Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

2006 Toyota Highlander-6395 Hyrid Electric Vehicle Battery Test Results

The U.S. Department of Energy's Advanced Vehicle Testing Activity conducts several different types of tests on hybrid electric vehicles, including testing hybrid electric vehicles batteries when both the vehicles and batteries are new, and at the conclusion of 160,000 miles of accelerated testing. This report documents the battery testing performed and battery testing results for the 2007 Toyota Highlander hybrid electric vehicle (Vin Number JTEDW21A160006395). Testing was performed by the Electric Transportation Engineering Corporation. The Advanced Vehicle Testing Activity is part of the U.S. Department of Energy's Vehicle Technologies Program. The Idaho National Laboratory and the Electric Transportation Engineering Corporation conduct Advanced Vehicle Testing Activity for the U.S. Department of Energy.

99 GENERAL AND MISCELLANEOUS↗

2006 Lexus RX400h-2575 Hybrid Electric Vehicle Battery Test Results

The U.S. Department of Energy's Advanced Vehicle Testing Activity conducts several different types of tests on hybrid electric vehicles, including testing hybrid electric vehicles batteries when both the vehicles and batteries are new, and at the conclusion of 160,000 miles of accelerated testing. This report documents the battery testing performed and battery testing results for the 2007 Lexus RX900h hybrid electric vehicle (Vin Number JTJHW31U660002575). Testing was performed by the Electric Transportation Engineering Corporation. The Advanced Vehicle Testing Activity is part of the U.S. Department of Energy's Vehicle Technologies Program. The Idaho National Laboratory and the Electric Transportation Engineering Corporation conduct Advanced Vehicle Testing Activity for the U.S. Department of Energy.

99 GENERAL AND MISCELLANEOUS↗

2006 Lexus RX400h-4807 Hybrid Electric Vehicle Battery Test Results

The U.S. Department of Energy's Advanced Vehicle Testing Activity conducts several different types of tests on hybrid electric vehicles, including testing hybrid electric vehicles batteries when both the vehicles and batteries are new, and at the conclusion of 160,000 miles of accelerated testing. This report documents the battery testing performed and battery testing results for the 2007 Lexus RX900h hybrid electric vehicle (Vin Number JTJHW31U660004807). Testing was performed by the Electric Transportation Engineering Corporation. The Advanced Vehicle Testing Activity is part of the U.S. Department of Energy's Vehicle Technologies Program. The Idaho National Laboratory and the Electric Transportation Engineering Corporation conduct Advanced Vehicle Testing Activity for the U.S. Department of Energy.

99 GENERAL AND MISCELLANEOUS↗

BENEFIT with Northeastern University: HVAC Hardware-in-the-Loop Experimental Testing of a Heat Pump and Air Conditioner

