Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Assurance Case”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Advanced Transmission Technologies – GETs and HPCs Session 2: Advanced Power Flow Control and Transmission Topology Optimization

The INL TADA GETs Cohort Session 2, held on November 7, 2025, conducted in collaboration with ScottMadden, focused on two core Advanced Transmission Technologies (ATTs): Advanced Power Flow Control (APFC) and Transmission Topology Optimization (TTO). These technologies are pivotal in enhancing grid flexibility, reliability, and cybersecurity resilience. APFC, particularly through modular FACTS devices like Modular Static Synchronous Series Compensators (M-SSSCs), enables dynamic voltage injection to reroute power flows. The session highlighted the deployment benefits of APFC, such as rapid installation, minimal civil works, and re-deployability. Regulatory drivers like FERC Order 2023 mandate the inclusion of Grid-Enhancing Technologies (GETs) in interconnection studies. Case studies from Central Hudson, CAISO, and National Grid (UK) demonstrated APFC’s effectiveness in congestion relief and cost savings. The session also addressed cybersecurity concerns, including firmware vulnerabilities, SCADA integration risks, and supply chain dependencies. Participants engaged in interactive exercises to rank cybersecurity and supply chain risks, emphasizing the need for robust digital assurance strategies. TTO involves software-based reconfiguration of transmission networks to optimize power flow without new infrastructure. The session showcased its operational value, with examples from SPP, PJM, and MISO showing significant congestion cost reductions. Cybersecurity vulnerabilities were discussed, particularly in API security and software supply chains, referencing incidents like SolarWinds and attacks on Danish utilities. Digital assurance exercises explored worst-case scenarios, attack paths, and mitigation responsibilities between vendors and utilities. Reliability challenges such as algorithm stability, vendor dependency, and operator trust were also examined. Cross-cutting themes emphasized the importance of digital assurance tools, including Software Bills of Materials (SBOMs) and hardware-in-loop testing. Human performance, training, and operational confidence were identified as critical enablers of technology adoption. The session concluded with a preview of Session 3, which will focus on High Performance Conductors (HPCs) and risk-based cybersecurity tools. Session 2 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Many roads may lead to Rome: Selected features of quality control within environmental assessment systems in the US, NL, CA, and UK

As there is no one-and-only concept on how to precisely define and establish quality control (QC) or quality assurance (QA) in the making of environmental assessments (EA), this paper presents selected features of international approaches that address quality in EA systems in the USA, the Netherlands, Canada, and the United Kingdom. Based on explanative case studies, we highlight the embedding of specific quality control features within the EA systems, the objectives and processes, and relevant transparency challenges. Such features of QC/QA approaches can be considered in cases where substantial quality control and assurance efforts are still missing. Yet further research needs to be conducted on the efficacy of these approaches, which remains beyond the scope of this study. - Highlights: • We present four tools for quality control and assurance from different EA systems. • Approaches vary in institutional setting, objectives, procedures, and transparency. • Highlighted features might provide guidance in cases where QC/QA is still lacking.

54 ENVIRONMENTAL SCIENCES↗

Safety of hydrogen pressure gauges.

Study of the relative safety afforded an operator by various hydrogen-pressure gauge case designs. It is shown that assurance of personnel safety, should a failure occur, requires careful selection of available gauge designs, together with proper mounting. Specific gauge case features and mounting requirements are recommended.

Voth, R. O.↗

Audit Report The Procurement of Safety Class/Safety-Significant Items at the Savannah River Site

