEV mandate design features, and the complex trade-offs involved among various policy goals.

54 ENVIRONMENTAL SCIENCES↗

Regulatory Treatment of Low Frequency External Events under a Risk-Informed Performance-Based Licensing Pathway: Enhanced SPRA-based Margins Assessment

Recently there has been development in the field of risk-informed performance-based (RIPB) design and licensing approaches, which leverage detailed risk assessments and performance-based metrics to allow flexibility and innovation. These RIPB approaches include the probabilistic treatment of external hazards, including low frequency events that are beyond the design basis. However, there are certain challenges that have been identified to the probabilistic treatment of low frequency external events, primarily due to uncertainty in the hazard curve and the associated plant response to rare, severe events. The NRC is currently developing 10 CFR Part 53 that would establish a technology-inclusive regulatory framework for use by applicants for new commercial advanced nuclear reactors. By examining the regulatory safety criteria contained within draft 10 CFR Part 53 and associated draft RIPB seismic design guidance, potential challenges were identified in demonstrating satisfaction of the safety criteria for low frequency external events, with specific difficulties associated with demonstrating compliance with the quantitative health objectives (QHOs). Non-LWRs are expected to utilize the direct calculation of offsite consequence, rather than use surrogates, for comparison to the QHOs, which can be particularly challenging as the previously identified uncertainties are compounded by uncertainties in the response of the neighboring population. The central recommendation from this effort is that it is necessary to develop an approach for demonstrating compliance with the safety criteria in draft Part 53 that addresses the key challenges while providing flexibility to applicants. This paper summarizes key findings, establishes a series of high-level goals, and reviews a newly developed approach to address the major challenges associated with assessing compliance with QHOs, with avenues to demonstrate compliance based on either the estimated consequence or the available margin to event occurrence, while also building on existing experience of seismic margins assessments. The paper also provides examples to demonstrate the application of the approach, as well as recommendations and potential future work.

external hazards↗

Search for Infrasound Signals in InSight Data Using Coupled Pressure/Ground Deformation Methods

The unprecedented quality and sampling rate of seismometer and pressure sensors of the InSight Mars mission allow us to investigate infrasound through its pressure and ground deformation signals. This study focuses on compliance effects induced by acoustic waves propagating almost horizontally close to the surface. The compliance of acoustic waves is first estimated using the compliance estimates from pressure perturbations moving at wind speed. Then, a marker of compliance events is used to detect events of ground deformation induced by pressure variations, in three frequency bands from 0.4 to 3.2 Hz, from InSight sol 180 to 690. Additional selection criteria are imposed on the detected events to focus on acoustic waves and to remove various noise sources (e.g., wind effects or seismometer artifacts). After an automated selection, the visual inspection of the records allows us to validate two infrasound candidates that cannot be related to pressure perturbations moving at wind speed nor to known noise sources. For our highest quality infrasound candidate, the relation between this event and a convective vortex occuring 10 s later is tested. The azimuth of the vortex position at the time of infrasound detection is not consistent with the arrival azimuth of the suspected infrasound inferred from the polarization of seismometer records, thus the link between these two phenomena cannot be demonstrated. Further investigations would require a better understanding of wind-related noise impacting InSight sensors and of the effects of lateral variations of subsurface mechanical properties on the ground deformations induced by atmospheric pressure variations.

