Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BOREHOLES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Project Plan: Salt in Situ Heater Test

This project plan gives a high-level description of the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition (SFWD) campaign in situ borehole heater test project planned for the Waste Isolation Pilot Plant (WIPP) site, titled the Brine Availability Test in Salt (BATS). BATS is the first stage in a planned sequence of tests to bolster the technical basis for disposal of heat generating waste in salt. This plan provides an overview of the schedule and responsibilities of the parties involved. This project is a collaborative effort by Sandia, Los Alamos, and Lawrence Berkeley National Laboratories to execute a series of small-diameter borehole heater tests in salt for the DOE-NE SFWD campaign. Design of a heater test in salt at WIPP has evolved over several years. The experiment has begun in January 2020 and the first phase will continue for several months with the possibility for follow on testing. BATS comprises a suite of modular tests, which consist of a group of adjacent horizontal boreholes in the wall of drifts at WIPP. Each test is centered around a packer-isolated heated borehole (12.2 cm [4.81 diameter) containing equipment for water-vapor collection and borehole closure monitoring, surrounded by smaller-diameter (up to 5.3 cm [2.11 diameter) satellite observation boreholes. Observation boreholes contain grouted-in temperature sensors, electrical resistivity tomography (ERT) sensors, and fiber optics; packer-isolated tracer release and sampling intervals; and acoustic emission (AE) piezoelectric sensors. A larger-diameter (12.2 cm [4.81) satellite borehole includes sorel and salt cement plugs, as part of an engineered barrier sealing test. The first two tests, to be implemented in parallel, are heated (target borehole wall temperature of 120 °C) and unheated, with similar arrays of observation borehole monitoring changes. Follow-on tests will be designed using information gathered from the first two tests, and may be conducted at other borehole wall temperatures, use multiple observation boreholes, and may include different measurement types and test designs. This 2020 update of the original 2018 project plan satisfies DOE-NE Spent Fuel and Waste Science and Technology (SFWST) milestone M3SF-205N010303034, as part of the SNL "Salt Disposal R&D" work package.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basement rock hybrid drilling

A system for monitoring borehole parameters and switching to millimeter wave drilling based on the borehole parameters is provided. The system can include a mechanical drilling apparatus for forming a first portion of a borehole of a well. The first portion of the borehole can be formed based on a permeability of the first portion of the borehole and a temperature within the first portion of the borehole. The system can also include a millimeter wave drilling apparatus configured to inject millimeter wave radiation energy into a second portion of the borehole of the well via a waveguide. The second portion of the borehole can be formed via the millimeter wave drilling apparatus in response to determining the permeability of the first portion of the borehole is below a permeability threshold value and the temperature within the first portion of the borehole exceeds a temperature threshold value.

Araque, Carlos↗

A Preliminary Investigation on the Cost Reduction Potential of Optimizing Bore Fields for Commercial Ground Source Heat Pump Systems

The high initial cost of ground heat exchangers (GHE) is a primary hurdle preventing wider adoption of ground source heat pump (GSHP) systems. GHEs used for commercial GSHP systems commonly consist of vertical boreholes installed on a grid with equal spacing between boreholes. Significant thermal loads require a large number of boreholes to be present in the field. However, due to thermal interactions among boreholes, the ground formation in the center of a bore field can, over time, become thermally saturated when the thermal load is not balanced on an annual basis. The loss of effectiveness due to thermal saturation at the center boreholes in regularly spaced borehole fields suggests that larger spacing near the center of the bore field could be more optimal, and in return reduce initial costs. Through computer simulations using the latest development of a GHE modeling tool, this study evaluates the impacts of various unconventional designs of the borehole field on the performance and cost of the GHEs of a typical commercial GSHP system. The unconventional designs include irregular spacing among boreholes with decreased spacing around the perimeter and increased spacing in the interior of the field. The unconventional bore field design shortens the total drilling length by up to 42% while giving better heat transfer performance than a conventional bore field design. The significant total bore length reduction is due to improved heat transfer effectiveness of each borehole in the unconventional bore field.