The Department of Energy operates several nuclear facilities at its Savannah River Site, and several additional facilities are under construction. This includes the National Nuclear Security Administration's Tritium Extraction Facility (TEF) which is designated to help maintain the reliability of the U.S. nuclear stockpile. The Mixed Oxide Fuel Fabrication Facility (MOX Facility) is being constructed to manufacture commercial nuclear reactor fuel assemblies from weapon-grade plutonium oxide and depleted uranium. The Interim Salt Processing (ISP) project, managed by the Office of Environmental Management, will treat radioactive waste. The Department has committed to procuring products and services for nuclear-related activities that meet or exceed recognized quality assurance standards. Such standards help to ensure the safety and performance of these facilities. To that end, it issued Departmental Order 414.1C, Quality Assurance (QA Order). The QA Order requires the application of Quality Assurance Requirements for Nuclear Facility Applications (NQA-1) for nuclear-related activities. The NQA-1 standard provides requirements and guidelines for the establishment and execution of quality assurance programs during the siting, design, construction, operation, and decommissioning of nuclear facilities. These requirements, promulgated by the American Society of Mechanical Engineers, must be applied to 'safety-class' and 'safety-significant' structures, systems and components (SSCs). Safety-class SSCs are defined as those necessary to prevent exposure off site and to protect the public. Safety-significant SSCs are those whose failure could irreversibly impact worker safety such as a fatality, serious injury, or significant radiological or chemical exposure. Due to the importance of protecting the public, workers, and environment, we initiated an audit to determine whether the Department of Energy procured safety-class and safety-significant SSCs that met NQA-1 standards at the Savannah River Site. Our review disclosed that the Department had procured and installed safety-class and safety-significant SSCs that did not meet NQA-1 quality standards. Specifically, we identified multiple instances in which critical components did not meet required quality and safety standards. For example: (1) Three structural components were procured and installed by the prime contractor at Savannah River during construction of the MOX Facility that did not meet the technical specifications for items relied on for safety. These substandard items necessitated costly and time consuming remedial action to, among other things, ensure that nonconforming materials and equipment would function within safety margins; (2) In six instances, items used in the construction of TEF failed to satisfy quality standards. In one of these situations, operating procedures had to be modified to ensure that the problem item did not compromise safety; and (3) Finally, at the ISP, one component that did not meet quality standards was procured. The failure of the item could have resulted in a spill of up to 15,000 gallons of high-level radioactive waste. Based on an extensive examination of relevant internal controls and procurement practices, we concluded that these failures were attributable to inadequate attention to quality assurance at Savannah River. Simply put, Departmental controls were not adequate to prevent and/or detect quality assurance problems. For example, Federal and prime contractor officials did not expressly require that subcontractors or lower-tiered vendors comply with quality assurance requirements. Additionally, management did not effectively communicate quality assurance concerns between the several Departmental program elements operating at Savannah River. The procurement and installation of these nonconforming components resulted in cost increases. For example, as of October 2008, the MOX Facility had incurred costs of more than $680,000 due to problems associated with the procurement of $11 million of nonconforming safety-class reinforcing steel. In general, the internal control weaknesses we discovered could have permitted, without detection, the procurement and installation of safety critical components that did not meet quality assurance standards. In a worst case scenario, undetected, nonconforming components could fail and injure workers or the public. In certain instances, the Department took steps to ensure that the prime contractors at Savannah River began action to remediate nonconforming components and to strengthen policies and procedures. Additionally, the Department took actions to ensure that critical components necessary for projects worked as designed by requiring that the prime contractor place personnel at manufacturers' locations. Further, the Department had suspended work with certain other manufacturers due to quality assurance problems.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Results of a Multi-Institutional Benchmark Test for Cranial CT/MR Image Registration

Purpose: Variability in computed tomography/magnetic resonance imaging (CT/MR) cranial image registration was assessed using a benchmark case developed by the Quality Assurance Review Center to credential institutions for participation in Children's Oncology Group Protocol ACNS0221 for treatment of pediatric low-grade glioma. Methods and Materials: Two DICOM image sets, an MR and a CT of the same patient, were provided to each institution. A small target in the posterior occipital lobe was readily visible on two slices of the MR scan and not visible on the CT scan. Each institution registered the two scans using whatever software system and method it ordinarily uses for such a case. The target volume was then contoured on the two MR slices, and the coordinates of the center of the corresponding target in the CT coordinate system were reported. The average of all submissions was used to determine the true center of the target. Results: Results are reported from 51 submissions representing 45 institutions and 11 software systems. The average error in the position of the center of the target was 1.8 mm (1 standard deviation = 2.2 mm). The least variation in position was in the lateral direction. Manual registration gave significantly better results than did automatic registration (p = 0.02). Conclusion: When MR and CT scans of the head are registered with currently available software, there is inherent uncertainty of approximately 2 mm (1 standard deviation), which should be considered when defining planning target volumes and PRVs for organs at risk on registered image sets.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Maxine Onsite: Estimating Dose from Chronic Atmospheric Radioactive Releases

