Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BUDGET AND FUNDING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Chapter 1: Introduction

This report describes analysis undertaken by EERE to better understand the extent to which the technologies and market improvements funded by its fiscal year (FY) 2006 Budget Request1 will make energy more affordable, cleaner, and more reliable.

budget↗

PACT Center: Perovskite PV Accelerator for Commercializing Technologies (Final Technical Report)

The Perovskite PV Accelerator for Commercializing Technologies (PACT) center was established in July 2021 as a national resource to accelerate the commercialization of perovskite photovoltaic (PV) technology in the United States. Since its inception, PACT has been led by Sandia National Laboratories (Sandia) in partnership with the National Laboratory of the Rockies (NLR), formerly known as NREL. From FY20-FY23, Los Alamos National Laboratory (LANL), CFV Labs, Black & Veatch (B&V), and the Electric Power Research Institute (EPRI) were part of the project team. LANL brought expertise in perovskite PV device designs and processing, CFV Labs (now GroundWork Renewables) provided initial indoor and outdoor measurement hardware technology, B&V led the initial effort on perovskite PV bankability, and EPRI worked on reviewing testing standards, identifying commercialization gaps, and helping to run PACT’s Industry Advisory Board, a group including representatives from commercial testing labs, independent engineering firms, insurance companies, state regulators, and electric utilities. To source perovskite PV module samples, PACT contracted with the University of North Carolina (UNC), the University of Toledo, the University of Washington, and SLAC/Stanford University to provide a steady stream of research-grade perovskite mini modules, enabling protocol development in advance of commercial module availability. The project period ran from July 1, 2021, through December 31, 2025, including a No Cost Extension. Starting in FY25, the project was continued as a Core Capability in the Lab Call portfolio and continues at a reduced budget with only Sandia and NLR as funded recipients. Notably, starting in FY25 PACT expanded its scope beyond MHP modules to accept all emerging PV mini module technologies for testing, including organic PV (OPV) and all-thin-film tandems, with the aim of supporting commercialization across the broader emerging PV ecosystem. With this change in scope the program was renamed the PV Accelerator for Commercializing Technologies, dropping perovskite from the name.

14 SOLAR ENERGY↗

Integrated optical MEMS using through-wafer vias and bump-bonding.

This LDRD began as a three year program to integrate through-wafer vias, micro-mirrors and control electronics with high-voltage capability to yield a 64 by 64 array of individually controllable micro-mirrors on 125 or 250 micron pitch with piston, tip and tilt movement. The effort was a mix of R&D and application. Care was taken to create SUMMiT{trademark} (Sandia's ultraplanar, multilevel MEMS technology) compatible via and mirror processes, and the ultimate goal was to mate this MEMS fabrication product to a complementary metal-oxide semiconductor (CMOS) electronics substrate. Significant progress was made on the via and mirror fabrication and design, the attach process development as well as the electronics high voltage (30 volt) and control designs. After approximately 22 months, the program was ready to proceed with fabrication and integration of the electronics, final mirror array, and through wafer vias to create a high resolution OMEMS array with individual mirror electronic control. At this point, however, mission alignment and budget constraints reduced the last year program funding and redirected the program to help support the through-silicon via work in the Hyper-Temporal Sensors (HTS) Grand Challenge (GC) LDRD. Several months of investigation and discussion with the HTS team resulted in a revised plan for the remaining 10 months of the program. We planned to build a capability in finer-pitched via fabrication on thinned substrates along with metallization schemes and bonding techniques for very large arrays of high density interconnects (up to 2000 x 2000 vias). Through this program, Sandia was able to build capability in several different conductive through wafer via processes using internal and external resources, MEMS mirror design and fabrication, various bonding techniques for arrayed substrates, and arrayed electronics control design with high voltage capability.

42 ENGINEERING↗

Cost reduction in space operations - Structuring a planetary program to minimize the annual funding requirement as opposed to minimizing the program runout cost

An approach is proposed for the structuring of a planetary mission set wherein the peak annual funding is minimized to meet the annual budget restraint. One aspect of the approach is to have a transportation capability that can launch a mission in any planetary opportunity; such capability can be provided by solar electric propulsion. Another cost reduction technique is to structure a mission test in a time sequenced fashion that could utilize essentially the same spacecraft for the implementation of several missions. A third technique would be to fulfill a scientific objective in several sequential missions rather than attempt to accomplish all of the objectives with one mission. The application of the approach is illustrated by an example involving the Solar Orbiter Dual Probe mission.

