Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “synchronization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,243 records · Page 69

Experimental Characterization Test of a Grid-Forming Inverter for Microgrid Applications

Standardized experimental testing protocols for grid forming (GFM) inverters to ensure expected operation under both normal and contingency conditions do not exist. Such protocols increase the confidence of system owner/operators that an inverter deployed in a proposed system will engage in typical behaviors to ensure interoperability with other units and ancillary equipment (e.g. protection equipment). This paper presents systematic and comprehensive test protocols to evaluate the performance of GFM inverters under the following operational configurations: islanded operation, heterogeneous islanded operation (parallel with a synchronous generator), grid-connected operation, and transition operation. A commercial GFM inverter is used to verify the test protocols and to understand the inverter's performance and functionalities. In particular, required configuration and tuning of the inverter will be explained in the full paper to enrich the testing protocol.

black start↗

Inter-Area Oscillation Damping with Type-5 Wind Power Plant

This paper investigates the potential of using brushless excitation (BLE) for not only riding through the fault but also to damp inter-area power oscillation with the help of a synchronous generator (SG) used in Type 5 Wind Power Plant (WPP). In BLE, an auxiliary synchronous generator (ASG) behaving like an exciter is coupled and driven by the rotor of the main SG. The BLE's field current's ASG is fed by two separate loops of the automatic voltage regulator (AVR) and power system stabilizer (PSS). The AVR system implements a control loop to regulate the generator terminal voltage, VT. For the PSS, the kinetic energy of the wind turbine is utilized according to the estimated rotational speed of the synchronous generator shaft of the SG. It may mitigate the necessity of any curtailment of active power for damping. The effectiveness of the proposed control scheme is verified with a three-phase short circuit fault in a two-area power system.

brushless↗

Structural Impact of Grid-Forming Inverters on Power System Coherency

This paper addresses the following fundamental research question: how does the integration of grid-forming inverters (GFMs) replacing conventional synchronous generators (SGs) impact the slow coherent eigen-structure and the low frequency oscillatory behavior of future power systems? Due to time-scale separated dynamics, generator states inside a coherent area synchronize over a fast time-scale due to stronger coupling, while the areas themselves synchronize over a slower time scale. Our mathematical analysis shows that due to the large-scale integration of GFMs, the weighted Laplacian structure of the frequency dynamics is preserved, however, the entries of the Laplacian may be significantly modified based on the location and penetration levels of the GFMs. This can impact and potentially significantly alter the coherency structure of the system. We have validated our findings with numerical results using the IEEE 68-bus test system.

Mukherjee, Sayak [BATTELLE (PACIFIC NW LAB)]↗

Small-Signal Stability Impacts of Load and Network Dynamics on Grid-Forming Inverters

This paper presents several stability analyses for grid-forming inverters and synchronous generators considering the dynamics of transmission lines and different load models. Load models are usually of secondary importance compared to generation source models, but as the results show, they play a crucial role in stability studies with the introduction of inverter-based resources. Given inverter control time scales, the implications of considering or neglecting electromagnetic transients of the network are very relevant in the stability assessments. In this paper, we perform eigenvalue analyses for inverter-based resources and synchronous machines connected to a load and explore the effects of multiples models under different network representations. We explore maximum loadability of inverter-based resources and synchronous machines, while analyzing the effects of load and network dynamic models on small-signal stability. The results show that the network representation plays a fundamental role in the stability of the system of different load models. The resulting stability regions are significantly different depending on the source and load model considered.

grid forming inverters↗

Switching-cycle-based Startup for Grid-connected Inverters

Conventional inverter startups, or grid synchronization, are hindered by slow dynamics and inrush current issues, which impede the integration of more renewable energy resources into the power grid. This paper overcomes the barriers by introducing a novel switching cycle-based startup approach for grid-connected inverters, eliminating the need for voltage sensors and phase-locked loops (PLLs). The proposed method surpasses the bandwidth constraints of traditional PLL-based techniques and achieves grid synchronization in just two switching cycles. Relying solely on sensed three-phase currents, synchronization is accomplished without inrush currents or the need for additional hardware or increased software complexity, resulting in a faster inverter startup. The paper also presents a sensitivity analysis to discuss the impact of critical parameters on the method's accuracy. As a result, the effectiveness of the proposed technique is demonstrated through simulation and experimental results.