Maxine Onsite: Developed to estimate dose to individuals who are working onsite but are not site employees. Follows the methodologies discussed in US NRC Regulatory Guides 1.109 and 1.111 to determine dose from a chronic atmospheric release. Determines the dose given relative air concentrations and deposition concentrations as input. We look at four locations onsite that may be accessed by members of the public. To show compliance with the EPA and DOE public dose limit of 10 mrem/yr, determining who is a member of the public or a worker onsite is necessary. SRS has defined a member of the public for NESHAPS and DOE O 458.1. Maxine Onsite runs on Microsoft Windows Operating System through a Microsoft Excel spreadsheet. Input from the user includes parameters that are variable such as air concentrations, and fixed, such as distance to the receptor and elemental iodine fraction. Maxine Onsite was developed from Maxine which is a program meant to calculate dose to the MEI via three pathways, external, inhalation, and ingestion. Maxine Onsite is meant for looking at the exposure through the external and inhalation pathways only, no local food production onsite. The ways that Maxine Onsite is used to calculate the dose to the MEI includes the following: - Determining the respective air concentration values at each location using distances from the release stack; - Breathing rates for the MEI; - Determining the amount of time the MEI is outside; - Determining the plume travel time. The following relative air and ground deposition values for proper execution of the spreadsheet come from MAXDOSE-SR and are needed to accurately determine the dose to the MEI: relative air concentration, relative air concentration decayed by 2.26 days, relative air concentration decayed and depleted for 8 days, and relative deposition. Test cases were designed, developed, and executed to determine the accuracy of Maxine Onsite, which were verified additionally through hand calculations. Several changes were made for testing, including varying air concentrations, distances, breathing rates, and shielding factors. Each test case was then verified through hand calculations to assure the accuracy of the calculated doses. The results from the test cases, as well as the default parameters, can be used for benchmarking Maxine Onsite in the future. Maxine Onsite performs as expected and produces correct and accurate results at each of the different locations onsite (TRL, B-Area Barracks, SRELCC, and Gunsite 51) for varying test cases. The input required by the user is minimal and includes the results of the dose to the MEI on the first page for ease of access. Future plans for Maxine Onsite include adding in the ingestion pathway and adding in atmospheric dispersion estimates to the spreadsheet.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

On wave stability in relativistic cosmic-ray hydrodynamics

Wave stability of a two-fluid hydrodynamical model describing the acceleration of cosmic rays by the first-order Fermi mechanism in relativistic, cosmic-ray-modified shocks is investigated. For a uniform background state, the short- and long-wavelength wave speeds are shown to interlace, thus assuring wave stability in this case. A JWKB analysis is performed to investigate the stability of short-wavelength thermal gas sound waves in the smooth, decelerating supersonic flow upstream of a relativistic, cosmic-ray-modified shock. The stability of the waves is assessed both in terms of the fluid velocity and density perturbations, as well as in terms of the wave action. The stability and interaction of the short-wavelength cosmic-ray coherent mode with the background flow is also studied.

Webb, G. M.↗

Model Checking Failed Conjectures in Theorem Proving: A Case Study

Interactive mechanical theorem proving can provide high assurance of correct design, but it can also be a slow iterative process. Much time is spent determining why a proof of a conjecture is not forthcoming. In some cases, the conjecture is false and in others, the attempted proof is insufficient. In this case study, we use the SAL family of model checkers to generate a concrete counterexample to an unproven conjecture specified in the mechanical theorem prover, PVS. The focus of our case study is the ROBUS Interactive Consistency Protocol. We combine the use of a mechanical theorem prover and a model checker to expose a subtle flaw in the protocol that occurs under a particular scenario of faults and processor states. Uncovering the flaw allows us to mend the protocol and complete its general verification in PVS.