This dataset includes HVAC Hardware-in-the-Loop (HIL) experimental results for a single stage, SEER 16, HSPF 9.5, 3-ton single-speed air source heat pump with 15 kW of backup auxiliary heating tested in both cooling and heating mode, and a two stage, SEER 21, 2-ton central air conditioner tested in cooling mode for a set of outdoor temperatures and indoor setpoint temperatures. In addition to these tests, experimental tests focused on the operation of auxiliary heating for the heat pump for winter condition were also conducted. The laboratory experiments for transient testing of the heat pump and air conditioner were conducted using the two HIL systems in the Systems Performance Laboratory (SPL) at NREL’s Energy Systems Integration Facility (ESIF). Further information on laboratory design and capabilities of the SPL along with the architecture of HVAC HIL system can be found in: Sparn, B. F. 2018. Laboratory Resources and Techniques to Evaluate Smart Home Technology (No. NREL/CP-5500-71696). National Renewable Energy Laboratory (NREL), Golden, CO (United States). https://www.nrel.gov/docs/fy18osti/71696.pdf and the experimental setup and validation of HVAC HIL platform can be found in: Ramaraj, S. and Sparn, B. 2022. Validation of HVAC Hardware-In-the-Loop Simulation for Advanced Control Strategies in Smart Homes (No. NREL/CP-5500-82562). National Renewable Energy Lab (NREL), Golden, CO (United States). https://www.nrel.gov/docs/fy22osti/82562.pdf. These experimental results can be used to validate how we currently model the cycling behavior of heat pumps and air conditioners. Additionally, many demand response programs implement heat pump and air conditioner control by changing the thermostat set point – these data may also be used to verify our models for heat pump and air conditioner demand response control are implemented correctly. The Test_Matrix file describes all the indoor and outdoor test conditions for heat pump and air conditioner and the file names of data sets include information about the test conditions. A wide range of outdoor air temperatures were chosen to accommodate summer and winter conditions. In addition to operating the HVAC equipment with different outdoor temperatures, we also operate the system with different indoor temperature set points to represent different grid signals or different operating conditions. For cooling conditions, the baseline set point is 72°F. To represent Load Up signals, the setpoint is changed to 68°F. The Load Shed set point is 76°F. For heating conditions, the baseline set point was assumed to be 68°F. The Load add set point is 72°F and the Load shed set point is 64°F. The starting indoor temperature for cooling conditions was set ~2°F above the indoor setpoint temperature so that the equipment turned on quickly. Similarly, the initial indoor temperature was set ~2°F lower than setpoint for heating mode tests to ensure that heating began quickly. The return air temperature was assumed to be equal to the indoor setpoint temperature in all cases. The experimental data are sampled at 1-second intervals. The data from ecobee thermostat at 5-minute interval are resampled and added to the corresponding file. The content of each data set is as follows: • T_Return (C): Measured return air temperature [C] • T_Return_SP (C): Return air temperature setpoint from E+ model, sent to HIL [C] • T_Supply (C): Measured supply air temperature at evaporator outlet [C] • T_Outdoor (C): Measured outdoor air temperature [C] • T_Outdoor_SP (C): Outdoor air temperature setpoint from weather file, sent to HIL [C] • T_Indoor (C): Measured indoor air temperature [C] • T_Indoor_SP (C): Indoor air temperature setpoint from E+ model, sent to HIL [C] • Outdoor Unit Power (W): Measured power of the outdoor unit [W] • Indoor Unit Power (W): Measured power of the indoor unit [W] • Evaporator Airflow Rate (CFM): Measured evaporator or indoor unit airflow rate sent to E+ model [CFM] • Cooling/Heating Capacity (kW): Calculated cooling/heating capacity sent to E+ model [kW] • T_SP_Thermostat (C): Thermostat cooling/heating setpoint temperature [C] • T_Indoor_Thermostat (C): Thermostat indoor air temperature [C]

24 POWER TRANSMISSION AND DISTRIBUTION↗

EMT Model Validation of a 2 MVA PV Inverter Using Transient and Frequency-Domain Hardware Testing: Preprint

This paper presents results and new insights gained from a hardware test campaign on a 2 MVA PV inverter for validating its vendor-supplied EMT model. The test campaign was conducted using a 7 MVA grid simulator and a 2 MW PV emulator. It considered both time-domain transient tests and frequency-domain impedance scan tests. The paper highlights the inadequacy of transient tests in capturing all critical resonance modes of the inverter, and the effectiveness of the frequency scan testing in addressing this problem. The paper shows the frequency scan testing as an effective tool for EMT model validation of IBR units which can highlight inaccuracies in the EMT models that are easy to overlook when model validation is performed using only the time-domain transient tests such as voltage ride-through and phase jump tests.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wave Energy Prize - 1/50th Testing - Float Inc. BergerABAM Rho-Cee Hybrid WEC

This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for Float Inc. During the testing of its 1/50th-scale device, Float Inc. Berger ABAM was deemed ineligible due to the fact that they brought a device with them to test and did not ship the device by the deadline stipulated in the Wave Energy Prize Rules. Because of this, analysis, results, and judging were not completed for this team/device. This submission included files such as: - 1/50th test data (raw & processed) - 1/50th test data video and pictures - 1/50th Test plans and testing documents

1/50th scale↗

A pulse-controlled modified-burst test instrument for accident-tolerant fuel cladding