14 SOLAR ENERGY↗

Trigger-based Incremental Data Processing with Unified Sync and Async Model

In recent years, more and more applications in the cloud have needs to process large-scale on-line datasets, which evolve over time as new entries are added and existing entries are modified. Several programming frameworks, such as Percolator and Oolong, are proposed for such incremental data processing and can achieve efficient processing with an event-driven abstraction. However, these frameworks are inherently asynchronous, leaving the heavy burden of managing synchronization to applications' developers, which further significantly restricts their usabilities. In this study, we propose a trigger-based incremental computing framework in the cloud, called Domino, with both synchronous and asynchronous mechanisms to coordinate parallel triggers. With this new framework, both synchronous and asynchronous applications can be seamlessly developed. Use cases and extensive evaluation results confirm that it can deliver sufficient performance, and also is easy to use for incremental applications in large-scale distributed computing.

97 MATHEMATICS AND COMPUTING↗

Performance Testing and Assessment of Protection Scheme Using Real-Time Hardware-in-the-Loop and IEC 61850 Standard

The main challenge of the microgrid is to design a suitable protection scheme due to the complexity of the architecture of the microgrid. The importance of the proposed protection technique is threefold. First, it presents a co-simulation platform to integrate between a simulated model on power system computer aided design (PSCAD)/real time digital simulator computer aided design (RSCAD) software’s and physical devices schweitzer engineering laboratories (SEL) 421-7 relays to protect the microgrid that includes different resources connected based on inverter interface. Second, it presents a comprehensive hardware/software setup to test the protective relays in a closed loop system and shows how to configure the protective relay’s International Electrotechnical Commission 61850 communications. Third, IEEE 1588 standard is used to provide sub nanoseconds latency between the simulated model that emulated on real time digital simulator (RTDS) and the external devices. Also, the measurement signals are synchronized between RTDS and the external devices using giga-transceiver synchronization card (GTSYNC) interface card and SEL-2488 satellite-synchronized network clock. The results showed that the co-simulation infrastructure introduces a highly dependable design, analysis, and testing environment for cyber and physical data flow in the system. Besides that, the voltages at ac/dc sides and frequency at fault condition were maintained due to the energy storage device contributions at different modes of operation.

42 ENGINEERING↗

Grid Forming Fast Frequency Response for PMSG-Based Wind Turbines

Electric power systems are undergoing a rapid transition from fuel-based generation using synchronous generators to renewable generation interfaced by power electronics. In this context, a key challenge is using renewable generation with limited controllability to contribute to power system stability. In this work, we investigate grid-forming control of permanent magnet synchronous generator (PMSG) wind turbines. The proposed control and curtailment strategy supports the entire spectrum of standard functions of grid-following (e.g. maximum power point tracking (MPPT) and grid-forming control (e.g., primary frequency control) without explicit mode switching. A detailed case study is used to compare the performance of the proposed control at operating points corresponding to MPPT and frequency control with standard grid-forming and grid-following controls. Further, the results demonstrate that (i) the proposed energy balancing grid forming control is self-synchronizing in MPPT mode, (ii) the (limited) energy storage and controllability of wind turbines can be adequately utilized to provide grid support, and (ii) the proposed control exhibits good performance under variable wind speeds and does not result in a significant increase of wind turbine fatigue loads.

17 WIND ENERGY↗

Grid Forming Control Tuning for a Hybrid Inverter-Based Resource Power Plant

A hybrid inverter-based resource (IBR) power plant consists of grid-following (GFL) and grid-forming inverter-based resources (GFM-IBR) connected in parallel. Here, this research focuses on how to design and tune GFM's control parameters to ensure stable operation of the hybrid power plant for weak and strong grid conditions. We consider two design cases: one where the GFL-IBR does not provide frequency support, and one where it does. It is found that the GFM's power-frequency synchronizing system can lose stability when the power-frequency droop constant is large and/or the grid is strong. Additionally, if the GFL has its frequency support enabled, oscillation stability worsens. To explain the mechanism of the interactions, we construct a feedback system for the synchronizing loop, which consists of the GFM's power-frequency droop control that generates the GFM's synchronizing angle, the GFL's phase-locked loop that measures the voltage phase angle, the GFL's frequency-power control that generates its power order, and the rest of the system. The feedback system is effective in illustrating the potential stability risks. Successful design ensures that the hybrid power plant can operate smoothly and ride through grid disturbances.

feedback systems↗

Relative reproductive phenology and synchrony affect neonate survival in a nonprecocial ungulate