Pike, Lee↗

SU-E-T-617: Plan Quality Estimation of Intensity-Modulated Radiotherapy Cases for Lung Cancer

Purpose: To estimate the planning quality of intensity-modulated radiotherapy in lung cancer cases and to provide preliminary data for the development of a planning quality assurance algorithm. Methods: 42 IMRT plans previously used in cases of solitary lung cancers were collected. Organs in or near the thoracic cavity, such as lung (ipsilateral, contralateral), heart, liver, esophagus, cord and bronchus were considered as organs at risk (OARs) in this study. The coverage index (CVI), conformity index (CI), homogeneity index (HI), volume, irregularity (standard deviation of center-surface distance) were used to compare PTV dose characteristics. The effective uniform dose (EUD), V10Gy, and V20Gy of the OARs were used to compare OAR dose characteristics. Results: Average CVI, CI, HI values were 0.9, 0.8, 0.1, respectively. CVI and CI had narrow Gaussian distribution curves without a singular value, but one case had a relatively high (0.25) HI because of location and irregular shape (Irregularity of 18.5 when average was 12.5) of PTV. EUDs tended to decrease as OAR-PTV distance increased and OAR-PTV overlap volume decreased. Conclusion: This work indicates the potential for significant plan quality deviation of similar lung cancer cases. Considering that this study were from a single department, differences in the treatment results for a given patient would be much more pronounced if multiple departments (and therefore more planners) were involved. Therefore, further examination of QA protocols is needed to reduce deviations in radiation treatment planning.

61 RADIATION PROTECTION AND DOSIMETRY↗

Toward Design Assurance of Machine-Learning Airborne Systems

In recent years, Artificial Intelligence (AI) systems, enabled by Machine Learning (ML)technology, have demonstrated impressive progress and provides historic opportunities for the aviation industry. However, several key aspects of ML technology are not compatible with existing design assurance standards and make certification problematic. In this paper, we present a case study of a visual system with a Deep Neural Network (DNN) intended to detect and identify airport runway signs. Different use cases and variants of this system exhibit different levels of criticality ranging from design assurance level (DAL) D to B. We use the case study to illustrate the challenges of certification according to the current standards, such asDO-178C. We present the system design, data generation, training, and verification in detail and describe how the design assurance objectives can be met for a DAL D variant of the system. We also discuss gaps and potential approaches for the higher design assurance levels.

Avionics↗

SU-E-T-250: New IMRT Sequencing Strategy: Towards Intra-Fraction Plan Adaptation for the MR-Linac

Purpose: To develop a new sequencer for IMRT planning that during treatment makes the inclusion of external factors possible and by doing so accounts for intra-fraction anatomy changes. Given a real-time imaging modality that will provide the updated patient anatomy during delivery, this sequencer is able to take these changes into account during the calculation of subsequent segments. Methods: Pencil beams are generated for each beam angle of the treatment and a fluence optimization is performed. The pencil beams, together with the patient anatomy and the above optimal fluence form the input of our algorithm. During each iteration the following steps are performed: A fluence optimization is done and each beam's fluence is then split to discrete intensity levels. Deliverable segments are calculated for each one of these. Each segment's area multiplied by its intensity describes its efficiency. The most efficient segment among all beams is then chosen to deliver a part of the calculated fluence and the dose that will be delivered by this segment is calculated. This delivered dose is then subtracted from the remaining dose. This loop is repeated until 90% of the dose has been delivered and a final segment weight optimization is performed to reach full convergence. Results: This algorithm was tested in several prostate cases yielding results that meet all clinical constraints. Quality assurance was performed on Delta4 and film phantoms for one of these prostate cases and received clinical acceptance after passing both gamma analyses with the 3%/3mm criteria. Conclusion: A new sequencing algorithm was developed to facilitate the needs of intensity modulated treatment. The first results on static anatomy confirm that it can calculate clinical plans equivalent to those of the commercially available planning systems. We are now working towards 100% dose convergence which will allow us to handle anatomy deformations. This work is financially supported by Elekta AB, Stockholm, Sweden.

