Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Skylab experiment integration overview

The complex Skylab experiment integration task entailed extensive technical interfacing and liaison. The integrator provided continuity as the experiment evolved through the major program phases. The phases included experiment proposal, experiment development, module integration testing, operations support planning, integrated systems testing, and mission support and evaluation. Skylab experiment program responsibilities are discussed along with a compatibility analysis, questions of documentation, status reviews, and aspects of design philosphy.

Schrock, S. R.↗

Energetic solar proton vs terrestrially trapped proton fluxes

The relative importance of solar and trapped proton fluxes in the consideration of shielding requirements for geocentric space missions is analyzed. Using models of these particles, their fluences encountered by spacecraft in circular orbits are computed as functions of orbital altitude and inclination, mission duration, threshold energy (10 to 100 MeV), and risk factor (for solar protons only), and ratios of solar-to-trapped fluences are derived. It is shown that solar protons predominate for low-altitude polar and very high-altitude missions, while trapped protons predominate for missions at low and medium altitudes and low inclinations. It is recommended that if the ratio of solar-to-trapped protons falls between 0.1 and 10, both fluences should be considered in planning shielding systems.

King, J. H.↗

Management systems research study

The development of a Monte Carlo simulation of procurement activities at the NASA Ames Research Center is described. Data cover: simulation of the procurement cycle, construction of a performance evaluation model, examination of employee development, procedures and review of evaluation criteria for divisional and individual performance evaluation. Determination of the influences and apparent impact of contract type and structure and development of a management control system for planning and controlling manpower requirements.

Bruno, A. V.↗

Seasat-A - A product of user interests

The paper describes how user requirements were integrated into the development of the Seasat-A program and shows how user requirements influenced sensor selection, mission planning, satellite systems design, and the end-to-end data system. User requirements included the measurement of ocean topography, surface winds, gravity waves, surface temperature, sea ice, salinity, and surface pressure. Particular attention is paid to the selection of sensors: compressed pulse radar altimeter, synthetic aperture imaging radar, microwave wind scatterometer, visible/infrared radiometer, and multispectral microwave radiometer.

Mccandless, S. W., Jr.↗

Planning for a data base system to support satellite conceptual design

The conceptual design of an automated satellite design data base system is presented. The satellite catalog in the system includes data for all earth orbital satellites funded to the hardware stage for launch between 1970 and 1980, and provides a concise compilation of satellite capabilities and design parameters. The cost of satellite subsystems and components will be added to the base. Data elements are listed and discussed. Sensor and science and applications opportunities catalogs will be included in the data system. Capabilities of the BASIS storage, retrieval, and analysis system are used in the system design.

Claydon, C. R.↗

The Automated Planetary Space Station

Results are presented for a study on mission definition and design to determine broad technology directions and needs for advanced planetary spacecraft and future planetary missions. The discussion covers mission selection, system design, and technology assessment and review for a multicomponent spacecraft exploration facility provided with nuclear power propulsion. As an example, the Automated Planetary Space Station at Jupiter is examined as a generic concept which has the capability of conducting in-depth investigations of different aspects of the entire Jovian system. Mission planning is discussed relative to low-thrust trajectory control, automatic target identification and landing, roving vehicle operation, and automated sample analysis.

Ivie, C. V.↗

Development of shuttle payloads

The development of payloads for the Shuttle is described in terms of two activities - one is oriented towards development of payload hardware, while the other is oriented towards the development of payload/Space Transportation System (STS) planning, scheduling, and integration techniques. This second activity is called STS Utilization Planning (SUP). In addition to describing the major aspects of SUP, a discussion of development activities on three payloads that typify direct Shuttle placement missions is included. These payloads are the First Spacelab Mission, the Atmospheric, Magnetospheric, and Plasmas in Space (AMPS) payload, and the Large Space Telescope (LST).

Murphy, J. T.↗

Space power system design and development from an economic point of view

The concept of a satellite solar power system offers a feasible, but unproven, long-range energy alternative. While the basic physics of these systems is understood, many developments are necessary in order to reduce the system cost to the point of being cost-competitive with alternative energy sources. Thus, a substantial technology advancement and verification program, plus test and demonstration satellite programs are necessary before a full-scale satellite can be designed and built. It is important to properly identify those elements of the technology that should be subject to development efforts, the goals of the corresponding development programs and the appropriate funding levels and schedules. Systems studies and designs play a major role in rationally formulating a development program. This paper uses an economic approach to place these studies into a framework for formulating a viable satellite solar power system development plan.

Hazelrigg, G. A., Jr.↗

Shuttle payload minimum cost vibroacoustic tests

This paper is directed toward the development of the methodology needed to evaluate cost effective vibroacoustic test plans for Shuttle Spacelab payloads. Statistical decision theory is used to quantitatively evaluate seven alternate test plans by deriving optimum test levels and the expected cost for each multiple mission payload considered. The results indicate that minimum costs can vary by as much as $6 million for the various test plans. The lowest cost approach eliminates component testing and maintains flight vibration reliability by performing subassembly tests at a relatively high acoustic level. Test plans using system testing or combinations of component and assembly level testing are attractive alternatives. Component testing alone is shown not to be cost effective.