Abstract Degree of reproductive synchronization in prey is hypothesized as a predator defense strategy reducing prey risk via predator satiation or predator avoidance. Species with precocial young, especially those exposed to specialist predators, should be highly synchronous to satiate predators (predator satiation hypothesis), while prey with nonprecocial (i.e. altricial) young, especially those exposed to generalist predators, should become relatively asynchronous to avoid predator detection (predator avoidance hypothesis). The white‐tailed deer Odocoileus virginianus in North America is an example of a nonprecocial ungulate that uses the hider strategy early in life; its primary predator (coyote; Canis latrans ) is a generalist, making white‐tailed deer a good model species to test the predator avoidance hypothesis. We used birth dates and known fates of white‐tailed deer neonates ( n = 1,032) across nine study sites varying in relative synchrony and predator assemblages to test the predator avoidance hypothesis. We predicted that relative birthing asynchrony of the population would increase relative survival at the population level; therefore, at the individual scale, neonate birth date nearer to mean birthing date in a respective population would not influence individual survival. Coyotes were responsible for the majority of predation events, and survival of those neonates increased the closer the individual was born to peak birthing season in each respective population. Also, at the population level, reproductive asynchronization negatively affected survival. Contrary to the predator avoidance hypothesis, our data indicate patterns in neonate survival for white‐tailed deer better support the predator satiation hypothesis at the individual and population level. Additionally, coyotes may present a selective force great enough to shift reproductive synchrony such that predator satiation may become a feasible defense strategy for neonates at local spatial scales. Our results indicate that synchronizing reproduction may still be the most effective strategy to reduce individual predation risk from generalist predators, particularly when the window of heightened resource availability to the prey is narrow. A free Plain Language Summary can be found within the Supporting Information of this article.

Michel, Eric S.↗

Data from Managing Flowering Time in Miscanthus and Sugarcane to Facilitate Intra- and Intergeneric Crosses

Miscanthus is a close relative of saccharum and a potentially valuable genetic resource for improving sugarcane. Differences in flowering time within and between miscanthus and saccharum hinders intra- and interspecific hybridizations. A series of greenhouse experiments were conducted over three years to determine how to synchronize flowering time of saccharum and miscanthus genotypes. We found that day length was an important factor influencing when miscanthus and saccharum flowered. Sugarcane could be induced to flower in a central Illinois greenhouse using supplemental lighting to reduce the rate at which days shortened during the autumn and winter to 1 min d-1, which allowed us to synchronize the flowering of some sugarcane genotypes with Miscanthus genotypes primarily from low latitudes. In a complementary growth chamber experiment, we evaluated 33 miscanthus genotypes, including 28 M. sinensis , 2 M. floridulus , and 3 M. ×giganteus collected from 20.9° S to 44.9° N for response to three day lengths (10 h, 12.5 h, and 15 h). High latitude-adapted M. sinensis flowered mainly under 15 h days, but unexpectedly, short days resulted in short, stocky plants that did not flower; in some cases, flag leaves developed under short days but heading did not occur. In contrast, for M. sinensis and M. floridulus from low latitudes, shorter day lengths typically resulted in earlier flowering, and for some low latitude genotypes, 15 h days resulted in no flowering. However, the highest ratio of reproductive shoots to total number of culms was typically observed for 12.5 h or 15 h days. Latitude of origin was significantly associated with culm length, and the shorter the days, the stronger the relationship. Nearly all entries achieved maximal culm length under the 15 h treatment, but the nearer to the equator an accession originated, the less of a difference in culm length between the short-day treatments and the 15 h day treatment. Under short days, short culms for high-latitude accessions was achieved by different physiological mechanisms for M. sinensis genetic groups from the mainland in comparison to those from Japan; for mainland accessions, the mechanism was reduced internode length, whereas for Japanese accessions the phyllochron under short days was greater than under long days. Thus, for M. sinensis , short days typically hastened floral induction, consistent with the expectations for a facultative short-day plant. However, for high latitude accessions of M. sinensis , days less than 12.5 h also signaled that plants should prepare for winter by producing many short culms with limited elongation and development; moreover, this response was also epistatic to flowering. Thus, to flower M. sinensis that originates from high latitudes synchronously with sugarcane, the former needs day lengths >12.5 h (perhaps as high as 15 h), whereas that the latter needs day lengths <12.5 h.