60 APPLIED LIFE SCIENCES↗

Clinical Implementation of Intensity Modulated Proton Therapy for Thoracic Malignancies

Purpose: Intensity modulated proton therapy (IMPT) can improve dose conformality and better spare normal tissue over passive scattering techniques, but range uncertainties complicate its use, particularly for moving targets. We report our early experience with IMPT for thoracic malignancies in terms of motion analysis and management, plan optimization and robustness, and quality assurance. Methods and Materials: Thirty-four consecutive patients with lung/mediastinal cancers received IMPT to a median 66 Gy(relative biological equivalence [RBE]). All patients were able to undergo definitive radiation therapy. IMPT was used when the treating physician judged that IMPT conferred a dosimetric advantage; all patients had minimal tumor motion (<5 mm) and underwent individualized tumor-motion dose-uncertainty analysis and 4-dimensional (4D) computed tomographic (CT)-based treatment simulation and motion analysis. Plan robustness was optimized by using a worst-case scenario method. All patients had 4D CT repeated simulation during treatment. Results: IMPT produced lower mean lung dose (MLD), lung V{sub 5} and V{sub 20}, heart V{sub 40}, and esophageal V{sub 60} than did IMRT (P<.05) and lower MLD, lung V{sub 20}, and esophageal V{sub 60} than did passive scattering proton therapy (PSPT) (P<.05). D{sub 5} to the gross tumor volume and clinical target volume was higher with IMPT than with intensity modulated radiation therapy or PSPT (P<.05). All cases were analyzed for beam-angle-specific motion, water-equivalent thickness, and robustness. Beam angles were chosen to minimize the effect of respiratory motion and avoid previously treated regions, and the maximum deviation from the nominal dose-volume histogram values was kept at <5% for the target dose and met the normal tissue constraints under a worst-case scenario. Patient-specific quality assurance measurements showed that a median 99% (range, 95% to 100%) of the pixels met the 3% dose/3 mm distance criteria for the γ index. Adaptive replanning was used for 9 patients (26.5%). Conclusions: IMPT using 4D CT-based planning, motion management, and optimization was implemented successfully and met our quality assurance parameters for treating challenging thoracic cancers.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Assessment and Assurance of Microelectronics Packaging Technology of Microelectromechanical Systems (MEMS)

Microelectromechanical systems (MEMS) have shown a significant promise in the last decade for a variety of applications such as air-bag, pressure sensors, accelerometer, microgyro, etc. Standard semiconductor microelectronics packaging needs the integrated circuits to be protected from the harsh environment, and provide electrical communication with the other parts of the circuit, facilitate thermal dissipation efficiently, and impart mechanical strength to the silicon die. Microelectronics packaging involves wafer dicing, bonding, lead attachment, encapsulation to protect from the environment, electrical integrity, and package leak tests to assure the packaging technology. In the case of MEMS the microstructures (active elements) often interfaces with the hostile environment where packaging leak tests and testing of such devices using chemical and mechanical parameters will be very difficult and expensive. Packaging of MEMS is significantly complex as they serve to protect from the environment and microstructures interact with the same environment to measure or affect the desired physical or chemical parameters. The most of the silicon circuitry is sensitive to temperature, moisture, magnetic field, light, and electromagnetic interference. The package must then protect the on-board silicon circuitry while simultaneously exposing the microsensor to the effect it 'measures to assure the MEMS technology by lowering the risk to zero. MEMS technology has a major application in developing a microspacecraft for space systems provided assurance of MEMS technology is sufficiently addressed nondestructively. This technology would eventually miniaturize many of the components of the spacecraft to reach the NASA's safety and mission assurance goal by building faster, cheaper, better, smaller spacecraft to explore the space more effectively by teaming-up with the other NASA centers using the limited resources available. This paper discusses the latest developments in the MEMS technology and challenging issues in the packaging of hermetically sealed and non-hermetically sealed MEMS sensor devices based on silicon, poly-silicon, and other materials for microspacecraft applications considering the space environment and reliability assurance qualification guidelines in perspective. Acknowledgments: The above research work is supported by the NASA Electronics Parts and Packaging Program (NEPP) and performed by the Jet Propulsion Laboratory, California Institute of Technology, Pasadena, CA under a contract with the NASA - Code Q for the Office of Safety and Mission Assurance Program 323-79.