Herman, D. H.↗

Beyond Solar-B: MTRAP, the Magnetic Transition Region Probe

The next generation of solar missions will reveal and measure fine-scale solar magnetic fields and their effects in the solar atmosphere at heights, small scales, sensitivities, and fields of view well beyond the reach of Solar-B. The necessity for, and potential of, such observations for understanding solar magnetic fields, their generation in and below the photosphere, and their control of the solar atmosphere and heliosphere, were the focus of a science definition workshop, 'High-Resolution Solar Magnetography from Space: Beyond Solar-B,' held in Huntsville Alabama in April 2001. Forty internationally prominent scientists active in solar research involving fine-scale solar magnetism participated in this Workshop and reached consensus that the key science objective to be pursued beyond Solar-B is a physical understanding of the fine-scale magnetic structure and activity in the magnetic transition region, defined as the region between the photosphere and corona where neither the plasma nor the magnetic field strongly dominates the other. The observational objective requires high cadence (less than 10s) vector magnetic field maps, and spatially resolved spectra from the IR, visible, vacuum UV, to the EUV at high resolution (less than 50km) over a large FOV (approximately 140,000 km). A polarimetric resolution of one part in ten thousand is required to measure transverse magnetic fields of less than 30G. The latest SEC Roadmap includes a mission identified as MTRAP to meet these requirements. Enabling technology development requirements include large, lightweight, reflecting optics, large format sensors (16K x 16K pixels) with high QE at 150 nm, and extendable spacecraft structures. The Science Organizing Committee of the Beyond Solar-B Workshop recommends that: (1) Science and Technology Definition Teams should be established in FY04 to finalize the science requirements and to define technology development efforts needed to ensure the practicality of MTRAP's observational goals; (2) The necessary technology development funding should be included in Code S budgets for FY06 and beyond to prepare MTRAP for a new start no later than the nominal end of the Solar-B mission, around 2010.

Davis, John M.↗

Hydrogen and Ferric Iron in Mars Materials

Knowledge of oxygen and hydrogen fugacity is of paramount importance in constraining phase equilibria and crystallization processes of melts, as well as understanding the partitioning of elements between the cope and silicate portions of terrestrial planets. H and Fe(3+) must both be analyzed in order to reconstruct hydrogen and oxygen fugacities on Mars. To date, SIMS data have elucidated D/H and H contents of hydrous phases in SNC meteorites, but until now anhydrous martian minerals have not been systematically examined for trace hydrogen. Ferric iron has been quantified using XANES in many martian phases, but integrated studies of both Fe(3+) and H on the same spots are really needed to address the H budget. Finally, the effects of shock on both Fe(3+) and H in hydrous and anhydrous phases must be quantified. Thus, the overall goal of this research was to understand the oxygen and hydrogen fugacities under which martian samples crystallized. In this research one-year project, we approached this problem by 1) characterizing Fe(3+) and H contents of SNC meteorites using both bulk (Mossbauer spectroscopy and uranium extraction, respectively) and microscale (synchrotron micro-XANES and SIMS) methods; 2) relating Fe(3+) and H contents of martian minerals to their oxygen and hydrogen fugacities through analysis of experimentally equilibrated phases (for pyroxene) and through study of volcanic rocks in which the oxygen and hydrogen fugacities can be independently constrained (for feldspar); and 3) studying the effects of shock processes on Fe(3+) and H contents of the phases of interest. Results have been used to assess quantitatively the distribution of H and Fe(3+) among phases in the martian interior, which will better constrain the geodynamic processes of the interior, as well as the overall hydrogen and water budgets on Mars. There were no inventions funded by this research.

Dyar, Melinda D.↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Business Intelligence Tools in the DSN

JPL has operated the Deep Space Network (DSN) on behalf of NASA since the 1960's. Over the last two decades, the DSN budget has generally declined in real-year dollars while the aging assets required more attention, and the missions became more complex. As a result, the DSN budget has been increasingly consumed by Operations and Maintenance (O&M), significantly reducing the funding wedge available for technology investment and for enhancing the DSN capability and capacity. Responding to this budget squeeze, the DSN launched an effort to improve the cost-efficiency of the O&M. In this paper we: elaborate on the methodology adopted to understand "where the time and money are used"-surprisingly, most of the data required for metrics development was readily available in existing databases-we have used commercial Business Intelligence (BI) tools to mine the databases and automatically extract the metrics (including trends) and distribute them weekly to interested parties; describe the DSN-specific effort to convert the intuitive understanding of "where the time is spent" into meaningful and actionable metrics that quantify use of resources, highlight candidate areas of improvement, and establish trends; and discuss the use of the BI-derived metrics-one of the most fascinating processes was the dramatic improvement in some areas of operations when the metrics were shared with the operators-the visibility of the metrics, and a self-induced competition, caused almost immediate improvement in some areas. While the near-term use of the metrics is to quantify the processes and track the improvement, these techniques will be just as useful in monitoring the process, e.g. as an input to a lean-six-sigma process.