Feedstock Production↗

Managing flowering time in Miscanthus and sugarcane to facilitate intra- and intergeneric crosses

Miscanthus is a close relative of Saccharum and a potentially valuable genetic resource for improving sugarcane. Differences in flowering time within and between Miscanthus and Saccharum hinders intra- and interspecific hybridizations. A series of greenhouse experiments were conducted over three years to determine how to synchronize flowering time of Saccharum and Miscanthus genotypes. We found that day length was an important factor influencing when Miscanthus and Saccharum flowered. Sugarcane could be induced to flower in a central Illinois greenhouse using supplemental lighting to reduce the rate at which days shortened during the autumn and winter to 1 min d -1 , which allowed us to synchronize the flowering of some sugarcane genotypes with Miscanthus genotypes primarily from low latitudes. In a complementary growth chamber experiment, we evaluated 33 Miscanthus genotypes, including 28 M . sinensis , 2 M . floridulus , and 3 M . ×giganteus collected from 20.9° S to 44.9° N for response to three day lengths (10 h, 12.5 h, and 15 h). High latitude-adapted M . sinensis flowered mainly under 15 h days, but unexpectedly, short days resulted in short, stocky plants that did not flower; in some cases, flag leaves developed under short days but heading did not occur. In contrast, for M . sinensis and M . floridulus from low latitudes, shorter day lengths typically resulted in earlier flowering, and for some low latitude genotypes, 15 h days resulted in no flowering. However, the highest ratio of reproductive shoots to total number of culms was typically observed for 12.5 h or 15 h days. Latitude of origin was significantly associated with culm length, and the shorter the days, the stronger the relationship. Nearly all entries achieved maximal culm length under the 15 h treatment, but the nearer to the equator an accession originated, the less of a difference in culm length between the short-day treatments and the 15 h day treatment. Under short days, short culms for high-latitude accessions was achieved by different physiological mechanisms for M . sinensis genetic groups from the mainland in comparison to those from Japan; for mainland accessions, the mechanism was reduced internode length, whereas for Japanese accessions the phyllochron under short days was greater than under long days. Thus, for M . sinensis , short days typically hastened floral induction, consistent with the expectations for a facultative short-day plant. However, for high latitude accessions of M . sinensis , days less than 12.5 h also signaled that plants should prepare for winter by producing many short culms with limited elongation and development; moreover, this response was also epistatic to flowering. Thus, to flower M . sinensis that originates from high latitudes synchronously with sugarcane, the former needs day lengths >12.5 h (perhaps as high as 15 h), whereas that the latter needs day lengths <12.5 h.

54 ENVIRONMENTAL SCIENCES↗

Implementing a Terrestrial Timing Solution: Best Practices

This document is an overview and guide on the concept of precision time and how an alternative terrestrial timing solution to the Global Positioning System (GPS) can be implemented. What follows is a set of recommendations and best practices, derived from research at Oak Ridge National Laboratory (ORNL), across industry, and within the U.S. government, to implement a system of precision timing synchronization to support resilient operations for the U.S. grid. Precision time is a fundamental necessity for operating the grid today, and it becomes even more important as the grid modernizes with clean energy sources, microgrids, and precision sensors placed throughout the grid system to ensure failureresistant operations. The Global Navigation Satellite System (GNSS), which includes (GPS), is currently the primary provider of precision timing today. A terrestrial-based system for time delivery and synchronization to augment GPS is outlined below and it would provide secure time, synchronized with Coordinated Universal Time (UTC), in the event of outages or other interruptions associated with time delivery.

47 OTHER INSTRUMENTATION↗

Progress in developing a superconducting accelerator for efficient eBeam and X-ray production

The PIP-II Accelerator is an 800 MeV superconducting Linac in the injection chain of the Fermilab accelerator complex. The LLRF systems for the 125 cavities which include a few normal conducting cavities in the warm front-end section, use a variety of LLRF hardware components and sub-systems that are part of the timing and synchronization system. This includes a master oscillator and phase averaging reference line, a beam pattern generator to enable beam transfer between non-harmonic RF systems and beam loading compensation systems synchronized to a start of beam trigger. The timing signals are based on a 650 MHz clock with manchester encoded event information and data provided over optical fiber. The timing and synchronization systems and their performance parameters will be described here.

