Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Administration and Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Learning Management System User Requirements for the National Nuclear Security Administration's International Nuclear Safeguards Engagement Program

The National Nuclear Security Administration's (NNSA) International Nuclear Safeguards Engagement Program (INSEP) is considering investing in new tools that would allow the program to support its partner states from a distance. At the same time, the program is considering approaches that would allow several organizations, including NNSA, IAEA, national laboratories and contractor staff, to collaborate in the development and maintenance of instructional content. Software systems known as Learning Management Systems (LMSs) might represent a mechanism through which INSEP could accomplish these goals (collaborative development and remote support). To assess the usefulness of an LMS, INSEP has specified its needs for delivering online training and compared those needs to the capability of a range of LMSs. This comparison will allow INSEP to determine whether an LMS would be a useful tool and may set the stage for a "make-buy" decision in the future. The study team concluded that INSEP's content development and delivery needs align well with the capabilities of the leading LMSs on the market today and that that INSEP performance requirements allow for a customized approach using existing training portals that are already available to NNSA. Additional work would be required to specify the desired processes for developing online training and outreach materials, structuring the databases, specifying the data that should be collected, and detailing the desired system reports and documentation.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Airport Information Sharing Concept Architecture

The National Airspace System (NAS) Air Traffic management, control and operation depends on a timely and efficient distribution of real time information generated by stakeholders and published from a variety of sources. The Federal Aviation Administration System Wide Information Management (SWIM) is a service oriented architecture design to provide stakeholders with timely NAS information. However, there are other sources of useful information generated by stakeholders that can be included in the management of NAS operations. Airport facilities are host to most stakeholders operating in the NAS (airspace user, airport authority, ground handling, controller tower) and thus large information is generated and consumed at these facilities. The NASA Glenn Research center has been investigating an information exchange architecture framework that would enable the timely, efficient and secure gathering and distribution information generated at airport facilities. This presentation describes the framework architecture concept for the efficient information exchange of airport information.

Airports↗

STS-114: Discovery Post Landing Press Briefing

Dean Acosta, NASA Public Affairs Deputy Assistant Administrator hosted this press briefing. Michael Griffin, NASA Administrator; Bill Parsons, Shuttle Program Manager; Michael Leinbach, Shuttle Launch Director; and Bill Ready, Space Operations Associate Administrator were present. The Panel specifically honored the Columbia crew as they praised Commander Eileen Collin's performance in bringing the Discovery and crew safe back to Earth. Re-entry, test flight and next test flight, thermal insulation, heat, vehicle inspection, turn around processing, and ferrying Discovery back to the Kennedy Space Center were topics covered with the News media. Michael Griffin announced the launching of Mars Reconnaissance Orbiter will take place the following morning.

Source record↗

Management of information in a research and development agency

The NASA program for managing scientific and technical information (STI) is examined, noting the technological, managerial, educational, and legal aspects of transferring and disseminating information. A definition of STI is introduced and NASA's STI-related management programs are outlined. Consideration is given to the role of STI management in NASA mission programs, research efforts supporting the management and use of STI, STI program interfaces, and the Automated Information Management Program to eliminate redundant automation efforts in common administrative functions. The infrastructure needed to manage the broad base of NASA information and the interfaces between NASA's STI management and external organizations are described.

Keene, Wallace O.↗

Management of information in a research and development agency

The NASA program for managing scientific and technical information (STI) is examined, noting the technological, managerial, educational, and legal aspects of transferring and disseminating information. A definition of STI is introduced and NASA's STI-related management programs are outlined. Consideration is given to the role of STI management in NASA mission programs, research efforts supporting the management and use of STI, STI program interfaces, and the Automated Information Management Program to eliminate redundant automation efforts in common administrative functions. The infrastructure needed to manage the broad base of NASA information and the interfaces between NASA's STI management and external organizations are described.

Keene, Wallace O.↗

National Aeronautics and Space Administration Marshall Space Flight Center Space Transportation Directorate Risk Management Implementation Program

The US civil aerospace program has been a great contributor to the creation and implementation of techniques and methods to identify, analyze, and confront risk. NASA has accomplished mission success in many instances, but also has had many failures. Anomalies have kept the Agency from achieving success on other occasions, as well. While NASA has mastered ways to prevent risks, and to quickly and effectively react and recover from anomalies or failures, it was not until few years ago that a comprehensive Risk Management process started being implemented in some of its programs and projects. A Continuous Risk Management (CRM) cycle process was developed and has been promoted and used successfully in programs and projects across the Agency.