Pellet-cladding mechanical interaction due to thermal expansion of nuclear fuel pellets during a reactivity-initiated accident (RIA) is a potential mechanism for failure of nuclear fuel cladding. To investigate the mechanical behavior of cladding during an RIA, we developed a mechanical pulse-controlled modified burst test instrument that simulates transient events with a pulse width from 10 to 300 ms. This paper includes validation tests of unirradiated and prehydrided ZIRLO cladding tubes. A ZIRLO cladding sample with a hydrogen content of 168 wt. ppm showed ductile behavior and failed at the maximum limits of the test setup with hoop strain to failure greater than 9.2%. ZIRLO samples showed high resistance to failure even at very high hydrogen contents (1,466 wt. ppm). When the hydrogen content was increased to 1,554 wt. ppm, brittle-like behavior was observed at a hoop strain of 2.5%. Preliminary scoping tests at room temperature with FeCrAl tubes were conducted to imitate the pulse behavior of transient test reactors during integral tests. The preliminary FeCrAl tests are informative from the perspective of characterizing the test rig and supporting the design of integral tests for current and potentially accident tolerant cladding materials.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct measurement and calculation of rubber bulk modulus by piston-cylinder method using conventional mechanical testing equipment

This article describes a method to directly measure the bulk modulus of rubber using a piston-cylinder type apparatus. The function of the testing apparatus is to reliably transfer load to the water inside the vessel and allow for the accurate and continuous measurement of volumetric displacement as the contents are compressed. During the test, load is applied to a piston-cylinder containing the rubber test sample and water using a conventional mechanical testing load frame. Load and the travel of the piston are recorded by a load cell and extensometer, respectfully. A brass or stainless steel plug of the same dimensions as the test sample is tested as a control sample to isolate the compliance of the system, including the compressibility of water and compliance of the piston-cylinder. The results from this control test are used to disincorporate the compliance of the system from the sample test results. Load-linear displacement data are mathematically converted to pressure-volumetric displacement data, from which bulk modulus is calculated. The test apparatus and method are validated using the known bulk modulus of water. Finally, the bulk modulus for two similar rubbers is evaluated. The validity of the results and limitations of the device are discussed.

36 MATERIALS SCIENCE↗

Tc-99 Adsorption on Selected Activated Carbons - Batch Testing Results

CH2M HILL Plateau Remediation Company (CHPRC) is currently developing a 200-West Area groundwater pump-and-treat system as the remedial action selected under the Comprehensive Environmental Response, Compensation, and Liability Act Record of Decision for Operable Unit (OU) 200-ZP-1. This report documents the results of treatability tests Pacific Northwest National Laboratory researchers conducted to quantify the ability of selected activated carbon products (or carbons) to adsorb technetium-99 (Tc-99) from 200-West Area groundwater. The Tc-99 adsorption performance of seven activated carbons (J177601 Calgon Fitrasorb 400, J177606 Siemens AC1230AWC, J177609 Carbon Resources CR-1240-AW, J177611 General Carbon GC20X50, J177612 Norit GAC830, J177613 Norit GAC830, and J177617 Nucon LW1230) were evaluated using water from well 299-W19-36. Four of the best performing carbons (J177606 Siemens AC1230AWC, J177609 Carbon Resources CR-1240-AW, J177611 General Carbon GC20X50, and J177613 Norit GAC830) were selected for batch isotherm testing. The batch isotherm tests on four of the selected carbons indicated that under lower nitrate concentration conditions (382 mg/L), Kd values ranged from 6,000 to 20,000 mL/g. In comparison. Under higher nitrate (750 mg/L) conditions, there was a measureable decrease in Tc-99 adsorption with Kd values ranging from 3,000 to 7,000 mL/g. The adsorption data fit both the Langmuir and the Freundlich equations. Supplemental tests were conducted using the two carbons that demonstrated the highest adsorption capacity to resolve the issue of the best fit isotherm. These tests indicated that Langmuir isotherms provided the best fit for Tc-99 adsorption under low nitrate concentration conditions. At the design basis concentration of Tc 0.865 µg/L(14,700 pCi/L), the predicted Kd values from using Langmuir isotherm constants were 5,980 mL/g and 6,870 mL/g for for the two carbons. These Kd values did not meet the target Kd value of 9,000 mL/g. Tests conducted to ascertain the effects of changing pH showed that at pH values of 6.5 and 7.5, no significant differences existed in Tc-adsorption performance for three of the carbons, but the fourth carbon performed better at pH 7.5. When the pH was increased to 8.5, a slight decline in performance was observed for all carbons. Tests conducted to ascertain the temperature effect on Tc-99 adsorption indicated that at 21 ºC, 27 ºC, and 32 ºC there were no significant differences in Tc-99 adsorption for three of the carbons. The fourth carbon showed a noticeable decline in Tc-99 adsorption performance with increasing temperature. The presence of volatile organic compounds (VOCs) in the source water did not significantly affect Tc-99 adsorption on either of two carbons tested. Technetium-99 adsorption differed by less than 15% with or without VOCs present in the test water, indicating that Tc-99 adsorption would not be significantly affected if VOCs were removed from the water prior to contact with carbon.

