Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

WE-F-16A-01: Commissioning and Clinical Use of PC-ISO for Customized, 3D Printed, Gynecological Brachytherapy Applicators

Purpose: (1) Evaluate the safety and radiation attenuation properties of PCISO, a bio-compatible, sterilizable 3D printing material by Stratasys, (2) establish a method for commissioning customized multi- and single-use 3D printed applicators, (3) report on use of customized vaginal cylinders used to treat a series of serous endometrial cancer patient. Methods: A custom film dosimetry apparatus was designed to hold a Gafchromic radio film segment between two blocks of PC-ISO and 3D-printed using a Fortus 400mc (StrataSys). A dose plan was computed using 13 dwell positions at 2.5 mm spacing and normalized to 1500 cGy at 1 cm. Film exposure was compared to control tests in only air and only water. The average Hounsfield Unit (HU) was computed and used to verify water equivalency. For the clinical use cases, the physician specifies the dimensions and geometry of a custom applicator from which a CAD model is designed and printed. Results: The doses measured from the PC-ISO Gafchromic film test were within 1% of the dose measured in only water between 1cm and 6cm from the channel. Doses increased 7–4% measured in only air. HU range was 11–43. The applicators were sterilized using the Sterrad system multiple times without damage. As of submission 3 unique cylinders have been designed, printed, and used in the clinic. A standardizable workflow for commissioning custom 3D printed applicators was codified and will be reported. Conclusions: Quality assurance (QA) evaluation of the PC-ISO 3D-printing material showed that PC-ISO is a suitable material for a gynecological brachytherapy vaginal cylinder in a clinical setting. With the material commissioning completed, if the physician determines that a better treatment would Result, a customized design is fabricated with limited additional QA necessary. Although this study was specific to PC-ISO, the same setup can be used to evaluate other 3D-printing materials.

60 APPLIED LIFE SCIENCES↗

Poster — Thur Eve — 39: Feasibility of Commissioning HybridArc with the Delta 4 two plane diode phantom: comparisons with Gafchromic Film

HybridArc is a relatively novel radiation therapy technique which combines optimized dynamic conformai arcs (DCA) and intensity modulated radiation therapy (IMRT). HybridArc has possible dosimetry and efficiency advantages over stand alone DCA and IMRT treatments and can be readily implemented on any linac capable of DCA and IMRT, giving strong motivation to commission the modality. The Delta4 phantom (Scandidos, Uppsala, Sweden) has been used for IMRT and VMAT clinical dosimetric verification making it a candidate for HybridArc commissioning. However the HybridArc modality makes use of several non co-planar arcs which creates setup issues due to the geometry of the Delta4, resulting in possible phantom gantry collisions for plans with non-zero couch angles. An analysis was done determining the feasibility of using the Delta4 fixed at 0° couch angle compared with results obtained using Gafchromic ETB2 film (Ashland, Covington Kentucky) in an anthropomorphic phantom at the planned couch angles. A gamma index analysis of the measured and planned dose distributions was done using Delta4 and DoseLab Pro (Mobius Medical Systems, Houston Texas) software. For both arc and IMRT sub-fields there is reasonable correlation between the gamma index found from the Delta4 and Gafchromic film. All results show the feasibility of using the Delta4 for HybridArc commissioning.

60 APPLIED LIFE SCIENCES↗

Sci—Fri PM: Dosimetry—06: Commissioning of a 3D patient specific QA system for hypofractionated prostate treatments

