Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “2023”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 127 records · Page 7

Electric Vehicle Charging Infrastructure Trends from the Alternative Fueling Station Locator: Fourth Quarter 2023

Electric vehicle (EV) charging infrastructure continues to rapidly change and grow. Using data from the U.S. Department of Energy's (DOE's) Alternative Fueling Station Locator, this report provides a snapshot of the state of EV charging infrastructure in the United States in the fourth calendar quarter of 2023 (Q4 2023) by charging level, network, and location. Additionally, this report measures the current state of charging infrastructure compared to the infrastructure requirement scenario outlined in the National Renewable Energy Laboratory (NREL) report, The 2030 National Charging Network: Estimating U.S. Light-Duty Demand for Electric Vehicle Charging Infrastructure. This information is intended to help transportation planners, policymakers, researchers, infrastructure developers, and others understand the rapidly changing landscape of EV charging infrastructure. This is the sixteenth report in a series. Reports from previous quarters can be found in the Alternative Fuels Data Center (AFDC) and NREL publication databases, as well as the AFDC Charging Infrastructure Trends page (https://afdc.energy.gov/fuels/electricity_infrastructure_trends.html).

33 ADVANCED PROPULSION SYSTEMS↗

2023 Southeast Decarbonization Workshop

Decarbonization refers to a large-scale shift away from fossil fuel sources for energy production and toward energy sources, energy end-use practices, and land management approaches that do not result in a net increase of carbon dioxide in the atmosphere. Decarbonization in the Southeastern United States is distinguished from that of other regions in the country by its potential impact on historically underserved populations and the ways this region’s human–environmental systems are predicted to fare in a climate-altered world. In parallel, ensuring a clean energy transition requires the ability to engage entire communities that are motivated to learn, build, and encourage the spread of so-called clean tech. In contrast to other technology trends from the past century, the foundation of clean tech is a shared sense of purpose—a collective strategy to mitigate the threats of climate change and support a better environment for everyone. As seen in the Office of Science and Technology Policy’s (OSTP’s) Net-Zero Technology Action Plan (2023), decarbonization is best accelerated by simultaneous investments in Innovation, Demonstration, and Deployment of technology in tandem with intentional policy and community-based solutions. The 2023 Southeast Decarbonization Workshop, hosted by the Georgia Institute of Technology (Georgia Tech) and Oak Ridge National Laboratory (ORNL), aimed to bring together members of our communities and a group of regional experts to strategize about opportunities in this important area, as well as to incorporate the important pillar of System Interactions to bridge the gap between clean tech’s intent and its impact.

54 ENVIRONMENTAL SCIENCES↗

Assessment of BQ-9000 Biodiesel Properties for 2023

This is the seventh in a series of reports documenting the quality of biodiesel from U.S.- and Canadian-based producers that participate in the BQ-9000 program, the biodiesel industry’s voluntary quality assurance program. Participants provided monthly data on critical quality parameters for calendar year 2023 with quality data provided to a team of experts, who removed any identifying company information and provided anonymized data to the National Renewable Energy Laboratory (NREL) for statistical analysis. New for 2023, data on kinematic viscosity, sulfated ash, distillation temperature, carbon residue, and cetane were collected, as well as individual levels of sodium, potassium, calcium, and magnesium. Critical quality parameters analyzed are listed in Table ES-1 with descriptive statistics.