Spitler, Jeffery↗

UT-GOM2-2 Drilling Fluid (Technical Note)

It is proposed that a salt-saturated, water-based mud might improve borehole stability for UT-GOM2-2 relative to a fresh-water-based mud. However, the primary objective for UT-GOM2-2 is to safely and successfully acquire uncompromised hydrate-bearing sediment cores. This can only be done if conditions stay within the hydrate stability zone, and well away from the hydrate stability boundary. The addition of salt to the drilling mud, shifts the hydrate stability boundary closer to estimated conditions. This shift, by some estimates of pressure and temperature, where conditions now fall outside of the hydrate stability zone, may result in borehole enlargement and the release of free gas into the borehole. This shift by all estimates, even when coring conditions stay inside the hydrate stability zone, shrinks the window between the estimated conditions and the hydrate stability boundary. This shift is likely to compromise the hydrate-bearing cores while they are being recovered from the bottom-hole to the rig floor. In this report we present two examples: 1) Assuming temperature and pressure from in-situ estimates: Hydrate within the target reservoirs (Orange and Blue) at Walker Ridge Block 313 (WR 313) will be outside the hydrate stability zone in the presence of a drilling mud with 9.5 wt.% salinity (the salinity of the proposed 10.5 ppg salt-based mud) at in situ pressure and temperature. Thus, the hydrate will be unstable. A 10.5 ppg salt-based mud may result in dissociation of the hydrate into its components: water and gas. 10.5 ppg salt-based mud may enlarge the borehole, release free gas into the borehole, and compromise the cores. 2) Assuming temperatures equal to the measured LWD borehole temperatures at this location: Hydrate within the target reservoirs will be stable with a salinity of 9.5 wt.% (the salinity of the proposed 10.5 ppg salt-based mud), but possibly unstable (just at the methane hydrate stability boundary) for a salinity of 17.2 wt.% (the salinity of the proposed 13.5 ppg salt-based kill mud). if the borehole has the same temperature as recorded during previous LWD drilling at this location. A 13.5 ppg salt-based kill mud may destabilize the borehole. More importantly, a 10.5 ppg salt-based mud does not provide a large enough window between the estimated conditions and the hydrate stability boundary. Core temperatures and pressures fluctuate from the bottom-hole conditions as the core is brought up from the bottom-hole to the rig floor. These fluctuations are likely to cause the hydrate in the cores to touch or cross the stability boundary. Therefore, cores captured using a 10.5 ppg salt-based mud are likely to be compromised during core recovery to the rig floor.

03 NATURAL GAS↗

The EGS Collab Project – Stimulations at Two Depths

The EGS Collab project, supported by the US Department of Energy, is performing intensively monitored rock stimulation and flow tests at the 10-m scale in an underground research laboratory to address challenges in implementing enhanced geothermal systems (EGS). Data and observations from the field tests are compared to simulations to understand processes and build confidence in numerical modeling of the processes. We have completed Experiment 1 (of 3), which examined hydraulic fracturing in a well-characterized underground fractured phyllite test bed at a depth of approximately 1.5 km at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. Testbed characterization included fracture mapping, borehole acoustic and optical televiewers, full waveform sonic, conductivity, resistivity, temperature, campaign p- and s-wave investigations and electrical resistance tomography. Borehole geophysical techniques including passive seismic, continuous active source seismic monitoring, electrical resistance tomography, fiber-based distributed strain, distributed temperature, and distributed acoustic monitoring, were used to carefully monitor stimulation events and flow tests. More than a dozen stimulations and nearly one year of flow tests were performed. Quality data and detailed observations were collected and analyzed during stimulation and water flow tests using ambient temperature and chilled water. We achieved adaptive control of the tests using real-time monitoring and rapid dissemination of data and near-real-time simulation. More detailed numerical simulation was performed to answer key experimental design questions, forecast fracture propagation trajectories and extents, and analyze and evaluate results. Data are freely available from the Geothermal Data Repository. Experiment 2 examines the potential for hydraulic shearing in amphibolite at a depth of about 1.25 km at SURF. This site has a different set of stress and fracture conditions than Experiment 1. The Experiment 2 testbed consists of nine subhorizontal boreholes configured in two fans of two boreholes which surround the testbed and contain grouted-in electrical resistance tomography, seismic sensors, active seismic sources and distributed fiber sensors. A “five-spot” set of test wells that extends from a custom mined alcove includes an injection well and four production/monitoring wells. The testbed was characterized geophysically and hydrologically, and three stimulations have been performed using the Step-Rate Injection Method for Fracture In-Situ Properties (SIMFIP) tool to measure strains, and a new strain quantifying tool (downhole robotic strain analysis tool -DORSA) was deployed in a monitoring hole during stimulation. Real-time data were broadcast during stimulations to allow real-time response to arising issues.