The objective of this work is to commission the 6MV-SRS beam model in COMPASS (v2.1, IBA-Dosimetry) and validate its use for patient specific QA of hypofractionated prostate treatments. The COMPASS system consists of a 2D ion chamber array (MatriXX{sup Evolution}), an independent gantry angle sensor and associated software. The system can either directly calculate or reconstruct (using measured detector responses) a 3D dose distribution on the patient CT dataset for plan verification. Beam models are developed and commissioned in the same manner as a beam model is commissioned in a standard treatment planning system. Model validation was initially performed by comparing both COMPASS calculations and reconstructions to measured open field beam data. Next, 10 hypofractionated prostate RapidArc plans were delivered to both the COMPASS system and a phantom with ion chamber and film inserted. COMPASS dose distributions calculated and reconstructed on the phantom CT dataset were compared to the chamber and film measurements. The mean (± standard deviation) difference between COMPASS reconstructed dose and ion chamber measurement was 1.4 ± 1.0%. The maximum discrepancy was 2.6%. Corresponding values for COMPASS calculation were 0.9 ± 0.9% and 2.6%, respectively. The average gamma agreement index (3%/3mm) for COMPAS reconstruction and film was 96.7% and 95.3% when using 70% and 20% dose thresholds, respectively. The corresponding values for COMPASS calculation were 97.1% and 97.1%, respectively. Based on our results, COMPASS can be used for the patient specific QA of hypofractionated prostate treatments delivered with the 6MV-SRS beam.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

SU-E-T-99: An Analysis of the Accuracy of TPS Extrapolation of Commissioning Data

Purpose: To investigate discrepancies between measured percent depth dose curves of a linear accelerator at depths beyond the commissioning data and those generated by the treatment planning system (TPS) via extrapolation. Methods: Relative depth doses were measured on an Elekta Synergy™ linac for photon beams of 6 -MV and 10-MV. SSDs for all curves were 100-cm and field sizes ranged from 4×4 to 35×35-cm{sup 2}. As most scanning tanks cannot provide depths greater than about 30-cm, percent depth dose measurements, extending 45-cm depths, were performed in Solid Water™ using a 0.125-cc ionization chamber (PTW model TN31012). The buildup regions of the curves were acquired with a parallel plate chamber (PTW model TN34001). Extrapolated curves were generated by the TPS (Phillips Pinnacle{sup 3} v. 9.6) by applying beams to CT images of 50-cm of Solid Water™ with density override set to 1.0-g/cc. Results: Percent difference between the two sets of curves (measured and TPS) was investigated. There is significant discrepancy in the buildup region to a depth of 7-mm. Beyond this depth, the two sets show good agreement. When analyzing the tail end of the curves, we saw percent difference of between 1.2% and 3.2%. The highest disagreement for the 6-MV curves was 10×10-cm{sup 2} (3%) and for the 10-MV curves it was the 35×35-cm{sup 2} (3.2%). Conclusion: A qualitative analysis of the measured data versus PDD curves generated by the TPS shows generally good agreement beyond 1-cm. However, a measurable percent difference was observed when comparing curves at depths beyond that provided by the commissioning data and at depths in the buildup region. Possible explanations for this include inaccuracies in modeling of the Solid Water™ or drift in beam energy since commissioning. Additionally, closer attention must be paid for measurements in the buildup region.

60 APPLIED LIFE SCIENCES↗

SU-E-T-193: Commissioning of An IntraOp Mobetron

Purpose: This study will describe the commissioning process of an Intra-Op Mobetron following the guidance of TG72 and includes a detailed method for measuring gap factors. Methods: Beam data was collected for 6, 9, and 12MeV electrons on the Mobetron using a PTW water tank and a Markus chamber. Commissioning data was collected for 3 sets of cones (0°, 15°, and 30° with respect to the water surface) that ranged in size from 3cm to 10cm diameter in half centimeter increments. Profiles were collected at six depths for all integer cones. PDI’s were taken for all cones in a path perpendicular to the water surface and then converted to dose using MEPHYSTO’s internal algorithm. The depth of maximum dose was determined from the PDD’s and used for measurement of output factors. Output factors were normalized to the 10cm flat cone. Gap factors were measured for all flat cones by raising the cone away from the water surface in defined gaps. These gap factors were measured at dmax for gaps of 1cm to 5cm in 1cm increments Gap factors and effective SSD values were calculated. Results: Output factors measured for all cones were within 3% of the representative beam data for flat cones. There is no published data on beveled cones, but the angled cone output factors agreed with the flat cones within 5%. Gap factors follow a linear pattern with the output decreasing 3–7% per centimeter gap depending on the size of the cone and energy. Effective SSD values calculated and fit a 3rd order polynomial curve with R2>0.98 for all energies. Conclusion: Commissioning of an Intra-Op Mobetron was completed with general agreement to published data. New data was published for beveled cones and a method for determining gap factors was established.