54 ENVIRONMENTAL SCIENCES↗

EVALUATION OF ARG-1 SAMPLES PREPARED BY CESIUM CARBONATE DISSOLUTION DURING THE ISOLOK SME ACCEPTABILITY TESTING

Evaluation of Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) cycle time identified several opportunities to improve the CPC processing time. The Mechanical Systems & Custom Equipment Development (MS&CED) Section of the Savannah River National Laboratory (SRNL) recently completed the evaluation of one of these opportunities - the possibility of using an Isolok sampling valve as an alternative to the Hydragard valve for taking DWPF process samples at the Slurry Mix Evaporator (SME). The use of an Isolok for SME sampling has the potential to improve operability, reduce maintenance time, and decrease CPC cycle time. The SME acceptability testing for the Isolok was requested in Task Technical Request (TTR) HLW-DWPF-TTR-2010-0036 and was conducted as outlined in Task Technical and Quality Assurance Plan (TTQAP) SRNLRP-2011-00145. RW-0333P QA requirements applied to the task, and the results from the investigation were documented in SRNL-STI-2011-00693. Measurement of the chemical composition of study samples was a critical component of the SME acceptability testing of the Isolok. A sampling and analytical plan supported the investigation with the analytical plan directing that the study samples be prepared by a cesium carbonate (Cs{sub 2}CO{sub 3}) fusion dissolution method and analyzed by Inductively Coupled Plasma - Optical Emission Spectroscopy (ICP-OES). The use of the cesium carbonate preparation method for the Isolok testing provided an opportunity for an additional assessment of this dissolution method, which is being investigated as a potential replacement for the two methods (i.e., sodium peroxide fusion and mixed acid dissolution) that have been used at the DWPF for the analysis of SME samples. Earlier testing of the Cs{sub 2}CO{sub 3} method yielded promising results which led to a TTR from Savannah River Remediation, LLC (SRR) to SRNL for additional support and an associated TTQAP to direct the SRNL efforts. A technical report resulting from this work was issued that recommended that the mixed acid method be replaced by the Cs{sub 2}CO{sub 3} method for the measurement of magnesium (Mg), sodium (Na), and zirconium (Zr) with additional testing of the method by DWPF Laboratory being needed before further implementation of the Cs{sub 2}CO{sub 3} method at that laboratory. While the SME acceptability testing of the Isolok does not address any of the open issues remaining after the publication of the recommendation for the replacement of the mixed acid method by the Cs{sub 2}CO{sub 3} method (since those issues are to be addressed by the DWPF Laboratory), the Cs{sub 2}CO{sub 3} testing associated with the Isolok testing does provide additional insight into the performance of the method as conducted by SRNL. The performance is to be investigated by looking to the composition measurement data generated by the samples of a standard glass, the Analytical Reference Glass - 1 (ARG-1), that were prepared by the Cs{sub 2}CO{sub 3} method and included in the SME acceptability testing of the Isolok. The measurements of these samples were presented as part of the study results, but no statistical analysis of these measurements was conducted as part of those results. It is the purpose of this report to provide that analysis, which was supported using JMP Version 7.0.2.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LNG Cascading Damage Study Volume I: Fracture Testing Report