Duarte, Luis Alberto↗

Mars scientific investigations as a precursor for human exploration

In the past two years, NASA has begun to develop and implement plans for investigations on robotic Mars missions which are focused toward returning data critical for planning human missions to Mars. The Mars Surveyor Program 2001 Orbiter and Lander missions will mark the first time that experiments dedicated to preparation for human exploration will be carried out. Investigations on these missions and future missions range from characterization of the physical and chemical environment of Mars, to predicting the response of biology to the Mars environment. Planning for such missions must take into account existing data from previous Mars missions which were not necessarily focused on human exploration preparation. At the same time, plans for near term missions by the international community must be considered to avoid duplication of effort. This paper reviews data requirements for human exploration and applicability of existing data. It will also describe current plans for investigations and place them within the context of related international activities. c 2000 International Astronautical Federation. Published by Elsevier Science Ltd. All rights reserved.

NASA Center HQS↗

DOE Data Days (Q4 FY2021 Report)

During the FY21Q4 the DOE Data Days (D3) leftover funds from D3 2020 were rolled-over to a new project task and project lead was transferred from Stan Ruppert to Rebecca Rodd. This project will be a continuation of previous DOE Data Day Conferences that were funded through the EOS project. The following are high-level accomplishments: Wrote a draft life-cycle plan for FY22 project for continuation of D3, Sought feedback from previous D3 committees to begin selection of FY22 planning committee, and Project management transitioned from Stan Ruppert to Rebecca Rodd in anticipation of Stan’s retirement at the end of FY21.

99 GENERAL AND MISCELLANEOUS↗

Future ATM Concepts Evaluation Tool (FACET) Interface Control Document

This Interface Control Document (ICD) documents the airspace adaptation and air traffic inputs of NASA's Future ATM Concepts and Evaluation Tool (FACET). Its intended audience is the project manager, project team, development team, and stakeholders interested in interfacing with the system. FACET equips Air Traffic Management (ATM) researchers and service providers with a way to explore, develop and evaluate advanced air transportation concepts before they are field-tested and eventually deployed. FACET is a flexible software tool that is capable of quickly generating and analyzing thousands of aircraft trajectories. It provides researchers with a simulation environment for preliminary testing of advanced ATM concepts. Using aircraft performance profiles, airspace models, weather data, and flight schedules, the tool models trajectories for the climb, cruise, and descent phases of flight for each type of aircraft. An advanced graphical interface displays traffic patterns in two and three dimensions, under various current and projected conditions for specific airspace regions or over the entire continental United States. The system is able to simulate a full day's dynamic national airspace system (NAS) operations, model system uncertainty, measure the impact of different decision-makers in the NAS, and provide analysis of the results in graphical form, including sector, airport, fix, and airway usage statistics. NASA researchers test and analyze the system-wide impact of new traffic flow management algorithms under anticipated air traffic growth projections on the nation's air traffic system. In addition to modeling the airspace system for NASA research, FACET has also successfully transitioned into a valuable tool for operational use. Federal Aviation Administration (FAA) traffic flow managers and commercial airline dispatchers have used FACET technology for real-time operations planning. FACET integrates live air traffic data from FAA radar systems and weather data from the National Weather Service to summarize NAS performance. This information allows system operators to reroute flights around congested airspace and severe weather to maintain safety and minimize delay. FACET also supports the planning and post-operational evaluation of reroute strategies at the national level to maximize system efficiency. For the commercial airline passenger, strategic planning with FACET can result in fewer flight delays and cancellations. The performance capabilities of FACET are largely due to its architecture, which strikes a balance between flexibility and fidelity. FACET is capable of modeling the airspace operations for the continental United States, processing thousands of aircraft on a single computer. FACET was written in Java and C, enabling the portability of its software to a variety of operating systems. In addition, FACET was designed with a modular software architecture to facilitate rapid prototyping of diverse ATM concepts. Several advanced ATM concepts have already been implemented in FACET, including aircraft self-separation, prediction of aircraft demand and sector congestion, system-wide impact assessment of traffic flow management constraints, and wind-optimal routing.

