Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Systems Engineering Management Plan NASA Traffic Aware Planner Integration Into P-180 Airborne Test-Bed

NASA's Traffic Aware Planner (TAP) is a cockpit decision support tool that provides aircrew with vertical and lateral flight-path optimizations with the intent of achieving significant fuel and time savings, while automatically avoiding traffic, weather, and restricted airspace conflicts. A key step towards the maturation and deployment of TAP concerned its operational evaluation in a representative flight environment. This Systems Engineering Management Plan (SEMP) addresses the test-vehicle design, systems integration, and flight-test planning for the first TAP operational flight evaluations, which were successfully completed in November 2013. The trial outcomes are documented in the Traffic Aware Planner (TAP) flight evaluation paper presented at the 14th AIAA Aviation Technology, Integration, and Operations Conference, Atlanta, GA. (AIAA-2014-2166, Maris, J. M., Haynes, M. A., Wing, D. J., Burke, K. A., Henderson, J., & Woods, S. E., 2014).

Maris, John↗

V/STOL wind-tunnel testing

Factors influencing effective program planning for V/STOL wind-tunnel testing are discussed. The planning sequence itself, which includes a short checklist of considerations that could enhance the value of the tests, is also described. Each of the considerations, choice of wind tunnel, type of model installation, model development and test operations, is discussed, and examples of appropriate past and current V/STOL test programs are provided. A short survey of the moderate to large subsonic wind tunnels is followed by a review of several model installations, from two-dimensional to large-scale models of complete aircraft configurations. Model sizing, power simulation, and planning are treated, including three areas is test operations: data-acquisition systems, acoustic measurements in wind tunnels, and flow surveying.

Koenig, D. G.↗

The ground testing of a 2 kWe solar dynamic space power system

The solar dynamic power system chosen by NASA for Space Station Freedom SSF requires validation in the vacuum/microgravity environment. The planned ground tests of a proof-of-concept 2 kWe solar dynamic system with address subsystem integration issues involving such major system components as the behavior of thermal energy storage materials. This test scheme will be scalable to 25 kWe, and will be flight-configured to incorporate features of the SSF's power module design.

Calogeras, James E.↗

Experimental Results of Integrated Refrigeration and Storage System Testing

Launch operations engineers at the Kennedy Space Center have identified an Integrated Refrigeration and Storage system as a promising technology to reduce launch costs and enable advanced cryogenic operations. This system uses a close cycle Brayton refrigerator to remove energy from the stored cryogenic propellant. This allows for the potential of a zero loss storage and transfer system, as well and control of the state of the propellant through densification or re-liquefaction. However, the behavior of the fluid in this type of system is different than typical cryogenic behavior, and there will be a learning curve associated with its use. A 400 liter research cryostat has been designed, fabricated and delivered to KSC to test the thermo fluid behavior of liquid oxygen as energy is removed from the cryogen by a simulated DC cycle cryocooler. Results of the initial testing phase focusing on heat exchanger characterization and zero loss storage operations using liquid oxygen are presented in this paper. Future plans for testing of oxygen densification tests and oxygen liquefaction tests will also be discussed. KEYWORDS: Liquid Oxygen, Refrigeration, Storage

