Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2024”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

WHOLESCALE - Water & Hole Observations Leverage Effective Stress Calculations And Lessen Expenses (Final Technical Report 2020 - 2024)

The WHOLESCALE acronym stands for Water & Hole Observations Leverage Effective Stress Calculations and Lessen Expenses. The goal of the WHOLESCALE project is to simulate the spatial distribution and temporal evolution of stress in the geothermal system at San Emidio in Nevada, United States. To reach this goal, the WHOLESCALE team has developed a methodology to incorporate and interpret data from four methods of measurement into a multi-physics model that couples thermal, hydrological, and mechanical (T H-M) processes. The WHOLESCALE team has applied this methodology at the San Emidio geothermal field, located ~100 km north of Reno, Nevada in the northwestern Basin and Range province. The WHOLESCALE team includes 30 individuals working at two universities, two national laboratories, and one industry partner. Two master-degree students and five post-doctoral researchers have gained professional experience and earned partial financial support via the WHOLESCALE project. The WHOLESCALE team has taken advantage of the perturbations created by changes in pumping operations during planned shutdowns in 2016, 2021, and 2022 to infer temporal changes in the state of stress in the geothermal system at San Emidio, Nevada, U.S. The WHOLESCALE results support the working hypothesis that increasing pore-fluid pressure reduces the effective normal stress acting across fault zones. During normal operations, pumping in deep production wells decreases fluid pressures and thus increases the effective normal stresses on faults, reducing microseismicity. During planned shutdowns, the cessation of production increases pore-fluid pressure and reduces effective normal stress. The WHOLESCALE products generated during the 4-year period between 2020 and 2024 include: three articles published in the open-access, peer-reviewed scientific literature, two master’s theses, 20 presentations or papers at scientific conferences, and 17 data sets available on public repositories. The WHOLESCALE project has been completed in two phases that included three performance periods separated by two Go/No-go Stage Gate Reviews. Tasks were classified by data type (i.e., Geologic Structure, Borehole, Geodesy, Hydrology, Seismology, and Modeling). The first phase of the project started July 31, 2020 and included ongoing project coordination (Task 1), a project kickoff (Task 2), analysis of existing data (Task 3), development of the initial stress model & deployment design (Task 4), and Go/No-go Decision Point #1 (Task 5). Phase II began with implementing the 2022 deployment (Task 6), followed by Go/No-go Decision Point #2 (Task 7) The remainder of Phase II consisted of analyzing data collected during deployment (Task 8), calibration of the stress model on all observations (Task 9), and the Final Review (August 23, 2024) & Reporting (Task 10).

15 GEOTHERMAL ENERGY↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2024

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2024. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2024 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

54 ENVIRONMENTAL SCIENCES↗

2024 International Conference on Ionizing Processes

This Basic Energy Sciences (BES) award provided targeted support to early-career investigators to facilitate their attendance and participation in the International Conference on Ionizing Processes (ICIP 2024), organized and hosted at the University of Notre Dame campus between August 11th and 15th, 2024. The support enabled young researchers to present their work through oral and poster presentations, engage with senior leaders in the field, and strengthen national research capabilities in radiation chemistry and related disciplines. A total of 19 young investigators from U.S. academic institutions and national laboratories received registration discounts, and 8 of them also received additional travel-offset awards. Four of the young investigators received travel offset awards without registration discounts; hence, the total number of awardees was 23. Five awards were given to young investigators from Brookhaven National Laboratory, five to Idaho National Laboratory, one to Los Alamos National Laboratory, one to Michigan State University, one to Colorado School of Mines, and 10 to Notre Dame Radiation Laboratory. Total DOE funding directly reduced financial barriers to participation, enhancing U.S. early-career representation at this important international conference.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Y-12 National Security Complex Biological Monitoring and Abatement Program—2024 Calendar Year Report