FACET↗

Critical Asset Management at the Start of the Pandemic

COVID-19 has changed the daily lives of so many people and forced many companies to examine their way of doing business, including their Asset Management programs. This virus has given way to an unprecedented set of challenges to continue conducting business as usual when everything is unusual. On June 16, 2020, members of the Northern California Chapter of the Association of Asset Management Professionals came together for a panel discussion on Critical Asset Management during the COVID-19 pandemic and beyond. Participants were representatives from health care, water, and national security, which are all considered essential industries.

Administration and management↗

Evaluation of the Monotonic Lagrangian Grid and Lat-Long Grid for Air Traffic Management

The Air Traffic Monotonic Lagrangian Grid (ATMLG) is used to simulate a 24 hour period of air traffic flow in the National Airspace System (NAS). During this time period, there are 41,594 flights over the United States, and the flight plan information (departure and arrival airports and times, and waypoints along the way) are obtained from an Federal Aviation Administration (FAA) Enhanced Traffic Management System (ETMS) dataset. Two simulation procedures are tested and compared: one based on the Monotonic Lagrangian Grid (MLG), and the other based on the stationary Latitude-Longitude (Lat- Long) grid. Simulating one full day of air traffic over the United States required the following amounts of CPU time on a single processor of an SGI Altix: 88 s for the MLG method, and 163 s for the Lat-Long grid method. We present a discussion of the amount of CPU time required for each of the simulation processes (updating aircraft trajectories, sorting, conflict detection and resolution, etc.), and show that the main advantage of the MLG method is that it is a general sorting algorithm that can sort on multiple properties. We discuss how many MLG neighbors must be considered in the separation assurance procedure in order to ensure a five-mile separation buffer between aircraft, and we investigate the effect of removing waypoints from aircraft trajectories. When aircraft choose their own trajectory, there are more flights with shorter duration times and fewer CD&R maneuvers, resulting in significant fuel savings.

Kaplan, Carolyn↗

Augmenting Space Technology Program Management with Secure Cloud & Mobile Services

The National Aeronautics and Space Administration (NASA) Game Changing Development (GCD) program manages technology projects across all NASA centers and reports to NASA headquarters regularly on progress. Program stakeholders expect an up-to-date, accurate status and often have questions about the program's portfolio that requires a timely response. Historically, reporting, data collection, and analysis were done with manual processes that were inefficient and prone to error. To address these issues, GCD set out to develop a new business automation solution. In doing this, the program wanted to leverage the latest information technology platforms and decided to utilize traditional systems along with new cloud-based web services and gaming technology for a novel and interactive user environment. The team also set out to develop a mobile solution for anytime information access. This paper discusses a solution to these challenging goals and how the GCD team succeeded in developing and deploying such a system. The architecture and approach taken has proven to be effective and robust and can serve as a model for others looking to develop secure interactive mobile business solutions for government or enterprise business automation.

Hodson, Robert F.↗

NASA information resources management handbook

This National Aeronautics and Space Administration (NASA) Handbook (NHB) implements recent changes to Federal laws and regulations involving the acquisition, management, and use of Federal Information Processing (FIP) resources. This document defines NASA's Information Resources Management (IRM) practices and procedures and is applicable to all NASA personnel. The dynamic nature of the IRM environment requires that the controlling management practices and procedures for an Agency at the leading edge of technology, such as NASA, must be periodically updated to reflect the changes in this environment. This revision has been undertaken to accommodate changes in the technology and the impact of new laws and regulations dealing with IRM. The contents of this document will be subject to a complete review annually to determine its continued applicability to the acquisition, management, and use of FIP resources by NASA. Updates to this document will be accomplished by page changes. This revision cancels NHB 2410.1D, dated April 1985.