Notardonato, W. U.↗

Low Purge and Mercury Recovery Testing with Sludge Batch 10 Tank 40 Simulant

Researchers at the Savannah River National Laboratory (SRNL) have completed testing as requested by Savannah River Mission Completion (SRMC) to perform experiments to determine the impact of using a lower or inert purge in Sludge Batch (SB) 10 processing under the Nitric-Glycolic Acid (NGA) flowsheet. A key objective of this testing was also to determine the mercury speciation and recovery during each experiment. The testing was performed as part of the SB10 Technical Task Request (TTR) and Task Technical and Quality Assurance Plan (TTQAP). Two sets of tests were performed, and a Run Plan was approved prior to each set of experiments to document the planned testing. Three initial experiments were completed to determine whether a low air purge would be beneficial to CPC processing at higher acid stoichiometry (110%) based on the Koopman minimum acid (KMA) equation (116% Hsu). One of the tests, an inert nitrogen purge experiment, was also completed to demonstrate that excluding oxygen did not introduce any new hazards. The experiments were designed to be identical except for the change in purge gas and purge flowrate from run to run. After reviewing the results from the initial three experiments, six additional tests were proposed by SRNL to support the lower purge study and to look for processing alternatives for improving mercury recovery. These additional six tests were all completed at a very low acid stoichiometry to mimic the pH experienced during processing in DWPF (~7). DWPF is processing SB10 sludge at an acid stoichiometry of 90% based on the Hsu equation. The additional SRNL experiments were performed at an acid stoichiometry of 62.5% KMA stoichiometry (66.3% Hsu) to produce a Sludge Receipt and Adjustment Tank (SRAT) product with a pH of about 7. All experiments used simulants of both SWPF streams, although no entrained solvent was added during any of the experiments

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Implementation of Collaborative Research Approaches

This poster reviews the collarborative research approaches that NASA has been designing and implementing for the Integrated Vehicle Health Management (IVHM) Project. The inputs for the technical plan are reviewed, the Research Test and Integration Plan (RTIP) WIKI, is used to create and propose a multi-themed and multi-partner research testing opportunities. The outputs are testing opportunities.

Venti, Mike W.↗

Assessing High Burnup U-19Pu-10Zr Fuel Performance against Historical and Modeled Behavior

Advancing the deployment of sodium-cooled fast reactors (SFRs) requires thorough testing of metallic fuel pins under accident conditions to establish safe operational limits of high burnup fuel. To conduct transient testing, a comprehensive understanding of steady-state fuel behavior obtained through both experimental characterization and accurate predictive capabilities is needed. This study comparatively assesses the steady-state irradiation performance of two high burnup U-19Pu-10Zr fuel pins, DP-36 and DP-40, irradiated under prototypic fast reactor conditions in preparation for planned safety testing at the Transient Reactor Test Facility. Since DP-40 was designated for use in the test and DP-36 serves as its sibling pin, non-destructive, engineering-scale post-irradiation examinations (PIE) were conducted on both pins while destructive examinations were performed exclusively on DP-36. The results were then assessed against historical performance data from similar fuel pins irradiated in the Experimental Breeder Reactor-II. Additionally, the steady-state irradiation of each pin was modeled using the BISON fuel performance code to assess the accuracy of current modeling capabilities in predicting the baseline irradiation behavior. Non-destructive examinations included neutron radiography to measure fuel column elongation, gamma scanning to verify pin integrity and fission product migration, and profilometry to assess dimensional changes. Benchmarking against existing PIE data revealed consistent patterns in axial fuel column growth and cladding diametral strain, though both pins exhibited longer low-density “fluff” structures, which can have implications for core reactivity and source term calculations. Destructive examinations on DP-36 included fission gas release analysis and sectioning for optical microscopy, which showed more complex constituent redistribution patterns than the traditionally accepted 3-ring model. The axial evolution of fractional areas and porosities of each of the redistributed zones were quantified and presented. Modeling comparisons showed agreement in fractional fission gas release but consistently overestimated axial and radial swelling and disagreed with measured axial porosity patterns. These conservative overpredictions suggested that the pins would appear closer to failure or operational limits at the start of transient tests, potentially leading to higher strain accumulation during the transient. While conservative estimates provide safety margins, they can negatively impact fuel economics. A review of the swelling models identified areas for improvement in the gaseous swelling, solid swelling, and fuel hot-pressing models when applied to ternary fuel. The results of this study highlight the critical importance of conducting pre-test characterization on both test and sibling pins to accurately capture steady-state fuel behavior, providing a precise baseline for post-test evaluations and essential inputs for transient modeling of the planned experiments. The analysis also revealed significant data gaps that require further investigation to enhance the understanding and prediction of fuel swelling and pore dynamics. Collecting comprehensive data across different irradiation conditions, burnup levels, and fuel compositions are essential for refining existing models and developing mechanistic models for both binary and ternary metallic fuels, ultimately improving the integration of modeling and experimental approaches in accident testing.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NASA Long Duration Balloon capability development project