43 PARTICLE ACCELERATORS↗

Real-Time Testbed for Smart Grid Recloser Controller

The growing need for a low voltage recloser has become apparent due to the rise in requirements for a smart grid. This includes more detailed management of power flow forward (towards load) and backward (towards generation), source synchronization in real time, more indepth fault responses, and the use of green energy. The SEL-651R-2 relay is a device that can manage these needs, especially in fault response and synchronization, and is commonly used in systems called microgrids. Microgrids are distribution level systems that are able to operate separated from the main grid, are typically installed much closer to the load(s), and are fed by distributed energy resources (DERs), such as wind, solar or diesel generators. The SEL-651R-2 is normally used in the field with presets operative settings, but the Western Michigan University (WMU) Center for Interdisciplinary Research on Secure, Efficient and Sustainable Energy Technology (WMU InterEnergy Center) wished to test this device in its range of capabilities for microgrid application. A Hardware-In-the-Loop (HIL) testbed was implemented and used through the Real Time Digital Simulator (RTDS) using the RSCAD software to test the SEL-651R-2's use cases and functions. The testbed includes a microgrid with interconnection to a larger main grid, and the relay is meant to control the recloser at the point of common coupling (PCC) between the main grid and microgrid. The testbed shows how basic protections, reclosing, and synchronization checks function when handling faults that affect both the microgrid and the main grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Grid-Forming Inverter Controls for Grid-Connected and Islanded Microgrid Integration

Autonomous grid-forming (GFM) inverter testbeds with scalable platforms have attracted interest recently. In this study, a self-synchronized universal droop controller (SUDC) was adopted, tested, and scaled in a small network and a test feeder using a real-time simulation tool to operate microgrids without synchronous generators. We presented a novel GFM inverter control adoption to better understand the dynamic behavior of the inverters and their scalability, which can impact the distribution system (DS). This paper provides a steady-state and transient analysis of the GFM power inverter controller via simulation to better understand voltage and frequency stabilization and ensure that the critical electric loads are not affected during a prolonged power outage. The controllers of the GFM inverter are simulated in HYPERSIM to examine voltage and frequency fluctuations. This analysis includes assessing the black start capability for photovoltaic microgrids, both grid-connected and islanded, during transient fault conditions. The high photovoltaic PV penetration levels open exciting opportunities and challenges for the DS. The GFM inverter control demonstrated appropriate response times for synchronization, connection, and disconnection to the grid. The DS has become more resilient and independent of fossil fuels by increasing the penetration of inverter-based distributed energy resources (DERs).

Ward, Laura (ORCID:0000000345501581)↗

diffReplication - An Energy-Aware Fault Tolerance Model for Silent Error Detection and Mitigation in Heterogeneous Extreme-scale Computing Environment

At extreme scale, the frequency of silent errors – a class of errors that remain undetected by low-level error detection mechanisms – increases significantly with the computational complexity of the application and the scale of the computing infrastructure. As hardware and software advances are made to usher in the next scientific era of computing, developing new approaches to mitigate the impact of silent errors remains a challenging problem. In this work, we propose an energy-aware fault-tolerance model, referred to diffReplication to overcome silent errors. In the proposed model, the main process is associated with one replica that executes at the same rate as the main process, and one diffReplica that is executed at a fraction of the main process' execution rate. If the main and its replica reach consensus at the end of a computation phase, the state of the diffReplica is updated and computation is resumed. If the synchronization attempt results in a disagreement, however, the diffReplica increases its execution speed to complete the computation and quickly reach the synchronization barrier. Assuming a single error over any given synchronization interval, a majority voting is used to reach consensus and tolerate silent errors. To further enhance its performance, diffReplication is augmented with speculative execution, whereby the main or its fast replica is selected to continue execution without waiting for the diffReplica. The selection process is based on the previous behaviour of the main and its replica. A performance analysis study is carried out to assess the performance of diffReplication, in terms of the energy saving and time-to-completion reduction achieved by the diffReplication scheme. The experiment shows that speculative execution reduces the time to completion with additional energy, and dynamic decision-making balances the energy consumption and time to completion.

97 MATHEMATICS AND COMPUTING↗

The use of satellite beacons for meteorological research

The use of microwave beacon transmissions from synchronous and near synchronous satellites is discussed as a means of measuring atmospheric absorption. It is suggested that, with a fixed angle of elevation of a synchronous satellite, complete diurnal coverage of the integrated absorption is available. In addition, with refined interferometric equipment, angle of arrival studies can be made and phase deviations measured.

Aarons, J.↗