43 PARTICLE ACCELERATORS↗

MO-D-BRD-03: Radiobiology and Commissioning of Electronic Brachytherapy for IORT

Electronic brachytherapy (eBT) has seen an insurgence of manufacturers entering the US market for use in radiation therapy. In addition to the established interstitial, intraluminary, and intracavitary applications of eBT, many centers are now using eBT to treat skin lesions. It is important for medical physicists working with electronic brachytherapy sources to understand the basic physics principles of the sources themselves as well as the variety of applications for which they are being used. The calibration of the sources is different from vendor to vendor and the traceability of calibrations has evolved as new sources came to market. In 2014, a new air-kerma based standard was introduced by the National Institute of Standards and Technology (NIST) to measure the output of an eBT source. Eventually commercial treatment planning systems should accommodate this new standard and provide NIST traceability to the end user. The calibration and commissioning of an eBT system is unique to its application and typically entails a list of procedural recommendations by the manufacturer. Commissioning measurements are performed using a variety of methods, some of which are modifications of existing AAPM Task Group protocols. A medical physicist should be familiar with the different AAPM Task Group recommendations for applicability to eBT and how to properly adapt them to their needs. In addition to the physical characteristics of an eBT source, the photon energy is substantially lower than from HDR Ir-192 sources. Consequently, tissue-specific dosimetry and radiobiological considerations are necessary when comparing these brachytherapy modalities and when making clinical decisions as a radiation therapy team. In this session, the physical characteristics and calibration methodologies of eBt sources will be presented as well as radiobiology considerations and other important clinical considerations. Learning Objectives: To understand the basic principles of electronic brachytherapy and the various applications for which it is being used. To understand the physics of the calibration and commissioning for electronic brachytherapy sources To understand the unique radiobiology and clinical implementation of electronic brachytherapy systems for skin and IORT techniques Xoft, Inc. contributed funding toward development of the NIST electronic brachytherapy facility (Michael Mitch).The University of Wisconsin (Wesley Culberson) has received research support funding from Xoft, Inc. Zoubir Ouhib has received partial funding from Elekta Esteya.

61 RADIATION PROTECTION AND DOSIMETRY↗

WE-EF-303-05: Development and Commissioning of Real-Time Imaging Function for Respiratory-Gated Spot-Scanning Proton Beam Therapy

Purpose: To realize real-time-image gated proton beam therapy (RGPT) for treating mobile tumors. Methods: The rotating gantry of spot scanning proton beam therapy has been designed to equip two x-ray fluoroscopy devices that enable real-time imaging of the internal fiducial markers during respiration. Three-dimensional position of the fiducial marker located near the tumor can be calculated from the fluoroscopic images obtained from orthogonal directions and therapeutic beam is gated only when the fiducial marker is within the predefined gating window. Image acquisition rate can be selected from discrete value ranging from 0.1 Hz to 30 Hz. In order to confirm the effectiveness of RGPT and apply it clinically, clinical commissioning was conducted. Commissioning tests were categorized to main three parts including geometric accuracy, temporal accuracy and dosimetric evaluation. Results: Developed real-time imaging function has been installed and its basic performances have been confirmed. In the evaluation of geometric accuracy, coincidence of three-dimensional treatment room coordinate system and imaging coordinate system was confirmed to be less than 1 mm. Fiducial markers (gold sphere and coil) were able to be tracked in simulated clinical condition using an anthropomorphic chest phantom. In the evaluation of temporal accuracy, latency from image acquisition to gate on/off signal was about 60 msec in typical case. In dosimetric evaluation, treatment beam characteristics including beam irradiation position and dose output were stable in gated irradiation. Homogeneity indices to the mobile target were 0.99 (static), 0.89 (w/o gating, motion is parallel to direction of scan), 0.75 (w/o gating, perpendicular), 0.98 (w/ gating, parallel) and 0.93 (w/ gating, perpendicular). Dose homogeneity to the mobile target can be maintained in RGPT. Conclusion: Real-time imaging function utilizing x-ray fluoroscopy has been developed and commissioned successfully in order to realize RGPT. Funding Support: This research was partially supported by Japan Society for the Promotion of Science (JSPS) through the FIRST Program. Conflict of Interest: Prof. Shirato has research fund from Hitachi Ltd, Mitsubishi Heavy Industries Ltd and Shimadzu Corporation.