A NASA development program is described for establishing near-global long-duration balloon (LDB) capabilities for both Antarctic and midlatitude applications. The program is intended to evaluate, research, and develop the balloon structures and systems needed for scientific payloads of over 1500 lbs for periods of up to three weeks. The systems examined include: control functions, data processing, power, navigation/positioning, and telecommunications. Test flights of the LDB Development Project in Antarctica are reported in which a 28 million cu ft balloon was launched with 3611 lbs of suspended weight. The subsystems under development are reported to work effectively for the test flights. Planned flights for the LDB based on these developments include gamma-ray and X-ray campaigns, a long-duration test in Antarctica, and an experiment based on magnetic passive isotopes.

Stuchlik, D.↗

NASA Advanced Space Suit Pressure Garment System Status 2023

This paper discusses the current focus of NASA’s Advanced Space Suit Pressure Garment Technology Development team’s efforts, the status of that work, and a summary of longer term technology development priorities and activities. The Exploration Extra-vehicular Activity Mobility Unit (xEMU) has been the team’s primary effort over the past several years. ICES papers in 2022 detailed the design of the xEMU pressure garment components. This paper outlines the design updates to the xPGS since that time. More notably, this paper documents the various tests executed with the xPGS to evaluate its performance, durability, and acceptability for microgravity and Lunar missions. An overview of ongoing and planned xEMU testing and training is provided. The PGS team’s transition from xEMU development and testing, to supporting the Exploration Extravehicular Activity Services (xEVAS) vendors will also be discussed. In addition, technology development efforts in coordination with the EVA and Human Surface Mobility Program (EHP), the NASA Engineering Safety Council (NESC) and the Small Business Innovation Research (SBIR) Program will be discussed in the context of supporting sustaining EVA operations on the Lunar surface over the coming decade. Finally, a brief review of longer-term pressure garment challenges and technology gaps will be presented to provide an understanding of the advanced pressure garment team’s technology investment priorities and needs.

spacesuit↗

NASA Advanced Space Suit Pressure Garment System Status and Development Priorities 2023

This paper discusses the current focus of NASA’s Advanced Space Suit Pressure Garment Technology Development team’s efforts, the status of that work, and a summary of longer term technology development priorities and activities. The Exploration Extra-vehicular Activity Mobility Unit (xEMU) has been the team’s primary effort over the past several years. ICES papers in 2022 detailed the design of the xEMU pressure garment components. This paper outlines the design updates to the xPGS since that time. More notably, this paper documents the various tests executed with the xPGS to evaluate its performance, durability, and acceptability for microgravity and Lunar missions. An overview of ongoing and planned xEMU testing and training is provided. The PGS team’s transition from xEMU development and testing, to supporting the Exploration Extravehicular Activity Services (xEVAS) vendors will also be discussed. In addition, technology development efforts in coordination with the EVA and Human Surface Mobility Program (EHP), the NASA Engineering Safety Council (NESC) and the Small Business Innovation Research (SBIR) Program will be discussed in the context of supporting sustaining EVA operations on the Lunar surface over the coming decade. Finally, a brief review of longer-term pressure garment challenges and technology gaps will be presented to provide an understanding of the advanced pressure garment team’s technology investment priorities and needs.

spacesuit↗

NASA Advanced Space Suit Pressure Garment System Status and Development Priorities 2023