58 GEOSCIENCES↗

U.S. Renewables Portfolio Standards 2021 Status Update: Early Release

Berkeley Lab’s annual status report on U.S. renewables portfolio standards (RPS) provides an overview of key trends associated with U.S. state RPS policies. The report, published in slide-deck form, describes recent legislative revisions, key policy design features, compliance with interim targets, past and projected impacts on renewables development, and compliance costs. The 2021 Early Release, published in lieu of a 2020 edition, presents historical data through year-end 2019, with some limited results for the year 2020. Key trends from this edition of the report include the following: Evolution of state RPS programs: States continue to refine and revise their RPS policies. Among other significant changes since the start of 2019, eight states enacted higher RPS targets or created new clean-energy/zero-carbon targets (AZ, DC, MD, NM, NV, VA, WA), in most cases setting targets equal to at least 50% of retail sales. Historical impacts on renewables development: Roughly half of all growth in U.S. renewable electricity (RE) generation and capacity since 2000 is associated with state RPS requirements, though that percentage has declined in recent years, representing 23% of all U.S. RE capacity additions in 2019. However, within particular regions-namely, the Northeast and Mid-Atlantic-RPS policies continue to serve a central role in motivating RE growth. Future RPS demand and incremental needs: RPS demand growth through 2030 will require roughly 90 GW of new RE capacity and will require total U.S. non-hydro RE generation to reach 17% of electricity sales (compared to 12% in 2019). Relative to EIA projections, this amounts to roughly one-third of projected RE growth over the next decade. RPS target achievement to-date: States have generally met their interim RPS targets in recent years, with only a few exceptions reflecting unique, state-specific issues. REC pricing trends: Prices for NEPOOL Class I RECs rose steeply over 2019, reaching $40/MWh and remaining at roughly that level over 2020. PJM Tier I REC prices continued to rise at a modest pace over the course of 2020, reaching $10/MWh by year-end. Prices for solar RECs remained relatively stable over 2020, and continue to exhibit wide variation across states, with the highest prices ($200-450/MWh) in NJ, MA, and DC.RPS compliance costs and cost caps: RPS compliance costs in 2019 averaged roughly 2.6% of retail electricity bills in RPS states, compared to 2.3% in 2018, with costs in most states ranging from 0.5% to 4.5% of retail electricity bills.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Ames National Laboratory Annual Site Environmental Report for CY2021

The primary purpose of this report is to summarize the performance of Ames National Laboratory’s environmental programs, present highlights of significant environmental activities, and confirm compliance with environmental regulations and requirements for calendar year 2021. This report is a working requirement of Department of Energy Order 231.1B, Environment, Safety and Health Reporting. It includes descriptions of the Laboratory’s site, mission, the status of its compliance with applicable environmental regulations, its planning and activities to maintain compliance, and a comprehensive review of its environmental protection, surveillance and monitoring activities. Ames National Laboratory is located on the campus of Iowa State University (ISU) and occupies 13 buildings owned by the Department of Energy (DOE). See the Laboratory’s Web page for location and Laboratory overview. The Laboratory also leases space in ISU owned buildings. In 2021, the Laboratory accumulated and disposed of hazardous waste under a U.S. Environmental Protection Agency (EPA) issued generator number. All waste was handled according to applicable EPA, State, and local regulations and DOE Orders. The Laboratory operates as a Small Quantity Generator (SQG) of hazardous waste. There were no radiological air emissions or exposures to the general public due to Laboratory activities in 2021 (See U.S. Department of Energy Air Emissions Annual Report in Appendix A.) The Laboratory has an established Environmental Radiological Protection Program (Plan 10200.041) per DOE Order 458.1 requirements. Plans, policies, and procedures are in place to protect the public and the environment against undue risk from radiation associated with DOE radiological activities. As indicated in prior Site Environmental Reports, formal pollution prevention awareness, waste minimization and recycling programs have been in practice since 1990, with improvements implemented most recently in 2017 with Iowa State University’s shift toward single-stream recycling. Included in recycling efforts are items such as batteries, monitors, corrugated cardboard, lamps, miscellaneous electronic office equipment, mixed paper, newsprint, food/beverage containers, and laboratory glassware. Ames National Laboratory also recycles/reuses salvageable metal, used oil, and foamed polystyrene peanuts, and encourages chemical redistribution and sharing among research groups. Ames National Laboratory reported its contractual performance to DOE-Ames Site Office (AMSO) through the Laboratory’s Performance Evaluation Measurement Plan (PEMP), and a performance level of “B+” was achieved in 2021 for Sustain Excellence and Enhance Effectiveness of Integrated Safety, Health, and Environmental Protection As reported in Site Environmental Reports for prior years, the Laboratory’s Environmental Management System (EMS) has been integrated into the Laboratory’s Integrated Safety Management System (ISMS) since 2005. The integration of EMS into Laboratory business practices allows the Laboratory to systematically review, address and respond to environmental impacts. In addition to DOE-identified objectives and targets, the EMS Steering Committee recommends annual environmental goals for the Laboratory. Due to the COVID-19 pandemic and limited onsite work staff, goals of reducing water usage and travel/commuting to promote the reduction of scope 3 greenhouse gases were achieved. All contract deliverables and environmental compliance activities were still met during this time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Distributed Energy Resource Visual Emulator: Phase 1