60 APPLIED LIFE SCIENCES↗

SU-F-T-49: Dosimetry Parameters and TPS Commissioning for the CivaSheet Directional Pd-103 Brachytherapy Source

Purpose: The CivaSheet is a new LDR Pd-103 brachytherapy device offering directional-radiation for preferentially irradiating malignancies with healthy-tissue sparing. Observations are presented on dosimetric characterization, TPS commissioning, and evaluation of the dosesuperposition- principle for summing individual elements comprising a planar CivaSheet Methods: The CivaSheet comprises individual sources (CivaDots, 0.05cm thick and 0.25cm diam.) inside a flexible bioabsorbable substrate with a 0.8cm center-to-center rectangular array. All non-radioactive components were measured to ensure accuracy of manufacturer-provided dimensional information. The Pd spatial distribution was gleaned from radioactive and inert samples, then modeled with the MCNP6 radiation-transport-code. A 6×6 array CivaSheet was modeled to evaluate the dose superposition principle for treatment planning. Air-kerma-strength was estimated using the NIST WAFAC geometry. Absorbed dose was estimated in water with polar sampling covering 0.05≤r≤15cm in 0.05cm increments and 0°≤θ≤180° in 1° increments. These data were entered into VariSeed9.0 and tested for the dose-superposition-principle. Results: The dose-rate-constant was 0.579 cGy/h/U with g(r) determined along the rotational-axis of symmetry (0°) instead of 90°. gP(r) values at 0.1, 0.5, 2, 5, and 10cm were 1.884, 1.344, 0.558, 0.088, and 0.0046. F(r,θ) decreased between 0° and 180° by factors of 270, 23, and 5.1 at 0.1, 1, and 10cm. The highest dose-gradient was at 92°, changing by a factor of 3 within 1° due to Au-foil shielding. TPS commissioning from 0.1≤r≤11cm and 0°≤θ≤180° demonstrated 2% reproducibility of input data except at the high-dose-gradient where interpolations caused 3% differences. Dose superposition of CivaDots replicated a multi-source CivaSheet array within 2% except where another CivaDot was present. Following implantation, the device is not perfectly planar. TPS accuracy utilizing the dose-superposition-principle through geometric repositioning of CivaDots supersedes TPS limitations of intersource shielding effects Conclusion: Dosimetric characterization, source commissioning, and evaluation of the dose-superposition-principle with VariSeed9.0 permits treatment planning for the CivaSheet brachytherapy device. Research supported in part by CivaTech Oncology, Inc.

60 APPLIED LIFE SCIENCES↗

SU-F-T-406: Verification of Total Body Irradiation Commissioned MU Lookup Table Accuracy Using Treatment Planning System for Wide Range of Patient Sizes

Purpose: To verify the accuracy of total body irradiation (TBI) measurement commissioning data using the treatment planning system (TPS) for a wide range of patient separations. Methods: Our institution conducts TBI treatments with an 18MV photon beam at 380cm extended SSD using an AP/PA technique. Currently, the monitor units (MU) per field for patient treatments are determined using a lookup table generated from TMR measurements in a water phantom (75 × 41 × 30.5 cm3). The dose prescribed to an umbilicus midline point at spine level is determined based on patient separation, dose/ field and dose rate/MU. One-dimensional heterogeneous dose calculations from Pinnacle TPS were validated with thermoluminescent dosimeters (TLD) placed in an average adult anthropomorphic phantom and also in-vivo on four patients with large separations. Subsequently, twelve patients with various separations (17–47cm) were retrospectively analyzed. Computed tomography (CT) scans were acquired in the left and right decubitus positions from vertex to knee. A treatment plan for each patient was generated. The ratio of the lookup table MU to the heterogeneous TPS MU was compared. Results: TLD Measurements in the anthropomorphic phantom and large TBI patients agreed with Pinnacle calculated dose within 2.8% and 2%, respectively. The heterogeneous calculation compared to the lookup table agreed within 8.1% (ratio range: 1.014–1.081). A trend of reduced accuracy was observed when patient separation increases. Conclusion: The TPS dose calculation accuracy was confirmed by TLD measurements, showing that Pinnacle can model the extended SSD dose without commissioning a special beam model for the extended SSD geometry. The difference between the lookup table and TPS calculation potentially comes from lack of scatter during commissioning when compared to extreme patient sizes. The observed trend suggests the need for development of a correction factor between the lookup table and TPS dose calculations.