Ramesham, Rajeshuni↗

Formal Foundations for Hierarchical Safety Cases

Safety cases are increasingly being required in many safety-critical domains to assure, using structured argumentation and evidence, that a system is acceptably safe. However, comprehensive system-wide safety arguments present appreciable challenges to develop, understand, evaluate, and manage, partly due to the volume of information that they aggregate, such as the results of hazard analysis, requirements analysis, testing, formal verification, and other engineering activities. Previously, we have proposed hierarchical safety cases, hicases, to aid the comprehension of safety case argument structures. In this paper, we build on a formal notion of safety case to formalise the use of hierarchy as a structuring technique, and show that hicases satisfy several desirable properties. Our aim is to provide a formal, theoretical foundation for safety cases. In particular, we believe that tools for high assurance systems should be granted similar assurance to the systems to which they are applied. To this end, we formally specify and prove the correctness of key operations for constructing and managing hicases, which gives the specification for implementing hicases in AdvoCATE, our toolset for safety case automation. We motivate and explain the theory with the help of a simple running example, extracted from a real safety case and developed using AdvoCATE.

Hierarchy↗

Modeling CO 2 flow in support of a shallow subsurface controlled leakage field test

Here, controlled release of carbon dioxide (CO 2 ) into the soil and atmosphere is performed to test detection and monitoring tools, for which several field laboratories were established by a number of institutions worldwide. Numerical simulations of CO 2 behavior in the shallow subsurface region are other forms of validation and verification of the leakage pathways and destinations. These reports aim to improve monitoring and verification of CO 2 in case of unexpected leakages for public assurance. In this work, we introduce the results of a numerical modeling study conducted to simulate the injection of CO 2 as carried out during a field test in Viamão, southern Brazil, where 20 kg day –1 of CO 2 was pumped for 30 days through a vertical well 3 m below ground in an altered granitic soil. Multiphase flow simulations were performed with the TOUGH2/EOS7CA software for unsaturated porous media, using field data and injection parameters, including sensitivity tests to permeability direction, diffusivity, and boundary conditions. Results with increased horizontal permeabilities are in better agreement with the field observations. In this condition, mass balance calculations indicate approximately 90% of injected CO2 (20 kg day –1 during 30 days) remains in the soil after 180 days from injection start, consistent with the measured flow through the soil–atmosphere interface.

03 NATURAL GAS↗

Geometric Verification of Dynamic Wave Arc Delivery With the Vero System Using Orthogonal X-ray Fluoroscopic Imaging