This report provides the results of the CY 2024 sampling of East Fork Poplar Creek (EFPC) as part of the Y-12 National Security Complex (Y-12) Biological Monitoring and Abatement Program (BMAP). The results are presented in the context of historical trends. The Y-12 BMAP was developed in 1985 to demonstrate that the effluent limits established for Y-12 protected the classified uses of the receiving stream, particularly the growth and propagation of aquatic life (Loar et al. 1989). Over the years, the BMAP has become an important and valuable long-term measure of stream conditions resulting from actions and activities at the Y-12 Complex. The BMAP currently consists of three tasks: (1) bioaccumulation monitoring, (2) benthic macroinvertebrate community monitoring, and (3) fish community monitoring. The benthic macroinvertebrate community monitoring task includes studies to evaluate the receiving stream’s biological integrity annually in comparison with Tennessee Water Quality Criteria following Tennessee Department of Environment and Conservation (TDEC) protocols. In addition to presenting the EFPC biological monitoring results, this report includes results from Comprehensive Environmental Response, Compensation, and Liability Act–funded BMAP programs in Bear Creek and McCoy Branch (presented in Appendixes A and B, respectively), as required in the Y-12 National Pollutant Discharge Elimination System (NPDES) permit. Additional biological testing at the Y-12 Complex includes toxicity testing of select storm drains as required in the NPDES permit. Although toxicity testing is not formally part of the BMAP, toxicity testing results from 2024 are provided in Appendix C.

54 ENVIRONMENTAL SCIENCES↗

2024 Annual Merit Review - Vehicle Technologies Office: Results Report

The 2024 U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy’s (EERE) Vehicle Technologies Office (VTO) Annual Merit Review (AMR) was held June 3-6, 2024, in Arlington, Virginia. The review encompassed work done by VTO: 226 individual activities were reviewed by 218 reviewers. Exactly 888 individual review responses were received for the VTO technical reviews. Each project was reviewed by 2–7 independent reviewers, with a majority of projects having 4–5 reviewers. The objective of the meeting was to review the accomplishments and plans for VTO over the previous 12 months, and provide an opportunity for industry, government, and academia to give inputs to DOE with a structured and formal methodology. The meeting also provided attendees with a forum for interaction and technology information transfer.

33 ADVANCED PROPULSION SYSTEMS↗

Annual Summary Report for the Remote-Handled Low-Level Waste Disposal Facility—FY 2024

This Fiscal Year (FY) 2024 annual summary report (ASR) documents the continued adequacy of the performance assessment (PA), the composite analysis (CA), and associated operating disposal- authorization statement (ODAS) technical-basis documents for the Remote-Handled (RH) Low-Level Waste (LLW) Disposal Facility at Idaho National Laboratory (INL). Annual review of the adequacy of the PA and CA for the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility ensures that conclusions of the analyses remain valid in accordance with requirements of Department of Energy (DOE) Order 435.1, “Radioactive Waste Management.” In FY 2024, no significant operational changes or other activities occurred that would cause deviation from the assumptions in the PA and CA pertaining to disposal geometry, verification of waste characteristics, tracking disposal inventories against total limits, facility-closure design, or institutional controls. Nineteen waste canister shipments were received at the RHLLW Disposal Facility, and all nineteen waste canisters were emplaced in disposal vaults.

12 - MGMT OF RADIOACTIVE AND NON-RADIOACTIVE WASTE↗

Annual Supply Chain for Photovoltaics (ASC-PV) in the United States: 2024 in Review

This report analyzes U.S. PV and BESS supply chains and costs in 2024, for PV module and battery technologies, structural and electrical balance of system (BOS) components, as well as PV recycling. The report concludes with an analysis of technology installation trends, government support for domestic manufacturing, manufacturing jobs, and the domestic content of PV systems installed in the United States in 2024.

14 SOLAR ENERGY↗

ARM Aerosol Measurement Science Group 2024 Strategic Planning Workshop Report

This report summarizes the results of the 2024 Strategic Planning Workshop conducted by the Aerosol Measurement Science Group (AMSG) for the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) User Facility. The objective of this workshop was to provide ARM facility guidance through specific recommendations relating to aerosol science for a period of five years. The AMSG primary focus of this workshop was to help advance strategic external partnership engagement for ARM’s aerosol measurement program. The workshop was held July 9-10, 2024 at the University of Utah. This was the third such workshop since the AMSG was chartered in 2015 to enhance coordination of ARM observations of aerosols and atmospheric trace gases with the needs of ARM users.