60 APPLIED LIFE SCIENCES↗

SU-F-T-669: Commissioning of An Electronic Brachytherapy System for Targeted Mouse Irradiation

Purpose: The aim of this study was to commission the Xoft Axxent™ electronic brachytherapy (eBT) source and 10 mm diameter surface applicator with NIST traceability for targeted irradiations of mouse anal carcinomas. Methods: The Xoft Axxent™ electronic brachytherapy (eBT) and 10 mm diameter surface applicator was chosen by the collaborating physician as a radiation delivery mechanism for mouse anal carcinomas. The target dose was 2 Gy at a depth of 3 mm in tissue to be delivered in a single fraction. To implement an accurate and reliable irradiation plan, the system was commissioned by first determining the eBT source output and corresponding dose rate at a depth of 3 mm in tissue. This was determined through parallel-plate ion chamber measurements and published conversion factors. Well-type ionization chamber measurements were used to determine a transfer coefficient, which correlates the measured dose rate at 3 mm to the NIST-traceable quantity, air-kerma rate at 50 cm in air, for eBT sources. By correlating these two quantities, daily monitoring in the well chamber becomes an accurate and efficient quality assurance technique. Once the dose-rate was determined, a treatment recipe was developed and confirmed with chamber measurements to deliver the requested dose. Radiochromic film was used to verify the dose distribution across the field. Results: Dose rates at 3 mm depth in tissue were determined for two different Xoft Axxent™ sources and correlated with NIST-traceable well-type ionization chamber measurements. Unique transfer coefficients were determined for each source and the treatment recipe was validated by measurements. Film profiles showed a uniform dose distribution across the field. Conclusion: A Xoft Axxent™ eBT system was successfully commissioned for use in the irradiation of mouse rectal tumors. Dose rates in tissue were determined as well as other pertinent parameters to ensure accurate delivery of dose to the target region.

60 APPLIED LIFE SCIENCES↗

SU-G-BRB-04: Automated Output Factor Measurements Using Continuous Data Logging for Linac Commissioning

Purpose: Linac commissioning is a time consuming and labor intensive process, the streamline of which is highly desirable. In particular, manual measurement of output factors for a variety of field sizes and energy greatly hinders the commissioning efficiency. In this study, automated measurement of output factors was demonstrated as ‘one-click’ using data logging of an electrometer. Methods: Beams to be measured were created in the recording and verifying (R&V) system and configured for continuous delivery. An electrometer with an automatic data logging feature enabled continuous data collection for all fields without human intervention. The electrometer saved data into a spreadsheet every 0.5 seconds. A Matlab program was developed to analyze the excel data to monitor and check the data quality. Results: For each photon energy, output factors were measured for five configurations, including open field and four wedges. Each configuration includes 72 fields sizes, ranging from 4×4 to 20×30 cm{sup 2}. Using automation, it took 50 minutes to complete the measurement of 72 field sizes, in contrast to 80 minutes when using the manual approach. The automation avoided the necessity of redundant Linac status checks between fields as in the manual approach. In fact, the only limiting factor in such automation is Linac overheating. The data collection beams in the R&V system are reusable, and the simplified process is less error-prone. In addition, our Matlab program extracted the output factors faithfully from data logging, and the discrepancy between the automatic and manual measurement is within ±0.3%. For two separate automated measurements 30 days apart, consistency check shows a discrepancy within ±1% for 6MV photon with a 60 degree wedge. Conclusion: Automated output factor measurements can save time by 40% when compared with conventional manual approach. This work laid ground for further improvement for the automation of Linac commissioning.