09 BIOMASS FUELS↗

Maritime Fuel Cell Generator Project: 2018 – 2023

This report summarizes activity in the Maritime Fuel Cell (MarFC) Generator Project from 2018 – 2023. FY 2018 saw the implementation of upgrades and repairs, making the unit more reliable and operator friendly. In FY2019 the team engaged the Scripps Institution of Oceanography (SIO) to use the MarFC to provide zero-emission shore power to the research vessel R/V Robert Gordon Sproul while in port at the Nimitz Marine Facility in San Diego, CA. In FY2020, the MarFC unit was shipped to San Diego, CA. A fueling contract with IGX was established to support MarFC operations at SIO, with renewable hydrogen provided by the California State University Los Angeles (CSULA) hydrogen station. The project team (Sandia, Cummins/Hydrogenics) provided training to SIO staff on the technical details of the MarFC, the safe use of hydrogen in general and the MarFC in particular. The first fueling of the unit at the SIO pier was successfully completed by IGX. The first powering of a vessel with fuel-cell shore power was conducted with the R/V Robert Gordon Sproul. While the mechanical systems (lights, AC, ventilation, hydraulics, pumps and cranes) were powered without incident, problems arose when powering the computer systems. Inspections carried out in FY2021 revealed the MarFC needed routine maintenance. Maintenance was performed and the unit was upgraded. The MarFC was turned on after the year pause, and initial test data on power levels and stability were collected. FY2022 was a year spent repairing, upgrading and testing the MarFC unit. Spikes in power and voltage were observed above 60 kW that could potentially extend below 60 kW with time. Such spikes could cause problems with the Sproul electrical systems. These age-related problems, the extended time for the Sproul spent in dry dock for scheduled upgrades, and the associated need to reschedule the vessel’s high-priority science missions made it no longer possible to deploy the unit at SIO. After due consideration, the decision was made by DOE, MARAD and the project team to cease the deployment, remove the MarFC from SIO, and not pursue further deployment activities. On December 2, 2022, the MarFC unit was removed from the Scripps Nimitz Marine Facility and shipped to Fridley, Michigan. The Cummins/Hydrogenics plan for the unit is to assess the condition of the MarFC subcomponents, and then use it as a training/learning system for technical employees new to hydrogen fuel-cell technology. After summarizing project activity from 2018 – 2023, this report provides a review of lessons learned. This report provides next steps in contemplating a follow-on project that would further advance the use of fuel-cell-based shore power in a marine setting. A comparison is made of the project results to the original objectives. This report ends with an accounting of presentations stemming from the project, and a list of references.

08 HYDROGEN↗

2023 Sandia Day at UT Austin

On Wednesday, March 8 th and Thursday, March 9 th , 2023, the University of Texas at Austin hosted Sandia National Laboratories (Sandia) for “Sandia Day 2023 at UT Austin” with the intention of reviewing, planning and shaping ongoing and future collaborations in key areas that reflect each organization’s priorities and strengths. The event brought together nearly 100 UT and Sandia participants including executive leadership, researchers, faculty, staff, and students. The primary sessions of Sandia Day consisted of a half-day tour of select J.J. Pickle Research Campus facilities, a networking happy hour, leadership meetings, presentations by both Sandia and UT Austin representatives in areas of research strategic priorities: Grid Resiliency, Examining Climate Change, and Microelectronics, and a research poster session with lunch. The group also discussed growth opportunities in the following research areas: nuclear and radiation engineering, pulsed power and fusion physics, and digital engineering, specifically as it related to materials discovery and advanced manufacturing. Appendix A contains the full Sandia Day agenda.

99 GENERAL AND MISCELLANEOUS↗

Annual Site Environmental Report: 2023 (ASER) for the SLAC National Accelerator Laboratory

This report, prepared by the SLAC National Accelerator Laboratory (SLAC) for the U.S. Department of Energy (DOE), SLAC Site Office (SSO), provides a comprehensive summary of the environmental program activities at SLAC for calendar year 2023. Annual Site Environmental Reports (ASERs) are prepared for all DOE sites with significant environmental activities and distributed to relevant external regulatory agencies and other interested organizations or individuals. To the best of my knowledge, this report accurately summarizes the results of the 2023 environmental monitoring, compliance, and restoration programs at SLAC. This assurance can be made based on SSO and SLAC review of the ASER, and quality assurance protocols applied to monitoring and data analyses at SLAC.

54 ENVIRONMENTAL SCIENCES↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2023

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 191 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2023, between October 1, 2022 and September 30, 2023, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

7th World Congress on Integrated Computational Materials Engineering (ICME 2023) (Final Technical Report)

Integrated Computational Materials Engineering (ICME) has received international attention due to its potential to shorten product development time, while lowering cost and improving design and manufacturing outcomes. ICME is an approach to designing materials solutions for specific applications that use computer modeling programs to predict the behavior of materials and integrate this information into the overall materials, processing, and manufacturing design cycle. The 7th World Congress on Integrated Computational Materials Engineering (ICME 2023) was held in Orlando, Florida from May 21–25, 2023 with the goal to convene stakeholders from across all areas of modeling and simulation, experimental specialization, and design, as well as from across academia, government, and industry, to address ICME tools and techniques and their integration, as well as to examine their application in engineering. This atmosphere facilitated rich interactions between the experimentalists, modelers, and computational and design, from academia, government, and industry, to discuss ICME tools and techniques and their application in engineering.