This paper discusses the current focus of NASA’s Advanced Space Suit Pressure Garment Technology Development team’s efforts, the status of that work, and a summary of longer term technology development priorities and activities. The Exploration Extra-vehicular Activity Mobility Unit (xEMU) has been the team’s primary effort over the past several years. ICES papers in 2022 detailed the design of the xEMU pressure garment components. This paper outlines the design updates to the xPGS since that time. More notably, this paper documents the various tests executed with the xPGS to evaluate its performance, durability, and acceptability for microgravity and Lunar missions. An overview of ongoing and planned xEMU testing and training is provided. The PGS team’s transition from xEMU development and testing, to supporting the Exploration Extravehicular Activity Services (xEVAS) vendors is discussed. In addition, technology development efforts in coordination with the EVA and Human Surface Mobility Program (EHP), the NASA Engineering Safety Council (NESC) and the Small Business Innovation Research (SBIR) Program will be discussed in the context of supporting sustaining EVA operations on the Lunar surface over the coming decade. Finally, a brief review of longer-term pressure garment challenges and technology gaps will be presented to provide an understanding of the advanced pressure garment team’s technology investment priorities and needs.

spacesuit↗

NASA Advanced Space Suit Pressure Garment System Status and Development Priorities 2024

This paper discusses the current focus of NASA’s Advanced Space Suit Pressure Garment Technology Development team’s efforts, the status of that work, and a summary of longer term technology development priorities and activities. The Exploration Extra-vehicular Activity Mobility Unit (xEMU) has been the team’s primary effort over the past several years. This paper documents the various tests executed with the xPGS to evaluate its performance, durability, and acceptability for microgravity and Lunar missions. An overview of ongoing and planned xEMU testing and training is provided. The PGS team’s efforts in supporting the Exploration Extravehicular Activity Services (xEVAS) vendors is discussed. In addition, technology development efforts in coordination with the EVA and Human Surface Mobility Program (EHP), the NASA Engineering Safety Council (NESC) and the Small Business Innovation Research (SBIR) Program will be discussed in the context of supporting sustaining EVA operations on the Lunar surface over the coming decade. Finally, a brief review of longer-term pressure garment challenges and technology gaps will be presented to provide an understanding of the advanced pressure garment team’s technology investment priorities and needs.

Shane M McFarland↗

NASA Advanced Space Suit Pressure Garment System Status and Development Priorities 2024

This paper discusses the current focus of NASA’s Advanced Space Suit Pressure Garment Technology Development team’s efforts, the status of that work, and a summary of longer term technology development priorities and activities. The Exploration Extra-vehicular Activity Mobility Unit (xEMU) has been the team’s primary effort over the past several years. This paper documents the various tests executed with the xPGS to evaluate its performance, durability, and acceptability for microgravity and Lunar missions. An overview of ongoing and planned xEMU testing and training is provided. The PGS team’s efforts in supporting the Exploration Extravehicular Activity Services (xEVAS) vendors is discussed. In addition, technology development efforts in coordination with the EVA and Human Surface Mobility Program (EHP), the NASA Engineering Safety Council (NESC) and the Small Business Innovation Research (SBIR) Program will be discussed in the context of supporting sustaining EVA operations on the Lunar surface over the coming decade. Finally, a brief review of longer-term pressure garment challenges and technology gaps will be presented to provide an understanding of the advanced pressure garment team’s technology investment priorities and needs.

Shane McFarland↗

Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle

NASA is maturing test and evaluation plans leading to flight readiness of the Ares I crew launch vehicle. Key development, qualification, and verification tests are planned . Upper stage engine sea-level and altitude testing. First stage development and qualification motors. Upper stage structural and thermal development and qualification test articles. Main Propulsion Test Article (MPTA). Upper stage green run testing. Integrated Vehicle Ground Vibration Testing (IVGVT). Aerodynamic characterization testing. Test and evaluation supports initial validation flights (Ares I-Y and Orion 1) and design certification.