54 ENVIRONMENTAL SCIENCES↗

2024 Bioenergy Industry Status Report

This report provides a snapshot of the bioenergy industry status at the end of 2024. The report compliments other annual market reports from the Department of Energy's (DOE's) Office of Energy Efficiency and Renewable Energy (EERE) offices and is supported by DOE'sOffice of Critical Minerals and Energy Innovation's Alternative Fuels and Feedstocks Office. The 2024 Bioenergy Industry Status Report focuses on past year data covering multiple dimensions of the bioenergy industry and does not attempt to make future market projections. There report covers production, consumption, plants, trade, and end-use for all biofuels, biopower, and biobased products where data is available. The report provides a balanced and unbiased assessment of the industry and associated markets. It is openly available to the public and is intended to complement other industry reports with a focus on DOE stakeholder needs.

09 BIOMASS FUELS↗

Bat Acoustic Survey Data Collected June 2024 in and near Self Sufficiency Parcel-2 (SSP2) on the Oak Ridge Reservation (ORR)

The US Department of Energy (DOE) Oak Ridge Reservation (ORR) is located in Anderson and Roane Counties, Tennessee. A portion of the ORR, known as Self-Sufficiency Parcel 2 (SSP2) is planned for transfer for private use. The SSP2 Site is approximately 670 acres (Figure 1-1), although the current plan is to only clear and develop a portion of this acreage. Any inquiries about the land transfer and future development should be directed to DOE Oak Ridge Environmental Management, as this is beyond the scope of the Natural Resources Management Team (NRMT). NRMT records bat data for the entire ORR, including acoustic monitoring, mist netting and cave surveys. A few surveys have previously been conducted for small land transfers adjacent to SSP2 (See Appendix A), but not for the entire SSP2 area. Since bats have a large range, it was decided that collecting data while SSP2 was still accessible would be beneficial for the NRMT dataset. Acoustic data was therefore collected within and near SSP2 during the summer of 2024. This write-up is not a Biological Assessment (BA). However, the data and information provided can be used during the creation of a BA and consultations with US Fish and Wildlife Service (USFWS) in order to comply with federal directives of the Endangered Species Act of 1973 (16 U. S. C. 153 et seq.). The SSP2 site was surveyed during summer roosting/maternity season of 2024 using ultrasonic acoustic monitors to record calls from all bat species whose home ranges include the ORR. Special note was taken for presence of Federally listed Endangered and Threatened (T&E) bat species, as well as bat species which are Proposed for Federal listing, Candidate for federal listing, and state listed. Summer roosting season, from May 15 to August 15, is crucial to forest-dwelling T&E bat species for rearing young and foraging. Results of these surveys indicate the presence of three Federally listed bat species: Gray bat (Myotis grisescens--Endangered), Indiana bat (Myotis sodalis--Endangered), and Northern long-eared bat (Myotis septentrionalis--Endangered). Two additional bat species were present on the SSP2 Site: Tricolored bat (Perimyotis subflavus--Proposed for Federal listing) and Little brown bat (Myotis lucifugus—Candidate for Federal listing).

54 ENVIRONMENTAL SCIENCES↗

NRC Reactor Operating Experience Analysis and Trend Summary: 2024 Update

This report presents a summary of the Nuclear Regulatory Commission’s (NRC’s) reactor operating experience analyses with data through 2024 as well as the reliability and frequency trends identified in the 2024 update reports for the component performance studies, loss-of-offsite power analysis, initiating events analysis, and system studies provided on the NRC Reactor Operating Experience Results and Databases website (https://nrcoe.inl.gov/).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Chloroform Fumigation Extraction for Microbial Biomass and Dissolved Organic Carbon from SPRUCE, Marcell Experimental Forest, Minnesota, 2021, 2022, and 2024