EGS Collab, Enhanced Geothermal Systems, EGS, fiel↗

Time-Lapse Gravity Monitoring of CO2 Migration Based on Numerical Modeling of a Faulted Storage Complex

In this study, the performance of both surface and borehole time-lapse gravity monitoring to detect CO2 leakage from a carbon storage site is evaluated. Several hypothetical scenarios of CO2 migration in a leaky fault, and thief zones at different depths at the Kimberlina site (California, USA) constitute the basis of the approach. The CO2 displacement is simulated using the TOUGH2 simulator applied to a detailed geological model of the site. The gravity responses to these CO2 plumes are simulated using forward modeling with sensors at ground surface and in vertical boreholes. Results of inversion on one scenario are also presented. The surface-based gravity responses obtained for the different leakage scenarios demonstrate that leakage can be detected at the surface in all the scenarios but the time to detection is highly variable (10 to 40 years) and dependent on the detection threshold considered. Borehole measurements of the vertical component of gravity provide excellent constrains in depth when they are located in proximity of the density anomaly associated with the presence of CO2, thus discriminating multiple leaks in different thief zones. Joint inversion of surface and borehole data can bring valuable information of the occurrence of leakages and their importance by providing a reasonable estimate of mass of displaced fluids. This study demonstrates the importance of combining multiphase flow simulations with gravity modeling in order to define if and when gravity monitoring would be applicable at a given storage site.

Time-lapse gravity monitoring, leak detection, CCS↗

Distributed Thermal Response Multi-Source Modeling to Evaluate Heterogeneous Subsurface Properties

A thorough assessment of thermal properties in heterogeneous subsurface is necessary in design of low-temperature borehole heat exchangers (BHEs). For this study, a distributed thermal response test (DTRT), which combines distributed temperature sensing (DTS) with a conventional thermal response test (TRT), was conducted in a U-bend geothermal loop installed in an open borehole at the University of Illinois at Urbana-Champaign to estimate thermal properties by analyzing the thermal response of different geologic materials while applying a constant heat input rate. Fiber-optic cables in the DTRT were deployed both inside the U-bend geothermal loop and in the center of the borehole to improve the accuracy of calculated heat-loss rates and borehole temperature profile measurements. To assess the subsurface thermal conductivity during the heating phase of the DTRT, a single-source model and a multi-source model, both based on the infinite line source method, were developed using the borehole temperature data and temperatures inside and along the outside of the loop, separately. The two models returned similar thermal conductivity values. The multi-source modeling has the advantage of predicting the thermal conductivity of heterogeneous geologic materials from borehole temperature profiles during the DTRT heating phase. Additionally, based on the distributed thermal conductivity measured in the borehole, estimates were made for both radial thermal impacts and the rate of heat loss in the BHE.

58 GEOSCIENCES↗

Results of Multiple Tracer Injections into Fractures in the EGS Collab Testbed-1

The EGS Collab project constructed an intermediate scale (~10-20 m) testbed at the 4850 level of the Stanford Underground Research Facility (SURF) in South Dakota for testing and validating fracture stimulation and flow/transport models. This testbed consists of eight ~200 ft (~60 m) HQ-diameter (9.6 cm) boreholes that are drilled into the crystalline rocks of the Poorman Formation from the West Access Drift tunnel. Of the eight boreholes, one borehole is used as an injection/stimulation well, while another sub-parallel borehole located about 10 m away from the injection well is used as a production well, and rest of the other boreholes are used as geophysical/fluid sampling monitoring wells. Hydraulic stimulation activities were conducted at three locations along the injection hole in an attempt to create direct fracture connections to the production hole. A flow system has been established between injection and production boreholes through a set of hydraulically stimulated fractures propagated from a notch located at 164 ft in the injection hole. Although we planned for a single production well, a set of natural fractures in the testbed is believed to have intersected the stimulated hydraulic fractures and provided additional flow paths for water to be transported to the drift through multiple monitoring boreholes and weep zones. As the flow tests continued after stimulation activities, single or a combination of two or three producers become dominant producers at different times, mostly as a response to intersection of hydraulic fracture and testbed wells, activation of natural fractures and making new leak points to the monitoring wells, resealing of leaky wells, and so on. Since late October 2018, multiple tracers were injected into the fracture system at the 164 ft location that involves both stimulated and natural fractures, and tracers were recovered from multiple locations in nearby wells and weep. The cumulative water recoveries over the time have ranged from 50 to 90%; however, the injected tracer recoveries from various production sources are much less (ranging from a few percentages to 38%). Changes in water/tracer recoveries, shifting of major producing wells from one well to the others, and other observations (e.g., microseismic, electric resistivity tomography, etc.) indicate a testbed that has undergone several changes since October 2018. In this paper, we present tracer recovery data accumulated during several tracer campaigns, provide conceptual testbed flow pathways, and provide observations that suggest a evolutionary nature of fracture volume and fracture geometry in the testbed.