36 MATERIALS SCIENCE↗

Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2023

Pacific Northwest National Laboratory (PNNL), one of the U.S. Department of Energy (DOE) Office of Science’s 10 national laboratories, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. There are three DOE offices within the Richland area. Two are responsible for the Hanford Site, whereas the Pacific Northwest Site Office oversees PNNL. PNNL prepares an Annual Site Environmental Report to meet the requirements of DOE Order 231.1B, Environment, Safety and Health Reporting, and DOE Order 458.1, Radiation Protection of the Public and the Environment, thus assuring that the public is informed of any PNNL-Richland campus or PNNL-Sequim campus event that could adversely affect the health and safety of the public, site staff, or the environment. The report provides a synopsis of ongoing environmental management performance and compliance activities for operations that occur at the PNNL-Richland campus in Richland, Washington, and at the PNNL-Sequim campus near Sequim, Washington. It describes the location of and background for each facility; addresses compliance with applicable DOE, federal, state, and local regulations, and site-specific permits; documents environmental monitoring efforts and their status; presents potential radiation doses to staff and the public in the surrounding areas; and describes DOE-required data quality assurance methods used for data verification. The ASER report describes Compliance with Federal, State, and Local Laws and Regulations in 2023, Environmental Sustainability, Environmental monitoring and dose assessment, Natural and Cultural Resource Management, and Quality Assurance activities that took place during Calendar Year 2023.

40 CFR 61 Subpart H↗

Final Report on the 2023 LaserNetUS Annual Meeting

LaserNetUS is a network of advanced laser facilities created by the Department of Energy Fusion Energy Sciences to provide greatly improved access to the most powerful lasers in North America. It is dedicated to the development of the high energy density physics workforce, especially the training and advancement of early career scientists. The network is helping to build a larger, better skilled and more diverse scientific community. The result of the work of LaserNetUS towards these goals was on display at the 2023 LaserNetUS Annual Meeting, held at the University of Maryland, College Park, Maryland on June 27-29, 2023 (Figure 1). The meeting had 216 participants, the largest sponsor/exhibitor participation of any LaserNetUS annual meeting, wide ranging plenary, invited, and contributed talks, a vigorous poster session, outreach to a diverse range of students, and two awards sessions.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Calendar Year 2023 Underground Test Area Annual Sampling Letter Report Nevada National Security Site

The calendar year 2023 annual sampling letter report presents Plan implementation and a summary of field activities, sampling methods, well completion diagrams, and analytical laboratory results from sampling of wells associated with the Pahute Mesa CAUs. The CY 2023 letter report also presents data from samples collected from Well ER-EC-11_p3 as part of a sampling investigation. This well was resampled because of anomalously low standard tritium (3H) results from bailer sampling that occurred in July 2021.

54 ENVIRONMENTAL SCIENCES↗

Clean Cities and Communities Partnership 2023 Activity Report

This is the 2023 report for the Clean Cities and Communities (CC&C) partnership. It tracks the metrics that have been reported by individual coalitions and aggregated to the national level. It looks at the various outreach activities, grant activities, and implementation of clean transportation technologies. Such technologies include natural gas vehicles, electric vehicles, propane vehicles, hydrogen fuel cell vehicles, biodiesel, ethanol, idle reduction technologies, fuel economy improvement technologies, vehicle-miles-traveled reduction technologies, and off-road technologies. The CC&C partnership had an energy use impact of over 1 billion gallons in 2023 and reduced emissions by nine million tons. Outreach, engagement, and training activities increased 18% from last year.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Fusion Materials Research at Oak Ridge National Laboratory in Fiscal Year 2023