To help federal energy managers assess, monitor, and manage cybersecurity while achieving decarbonization, the National Renewable Energy Laboratory's Distributed Energy Resource Cybersecurity Framework (DER-CF) offers a comprehensive, web-based assessment tool focusing on cyber governance or policies, technical management, and physical security. The DER-CF currently presents users with a series of pertinent cybersecurity questions, which are used to generate a site-specific report and recommendations. This paper outlines a technical approach to integrate the DER-CF with another key asset—NREL's Advanced Research on Integrated Energy Systems (ARIES) Cyber Range—to visualize cybersecurity resilience and compliance and to enhance the usability and accessibility of the DER-CF. The result is a new tool called the Distributed Energy Resource Visual Emulator (DER-VE). Its development will include regular conversations with stakeholders to assess the effectiveness of these efforts, refine the visualization capability, and ensure its value to our partners. Phase 0 of the integration project was concluded in 2021. Phase 1, completed in 2022, has two components: The first is developing a working visualization of system compliance using the DER-CF, and the second is planning the design of a server application that takes input data from the DER-CF and creates a personal emulated environment of the user's system or a selected reference architect. Major components that were addressed in this phase are the DER-CF output, compliance visualization, data model, and compliance server design.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FERC Order No. 2222 and Considerations for Distributed Wind

The Federal Energy Regulatory Commission (FERC) issued Order No. 2222 in October 2020. The rule directs Regional Transmission Organizations and Independent System Operators (ISOs) to amend their tariffs and participation models to accommodate heterogeneous distributed energy resource (DER) aggregations in the wholesale energy markets that they operate, including capacity, energy, and ancillary service markets. The Commission issued the rule to better capture the benefits provided by DERs deployed in the United States, whose use has been expanding rapidly. The Commission defines DERs as “any resource located on the distribution system, any subsystem thereof or behind a customer meter,” including but not limited to “electric storage resources, distributed generation, demand response, energy efficiency, thermal storage, and electric vehicles and their supply equipment.” The rule aims to increase DER participation in wholesale markets by allowing the creation of DER aggregations, in which multiple DERs that are too small to meet minimum capacity requirements for wholesale markets individually would be able to participate in markets as a single unit. As of June 20, 2023, all ISOs have filed initial compliance plans and a number have begun implementation. Compliance dates range from 2024 to 2029, with Midcontinent ISO having the latest date of compliance proposed for 2029. Southwest Power Pool still has an outstanding date, having no final order yet from FERC, but a target date of the third quarter of calendar year 2025. The rule, which is technology agnostic and requires ISOs to create participation plans that accommodate different DERs, provides an opportunity for distributed wind market expansion. In addition, distributed wind can bring benefits to heterogenous DER aggregations. These benefits include resource diversity (i.e., a complementary generation profile to other types of distributed generation), its small footprint and ability to be co-located with load, and its potential to provide frequency response, voltage support, and black start services, among other ancillary services. This report provides a status update on FERC Order No. 2222, the current state of ISO compliance, and information relevant to the distributed wind industry as DER aggregators and other stakeholders expand their participation to wholesale energy markets.

17 WIND ENERGY↗

Monitoring Plan for the Idaho National Laboratory Remote Handled Low Level Waste Disposal Facility

This monitoring plan for Idaho National Laboratory’s Remote-Handled Low Level Waste Disposal Facility was developed to meet the requirements for monitoring low-level waste disposal facilities according to the U.S. Department of Energy (DOE) Order 435.1, “Radioactive Waste Management,” and the guidance provided in the associated technical standard “Disposal Authorization Statement and Tank Closure Documentation” (DOE-STD-5002-2017). The purpose of this monitoring plan is to document a monitoring strategy that includes (1) compliance monitoring activities to demonstrate compliance with regulatory standards/limits and (2) performance monitoring to build confidence the facility is performing as demonstrated in the facility performance assessment (PA) (DOE-ID 2018a), composite analysis (CA) (DOE ID 2012), and CA addendum (DOE-ID 2018b). The de minimus impact to the aquifer predicted by the PA suggests that aquifer compliance monitoring should be augmented with performance monitoring of the drainage course materials and sedimentary interbeds in the vadose zone beneath the facility to provide a more effective means of identifying performance deviations. The monitoring approach delineated in this document was informed by the systems evaluation of natural and engineered facility features presented in the PA, an assessment of aquifer baseline conditions (INL 2017d), the dose analysis conducted in support of the PA and CA, and monitoring data collected during the first four years of facility operations (baseline monitoring phase) (INL 2023b). This plan provides monitoring locations, sampling frequencies, and sampling methods; recommendations for data evaluation; and a description of the monitoring plan implementation. Collected data will be used to demonstrate facility compliance and to identify conditions that are not consistent with the key assumptions made by the PA and CA.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2022 (Final Report)

