Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “APS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Additional Protocol (AP) Protocol Reporter version 3.0 (PR3) System Requirements Specification (SRS)

The Protocol Reporter (PR) was developed by the International Atomic Energy Agency (IAEA) to assist Member States in the creation and preparation of declarations pursuant to articles 2 and 3 of the model Additional Protocol (AP, INFCIRC/540, corrected), and was designed to be a complete tool for compiling, arranging, editing, managing, and submitting State declarations in support of the AP.

Cain, Ronald A.↗

A Survey of Floor Vibration Noise at All Sectors in the APS Experiment Hall

A vibration survey of the APS experiment hall floor was conducted. It was found that beamlines 10-20 have particularly low levels of vibration when compared to the rest of the facility. The vibration spectrum for each beamline floor can be found in the appendix. Throughout the majority of the 5-100 Hz vibration spectrum beamlines at the APS fall below the most stringent NEST vibration criteria. Lastly, it was concluded that the magnitude of vibrations at a particular beamline is largely dependent upon the magnitude of vibrations present at the nearby mezzanine support column.

43 PARTICLE ACCELERATORS↗

Testing of an AP-105 Precipitation Simulant

A tank AP-105 chemical simulant was developed and diluted with Washington River Protection Solutions (WRPS)-supplied raw water to evaluate the stability of AP Farm wastes with respect to precipitation under Direct Feed Low-Activity Waste (DFLAW)-typical waste feed staging operations. The current report provides a high-level summary of the basis for simulant selection, the recommended (and prepared) simulant chemistry, and observed stability with respect to solids formation upon simulant preparation and subsequent dilution with raw water.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fiscal Year 2020 Filtration of Hanford Tank Waste 241-AP-105

Bench-scale filtration testing of 15 liters of 241-AP-105 supernatant was conducted using a Mott inline filter Model 6610 (media grade 5) backpulsed dead-end filter (BDEF) in the hot cells of the Radiochemical Processing Laboratory at Pacific Northwest National Laboratory. The as-received samples were diluted with raw water from the Hanford Site to assess the propensity for solids to form upon dilution and to assess the impact those solids have on filtration performance. The feed was split into two batches. The first batch was settled and decanted as planned in Tank Side Cesium Removal operations. The BDEF was used to filter this AP-105 feed at a targeted flux of 0.065 gpm/ft 2 and exhibited no measurable pressure increase during filtration. The second batch was fed to the BDEF with solids resuspended. This was also operated at the targeted flux of 0.065 gpm/ft 2 . In this case, the target pressure differential of 2 psid (resistance of 6.24 × 10 10 m -1 ) was reached in slightly more than 12 h. A backpulse restored the filter flux; however, the time to the next backpulse was slightly shorter. These tests indicate that after the addition of raw water, settle and decant effectively removed solids from the feed. It is not possible to assess the time required for these solids to settle based on the result from these tests. However, if sufficient time is allowed for the solids to settle, no measurable filter fouling was observed in current testing. In contrast, if insufficient time is allowed for solids to settle, filter fouling will occur relatively quickly and will likely require backpulses more frequently than every 12 hours (1.91 m 3 /m 2 volume filtered). Solids concentrated from backpulse solutions displayed large variability in composition with Al-silicates and mixed chromium-aluminum oxide phases. Amounts of Mg, Fe, and Ca were also found in the presence of Na and O. These solids could be grouped in three categories: (1) soluble Na-salts that formed large block-like particles but were made up of fibrous materials, (2) amorphous Al-phases, and (3) colloidal iron oxides with an average particle diameter of 4.2 µm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spent Crystalline Silicotitanate Storage Study—Post AP-105DF Processing