As part of the liquefied natural gas (LNG) Cascading Damage Study, a series of structural tests were conducted to investigate the thermal induced fracture of steel plate structures. The thermal stresses were achieved by applying liquid nitrogen (LN 2 ) onto sections of each steel plate. In addition to inducing large thermal stresses, the lowering of the steel temperature simultaneously reduced the fracture toughness. Liquid nitrogen was used as a surrogate for LNG due to safety concerns and since the temperature of LN 2 is similar (-190°C) to LNG (-161°C). The use of LN 2 ensured that the tests could achieve cryogenic temperatures in the range an actual vessel would encounter during a LNG spill. There were four phases to this test series. Phase I was the initial exploratory stage, which was used to develop the testing process. In the Phase II series of tests, larger plates were used and tested until fracture. The plate sizes ranged from 4 ft square pieces to 6 ft square sections with thicknesses from ¼ inches to ¾ inches. This phase investigated the cooling rates on larger plates and the effect of different notch geometries (stress concentrations used to initiate brittle fracture). Phase II was divided into two sections, Phase II-A and Phase II-B. Phase II-A used standard A36 steel, while Phase II-B used marine grade steels. In Phase III, the test structures were significantly larger, in the range of 12 ft by 12 ft by 3 ft high. These structures were designed with more complex geometries to include features similar to those on LNG vessels. The final test phase, Phase IV, investigated differences in the heat transfer (cooling rates) between LNG and LN 2 . All of the tests conducted in this study are used in subsequent parts of the LNG Cascading Damage Study, specifically the computational analyses.

03 NATURAL GAS↗

Evaluation of Cavity Collapse and Surface Crater Formation for Selected Lawrence Livermore National Laboratory Underground Nuclear Tests - 2011, Part 2

This report evaluates collapse evolution for selected Lawrence Livermore National Laboratory (LLNL) underground nuclear tests at the Nevada National Security Site (NNSS, formerly called the Nevada Test Site). The work is being done to support several different programs that desire access to the ground surface above expended underground nuclear tests. The programs include: the Borehole Management Program, the Environmental Restoration Program, and the National Center for Nuclear Security Gas-Migration Experiment. Safety decisions must be made before a crater area, or potential crater area, can be reentered for any work. Evaluation of cavity collapse and crater formation is input into the safety decisions. Subject matter experts from the LLNL Containment Program who participated in weapons testing activities perform these evaluations. Information used included drilling and hole construction, emplacement and stemming, timing and sequence of the selected test and nearby tests, geology, yield, depth of burial, collapse times, surface crater sizes, cavity and crater volume estimations, ground motion, and radiological release information. Both classified and unclassified data were reviewed. The evaluations do not include the effects of erosion that may modify the collapse craters over time. They also do not address possible radiation dangers that may be present. Various amounts of information are available for these tests, depending on their age and other associated activities. Lack of data can hamper evaluations and introduce uncertainty. We make no attempt to quantify this uncertainty. Evaluation of Cavity Collapse and Surface Crater Formation for Selected Lawrence Livermore National Laboratory Underground Nuclear Tests - 2011 was published on March 2, 2011. This report, considered Part 2 of work undertaken in calendar year 2011, compiles evaluations requested after the March report. The following unclassified summary statements describe collapse evolution and crater stability in response to a recent request to review 6 LLNL test locations in Yucca Flat, Rainier Mesa, and Pahute Mesa. They include: Baneberry in U8d; Clearwater in U12q; Wineskin in U12r, Buteo in U20a and Duryea in nearby U20a1; and Barnwell in U20az.

07 ISOTOPE AND RADIATION SOURCES↗

Legacy Vehicle Fuel System Testing with Intermediate Ethanol Blends

The effects of E10 and E17 on legacy fuel system components from three common mid-1990s vintage vehicle models (Ford, GM, and Toyota) were studied. The fuel systems comprised a fuel sending unit with pump, a fuel rail and integrated pressure regulator, and the fuel injectors. The fuel system components were characterized and then installed and tested in sample aging test rigs to simulate theexposure and operation of the fuel system components in an operating vehicle. The fuel injectors were cycled with varying pulse widths during pump operation. Operational performance, such as fuel flow and pressure, was monitored during the aging tests. Both of the Toyota fuel pumps demonstrated some degradation in performance during testing. Six injectors were tested in each aging rig. The Fordand GM injectors showed little change over the aging tests. Overall, based on the results of both the fuel pump testing and the fuel injector testing, no major failures were observed that could be attributed to E17 exposure. The unknown fuel component histories add a large uncertainty to the aging tests. Acquiring fuel system components from operational legacy vehicles would reduce theuncertainty.