Pacific Northwest National Laboratory (PNNL), one of the U.S. Department of Energy (DOE) Office of Science’s 10 national laboratories, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. There are three DOE offices within the Richland area. Two are responsible for the Hanford Site, whereas the Pacific Northwest Site Office (PNSO) oversees PNNL. PNNL prepares this Annual Site Environmental Report to meet the requirements of DOE Order 231.1B, Environmental, Safety and Health Reporting, and DOE Order 458.1, Radiation Protection of the Public and the Environment, assuring that the public is informed of any PNNL-Richland Campus or PNNL-Sequim Campus event that could adversely affect the health and safety of the public, site staff, or the environment. The report provides a synopsis of ongoing environmental management performance and compliance activities for operations that occur on the PNNL-Richland Campus in Richland, Washington, and at the PNNL-Sequim Campus near Sequim, Washington. It describes the location of and background for each facility; addresses compliance with applicable DOE, federal, state, and local regulations, and site-specific permits; documents environmental monitoring efforts and their status; presents potential radiation doses to staff and the public in the surrounding areas; and describes DOE-required data quality assurance methods used for data verification. The ASER summarizes site compliance with federal, state, and local environmental laws, regulations, policies, directives, permits, and Orders, and provides environmental management performance benchmarks and their status to the public, regulatory agencies, community officials, Native American tribes, and public interest groups.

54 ENVIRONMENTAL SCIENCES↗

An Energy Codes Gap Analysis Field Study in the Southwest (Final Technical Report)

The primary goal of the “An Energy Codes Gap Analysis Field Study in the Southwest” project was to improve housing through strengthened building energy code implementation in two states, Colorado and Nevada, leading to greater energy and utility bill savings for households. Colorado is a home rule state. Nevada adopts a statewide code, but cities and counties must also adopt the code, making the state function like a home rule state. To broaden the impact of the project, an additional goal was to share and amplify project experiences, findings, and lessons that can be applied in other states. To achieve these goals, the project’s key objectives were to examine how residential energy codes are implemented in partner states; to use these findings to strengthen codes implementation through enhanced education, training, and outreach; and to enhance energy code technical assistance capabilities in the two partner states. In both partner states, the project led to the creation of a quantitative baseline understanding of compliance with high-impact energy code requirements, such as foundation, wall, and ceiling R-value; window U-factor and SHGC; envelope air tightness; duct tightness; and high-efficiency lighting. It then applied this baseline information to directly inform training in geographic areas with high levels of building and construction activity. The project has placed Colorado and Nevada among 23 states across the country that have conducted a single-family residential field study based on the established U.S. Department of Energy (DOE) methodology since 2014. It has also helped each State Energy Office test models for partnership- and relationship-building among government agencies and key stakeholder groups, including the State Energy Office and relevant code administration and professional licensing agencies, building officials, designers, builders, trades and utilities. At the national level, the project helped educate and inform State and Territory Energy Offices on a replicable methodology to assess energy code construction practices, effective stakeholder engagement strategies, and tailored energy code education and training. These findings are particularly pertinent for home-rule states, such as Colorado and Nevada, which rely on local government awareness and action to advance and implement building energy codes. By raising awareness of code adoption and compliance, this project has helped to equip each partner state with data on code compliance, strategies, education, and partnership models to advance building energy codes. This in turn will have an important impact on new construction practices in Colorado and Nevada, leading to more energy efficient and affordable housing. Currently, more than 62 percent of Colorado’s population lives in one of the 55 jurisdictions that have adopted the 2021 IECC to date, while nearly 95 percent of the state's population lives in one of the 208 jurisdictions that have adopted a code at 2015 IECC levels or higher. In Nevada, the 2018 IECC was adopted by the Governor’s Office of Energy in July 2018. By July 2020, 47 percent of the adopted energy code in the state was 2018 IECC which covers 96.5 percent of Nevada’s population. The training materials funded by this project focus on the 2021 IECC and will continue to be relevant in the two states as additional jurisdictions update their building energy codes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