The materials science challenge of providing a suite of suitable materials to satisfy the technology to achieve fusion energy is addressed in this ORNL program. The inability of currently available materials and components to withstand the harsh fusion nuclear environment requires development of new materials, and an understanding of their response to the fusion environment. The overarching goal of the ORNL Fusion Materials program is to provide the applied materials science support and materials understanding to underpin the ongoing DOE Office of Science—Fusion Energy Sciences program, in parallel with developing the materials for fusion power systems. In this effort the program continues to be integrated both with the larger U.S. and international fusion materials communities and with the U.S. and international fusion design and technology communities. The excitement of this program comes from the priorities given to this subject in the two recent fusion reviews, by the FESAC and NAS committees. An important element of those recommendations is the support for pivoting the national R&D emphasis to the Fusion Materials and Technologies (FM&T), the long-advocated Fusion Prototypic Neutron Source, and for the Fusion Pilot Plant study that will help focus program direction and efforts. Furthermore, the surge of venture capital investment into the private fusion industry start-ups over the last few years is anticipated to help accelerate all aspects of the fusion energy development. This twelfth annual report of the ORNL (Oak Ridge National Laboratory) Fusion Reactor Materials Program summarizes the accomplishments in Fiscal Year 2023 (FY2023). The year was the first to return to full post-COVID-restriction operations, with students and international assignees no longer impacted by COVID restrictions, as in FY20-21-22. Following the pattern of planning used in this program, work for the year FY2023 focused on having the data and productivity to support a strong presence at the International Conference on Fusion Reactor Materials (ICFRM) 21, organized by Spain and occurred in October 2023. Twenty-nine ORNL-led abstracts were submitted, with all accepted. Four were invited presentations, nine contributed oral, fourteen posters, and two withdrawn due to unforeseen circumstances. Additionally, nine external abstracts with ORNL contributing authors were presented. These will be reported in the FY24 report next year.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Financial Analysis of the High Flow Experiment conducted at the Glen Canyon Dam during Water Year 2023

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specified criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report examines the financial implications of the high flow experiment (HFE) conducted at GCD during the spring of Water Year (WY) 2023 as required by the LTEMP HFE Protocol. This report is part of a series of reports that describe the financial costs of LTEMP experimental releases since the 2016 ROD was adopted in January 2017. Previous reports analyzed the impact of several past HFEs and Bug Flow Experiments. This report focuses on the HFE conducted in April 2023. For this experimental release, financial costs of approximately $1.33 million were incurred because the HFE required sustained water releases exceeding the power plant’s maximum turbine flow rate. In addition, during the experiment, operators were not allowed to shape GCD power production, either to follow Firm Electric Service (FES) customer day-ahead energy deliveries or to respond to market prices. This study identifies the main factors contributing to the HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate Western Area Power Administration (WAPA) financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the operations that actually occurred and (2) a “Without Experiment” case that simulates operations under the assumption that the HFE did not occur. The “With Experiment” case mimics operations during the HFE and the entire month the HFE occurred. It complies with LTEMP hourly and daily operating criteria. The “Without Experiment” case assumes that the HFE did not occur. The monthly water release volume is assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices. In addition to estimating the financial impact of the HFE, the team used the CRiSPPy model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the HFE, and WAPA operating practices.

13 HYDRO ENERGY↗

2023 Annual Merit Review Vehicle Technologies Office Results Report

The 2023 U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy's (EERE) Vehicle Technologies Office (VTO) Annual Merit Review (AMR) was held June 12-15, 2023, as a hybrid event with in-person and virtual attendance. The review encompassed work done by VTO: 257 individual activities were reviewed by 266 reviewers. Exactly 991 individual review responses were received for the VTO technical reviews. The objective of the meeting was to review the accomplishments and plans for VTO over the previous 12 months, and provide an opportunity for industry, government, and academia to give inputs to DOE with a structured and formal methodology. The meeting also provided attendees with a virtual forum for interaction and technology information transfer.