A Tank-Side Cesium Removal (TSCR) system is under development by Washington River Protection Solutions to support initial production of immobilized low-activity waste (LAW) by feeding Hanford tank supernate from tank farms to the Hanford Waste Treatment and Immobilization Plant (WTP) LAW Facility. Tank waste supernate will be filtered to remove suspended solids and then Cs will be removed by processing it through crystalline silicotitanate (CST) ion exchange media manufactured by Honeywell UOP, LLC. The Cs-loaded CST columns will be stored indefinitely, with a goal of eventual CST removal and treatment. Thus, the spent CST needs to be recoverable after undetermined storage time. Previous testing with AP-105 simulant showed that rinsing the CST bed with 3 bed volumes (1.4 apparatus volumes [AVs]) of 0.1 M NaOH resulted in a dried bed that maintained flow characteristics indicative of ease of recovery. This study explored the intermediate conditions (between feed dried in place and the 1.4 AVs of 0.1 M NaOH rinse) to evaluate CST bed properties after: 1) stoppage with feed in place; 2) stoppage after draining feed; 3) stoppage after 0.7 AV of 0.1 M NaOH rinse through column; 4) stoppage after 1.5 AVs of 0.1 M NaOH rinse through column. Post processing, each column was heated at 50 °C for 19 days under pseudo-storage conditions to simulate the expected dried and stored CST bed conditions. Testing was conducted at the small scale (12-mL bed volume); actual, Cs-depleted, AP-105 tank waste was used as the feed. Post-dried CST bed physical properties (angle of repose and penetration depth) were measured to evaluate how CST moved and flowed. All process stop-conditions resulted in a solidified CST bed except for the final condition, 1.5 AVs of 0.1 M NaOH rinse. At this small scale, the three CST beds presented an issue for retrievability after the short storage period (19 days at 50 °C). The latter case confirmed the results from simulant testing. The testing was intended to provide a preliminary assessment of issues that may arise from desiccation of CST during storage with the indicated salt solutions in place. Since these were small-scale tests, the processing system did not scale to full scale conditions exactly; however, the tests did provide insight into the impact on the dried and stored CST bed after stopping processing at an earlier step (upset condition) than normal. These results indicate that if an upset condition occurs at TSCR, a dilute hydroxide rinse should be considered before the CST dries from internal heating.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of Respirator Cartridge Performance Testing on a Hanford AP Tank Farm Primary Exhauster Slipstream

Washington River Protection Solutions (WRPS) conducted tests on two types of chemical cartridges for use in air purifying respirators (APR) to determine the period of time that the cartridges would provide adequate performance1 for APRs used to protect workers when exposed to a mixture of Chemicals of Potential Concern (COPCs) from vapors exiting the exhauster for the Hanford AP tank farm. The Occupational Safety and Health Administration (OSHA) identifies cartridge testing as a valid approach for establishing a cartridge change schedules. Testing is commonly applied in situations where mixtures of COPCs exist, and where other approaches, such as manufacturer recommendations and modeling, are less reliable. The tests were designed and conducted to assure measurement and/or control of the key variables OSHA identified as important to estimate cartridge service life, including temperature, humidity, COPC concentration, breathing rate, and cartridge adsorption capacity. Testing was conducted from June 24-26, 2016, on a slipstream from the AP exhauster fed to a respirator cartridge test stand developed by WRPS in collaboration with HiLine Engineering (Richland, Washington). Multipurpose respirator cartridges, SCOTT 7422-SD1 and SCOTT 7422-SC1 (SCOTT Safety, Monroe, North Carolina) were assessed on separate days. Sample media (sorbent tubes) were used to collect samples of the vapor stream entering and exiting the respirator cartridge and were subsequently analyzed for COPC concentrations. Pacific Northwest National Laboratory was tasked with conducting an independent analysis of the analytical results and making recommendations based on the results for respiratory cartridge performance and service life.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fiscal Year 2023 Filtration of Hanford Tank 241-AP-105 Supernatant at 16 °C

Approximately 9 liters of supernatant from Hanford waste tank 241-AP-105 was delivered by Washington River Protection Solutions to the Radiochemical Processing Laboratory (RPL) at Pacific Northwest National Laboratory. The as-received AP-105 waste was diluted with process water (Columbia River water) from approximately 8.7 M sodium (nominal tank concentration) and partitioned into a batch of 7 M sodium and a batch of 5.5 M sodium. Dilution increased the combined volume of the two batches to approximately 7.8 liters of 7 M Na feed and 4.4 liters of 5.5 M Na feed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Constraints on a Proton Synchrotron Origin of VHE Gamma Rays from the Extended Jet of AP Librae