Metrics↗

Increasing the Cost-efficiency of the DSN

JPL has operated the Deep Space Network (DSN) on behalf of NASA since the 1960's. Over the last two decades, the DSN budget has generally declined in real-year dollars while the aging assets required more attention, and the missions became more complex. As a result, the budget has been increasingly consumed by Operations and Maintenance (O and M), significantly reducing the funding wedge available for technology investment and for enhancing the DSN capability and capacity. Responding to this budget squeeze, the DSN launched an effort to improve the cost-efficiency of the O and M. In this paper we: Analyze the components of O&M. We note for example that, for the DSN, less than 20% of the staff engage in the traditional human-in-front-a-console role, so any effort to increase the cost efficiency must go beyond reducing the number of "Real-time operators." Explain the underlying organizational and cultural structures. Any cost-efficiency activities changes either accept, or carefully modify these structures. For example, the DSN O&M is based on the concept that there are three nearly identical antenna complexes separated by approximately 1200 in latitude and that each antenna complex is operated by a different contractor (driven by international agreements). Explore planned changes in the customer interface, e.g. web-based automated scheduling, and the processes required for a transition. Changes have to be evaluated in the larger end-to-end context, e.g. do the changes provide a net cost-efficiency for the DSN and the missions, or do they merely shift cost from the DSN to the missions. Consider possible significant changes in real-time pass management, e.g. full-remoting of operations, and lights-dim operations, while maintaining (or improving) the performance metrics of the DSN. Investigate how procedural and administrative changes could increase cost-efficiency, in conjunction with changes in the customer interfaces and real-time pass management. Examples would be handling of inter-governmental agreements, improved sharing of resources with other agencies, and better use of commercial (rather than government) resources

Deep Space Network (DSN)↗

T-1020: NaI Crystal Test for DM-Ice

This is a memorandum of understanding between the Fermi National Accelerator Laboratory (Fermilab) and the experimenters of the Nai Crystal Test for DM-Ice from the University of Wisconsin who have committed to participate in detector tests to be carried out during the 2011 — 2012 Fermilab Neutrino program. The memorandum is intended primarily for the purpose of recording expectations for budget estimates and work allocations for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to modify this memorandum to reflect such required adjustments. Actual contractual obligations will be set forth in separate documents. The DM-Ice collaboration is designing a sodium-iodide (Nai) based detector for a direct dark matter search. The detectors should have low readout noise and background levels to carry out a sensitive search. A 17-kg version of the experiment is running at the South Pole, 2500 m deep in the Antarctic ice, and a larger scale experiment is currently being designed. One of the keys to the success of the experiment is to have a good understanding of the background levels intrinsic in the Nai detectors. To measure the background level, the detectors have to be shielded against cosmic rays. The lead shielding used for DAMIC (see T-987) in the Minos Underground Areas is a well-suited location for this test since it offers enough overburden to shield against cosmic rays, lead shielding, and experimental infrastructure.

47 OTHER INSTRUMENTATION↗

ATLAS Tile Calorimeter Upgrade Electronics Test

This is a memorandum of understanding between the Fermi National Accelerator Laboratory (Fermilab) and the experimenters of the University of Chicago who have committed to participate in beam tests to be carried out during the 2013-2014 Fermilab Test Beam Facility program. The memorandum is intended solely for the purpose of recording expectations for budget estimates and work allocations for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to modify this memorandum to reflect such required adjustments. Actual contractual obligations will be set forth in separate documents.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Tests of a high rate pixel detector for CMS upgrade

This is a Technical Scope of Work (TSW) between the Fermi National Accelerator Laboratory (Fermilab) and the experimenters of the CMS Pixel group, which consists of individuals from the Bristol University, CERN, Fermilab, Rutherford Laboratory (UK), and National Taiwan University who have committed to participate in beam tests to be carried out during the 2013 - 2014 Fermilab Test Beam Facility program. The TSW is intended solely for the purpose of recording expectations for budget estimates and work allocations for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to modify this TSW to reflect such required adjustments. Actual contractual obligations will be set forth in separate documents. This TSW fulfills Article 1 (facilities and scope of work) of the User Agreements signed (or still