33 ADVANCED PROPULSION SYSTEMS↗

Energy Efficient Mobility Systems (2023 Annual Progress Report)

This document summarizes the progress of VTO Energy Efficient Mobility Systems projects supported during the fiscal year 2023. DOE conducts research to understand how the changing mobility landscape will affect transportation energy consumption and identifies opportunities to create more efficient, affordable, reliable, accessible, equitable, and secure transportation options that enhance mobility for individuals and businesses. Within EERE, the EEMS Program is responsible for this research portfolio. This APR describes work that the EEMS Program conducted during FY 2023 in support of the EEMS Program goals.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

LandScan Global 2023: Silver Edition

For a quarter of a century, the LandScan Global (LSG) project has annually released a global, high-resolution gridded population dataset representing the ambient or unwarned population at a 30 arcsecond resolution. LSG supports a range of applications such as emergency management, disaster response, and human health and security for understanding populations at risk. The 2023 release of LSG, the LandScan Silver Edition, represents a major methodological leap forward while also leveraging previous knowledge—the previous year was the baseline for the current annual update carrying forward valuable knowledge of the built environment for the past quarter century—to train the machine learning models. Compared with annual releases over the past 24years, multiple advancements were made to different aspects of the methodology to achieve reproducibility, transparency, and consistent global propagation of solutions to modeling or population distribution issues identified during the review process. These novel changes include incorporation of the latest available geospatial inputs across the globe, machine learning models instead of manual modifications, population feature importance analysis, open-source solutions vs. proprietary software, generation of multiple global versions, analytic validations, and human-in-the-loop revisions to produce the final version. Additionally, algorithms—such as anomaly detection—were introduced to quickly identify areas of focus to develop a new and robust systematic review. Significant changes in modeled population distributions were observed between the 2022 and 2023 releases, largely attributable to improvements in data and methods and discussed thoroughly within this report. In summation, the LandScan Silver Edition leverages the best of the past quarter century of LSG legacy knowledge and continues a tradition of applying cutting-edge enhancements to serve as a new benchmark for accurate, actionable gridded population data

Lebakula, Viswadeep↗

Observations of surface energy fluxes and meteorology in the seasonally snow-covered high-elevation East River watershed during SPLASH, 2021–2023

Abstract. From autumn 2021 through summer 2023, scientists from the National Oceanic and Atmospheric Administration (NOAA) and partners conducted the Study of Precipitation, the Lower Atmosphere, and Surface for Hydrometeorology (SPLASH) campaign in the East River watershed of Colorado. One objective of SPLASH was to observe the transfer of energy between the atmosphere and the surface, which was done at several locations. Two remote sites were chosen that did not have access to power utilities. These were along the valley floor near the East River in the vicinity of the unincorporated town of Gothic, Colorado. Energy balance measurements were made at these locations using autonomous, single-level flux towers referred to as atmospheric surface flux stations (ASFSs). The ASFSs were deployed on 28 September 2021 at the Kettle Ponds Annex site and on 12 October 2021 at the Avery Picnic site and operated until 19 July and 21 June 2023, respectively. Measurements included basic meteorology; upward and downward longwave and shortwave radiative fluxes and subsurface conductive flux, each at 1 min resolution; 3-D winds from a sonic anemometer and H2O/CO2 from an open-path gas analyzer, both at 20 Hz from which sensible, latent heat, and CO2 fluxes were derived; and profiles of soil properties in the upper 0.5 m (both sites) and temperature profiles through the snow (at Avery Picnic), each reported between 10 min and 6 h. The system uptime was 97 % (Kettle Ponds) and 90 % (Avery Picnic), and collectively 1184 d of data was obtained between the stations. The purpose of this article is to document the ASFS deployment at SPLASH, to document the data acquisition and post-processing of measurements, and to serve as a guide for interested users of the data sets, which are archived at Zenodo (https://doi.org/10.5281/zenodo.10313363, Cox et al., 2023b; https://doi.org/10.5281/zenodo.10327409, Cox et al., 2023c; https://doi.org/10.5281/zenodo.10313894, Cox et al., 2023d; https://doi.org/10.5281/zenodo.10307825, Cox et al., 2023e; https://doi.org/10.5281/zenodo.10310520, Cox et al., 2023f) with the Creative Commons Attribution 4.0 International license.

Cox, Christopher J. (ORCID:0000000322037173)↗