Purpose: The purpose of this study was to define an independent verification method based on on-board orthogonal fluoroscopy to determine the geometric accuracy of synchronized gantry–ring (G/R) rotations during dynamic wave arc (DWA) delivery available on the Vero system. Methods and Materials: A verification method for DWA was developed to calculate O-ring-gantry (G/R) positional information from ball-bearing positions retrieved from fluoroscopic images of a cubic phantom acquired during DWA delivery. Different noncoplanar trajectories were generated in order to investigate the influence of path complexity on delivery accuracy. The G/R positions detected from the fluoroscopy images (DetPositions) were benchmarked against the G/R angulations retrieved from the control points (CP) of the DWA RT plan and the DWA log files recorded by the treatment console during DWA delivery (LogActed). The G/R rotational accuracy was quantified as the mean absolute deviation ± standard deviation. The maximum G/R absolute deviation was calculated as the maximum 3-dimensional distance between the CP and the closest DetPositions. Results: In the CP versus DetPositions comparison, an overall mean G/R deviation of 0.13°/0.16° ± 0.16°/0.16° was obtained, with a maximum G/R deviation of 0.6°/0.2°. For the LogActed versus DetPositions evaluation, the overall mean deviation was 0.08°/0.15° ± 0.10°/0.10° with a maximum G/R of 0.3°/0.4°. The largest decoupled deviations registered for gantry and ring were 0.6° and 0.4° respectively. No directional dependence was observed between clockwise and counterclockwise rotations. Doubling the dose resulted in a double number of detected points around each CP, and an angular deviation reduction in all cases. Conclusions: An independent geometric quality assurance approach was developed for DWA delivery verification and was successfully applied on diverse trajectories. Results showed that the Vero system is capable of following complex G/R trajectories with maximum deviations during DWA below 0.6°.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

An Examination of Coarse Sun Sensor Contingencies in Attitude Determination and the Sun Vector Calculation

Satellite pointing is vital to the success of a mission. One element of that entails describing the position of the sun relative to the frame of the satellite. Coarse Sun Sensors (CSS) are typically used to provide the information to calculate the sun's position in Safe Modes or contingency operations. In the OCO-2 configuration there are 13 CSS total, which provide redundant 4 celestial coverage. Failures of the individual CSS elements can introduce holes in the celestial coverage resulting in potential loss of sun knowledge. These failures must be analyzed to determine if the contingency plan is sufficient to assure mission success. First the static case was looked at and determined that at a maximum, 3 CSS failures can be sustained on the body and 1 on the array without causing coverage holes. Also array sensors are more important to mission success. The Sun Vector calculation has been transcribed to MATLAB code and failure scenarios are being examined to determine the maximum error given a set of failure scenarios. This activity indicated that if there is a loss of the sun, the sun-searching algorithm could be modified to use XZ rotation as that is guaranteed to find it whereas the design using the YZ rotation misses the sun if it is at the + or - Y orientation.

celestial bodies↗

SU-E-T-235: Data Mining for Evaluating Treatment Performances Over a Large Quantity of Data to Monitor and Improve SBRT Workflow

Purpose: To quality assure a large quantity of retrospective treatment cases for treatment performances by randomly sampling is inefficient. Here we provide a method to efficiently monitor and investigate the QA of SBRT workflow over Mosaiq. Methods: The code developed with Microsoft SQL Server Management Studio 2008R2 and VBA was used for retrieving and sorting data from Mosaiq (version 2.3–2.6 during 2012–2015). SBRT patients were filtered by fractional dose over 350cGy and total fraction number less than 6, which SBRT prescriptions were defined. The quality assurance on the SBRT workflow was focused on the treatment deliveries such as patient positioning setup, CBCT indicated offsets and couch shifted corrections. The treatment delivery were done by Varian Truebeam systems and the record/verify by Mosaiq. Results: Total 82 SBRT patients corresponding to 103 courses and 854 CBCT images were found by the retrieval query. Most centers record daily pre-treatment (Pre-Tx: before treatment shift) image-guided shifts along treatment course for inter-fraction motion record, and it is useful to also verify it with post-treatment imaging (Post-Tx: after treatment CBCT verification) to verify intra-fraction motion. Analyzing the details of daily recorded shifts can reveals the information of patient-setup and staff’s record/verify behaviors. 3 examples were provided as solid evidences and on-going rectification for preventing future mistakes. Conclusions: The report gave feasible examples for inspector to verify a large amount of data during site investigation. This program can also be extended to a scheduled data mining with software to periodical analyze the timely records in Mosaiq, for example, a various control charts for different QA purposes. As the current trend of automation in radiation therapy field, the data mining would be a necessary tool in the future, just as the automatic plan quality evaluation has been under development in Eclipse.

60 APPLIED LIFE SCIENCES↗