15 GEOTHERMAL ENERGY↗

Initial Field Testing in the Deep Subsurface for the Thermal Breakout Project for Measuring In Situ Stress

The current state-of-the-art technology for in situ stress measurements involves an integrated approach that combines borehole breakout observations, drilling-induced tensile fractures, and hydraulic fracturing tests (i.e., mini-fracs); however, this methodology has several limitations that often prevent successful in situ stress measurements. One major limitation is that breakouts do not appear in every borehole and are generally a natural occurrence that cannot easily be controlled. Because borehole breakouts are used to measure the maximum horizontal in situ stress magnitude, the absence of borehole breakouts presents a major data gap for in situ stress measurements. As a response to this data gap a new thermal breakout technology is being developed that will provide a method for thermally inducing borehole breakouts and obtaining consistent measurements of the maximum horizontal stress magnitude. This thermal breakout technology involves heating the borehole and increasing the thermoelastic compressive stress in the rock until a breakout develops, which is directly correlated to the maximum horizontal stress magnitude. An initial component of the thermal breakout project involves developing a prototype downhole tool and performing field testing in the deep subsurface. The primary objective of the initial tool development and field testing is to provide a physical proof of concept for the thermal breakout technology. Three thermal breakout field tests were performed at approximately 4850 feet deep in the Sanford Underground Research Facility. Each test was performed in a borehole that had been previously used for overcoring stress measurements. The third and final test successfully created two diametrically opposed breakouts after deploying the thermal breakout tool for approximately 3 hours of continuous heating. Post-analysis of the thermally induced breakouts confirmed that the thermal breakout orientation directly corresponds to the known in situ stress orientation and magnitude.

Voegeli, Sam↗

Basement rock hybrid drilling

A system for monitoring and controlling downhole pressure of a well borehole relative to a lithostatic pressure of rock surrounding the borehole is provided. The system can include a millimeter wave drilling apparatus including a gyrotron configured to inject millimeter wave radiation energy into a borehole of a well via a waveguide configured for insertion into the borehole. The borehole can be formed via the millimeter wave drilling apparatus and having a downhole pressure monitored at a bottom of the well. The system can also include a compressor fluidically coupled to the borehole and configured to control the downhole pressure via a gas supplied into and/or received from the borehole. The compressor can be configured to control the downhole pressure relative to a lithostatic pressure determined for rock surrounding the well at the bottom of the well.

Araque, Carlos↗

Deterministic and Statistical Modeling of a New Thermal Breakout Technology for Measuring the Maximum Horizontal In-Situ Stress

The current state-of-the-art technology for in-situ stress measurements involves an integrated approach that combines borehole breakout observations, drilling-induced tensile fractures, and hydraulic fracturing tests (i.e., “mini-fracs”). This methodology has achieved wide application in the oil and gas industry but has several limitations that often prevent successful in-situ stress measurements. One major limitation is that breakouts do not appear in all boreholes and are generally only a natural occurrence that cannot easily be controlled. Because borehole breakouts are used to directly measure the maximum horizontal in-situ stress magnitude, the absence of borehole breakouts presents a major data gap for in-situ stress measurements. In response to this data gap, a new US Department of Energy (US DOE)-sponsored thermal breakout technology that will provide a method for thermally inducing borehole breakouts and allow the consistent measurement of the maximum horizontal stress magnitude is currently in development. This thermal breakout technology involves heating the borehole and increasing the thermoelastic compressive stress in the rock until a breakout develops, which can be directly correlated to the maximum horizontal stress magnitude. The first step in this project was an analytical modeling study of the thermal breakout process. Based on the Kirsch solution (Kirsch 1898), a deterministic and statistical analysis was performed on the pertinent parameters that influence the maximum horizontal stress calculation. As a result of the analysis, the findings indicate that the thermal breakout technology is feasible and provides improved accuracy and/or an enhanced ability to measure the maximum horizontal stress. Future work as part of this US DOE-sponsored project includes additional validation through more detailed numerical modeling, laboratory testing, and field testing of the thermal breakout technology.