The multiwavelength photon spectrum from the BL Lac object AP Librae extends from radio to TeV gamma rays. The X-ray to very high-energy gamma-ray emission from the extended jet of this source has been modeled with inverse Compton (IC) scattering of relativistic electrons off the cosmic microwave background (CMB) photons. The IC/CMB model requires the kpc-scale extended jet to be highly collimated with a bulk Lorentz factor close to 10. Here we discuss the possibility of a proton synchrotron origin of X-rays and gamma rays from the extended jet with a bulk Lorentz factor of 3. This scenario requires an extreme proton energy of 3.98 × 10{sup 21} eV and a high magnetic field of 1 mG of the extended jet with jet power ∼5 × 10{sup 48} erg s{sup −1} in particles and the magnetic field (which is more than 100 times the Eddington luminosity of AP Librae) to explain the very high-energy gamma-ray emission. Moreover, we have shown that X-ray emission from the extended jets of 3C 273 and PKS 0637-752 could be possible by proton synchrotron emission with jet power comparable to the Eddington luminosities.

79 ASTRONOMY AND ASTROPHYSICS↗

Shuttle APS propellant thermal conditioner study

A study program was performed to allow selection of thermal conditioner assemblies for superheating O2 and H2 at supercritical pressures. The application was the auxiliary propulsion system (APS) for the space shuttle vehicle. The O2/H2 APS propellant feed system included propellant conditioners, of which the thermal conditioner assemblies were a part. Cryogens, pumped to pressures above critical, were directed to the thermal conditioner assembly included: (1) a gas generator assembly with ignition system and bipropellant valves, which burned superheated O2 and H2 at rich conditions; (2) a heat exchanger assembly for thermal conditioning of the cryogenic propellant; and (3) a dump nozzle for heat exchanger exhaust.

Pearson, W. E.↗

A comparison of the geomagnetic ap index with fluctuations in B and V - Mariner 5

Mariner 5 data for the interplanetary magnetic field and the solar wind velocity are compared with terrestrial ap values for the period from June 15, to August 22, 1967. It is concluded that fluctuations in the interplanetary magnetic field are more closely coupled to geomagnetic activity as measured with the ap index than are fluctuations in the solar wind velocity. During periods of high-level activity, the data support the Dessler and Walters (1964) model where the magnetic field is the primary causal agent of geomagnetic activity.

Jones, D. E.↗

Preignition reactions of AP-HTPB propellants studied by IR spectrometry

IR absorption spectrometry was used to follow the disappearance of NH and CH bonds during the pyrolysis of a polymer film containing 30 weight percent ammonium perchlorate (AP). The remaining 70 weight percent consisted of a mixture of 92.5 weight percent hydroxyl-terminated polybutadiene (HTPB) and 7.5 weight percent isophrone diisocyanate (IPDI). The results indicate that polymer decomposition is induced by products of AP decomposition, and that about 2.5 CH bonds disappear for each NH bond that disappears. The diffusion process occurring in the later stages of the reaction is analyzed in an attempt to account for the unexpectedly low activation energy.

Law, R. J.↗

X-ray emission from an Ap star /Phi Herculis/ and a late B star /Pi Ceti/

Using the HEAO 1 soft X-ray sky survey, a search was conducted for X-ray emission from 18 stars in the spectral range B5-A7. The detection of 0.25 keV X-ray sources consistent with the positions of Pi Ceti, a normal B7 V star, and Phi Herculis, a classic Ap star was reported. The detection of these stars argues for large mass motions in the upper layers of stars in this spectral range, and argues against radiative diffusion as the source of abundance anomalies in Ap stars.

Cash, W.↗

The UV resonance lines of three hot Ap stars: HD 133029, HD 175362 and HD 219749

High resolution spectra of the Ap stars HD 133929, HD 175329 and HD 219749 were obtained during two 16 hour shifts with the IUE satellite at Goddard Space Flight Center. Stellar wind, extended atmosphere in rigid corotation with the stellar surface, and the influence of the strong magnetic field on the upper part of the atmosphere would explain the shape and the strength of the resonance lines. The resonance lines of HD 175362 in particular show very peculiar behavior. The necessary driving forces for the expanding envelope are not compatible with the diffusion theory of the Ap atmospheres.