43 PARTICLE ACCELERATORS↗

Negotiating Terms and Conditions: An Overview of the Federal Energy Regulatory Commission Hydropower Settlement Agreement Process

The process for obtaining, transferring, or surrendering a Federal Energy Regulatory Commission (FERC) hydropower license or exemption from licensing can be a series of complex negotiations. In many instances, the process may include stakeholders with different and/or competing perspectives or objectives related to the original license, new license (i.e., relicense), transfer of a license, or surrender of a license. Divergent perspectives and objectives can lead to disputes among project participants, which may impact the development of FERC license terms and conditions. One mechanism to resolve disputes between project participants involving a FERC authorization is informal and formal settlement agreement conferences, which often result in settlement agreements addressing the disputed issues. This report provides hydropower stakeholders with a better understanding of the FERC settlement agreement process, including information on: How to initiate a settlement agreement. The procedural steps associated with the settlement agreement process. The legal standards the Commission must adhere to when determining whether settlement agreement provisions can become lawful and enforceable terms or conditions of a FERC authorization. Examples of settlement agreement provisions included as license terms and conditions or in off-license agreements from a collection of settlement agreements and Commission orders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Commissioning an Engineering Scale Coal Gasifier

This report explains the development, commissioning, and testing of an engineering scale slagging coal gasifier at PNNL. The initial objective of this project was to commission the gasifier with zero safety incidents. The commissioning work was primarily an empirical study that required an engineering design approach. After bringing the gasifier on-line, tests were conducted to assess the impact of various operating parameters on the synthesis gas (syngas) product composition. The long-term intent of this project is to produce syngas product for use by internal Pacific Northwest National Laboratory (PNNL) researchers in catalyst, materials, and instrumentation development. Future work on the project will focus on improving the reliability and performance of the gasifier, with a goal of continuous operation for greater than 4 hours using coal feedstock. In addition, alternate designs that allow for increased flexibility regarding the fuel sources that can be used for syngas production is desired. Continued modifications to the fuel feed system will be pursued to address these goals. Alternative feed mechanisms such as a coal/methanol slurry are being considered.

01 COAL, LIGNITE, AND PEAT↗

Commissioning results from the recently upgraded RHIC LLRF system

During RHIC Run 10, the first phase of the LLRF Upgrade was successfully completed. This involved replacing the aging VME based system with a modern digital system based on the recently developed RHIC LLRF Upgrade Platform, and commissioning the system as part of the normal RHIC start up process. At the start of Run 11, the second phase of the upgrade is underway, involving a significant expansion of both hardware and functionality. This paper will review the commissioning effort and provide examples of improvements in system performance, flexibility and scalability afforded by the new platform. The RHIC LLRF upgrade is based on the recently developed RHIC LLRF Upgrade Platform. The major design goals of the platform are: (1) Design a stand alone, generic, digital, modular control architecture which can be configured to satisfy all of the application demands we currently have, and which will be supportable and upgradeable into the foreseeable future; and (2) It should integrate seamlessly into existing controls infrastructure, be easy to deploy, provide access to all relevant control parameters (eliminate knobs), provide vastly improved diagnostic data capabilities, and permit remote reconfiguration. Although the system is still in its infancy, we think the initial commissioning results from RHIC indicate that these goals have been achieved, and that we've only begun to realize the benefits the platform provides.