09 BIOMASS FUELS↗

Duration Test Report for the SWIFT Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Three turbines where selected for testing at the National Wind Technology Center (NWTC) as a part of round two of the Small Wind Turbine Independent Testing project. Duration testing is one of up to 5 tests that may be performed on the turbines. Other tests include power performance, safety and function, noise, and power quality. The results of the testing will provide the manufacturers with reports that may be used for small wind turbine certification.

17 WIND ENERGY↗

Safety and Function Test Report for the SWIFT Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Three turbines where selected for testing at the National Wind Technology Center (NWTC) as a part of round two of the Small Wind Turbine Independent Testing project. Safety and Function testing is one of up to 5 tests that may be performed on the turbines. Other tests include power performance, duration, noise, and power quality. The results of the testing will provide the manufacturers with reports that may be used for small wind turbine certification.

17 WIND ENERGY↗

Safety and Function Test Report for the Viryd CS8 Wind Turbine

This test was conducted as part of the U.S. Department of Energy's (DOE) Independent Testing project. This project was established to help reduce the barriers of wind energy expansion by providing independent testing results for small turbines. Several turbines were selected for testing at the National Wind Technology Center (NWTC) at the National Renewable Energy Laboratory (NREL) as a part of the Small Wind Turbine Independent Testing project. Safety and function testing is one of up to five tests that may be performed on the turbines. Other tests include duration, power performance, acoustic noise, and power quality. Viryd Technologies, Inc. of Austin, Texas, was the recipient of the DOE grant and provided the turbine for testing.

17 WIND ENERGY↗

Independent Review of AFC 2A, 2B, and 2E ATR Irradiation Tests

As part of the Department of Energy Advanced Fuel Cycle program, a series of fuels development irradiation tests have been performed in the Advanced Test Reactor (ATR) at the Idaho National Laboratory. These tests are providing excellent data for advanced fuels development. The program is focused on the transmutation of higher actinides which best can be accomplished in a sodium-cooled fast reactor. Because a fast test reactor is no longer available in the US, a special test vehicle is used to achieve near-prototypic fast reactor conditions (neutron spectra and temperature) for use in ATR (a water-cooled thermal reactor). As part of the testing program, there were many successful tests of advanced fuels including metals and ceramics. Recently however, there have been three experimental campaigns using metal fuels that experienced failure during irradiation. At the request of the program, an independent review committee was convened to review the post-test analyses performed by the fuels development team, to assess the conclusions of the team for the cause of the failures, to assess the adequacy and completeness of the analyses, to identify issues that were missed, and to make recommendations for improvements in the design and operation of future tests. Although there is some difference of opinion, the review committee largely agreed with the conclusions of the fuel development team regarding the cause of the failures. For the most part, the analyses that support the conclusions are sufficient.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FY-2015 Methyl Iodide Deep-Bed Adsorption Test Report

Nuclear fission produces fission and activation products, including iodine-129, which could evolve into used fuel reprocessing facility off-gas systems, and could require off-gas control to limit air emissions to levels within acceptable emission limits. Deep-bed methyl iodide adsorption testing has continued in Fiscal Year 2015 according to a multi-laboratory methyl iodide adsorption test plan. Updates to the deep-bed test system have also been performed to enable the inclusion of evaporated HNO 3 and increased NO 2 concentrations in future tests. This report summarizes the result of those activities. Test results showed that iodine adsorption from gaseous methyl iodide using reduced silver zeolite (AgZ) resulted in initial iodine decontamination factors (DFs, ratios of uncontrolled and controlled total iodine levels) under 1,000 for the conditions of the long-duration test performed this year (45 ppm CH3I, 1,000 ppm each NO and NO 2 , very low H 2 O levels [3 ppm] in balance air). The mass transfer zone depth exceeded the cumulative 5-inch depth of 4 bed segments, which is deeper than the 2-4 inch depth estimated for the mass transfer zone for adsorbing I 2 using AgZ in prior deep-bed tests. The maximum iodine adsorption capacity for the AgZ under the conditions of this test was 6.2% (6.2 g adsorbed I per 100 g sorbent). The maximum Ag utilization was 51%. Additional deep-bed testing and analyses are recommended to (a) expand the data base for methyl iodide adsorption and (b) provide more data for evaluating organic iodide reactions and reaction byproducts for different potential adsorption conditions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