Source record↗

Air Traffic Management Technology Demonstration 1 (ATD-1) Tech Transfer Document Summary: Version 3.0

This document summarizes transfer of NASA's terminal sequencing and spacing (TSS) and interval management (IM) technologies to the FAA (Federal Aviation Administration), as part of its Air Traffic Management Technology (ATM) Demonstration 1 activity. This activity, referred to as ATD-1, is part of NASA's Airspace Systems Program (ASP) specifically, its System Analysis, Integration, and Evaluation (SAIE) Project. ATD-1 is a multi-year research and development effort aimed at accelerating implementation and deployment of NASA-developed ATM technologies by the FAA. These technologies are designed to improve the utilization of Performance-Based Navigation (PBN) procedures inside congested terminal airspace. In terms of NASA's Technology Readiness Levels (TRLs), ATD-1 is focused on maturing its associated technologies from the Technology Development stage (TRL 4) to the Technology Demonstration stage (TRL 6). In order to ensure that the products of this tech-transfer are relevant and useful, NASA has created strong partnerships with the FAA and key industry stakeholders.

Technology transfer↗

STS-114: Discovery Post Landing Press Briefing

A post landing discussion of the STS-114 Space Shuttle Discovery is shown. Dean Acosta, Deputy Assistant Administrator of Public Affairs introduces the panel. The panel consists of: Michael Griffin, NASA Administrator, Bill Parsons, Space Shuttle Program Manager, Mike Leinbach, NASA Launch Director, and Bill Readdy, Associate Administrator for Space Operations. Mike Griffin answers questions from the news media about the amount of damage to the Space Shuttle and the possibility of returning to space, Mike Leinbach addresses the question about the process of bringing Discovery back to Kennedy Space Center and Bill Parsons talks about milestones reached during this mission.

Source record↗

Building 438 Drainage Channel Soil Sampling and Analysis Plan (February 2023)

This Soil Sampling and Analysis Plan (SAP) was prepared by the Environmental Function Area (EFA)/Technical Services Department (TSD) of the Environment, Safety & Health (ES&H) Directorate for the Project Management Office (PMO) for the proposed Building 438 Drainage Channel Project (project) located near Building 438 (B438) in the southern portion, Building 433 (B433) in the middle portion, and Building 543 (B543) in the northern portion (project area as shown on Figure 1). The purpose of the SAP was to describe the procedures for collection and analysis of environmental samples and evaluation of analytical data (chemical and radiological) to determine management options of excavated soil during project construction in accordance with Lawrence Livermore National Laboratory’s (LLNL) Soils Screening and Management Plan (SSMP) (LLNL 2022), which is consistent with U.S. Environmental Protection Agency (EPA) guidance for developing Data Quality Objectives for environmental data (EPA 2006). The SAP was developed in accordance with the SSMP and based on preliminary design information provided to EFA by PMO.

54 ENVIRONMENTAL SCIENCES↗

A Historic Context and Mitigation Documentation for a Portion of the U12n Tunnel Ventilation and Containment Systems, Area 12, Nevada National Security Site, Nye County, Nevada

The National Nuclear Security Administration Nevada Field Office (NNSA/NFO) has proposed repurposing the U12n Vent Hole #2 (SHPO Resource S2488) and the U12n.10 Vent Hole (S2489) for water sampling in the U12n Tunnel. The vent holes are part of the historic ventilation system for the tunnel and are contributing elements to the U12n Tunnel Historic District (D84). In consultation with the SHPO, NNSA/NFO determined the undertaking will have an adverse effect on the vent holes. The NNSA/NFO and the SHPO negotiated a memorandum of (MOA) with stipulations to mitigate adverse effects. This submission is to comply with the stipulations in the executed Memorandum of Agreement Between the National Nuclear Security Administration Nevada Field Office, Environmental Management Nevada Program Office, and the Nevada State Historic Preservation Officer Regarding Repurposing of Portions of the Ventilation System of the U12n Tunnel Complex Located in Area 12 at the Nevada National Security Site. In accordance with the MOA, the manuscript provides a historic context that describes the development and functioning of the historic U12n Tunnel ventilation system for underground nuclear tests (Stipulation III.C). High resolution digital color images of the vent hole containment doors, nearby elements, and overviews were obtained and keyed to a map and a photo index (Stipulation III.A) (Appendix A). Lastly, Architectural Resource Assessment (ARA) forms were completed for each of the vent holes and Historic District D84 (Stipulation III.B) (Appendix B). The documentation including the historic context report, photographs, image files, and resource forms produced to fulfill the terms of the MOA will be archived with the Nuclear Testing Archive in Las Vegas (Stipulation III.D).

54 ENVIRONMENTAL SCIENCES↗