Cockrell, Charles↗

ASME Code Qualification Plan for LPBF 316 SS

This report describes a plan to qualify laser powder bed fusion (LPBF) 316 stainless steel for use with the American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code Section III, Division 5 rules for metallic components in high temperature nuclear reactors. Accomplishing this goal would make the material and manufacturing process available to vendors for inclusion in the next generation of advanced, high temperature reactors. The general approach adopted here is to treat LPBF 316 as if it was a completely new material and to develop a plan to qualify the material according to the current ASME practices. One key goal of this work is to explore and develop accelerated qualification approaches that might reduce the time required to qualify new materials by reducing the need for long term testing. However, the qualification plan here does not employ any accelerated qualification approaches to provide a limiting, bounding description of the number, duration, and types of testing required to qualify LPBF 316 without such techniques and to describe a comprehensive dataset that could be used to explore and validate accelerated qualification approaches in the future. The report addresses the fundamental challenges to qualifying Advanced Manufacturing (AM) materials for high temperature applications and summarizes the ASME Section III qualification process as well as current efforts to qualify LBPF and DED 316 for low temperature applications. The report then discusses specific issues, both material and logistical, related to qualifying PBF 316 steel. The final chapters of the report describe a complete test plan designed to generate sufficient data to qualify the material as well as a data management plan for how to store and manage the data to eventually provide the test data packaged needed to qualify the material with ASME.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advanced Collision Detection and Site Monitoring for Avian and Bat Species for Offshore Wind Energy (Final Technical Report)

This final technical report summarizes the outcomes from a project that aimed to design, build, and test a persistent and autonomous monitoring system for avian and bat collisions with offshore wind turbines blades and structures. The system comprises four primary sensor modules: 1) on-blade sensor modules for collision detection and dual-vision image capture on each blade with both visible light and near-infrared imagers; 2) additional on-blade collision sensors mounted further from the root; 3) a nacelle-mounted unit including a 360º camera and ultrasonic microphone array; and, 4) an on-blade, high-performance infrared camera module. Primary targeted outcomes were high sensitivity for the detection of blade strikes from bats and small birds, and automatically captured visual confirmation of the striking object; these features are critical for monitoring offshore wind turbine installations, where ground-based methods are not viable. In addition, local recording will provide a long-term sensor recording database. Following laboratory validation, field testing was conducted on an operational wind turbine in collaboration with the National Wind Technology Center at the NREL Flatirons campus over two planned field tests.

17 WIND ENERGY↗

The development of an augmentor wing jet STOL research aircraft (modified C-8A). Volume 2: Analysis of contractor's flight test

The initial flight test phase of the modified C-8A airplane was conducted. The primary objective of the testing was to establish the basic airworthiness of the research vehicle. This included verification of the structural design and evaluation of the aircraft's systems. Only a minimum amount of performance testing was scheduled; this has been used to provide a preliminary indication of the airplane's performance and flight characteristics for future flight planning. The testing included flutter and loads investigations up to the maximum design speed. The operational characteristics of all systems were assessed including hydraulics, environmental control system, air ducts, the vectoring conical nozzles, and the stability augmentation system (SAS). Approaches to stall were made at three primary flap settings: up, 30 deg and 65 deg, but full stalls were not scheduled. Minimum control speeds and maneuver margins were checked. All takeoffs and landings were conventional, and STOL performance was not scheduled during this phase of the evaluation.

Skavdahl, H.↗

An Approach to Reliability Testing of Microcircuits at Cryogenic Conditions

This viewgraph presentation reviews an approach to testing microcircuits at cryogenic temperatures. Standard testing procedures are not adequate to test microcircuits that are to operate at cryogenic temperatures. It is therefore necessary to perform analysis of operation conditions and reliability conditions for planning qualification testing of microcircuits at cryogenic temperatures. The major degradations for microcircuits operating at low temperatures depend on the number of switching cycles rather than on the duration of part operation. Therefore instead of accelerating degradation of the parts by increasing the level of stress, the possibility of which is very limited at cryogenic temperatures, the reliability testing can be based on the number of switching cycles.

Teverovsky, Alexander↗