58 GEOSCIENCES↗

Comparative Analysis of HEATNETS for Geothermal Network Performance

Thermal energy networks (TENs), also known as 5th generation district energy systems, or more specifically geothermal networks when exchanging heat with geothermal boreholes, are an important technology for decarbonization. In these networks an ambient loop connects buildings and thermal sources, such as a borehole field, to exchange energy and maintain a desired loop temperature. Water-source heat pumps are used at the buildings to connect to the ambient or thermal loop to meet to the building heating and cooling loads and maintain comfort. A semi-transient, reduced-order technical model and techno-economic model, called HEATNETS, has been developed at NREL that captures the flow of energy around a TEN. In this work, a comparison of the HEATNETS technical model and a well-known coding platform used for modeling geothermal networks, TRNSYS, has been completed for a proposed geothermal network as a verification and validation process. Hourly data provided from the TRNSYS simulation included building loads, pumping power, heat pump power, temperature entering and leaving the borehole field, and mass flow rates. The hourly borehole temperatures were used to create a linear regression model utilized in HEATNETS to estimate the borehole field heat exchange. The building loads and mass flow rates were direct inputs to HEATNETS while the pumping power, heat pump power, borehole temperatures, and coefficients of performance were all simulated and calculated by HEATNETS, allowing for direct comparison of the thermal energy transfer HEATNETS considers the full process from design inputs to economic outputs and can provide modeling options for high-level initial system design and operational optimization. This study focuses on a validation of HEATNETS using results from TRNSYS. HEATNETS is not intended to replace other modeling tools, but this work demonstrates, via a comparison with an industry standard code, that HEATNETS can be a unique, high-level and rapid modeling tool for estimating the performance of a full geothermal network system.

15 GEOTHERMAL ENERGY↗

Comparative Analysis of HEATNETS for Geothermal Network Performance: Preprint

Thermal energy networks (TENs), also known as 5th generation district energy systems, or more specifically geothermal networks when exchanging heat with geothermal boreholes, are an important technology for decarbonization. In these networks an ambient loop connects buildings and thermal sources, such as a borehole field, to exchange energy and maintain a desired loop temperature. Water-source heat pumps are used at the buildings to connect to the ambient or thermal loop to meet to the building heating and cooling loads and maintain comfort. A semi-transient, reduced-order technical model and techno-economic model, called HEATNETS, has been developed at NREL that captures the flow of energy around a TEN. In this work, a comparison of the HEATNETS technical model and a well-known coding platform used for modeling geothermal networks, TRNSYS, has been completed for a proposed geothermal network as a verification process. Hourly data provided from the TRNSYS simulation included building loads, pumping power, heat pump power, temperature entering and leaving the borehole field, and mass flow rates. The hourly borehole temperatures were used to create a linear regression model utilized in HEATNETS to estimate the borehole field heat exchange. The building loads and mass flow rates were direct inputs to HEATNETS while the pumping power, heat pump power, borehole temperatures, and coefficients of performance were all simulated and calculated by HEATNETS, allowing for direct comparison of the thermal energy transfer, rather than also comparing control systems responses. HEATNETS considers the full process from design inputs to economic outputs and can provide modeling options for high-level initial system design and operational optimization. This study shows that HEATNETS, while not intended to replace other modeling tools, can be a unique modeling tool for the performance of a full geothermal network system.