This data set provides the results for chloroform fumigation extraction (CFE) of peat samples collected from ambient and experimental plots in the Spruce and Peatland Responses Under Environmental Change (SPRUCE) Experiment site in June and August of 2021, June of 2022, and June, August, and October of 2024. The SPRUCE Experiment site is in the Marcell Experimental Forest in northern Minnesota, USA. The data set includes values for microbial biomass carbon (MBC), microbial biomass nitrogen (MBN), dissolved organic carbon (DOC), dissolved nitrogen (DN), moisture content (MC, available for 2021 and 2022 only) and gravimetric water content (GWC) at 11 depth increments of two-meter peat cores taken from 12 sampling sites at SPRUCE (10 temperature treatment enclosures, 2 ambient temperature treatment enclosures). The sample analysis followed standard methods. The samples were analyzed using a Shimadzu Total Organic Carbon/Nitrogen (TOC/N) analyzer (TOC-V and TOC-L; 2021-2022) or an Elementar vario TOC Cube (2024), liquid catalytic oxidation combustion analyzers for total carbon and nitrogen analysis. This dataset contains two data files in comma separate (.csv) format. Additional metadata are provided: two data dictionaries and a file-level metadata file in comma separate (.csv) format and a user guide in PDF (*.pdf) format.

dissolved nitrogen↗

2024 Standard Scenarios: A U.S. Electricity Sector Outlook

This data corresponds to the 2024 Standard Scenarios report, which contains a suite of forward-looking scenarios of the possible evolution of the U.S. electricity sector through 2050. These files contain modeled projections of the future. Although we strive to capture relevant phenomena as comprehensively as possible, the models used to create this data are unavoidably imperfect, and the future is highly uncertain. Consequentially, this data should not be the sole basis for making decisions. In addition to drawing from multiple scenarios within this set, we encourage analysts to also draw on projections from other sources, to benefit from diverse analytical frameworks and perspectives when forming their conclusions about the future of the power sector. For further discussions about the limitations of the models underlying this data, see section 1.4 of the "ReEDS Documentation" linked below. For scenario descriptions, input assumptions, and metric definitions for the data in these files, see the "2024 Standard Scenarios Report" linked below.

2050↗

Global Carbon Budget 2024

Abstract. Accurate assessment of anthropogenic carbon dioxide (CO2) emissions and their redistribution among the atmosphere, ocean, and terrestrial biosphere in a changing climate is critical to better understand the global carbon cycle, support the development of climate policies, and project future climate change. Here we describe and synthesize datasets and methodologies to quantify the five major components of the global carbon budget and their uncertainties. Fossil CO2 emissions (EFOS) are based on energy statistics and cement production data, while emissions from land-use change (ELUC) are based on land-use and land-use change data and bookkeeping models. Atmospheric CO2 concentration is measured directly, and its growth rate (GATM) is computed from the annual changes in concentration. The global net uptake of CO2 by the ocean (SOCEAN, called the ocean sink) is estimated with global ocean biogeochemistry models and observation-based fCO2 products (fCO2 is the fugacity of CO2). The global net uptake of CO2 by the land (SLAND, called the land sink) is estimated with dynamic global vegetation models. Additional lines of evidence on land and ocean sinks are provided by atmospheric inversions, atmospheric oxygen measurements, and Earth system models. The sum of all sources and sinks results in the carbon budget imbalance (BIM), a measure of imperfect data and incomplete understanding of the contemporary carbon cycle. All uncertainties are reported as ±1σ. For the year 2023, EFOS increased by 1.3 % relative to 2022, with fossil emissions at 10.1 ± 0.5 GtC yr−1 (10.3 ± 0.5 GtC yr−1 when the cement carbonation sink is not included), and ELUC was 1.0 ± 0.7 GtC yr−1, for a total anthropogenic CO2 emission (including the cement carbonation sink) of 11.1 ± 0.9 GtC yr−1 (40.6 ± 3.2 GtCO2 yr−1). Also, for 2023, GATM was 5.9 ± 0.2 GtC yr−1 (2.79 ± 0.1 ppm yr−1; ppm denotes parts per million), SOCEAN was 2.9 ± 0.4 GtC yr−1, and SLAND was 2.3 ± 1.0 GtC yr−1, with a near-zero BIM (−0.02 GtC yr−1). The global atmospheric CO2 concentration averaged over 2023 reached 419.31 ± 0.1 ppm. Preliminary data for 2024 suggest an increase in EFOS relative to 2023 of +0.8 % (−0.2 % to 1.7 %) globally and an atmospheric CO2 concentration increase by 2.87 ppm, reaching 422.45 ppm, 52 % above the pre-industrial level (around 278 ppm in 1750). Overall, the mean of and trend in the components of the global carbon budget are consistently estimated over the period 1959–2023, with a near-zero overall budget imbalance, although discrepancies of up to around 1 GtC yr−1 persist for the representation of annual to semi-decadal variability in CO2 fluxes. Comparison of estimates from multiple approaches and observations shows the following: (1) a persistent large uncertainty in the estimate of land-use change emissions, (2) low agreement between the different methods on the magnitude of the land CO2 flux in the northern extra-tropics, and (3) a discrepancy between the different methods on the mean ocean sink. This living-data update documents changes in methods and datasets applied to this most recent global carbon budget as well as evolving community understanding of the global carbon cycle. The data presented in this work are available at https://doi.org/10.18160/GCP-2024 (Friedlingstein et al., 2024).