Rakos, K. D.↗

APS-Workshop on Characterization of MMIC (Monolithic Microwave Integrated Circuit) Devices for Array Antenna

The IEEE AP-S ADCOM is attempting to expand its educational, tutorial and information exchange activities as a further benefit to all members. To this end, ADCOM will be forming specialized workshops on topics of interest to its members. The first such workshop on Characterization and Packaging of MMIC Devices for Array Antennas was conceived. The workshop took place on June 13, 1986 as part of the 1986 International Symposium sponsored by IEEE AP-S and URSI in Philadelphia, PA, June 9-13, 1986. The workshop was formed to foster the interchange of ideas among MMIC device users and to provide a forum to collect and focus information among engineers experienced and interested in the topic. After brief presentations by the panelists and comments from attendees on several subtopics, the group was divided into working committees. Each committee evaluated and made recommendations on one of the subtopics.

Smetana, Jerry↗

Periodic variation in the geomagnetic activity - A study based on the Ap index

The monthly and daily samples of the Ap index for the interval from 1932 through 1982 were studied using the power spectrum technique. Results obtained for Bartel's period (about 27 days), the semiannual period, the dual-peak solar cycle distribution of geomagnetic storms, and certain other medium-scale periodicities are examined in detail. In addition, results on the cumulative occurrence number of storms per decade as a function of the Ap and Dst indices for the storm are presented.

De Gonzalez, Alicia L. C.↗

Comment on the Predicted Size of Cycle 23 Based on the Inferred Three-Cycle Quasi-Periodicity of the Planetary Index Ap

Recently, Ahluwalia [1998] reviewed the solar and geomagnetic data for the last 6 decades and remarked that these data "indicate the existence of a three-solar-activity-cycle quasi-periodicity in them." Futhermore, on the basis of this inferred quasi-periodicity, he asserted that cycle 23 represents the initial cycle in a new 3-cycle string, implying that it "will be more modest (a la cycle 17) with an annual mean sunspot number count of 119.3 +/- 30 at the maximum," a prediction that is considerably below the consensus prediction of 160 +/- 30 by Joselyn et al. [1997] and of similar predictions by others based on a variety of predictive techniques. Several major sticking points of Ahluwalia's presentation, however, must be redressed, and these issues form the basis of this comment. In particular, it is shown that Ahluwalia used inappropriate values of the Ap index in his analysis, that the inferred 3-cycle relationship which Ahluwalia claims for both Ap and SSN does not exist for the previous 6-cycle interval (prior to cycle 17) for SSN, that his inferred fit is only of marginal statistical significance (having r = 0.81), and that two alternative precursor fits (both with r = 0.96 or greater) exist which strongly suggest that R max for cycle 23 will be much larger than forecast by Ahluwalia (namely, about 168-187). Thus, caution must be exercised in accepting Ahluwalia's findings.

Hathaway, David H.↗

Chandra X-Ray Observatory's Radiation Environment and the AP-8/AE-8 Model

The Chandra X-ray Observatory (CXO) was launched on July 23, 1999 and reached its final orbit on August 7, 1999. The CXO is in a highly elliptical orbit, approximately 140,000 km x 10,000 km, and has a period of roughly 63.5 hours (approx. 2.6 days). It transits the Earth's Van Allen belts once per orbit during which no science observations can be performed due to the high radiation environment. The Chandra X-ray Observatory Center (CXC) currently uses the National Space Science Data Center's "near Earth" AP-8/AE-8 radiation belt model to predict the start and end times of passage through the radiation belts. However, our scheduling software only uses a simple dipole model of the Earth's magnetic field. The resulting B, L magnet coordinates, do not always give sufficiently accurate predictions of the start and end times of transit of the Van Allen belts. We show this by comparing to the data from Chandra's on-board radiation monitor, the EPHIN (Electron, Proton, Helium Instrument particle detector) instrument. We present evidence that demonstrates this mis- of the radiation belts as well as data that also demonstrate the significant variability of one radiation belt transit to the next as experienced by the CXO. We present an explanation for why the dipole implementation of the AP-8/AE-8 gives inaccurate results. We are also investigating use of the Magnetospheric Specification and Forecast Model (MSM) - a model that also accounts for radiation belt variability and geometry.

Virani, S. N.↗