Stahle, C. V.↗

DSN telemetry system, Mark 3-77

A description is given of the DSN Telemetry System, Mark3-77, which is used to support multiple deep space missions. Telemetry functions performed by the Deep Space Stations, Ground Communications Facility, and the Network Operations Control Center are defined. Recent improvements to the system and planned upgrades are described.

Gatz, E. C.↗

Shuttle/tethered satellite system

A tethered satellite system has been conceived as a device to extend the capability of the Space Shuttle to perform scientific/applications investigations and operational activities. The concept envisions a multiple-use tethered system with closed-loop control, capable of supporting a payload or satellite suspended from the Shuttle cargo bay, toward or away from the earth, at distances up to 100 kilometers from the Shuttle. This paper discusses the background and results of early analyses and feasibility studies, and presents a design and operational description of the system. Also presented are a discussion of potential applications of the Tethered Satellite System, and plans for an operational verification flight in 1982.

Rupp, C. C.↗

Space transportation, satellite services, and space platforms

The paper takes a preview of the progressive development of vehicles for space transportation, satellite services, and orbital platforms. A low-thrust upper stage of either the ion engine or chemical type will be developed to transport large spacecraft and space platforms to and from GEO. The multimission spacecraft, space telescope, and other scientific platforms will require orbital serves going beyond that provided by the Shuttle's remote manipulator system, and plans call for extravehicular activity tools, improved remote manipulators, and a remote manned work station (the cherry picker).

Disher, J. H.↗

Redox flow cell energy storage systems

The redox flow cell energy storage system being developed by NASA for use in remote power systems and distributed storage installations for electric utilities is presented. The system under consideration is an electrochemical storage device which utilizes the oxidation and reduction of two fully soluble redox couples (acidified chloride solutions of chromium and iron) as active electrode materials separated by a highly selective ion exchange membrane. The reactants are contained in large storage tanks and pumped through a stack of redox flow cells where the electrochemical reactions take place at porous carbon felt electrodes. Redox equipment has allowed the incorporation of state of charge readout, stack voltage control and system capacity maintenance (rebalance) devices to regulate cells in a stack jointly. A 200 W, 12 V system with a capacity of about 400 Wh has been constructed, and a 2 kW, 10kWh system is planned.

Thaller, L. H.↗

Satellite power system (SPS) concept definition study. Volume 3: Experimental verification definition

An evolutionary Satellite Power Systems development plan was prepared. Planning analysis was directed toward the evolution of a scenario that met the stated objectives, was technically possible and economically attractive, and took into account constraining considerations, such as requirements for very large scale end-to-end demonstration in a compressed time frame, the relative cost/technical merits of ground testing versus space testing, and the need for large mass flow capability to low Earth orbit and geosynchronous orbit at reasonable cost per pound.

Hanley, G. M.↗

Spectrophotovoltaic orbital power generation, phase 2

A subscale model of the spectral splitting concentrator system with 10" aperture is defined and designed. The model is basically a scaled down version of Phase 1 design with an effective concentration ratio up to 1000:1. The system performance is predicted to be 21.5% for the 2 cell GaAs/Si system, and 20% for Si/GaAs at AM2 using realistic component efficiencies. Component cost of the model is projected in the $50K range. Component and system test plans are also detailed.

Lo, S. K.↗

Shuttle/tethered satellite system

A tethered satellite system was conceived as a device to extend the capability of the Space Shuttle to perform scientific/applications investigations and operational activities. The concept envisions a multiple-use tethered system with closed-loop control, capable of supporting a payload or satellite suspended from the Shuttle cargo bay, toward or away from the Earth, at distances up to 100 kilometers from the Shuttle. The background and results of early analyses and feasibility studies are discussed and a design and operational description of the system are presented. Also presented are a discussion of potential applications of the Tethered Satellite System, and plans for an operational verification flight in 1982.

Rupp, C. C.↗

Development of a low risk augmentation system for an energy efficient transport having relaxed static stability

An augmentation system for a 230 passenger, twin engine aircraft designed with a relaxation of conventional longitudinal static stability was developed. The design criteria are established and candidate augmentation system control laws and hardware architectures are formulated and evaluated with respect to reliability, flying qualities, and flight path tracking performance. The selected systems are shown to satisfy the interpreted regulatory safety and reliability requirements while maintaining the present DC 10 (study baseline) level of maintainability and reliability for the total flight control system. The impact of certification of the relaxed static stability augmentation concept is also estimated with regard to affected federal regulations, system validation plan, and typical development/installation costs.

Sizlo, T. R.↗

LANDSAT-D Mission Operations Review (MOR)

The integrated LANDSAT-D systems operation plan is presented and discussed with respect to functional elements, personnel, and procedures. Specifically, a review of the LANDSAT-D program, mission requirements and management, and flight operations is given.

Source record↗