43 PARTICLE ACCELERATORS↗

CMS Forward Calorimetry R&D

This is a technical scope of work (TSW) between the Fermi National Accelerator Laboratory (Fermilab) and the experimenters of the CMS Forward Calorimetry Taskforce (FCAL group) who have committed to participate in beam tests to be carried out during the 2013-2016 Fermilab Test Beam Facility program. The TSW is intended primarily for the purpose of recording expectations for budget estimates and work allocations for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to modify this scope of work to reflect such required adjustments. Actual contractual obligations will be set forth in separate documents.

Bilki, Burak↗

T-1073: 2016 Precision Beam Timing Monitor

This is a technical scope of work (TSW) between the Fermi National Accelerator Laboratory (Fermilab) and the experimenters of Fermilab, Northern Illinois University (NIU), Lewis University, and Purdue University, who have committed to participate in beam tests to be carried out during the 2015-2016 Fermilab Test Beam Facility program. The TSW is intended primarily for the purpose of recording expectations for budget estimates and work allocations for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to modify this scope of work to reflect such required adjustments. Actual contractual obligations will be set forth in separate documents. This TSW fulfills Article 1 (facilities and scope of work) of the User Agreements signed (or still to be signed) by an authorized representative of each institution collaborating on this experiment.

43 PARTICLE ACCELERATORS↗

T-1068: The Beam Test for the SVX4 Telescope

This is a technical scope of work (TSW) between the Fermi National Accelerator Laboratory (Fermilab) and the experimenters of KEK and Osaka University who have committed to participate in beam tests to be carried out during the 2016 Fermilab Test Beam Facility program. The TSW is intended primarily for the purpose of recording expectations for budget estimates and work allocations for Fermilab, the funding agencies and the participating institutions. It reflects an arrangement that currently is satisfactory to the parties; however, it is recognized and anticipated that changing circumstances of the evolving research program will necessitate revisions. The parties agree to modify this scope of work to reflect such required adjustments. Actual contractual obligations will be set forth in separate documents. This TSW fulfills Article 1 (facilities and scope of work) of the User Agreements signed (or still to be signed) by an authorized representative of each institution collaborating on this experiment.

43 PARTICLE ACCELERATORS↗

Scalable Membrane Electrode Assembly Stack Production for Reliable Thermal Electrochemical Converters (SMART)

This Final Close Out Report documents all activities, progress, and results accomplished under the SMART project, funded by the Department of Energy (DOE), during Budget Period 1 (BP1), covering 10/01/2023 to 07/31/2025. Although official preaward approval was granted on 05/10/2024, contracting delays shifted the award and formal project start to 10/01/2024. In the absence of an official kick-off meeting, early interactions focused on planning for key technical challenges, particularly the design and logistics for the JTEC device test platform.

30 DIRECT ENERGY CONVERSION↗

National photovoltaic program

Department of Energy budget plans for 1982 are presented including general funding levels and key program achievements. Activities that are cost-shared with industry are summarized and cell efficiency improvements with time and industry accomplishments are discussed.

Prince, M.↗

Development of a Large Scale, High Speed Wheel Test Facility

Draper Laboratory, with its internal research and development budget, has for the past two years been funding a joint effort with the Massachusetts Institute of Technology (MIT) for the development of a large scale, high speed wheel test facility. This facility was developed to perform experiments and carry out evaluations on levitation and propulsion designs for MagLev systems currently under consideration. The facility was developed to rotate a large (2 meter) wheel which could operate with peripheral speeds of greater than 100 meters/second. The rim of the wheel was constructed of a non-magnetic, non-conductive composite material to avoid the generation of errors from spurious forces. A sensor package containing a multi-axis force and torque sensor mounted to the base of the station, provides a signal of the lift and drag forces on the package being tested. Position tables mounted on the station allow for the introduction of errors in real time. A computer controlled data acquisition system was developed around a Macintosh IIfx to record the test data and control the speed of the wheel. This paper describes the development of this test facility. A detailed description of the major components is presented. Recently completed tests carried out on a novel Electrodynamic (EDS) suspension system, developed by MIT as part of this joint effort are described and presented. Adaptation of this facility for linear motor and other propulsion and levitation testing is described.

Kondoleon, Anthony↗