15 GEOTHERMAL ENERGY↗

Creation of a Mixed-Mode Fracture Network at Mesoscale Through Hydraulic Fracturing and Shear Stimulation

Enhanced Geothermal Systems could provide a substantial contribution to the global energy demand if their implementation could overcome inherent challenges. Examples are insufficient created permeability, early thermal breakthrough, and unacceptable induced seismicity. In this study we report on the seismic response of a mesoscale hydraulic fracturing experiment performed at 1.5-km depth at the Sanford Underground Research Facility. We have measured the seismic activity by utilizing a 100-kHz, continuous seismic monitoring system deployed in six 60-m length monitoring boreholes surrounding the experimental domain in 3-D. The achieved location uncertainty was on the order of 1 m and limited by the signal-to-noise ratio of detected events. These uncertainties were corroborated by detections of fracture intersections at the monitoring boreholes. Three intervals of the dedicated injection borehole were hydraulically stimulated by water injection at pressures up to 33 MPa and flow rates up to 5 L/min. We located 1,933 seismic events during several injection periods. The recorded seismicity delineates a complex fracture network comprised of multistrand hydraulic fractures and shear-reactivated, preexisting planes of weakness that grew unilaterally from the point of initiation. We find that heterogeneity of stress dictates the seismic outcome of hydraulic stimulations, even when relying on theoretically well-behaved hydraulic fractures. Once hydraulic fractures intersected boreholes, the boreholes acted as a pressure relief and fracture propagation ceased. In order to create an efficient subsurface heat exchanger, production boreholes should not be drilled before the end of hydraulic stimulations.

58 GEOSCIENCES↗

Evaluation of Electrical Resistivity Tomography to Monitor the Transport of Past Releases Beneath Tank Farms

Underground storage tanks at the Hanford Site, in southeastern Washington State, hold radioactive waste generated from four decades of plutonium production. The 149 single-shell tanks and the 28 double-shell tanks have all exceeded their initial design life of approximately 25 years. At least 67 tanks are assumed to have leaked in the past, resulting in radioactive releases into the vadose zone. Gamma ray logging within dry monitoring wells is currently the primary method for tracking the migration of leaked tank waste through the vadose zone. While this approach provides an accurate assessment of radioactive contamination, that information is only provided near (within ~1m) the borehole, leaving most of the vadose zone unmonitored, particularly the important region directly beneath the tank. This report describes a numerical study that investigates the feasibility and performance of time-lapse 3D electrical resistivity tomography (ERT) for long-term monitoring of a hypothetical tank waste location and migration through the vadose zone. ERT is a method of remotely imaging the bulk electrical conductivity (EC) of the subsurface, which is significantly impacted by the presence of conductive solid and liquid tank waste. The release of liquid tank wastes increases subsurface fluid conductivity and saturation over time, creating a target to use time-lapse ERT for long-term monitoring. Although the presence of metallic infrastructure can cause ERT interference, recent advancements in ERT data processing enable the deleterious effects of buried metallic infrastructure (e.g. pipes, wellbore casings, tanks) to be removed to better determine the liquid tank waste migration over time. Three hypothetical realistic scenarios were simulated in the ERT evaluation. The first two scenarios assume the same leak amount and rate (i.e., between 1/1/1951 and 12/31/1951 at the rate of 347 m 3 per year) but different leaky tanks. Scenario 1 assumes leaks under tank B-102, which is located on the edge of the B-tank farm and surrounded by a few metallic infrastructure including cased pipes/wells/tanks. Scenario 2 assumes leaks under tank B-108, which is located near the center of the B-tank farm and surrounded by larger amount of metallic infrastructure than B-102. Scenario 3 assumes the same metallic infrastructure as B-102, with a more recent contaminant leak that was simulated to have occurred between 1/1/2018 and 12/31/2023 at a rate of 1.89 m 3 per year. The leak time in Scenarios 1 and 2 corresponds to a historical overfill event in 1951 and Scenario 3 corresponds to a recent found tank leak in 2019. In each scenario, a “true” bulk EC model vs. time reflecting contaminant migration was generated. ERT data was simulated from these “true” bulk EC models and a time-lapse ERT inversion produced “imaged” bulk EC vs. time. Three electrode configurations in two, four and eight boreholes surrounding the leak tank were used in the ERT simulations in each scenario. These borehole configurations were considered logistically feasible and cost-effective for monitoring. The hypothetical ERT boreholes are assumed to have non-metallic casing. By comparing the “imaged” bulk EC with the “true” bulk EC, it was demonstrated that the three configurations of wells used (two, four, and eight wells) were able to successfully monitor the migration of tank leaks through the vadose zone, with bulk EC resolution increasing with the number of down borehole ERT arrays for all scenarios. Therefore, the use of eight boreholes to perform ERT monitoring beneath the tanks provided the best spatiotemporal information.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