Friedlingstein, Pierre (ORCID:0000000333094739)↗

Supply Chain for Photovoltaics in the United States: 2024 in Review

Solar photovoltaic (PV) and battery energy storage system (BESS) technologies are two immediately available options for meeting U.S. electricity demands, which are increasing due to expansion of loads from end uses including data centers, buildings, vehicles, and factories. Globally, PV and BESS supply chains are dominated by products manufactured in China and elsewhere by Chinese companies. However, U.S. PV and BESS manufacturing have recently grown, with some capacity in each step of the PV supply chain, albeit not enough to currently meet demand with domestic manufacturing alone. This study analyzes U.S. PV supply chains and costs in 2024, for the crystalline silicon and cadmium telluride module supply chains. The full report additionally addresses the PV balance of system, inverter and BESS supply chains. The study concludes with an analysis of technology installation trends, government support for domestic manufacturing, manufacturing jobs, and the domestic content of PV systems installed in the United States in 2024.

14 SOLAR ENERGY↗

Status and Trends in the U.S. Voluntary Power Market: 2024 Data

Voluntary renewable power, for this report, refers to renewable energy procurement by retail electricity customers above what is otherwise provided by load-serving entities. This report is part of an annual series of reports synthesizing trends in the U.S. voluntary renewable power market. In 2024, about 9.2 million retail electricity customers procured about 315 million megawatt-hours (MWh) of voluntary renewable power (Figure ES-1). Estimated voluntary renewable power market sales represented about 45% of renewable energy sales excluding large hydropower and about 8% of all U.S. retail electricity sales in 2024. Most of the remainder of U.S. renewable energy sales reflects renewable energy procured by load-serving entities to comply with state renewable energy mandates.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2024 JISEA Annual Meeting: Session 1

This is the presentation for the 2024 JISEA Annual Meeting Session 1: Hard-to-Decarbonize Industries, which took place on February 26, 2024. The presentation includes slides from Chad Reese, Environmental Affairs Manager at the San Diego County Regional Airport Authority, on sustainability efforts at the San Diego International Airport; Jordan Lambert, Director of Ag Innovation at Colorado State University, on agricultural decarbonization; Ana Aday, Materials Science Researcher at NREL, on decarbonizing the cement and concrete industry; and Rolf Weberg, Director of the Natural Resource Research Institute at the University of Minnesota Duluth, on integrated industrial decarbonization.

agriculture decarbonization↗

2024 JISEA Annual Meeting: Session 2

This is the presentation for the 2024 JISEA Annual Meeting Session 2: Technology-Society Interface, which took place on February 26, 2024. The presentation includes slides from Maria Curry-Nkansah, Senior Research Advisor at NREL, on clean energy transition case studies.

clean energy technologies↗