43 PARTICLE ACCELERATORS↗

Commissioning of the ITER-like ICRF antenna for JET

The new JET ion cyclotron resonance frequency (ICRF) ITER-like antenna (ILA), which was assembled during 2006, was commissioned on the JET RF testbed prior to installation on the JET torus. The 4 resonant double loops (RDL) of the ILA were tested at high power at 42 MHz up to 42 kV for 5 s in 10 min intervals. Low power matching studies using a saltwater load placed in front of the ILA have allowed testing and optimizing proposed matching algorithms on single RDLs, paired RDLs and finally on the full array. The upper limit of the frequency range of the ILA appears to be limited to 47 49 MHz due to the effect on the electrical lengths of the connection between the capacitors and the conjugate T point. Capacitor position scans have allowed obtaining the necessary data to confirm the RF model of the RDL which is necessary for the scattering matrix arc detection. The latter is deemed necessary in order to detect arcs at the low impedance conjugate T of the circuit. The antenna was installed onto JET during August 2007 and commissioning on plasma started May 2008. At present the commissioning of the ILA on JET is ongoing in a series of dedicated experimental campaigns.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

LARP LHC 4.8 GHZ Schottky System Initial Commissioning with Beam

The LHC Schottky system consists for four independent 4.8 GHz triple down conversion receivers with associated data acquisition systems. Each system is capable of measuring tune, chromaticity, momentum spread in either horizontal or vertical planes; two systems per beam. The hardware commissioning has taken place from spring through fall of 2010. With nominal bunch beam currents of 10{sup 11} protons, the first incoherent Schottky signals were detected and analyzed. This paper will report on these initial commissioning results. A companion paper will report on the data analysis curve fitting and remote control user interface of the system. The Schottky system for the LHC was proposed in 2004 under the auspices of the LARP collaboration. Similar systems were commissioned in 2003 in the Fermilab Tevatron and Recycler accelerators as a means of measuring tunes noninvasively. The Schottky detector is based on the stochastic cooling pickups that were developed for the Fermilab Antiproton Source Debuncher cooling upgrade completed in 2002. These slotted line waveguide pickups have the advantage of large aperture coupled with high beam coupling characteristics. For stochastic cooling, wide bandwidths are integral to cooling performance. The bandwidth of slotted waveguide pickups can be tailored by choosing the length of the pickup and slot spacing. The Debuncher project covered the 4-8 GHz band with eight bands of pickups, each with approximately 500 MHz of bandwidth. For use as a Schottky detector, bandwidths of 100-200 MHz are required for gating, resulting in higher transfer impedance than those used for stochastic cooling. Details of hardware functionality are reported previously.

43 PARTICLE ACCELERATORS↗

OPERATION AND COMMISSIONING OF THE JEFFERSON LAB UV FEL USING AN SRF DRIVER ERL

We describe the operation and commissioning of the Jefferson Lab UV FEL using a CW SRF ERL driver. Based on the same 135 MeV linear accelerator as the Jefferson Lab 10 kW IR Upgrade FEL, the UV driver ERL uses a bypass geometry to provide transverse phase space control, bunch length compression, and nonlinear aberration compensation necessitating a unique set of commissioning and operational procedures. Additionally, a novel technique to initiate lasing is described. To meet these constraints and accommodate a challenging installation schedule, we adopted a staged commissioning plan with alternating installation and operation periods. This report addresses these issues and presents operational results from on-going beam operations.

43 PARTICLE ACCELERATORS↗

Commissioning of the IGp Feedback System at DAFNE

The iGp (Integrated Gigasample Processor) is an innovative digital bunch-by-bunch feedback system developed by a KEK / SLAC / INFN-LNF joint collaboration. The processing unit can sample at 500 MHz and compute the bunch-by-bunch output signal for up to {approx}5000 bunches. The feedback gateware code is implemented inside just one FPGA (Field Programmable Gate Array) chip, a Xilinx Virtex-II. The FPGA implements two banks of 16-tap FIR (Finite Impulse Response) filters. Each filter is realtime programmable through the operator interface. At DA{Phi}NE, the Frascati {Phi}-Factory, two iGp units have been commissioned in the April 2007. The iGp systems have substituted the previous betatron feedback systems. This insertion has been very fast and has shown no problems involving just a substitution of the old, less flexible, digital systems, letting unchanged the baseband analog frontend and backend. The commissioning has been very simple, due to the complete and powerful EPICS operator interface, working well in local and remote operations. The software includes also tools for analyzing post processor data. A description of the commissioning with the operations done is reported.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